0405_A_TV-DTS and TV Distribution System PM_ARCTICROH14R2.doc

DOC document 74 KB Posted

Attached to
REGULAR OVERHAUL/DRYDOCK FOR USNS ARCTIC
Solicitation number
N32205-14-R-2000
Issued by

About this file

WI 405

View the file

Other files

File Type Posted
N32205-14-R-2000-0008.doc DOC document
USNS_ARCTIC_Amend_0005.doc DOC document
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
P0004_(Amendment_4).doc DOC document
P0002.doc DOC document
Q_ _A_USNS_ARCTIC_14-R-2000.docx DOCX document
SIGNED_J_A1.pdf PDF
DD Form 1423-1 SWI-017 Sep12.pdf PDF
DD Form 1423-1 SWI-901 Sep2012.pdf PDF
0408_A_UHF Transceiver Groom_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-016 14Sep12.pdf PDF
DD Form 1423-1 SWI-021 Sep12.pdf PDF
0108_A_Modifications for Load Line.docx DOCX document
DD Form 1423-1 SWI-013 Sep12.pdf PDF
DD Form 1423-1 SWI-011 T-AOE Sep12.pdf PDF
DD Form 1423-1 SWI-008 Sep12.pdf PDF
0910_A_ Main Propulsion Shafting_ARCTICROH14R1.doc DOC document
DD Form 1423-1 SWI-004 Sep12.pdf PDF
DD Form 1423-1 SWI-006 Sep12.pdf PDF
DD Form 1423-1 SWI-002.pdf PDF
ARCTIC ROH-DD Work Item IndexR3.doc DOC document
DD Form 1423-1 SWI-023 Sep12.pdf PDF
0402_A_Radar Preventitive Maintenance_ARCTICROH14R2.doc DOC document
0406_A_Underwater Speed Log PM_ARCTICROH14R2.doc DOC document
USNS_ARCTIC_Amend_0003.doc DOC document
0404_A_ Antenna Preventative Maintance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-020 14Sep12.pdf PDF
DD Form 1423-1 SWI-014 Sep12.pdf PDF
DD Form 1423-1 SWI-022 Sep12.pdf PDF
0801_A_Ventilation System Cleaning —
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012 - ARCTICROH14R3.doc DOC document
DD Form 1423-1 SWI-010 Sep12.pdf PDF
Copy_of_J-3_Category_B_Items_123013.xls XLS spreadsheet
0407_A_OE-82C-WSC-1-V Antenna Group Maintenance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-012 Sep12.pdf PDF
DD Form 1423-1 SWI-007 Sep12.pdf PDF
DD Form 1423-1 SWI-019 Sep12.pdf PDF
DD Form 1423-1 SWI-003 Sep12.pdf PDF
DD Form 1423-1 SWI-018 Sep12.pdf PDF
DD Form 1423-1 SWI-015 Sep2012.pdf PDF
DD Form 1423-1 SWI-001 14Sep12.pdf PDF
DD Form 1423-1 SWI-024 Sep12.pdf PDF
0919_B_Replace Stern Tube Shaft Bearing LinersARCTICROH14R2.doc DOC document
WI_025_Attachment.pdf PDF
WI_1013_-_EQUIPMENT_INSPECTION_SPEC_ARCTICROH14R3.pdf PDF
Q_AND_A_FPR_N32205-14-R-2000.docx DOCX document
WI_024_Attachment.pdf PDF
Copy_of_USNS_Supply_Configuration_List.xls XLS spreadsheet
WI_1011_-_TROLLEY_STOWAGE_ARMS_MOD_ARCTICROH14R2.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE 8)

COMMUNICATION & NAVIGATIONAL AIDS

RFP NO. N32205-14-R-2000

Ammendmant 001

ITEM NO. 405

CATEGORY "A"

MSC/PM1CM2/JB

TV-DTS AND TV DISTRIBUTION SYSTEM PM

1.0 ABSTRACT:

1.1. Perform TV-DTS System Preventative Maintenance and Testing and site TV distribution system throughout the ship.

2.0 REFERENCES:

2.1. Television-Direct To Sailor (TV-DTS) OE-556/U installation and maintenance manual. (Contractor must have own copy of manual).

2.2. TV-DTS System check off sheet

2.3. MSC Drawing 434-8389785; As Found Block Wiring Diagram

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location:

3.1.1 Topside, Comms center 03 level.

3.1.2 2nd Deck Aft Site TV, TV-DTS Rack

3.1.3 All working and living spaces on the vessel.

3.2 Quantity: One MARINE STABILIZED TV-DTS ANTENNA SYSTEM (ABD & BDE)

3.3 Item Description/Manufacturer’s Data:

Antenna Control Unit (AL-7200-3M)

Uninterruptible Power Supply

Servo Driver Unit (AL-7200-2-SDU)

Inertial Measurement Unit (AL-7200-IMU)X/Y Pedestal (AL-7204-1)

Radome (17-0502) Base (17-1347)

Reflector (96732/Q)

C-Band Feed Assy (18-0300)

C LNB Filter

GPS Antenna

3.3.1 TV Distribution cabling and distribution equipment throughout out the ship, splitters, AMPS, TV Drops; all spaces with TV drops; and cables leading from the pier connection to Site TV; all cables leading from TV-DTS Antenna to Site TV, including main distribution space, all Cables leading from SITE TV to each individual distribution drop throughout ship and all devices in between.

3.4 Item Description/Manufacturer's Data: None

3.5 Bill of Materials: None

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1. The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs: 1 through 7, and 29.

5.2. The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1. Arrangement/Outfitting: None

7.2. Structural: None

7.3. Mechanical/Fluids: None

7.4. Electrical: None

7.5. Electronics:

7.5.1. Provide all Labor and Materials to accomplish work under this item.

7.5.2. Provide the services of TV-DTS representative to perform the TV-DTS System check off sheet outlined in Reference 2.2. Contractor shall submit a written report indicating test results of Reference 2.2. Provide a full condition report to port engineer with in 24 hrs of test completion, test shall be completed within six (6) days of arrival. The contractor shall ensure the Antenna Pedestal is bonded in accordance with Reference 2.1 with CRES “316” hardware. The contractor shall furnish new bond straps.

7.5.3. Perform tests and adjustments on Site-TV Distribution system in accordance with the manufacturer’s specifications.

7.5.4. Test and operate ships’ site entertainment system distribution outlets throughout ship. Inspect outlets, distribution cabling directional couplers, taps, amplifiers and splitters for incorrect connections that cause imbalance of system. Inspect for by-passed or missing components or unauthorized modifications to the distribution. For bidding purposes assume replacement of 10 (ten) splitter/taps and 1 (one) amplifier.

7.5.5. Contractor shall visit each work space, passageways, berthing compartment, mess areas, staterooms, lounge and habitability space and inspect for TV distribution components and TV drops. If a TV drop or distribution device is found the Contractor shall determine how signal is routed from site TV to endpoint for the purpose of updating Reference 2.3.

a. Using a field strength meter visit EACH room with a TV distribution drop to verify the signal is similar to what is being sent from main distribution unit.

b. Visually inspect television entertainment system and ancillary equipment for damage, deterioration, loose and missing or inoperative parts

c. Report all findings to MSCREP within 24 hours of test being conducted. Test to be conducted within 30 days of start of arrival. It is intended that contractor will have to walk out entire system in order to find all splices, drops, splitters, amps, TV drops, and dead ended cable.

d. Visually Inspect internal surface of television entertainment system and ancillary equipment listed under Paragraph 3.0, for damage, deterioration, loose and missing or inoperative parts.

e. Replace all desiccants in Antenna unit, one each in SDU and IMU.

7.6. Preparation of Drawings/Documentation:

7.6.1. Prepare a drawing (revise Reference 2.3) of “As Released” condition, showing approximate locations of components; splitters, amps, TV drops, etc. Show Cable sizes and Type; provide appropriate notes to document installation of Site TV distribution system. The intent is to have an accurate one line diagram of distribution system that can be used in the maintenance and trouble shooting of the system.

7.7. Painting:

7.7.1. All new and disturbed surfaces

7.8. Marking:

7.8.1. Provide new Label Plates on all Splitters, Drops, amps, and Terminals, Per GTR 29.

7.9. Manufacturer’s Representative:

7.9.1. The contractor shall provide the services of a manufacturer’s representative to perform all work in this spec item and absorb all costs for same. Other representatives may be considered if they provide the MSC Electronic Rep with a signed letter of qualification from the equipment manufacturer or a certificate of training.

8.0 GENERAL REQUIREMENTS: None Additional

405-4

File details come from the government source that posted it. Updated .