0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012 - ARCTICROH14R3.doc

DOC document 219 KB Posted

Attached to
REGULAR OVERHAUL/DRYDOCK FOR USNS ARCTIC
Solicitation number
N32205-14-R-2000
Issued by

About this file

WI 021

View the file

Other files

File Type Posted
N32205-14-R-2000-0008.doc DOC document
USNS_ARCTIC_Amend_0005.doc DOC document
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
P0004_(Amendment_4).doc DOC document
P0002.doc DOC document
Q_ _A_USNS_ARCTIC_14-R-2000.docx DOCX document
SIGNED_J_A1.pdf PDF
DD Form 1423-1 SWI-017 Sep12.pdf PDF
DD Form 1423-1 SWI-901 Sep2012.pdf PDF
0408_A_UHF Transceiver Groom_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-016 14Sep12.pdf PDF
DD Form 1423-1 SWI-021 Sep12.pdf PDF
0108_A_Modifications for Load Line.docx DOCX document
DD Form 1423-1 SWI-013 Sep12.pdf PDF
DD Form 1423-1 SWI-011 T-AOE Sep12.pdf PDF
DD Form 1423-1 SWI-008 Sep12.pdf PDF
0910_A_ Main Propulsion Shafting_ARCTICROH14R1.doc DOC document
DD Form 1423-1 SWI-004 Sep12.pdf PDF
DD Form 1423-1 SWI-006 Sep12.pdf PDF
DD Form 1423-1 SWI-002.pdf PDF
ARCTIC ROH-DD Work Item IndexR3.doc DOC document
DD Form 1423-1 SWI-023 Sep12.pdf PDF
0402_A_Radar Preventitive Maintenance_ARCTICROH14R2.doc DOC document
0406_A_Underwater Speed Log PM_ARCTICROH14R2.doc DOC document
USNS_ARCTIC_Amend_0003.doc DOC document
0404_A_ Antenna Preventative Maintance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-020 14Sep12.pdf PDF
DD Form 1423-1 SWI-014 Sep12.pdf PDF
DD Form 1423-1 SWI-022 Sep12.pdf PDF
0801_A_Ventilation System Cleaning —
DD Form 1423-1 SWI-010 Sep12.pdf PDF
Copy_of_J-3_Category_B_Items_123013.xls XLS spreadsheet
0407_A_OE-82C-WSC-1-V Antenna Group Maintenance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-012 Sep12.pdf PDF
DD Form 1423-1 SWI-007 Sep12.pdf PDF
DD Form 1423-1 SWI-019 Sep12.pdf PDF
DD Form 1423-1 SWI-003 Sep12.pdf PDF
DD Form 1423-1 SWI-018 Sep12.pdf PDF
DD Form 1423-1 SWI-015 Sep2012.pdf PDF
0405_A_TV-DTS and TV Distribution System PM_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-001 14Sep12.pdf PDF
DD Form 1423-1 SWI-024 Sep12.pdf PDF
0919_B_Replace Stern Tube Shaft Bearing LinersARCTICROH14R2.doc DOC document
WI_025_Attachment.pdf PDF
WI_1013_-_EQUIPMENT_INSPECTION_SPEC_ARCTICROH14R3.pdf PDF
Q_AND_A_FPR_N32205-14-R-2000.docx DOCX document
WI_024_Attachment.pdf PDF
Copy_of_USNS_Supply_Configuration_List.xls XLS spreadsheet
WI_1011_-_TROLLEY_STOWAGE_ARMS_MOD_ARCTICROH14R2.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE 8)

GENERAL REQUIREMENTS RFP NO.N32205-14-R-2000

5 OCTOBER 2012

ITEM 021 Category “A” MSC/PO1B/REV OCT 12

CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACE

1.0 ABSTRACT:

1.1 This work item describes the requirement to open, clean, gas-free, maintain, and close miscellaneous tanks, voids, cofferdams, and spaces. Storage of re-usable fuel and lube oils is also required.

2.0 REFERENCES/ENCLOSURES:

2.1 References

2.1.1 NAVSEA Drawing 801-6360502 REV A, Capacity Curves for Tanks

2.1.2 NAVSEA Drawing 801-6360541 REV C, Cross Curves of Stability

2.2 Enclosures

2.2.1 USNS ARCTIC (T-AOE 8) List of Applicable Tanks, Voids and Cofferdams

3.0 ITEM LOCATION / DESCRIPTION: See Enclosure 2.2.1.

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIAL: None Additional.

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7, 22, 23, and 29.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review all other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

5.3 In the event that any tank contents are deemed to be hazardous wastes in accordance with federal, state and local (CONUS) or international (OCONUS) standards, the costs for handling and disposal of those wastes shall be covered under work item 023 of this work package.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 Tank coating system conditions shall be identified and documented by the contractor during tank surveys. ABS surveyor shall receive a copy of contractor’s reports.

7.0 STATEMENT OF WORK REQUIRED

7.1 It is the contractor’s responsibility to analyze and properly plan tank unloading procedures to ensure that no undue stresses are imposed on the vessel structure. Ship’s force and MSCREP will assist contractor with ship loading documents and software. The contractor shall utilize the services of a Naval Architect or structural engineer to support this planning. The contractor shall provide their tank unloading plan to the MSCREP at least 2 business days prior to starting this work to permit review and approval by MSC Naval Architect.

7.2 Contractor and Ships Force shall take, record, and verify soundings of all tanks listed in enclosure 2.2.1, on arrival at the contractor’s facility. Chief Engineer shall review and endorse all soundings taken/recorded. Submit copy of endorsed record to the MSCREP.

7.3 Provide a clean storage facility with a capacity of approximately 1,100,000 gals of fuel oil, 50,000 gals of JP-5 and 35,000 gals of lube oil. Contractor designated storage facility shall be inspected by the MSCREP for cleanliness and acceptability prior to any transferring of fuel oil and lube oil. Prior to off loading of liquids, samples shall be taken by the contractor of each of the tanks to be moved to temporary storage. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately. Upon completion of transferring of liquids, the contractor, in conjunction with ship's force, shall validate quantities at the storage facility.

7.3.1 In the event that contamination is suspected, a change order will be issued to the contractor to have a laboratory analysis conducted on the sample.

7.4 Removals: The ship will pump down tanks to low suction, either to other tanks onboard or to shore storage facilities. In the event that the tank contents are being moved off the ship, the contractor shall provide support to the vessel, including all hoses and manpower on the shore side to accomplish this removal. Contractor shall be responsible to provide all pumps, hoses, fittings and personnel to safely remove all remaining tank contents as identified in enclosure 2.2.1. Applicable federal, state, local or international procedures for transferring fuel and lube oils over water shall be followed by the contractor. Contents to be temporarily stored are indicated in the enclosure. All other liquids shall be disposed of in accordance with local, state, federal and/or international regulations. In some states, the presence of oil in the wash water may deem the mixture to be hazardous waste. When pricing this item, the contractor shall assume that oil is present in the tank wash water. The cost for disposal of the mixture shall be included in the price quote regardless of whether or not, due to the presence of oil, the wash water is deemed hazardous waste or non-hazardous waste. If the mixture is determined to be hazardous waste due to some contaminant other than oil, the procedures outlined in Item 0023 shall be used for the identification, handling and disposal. The costs for removal are still part of this (WI 021) work item. All other costs for offload and disposal shall be captured in this work item.

7.5 When directed by the MSCREP, return all fuel oil and lube oil to the vessel. Prior to returning of liquids, the contractor, together with ship's force, shall take samples of all stored liquids. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with temporary storage tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately.

7.6 Accomplish the following for each tank/space listed in enclosure 2.2.1:

7.6.1 Open manholes and erect/maintain safety guards over openings.

7.6.2 Temporarily provide blowers and ventilate tanks and spaces, inclusive of confined areas around manhole covers. Ventilation of the tanks shall be accomplished so as to prevent tank fumes from exhausting in the interior compartments of the ship.

7.6.3 Temporarily provide and maintain, as required, tank lamping/lighting. Lighting shall be explosion proof, safety type lights.

7.6.4 Ammendmant > In all cargo tanks, the contractor shall remove all fencing/guards/screens from the tank suction and fill lines. This includes the area commonly referred to as the suction bellmouth. The contractor shall submit a condition report citing any missing/broken studs. Repairs submitted via the condition report process are subject to a condition report.

7.6.5 Ammendmant > For the V1 and V2 tanks in the MSD spaces, remove all piping interferences to facilitate opening the tank lids.

7.7 Clean and Gas Free tanks and spaces listed in enclosure 2.2.1. Cleaning shall completely remove all traces of dirt, sludge, debris and liquids. All tanks and spaces shall be presented in a clean and dry condition and shall be ready to be certified and maintained “Safe for Men/ Safe for Hot Work”. The provision of gas free certificates is covered under work item 020 of this work package.

7.7.1 Where a battery of tanks is designated for cleaning and gas freeing, all interior spaces in way of same, such as cofferdams, voids, bilges, bilge wells and other spaces, even if not specifically mentioned, shall be considered as being included as spaces to be cleaned and gas freed.

7.7.2 For all tanks and spaces indicated in enclosure 2.2.1, air vents, sounding tubes, filling and suction lines and other appurtances shall be included for cleaning and gas freeing. Secondary manhole covers for each tank shall also be opened.

7.7.3 Post Original Gas Free Certification at each Tank/Space Location. Certificate shall be mounted directly at the tank/space manhole entrance.

7.7.4 Post copy of Gas Free Certificates at the designated gangway access to the vessel. Certifications posted at gangway shall be in a protective weather/water proof enclosure that is accessible and visible.

7.8 Surveys and testing requirements for these tanks shall be addressed in other work items in this work package.

7.9 At the conclusion of all required work, conduct a final closeout inspection for each tank / space listed in enclosure 2.2.1 with the MSCREP. No tank shall be closed until a final inspection is accomplished with the MSCREP in attendance.

7.9.1 Contractor is responsible for repairing all tank coating damage caused by work in this solicitation work package. During close out inspection, if coatings are found damaged by contractor’s work, contractor shall repair damaged areas prior to final close out of tank/space, at contractor’s expense. Damaged coatings shall be repaired in accordance with MSC paint system and the paint representative’s recommendations.

7.9.2 Ensure all blowers, lighting, staging, tools, and miscellaneous equipment are removed prior to the final inspection. Any staging necessary for MSCREP close out inspection shall be removed just prior to final acceptance close out of tank/space.

7.9.3 Present Tank in “Final” clean condition. No dirt, dust, debris or liquids shall be allowed. Any tank or space failing the close out inspection, shall be re-cleaned until passing MSCREP inspection (repeated cleanings and inspections will be at contractor expense, and may become subject to issuance of a QDR).

7.10 Upon acceptance of final closeout inspection and by direction of the MSCREP, reinstall manhole covers using new gaskets, grommets, and wicking. Submit a Condition Found Report for any missing or damaged fasteners or hardware.

7.11 The following tanks and spaces, included in enclosure 2.2.1, shall be opened, cleaned and prepared for gas free certification within 7 days of the shipyard availability start:

· Shaft Alley (7-565-1-Q)

· MMR-1 (7-455-0-E)

· MMR-2 (7-510-0-E)

· JP-5 Pump room (7-205-0-E)

· DFM Pump room (7-395-0-E)

· AMR

(3-105-0-E)

· AMR Pump Room (6-132-0-E)

· Forward MSD Space (3-183-1-A)

· Forward CHT Space (3-161-1-Q)

· Aft MSD Space (2-667-1-A)

· Aft CHT Space (3-605-0-Q)

· Elevator Trunk Pits No. 1 thru No. 7

· Conveyor Trunk Pits No. 1 thru No. 4

· Also, Any/all sub-bilge level voids, trunks, cofferdams, rose boxes, bilge wells, and other drainage collection pits throughout the vessel.

7.12 Required Deliverable Report:Contractor shall create, maintain, update, and submit weekly during the progress meeting, a tank/space work matrix. This matrix shall contain the following information:

A.
Tank / Space Name
B.
Tank/Space Location Designation
C.
Date Tank/Space Opened
D.
Date Gas Free Cleaning Started
E.
Date Gas Free Cleaning Completed
F.
Date Gas Free Cert. Received
G.
Date ABS Initial Structural Survey Complete
H.
Date Air Test / Hydro Test Completed
I.
Date Final Tank/Space Cleaning Started
J.
Date Final Tank/Space Cleaning Completed
K.
Date Tank/Space Final Close
L.
Tank/Space Related Repair Status: List major job sequence within a tank/space followed by date start & date completed (such as below):

* Access Cuts -> Date Removed / Date Installed

* Blasting -> date start / date complete

* Painting -> date start / date complete

* Related work items internal repairs (pipe, valve, structure, etc)

* Related work items external repairs (welding, UT’s, zincs, other structural related; etc.)

* Fluids added / removed from tank/space (pot water chlorination; Undocking Stability; fuels/oils; etc.)

M.
Other

7.13 Paint all disturbed surfaces to match surroundings.

7.14 Preparation of Drawings: None.

7.15 Manufacturer's Rep: None.

8.0 GENERAL REQUIREMENTS: None

ENCLOSURE 2.2.1 – USNS ARCTIC

(T-AOE-8)

TANKS, VOIDS, AND COFFERDAMS

NOTE: Tank Arrival Conditions are estimates only.

Cargo Oil (DFM) Tanks

Description
Tank Location
95% Capacity

(gals) Area

(sqft) Arrival

Condition

(Ltons)

Cargo Oil Tank

Cargo Oil Tank

Cargo Oil Tank

Cargo Oil Or Settling Tank

Cargo Oil Tank

Cargo Oil Tank

Contam Cargo Oil Cltg Tank

Cargo Oil Tank

Cargo JP-5 Tanks

Description
Tank Location
95% Capacity

(gals) Area

(sqft) Arrival

Condition

Cargo/JP-5 Settling Tank

Cargo JP-5 Tank

Contam Cargo JP-5 Cltg Tank

Cargo JP-5 Tank

Cargo JP-5 Tank

Cargo JP-5 Tank

Cargo JP-5 Tank

Cargo JP-5 Tank

Cargo JP-5 Tank

Cargo JP-5 Tank

Cargo JP-5 Tank

Description

95% Capacity

(gals) Area

(sqft) Arrival

Condition

Cargo JP-5 or Cargo Oil Tank

Cargo JP-5 or Cargo Oil Tank

Cargo JP-5 or Cargo Oil Tank

Cargo JP-5 or Cargo Oil Tank

Cargo JP-5 or Cargo Oil Tank

Description

100% Capacity

(gals) Area

(sqft) Arrival

Condition

Reserve Feed Tank

Reserve Feed Tank

Potable Water Tank

Potable Water Tank

Potable Water Tank

Potable Water Tank

Condensate Drain Tank

Condensate Drain Tank

Description

100% Capacity

(gals) Area

(sqft) Arrival

Condition

Fore Peak Tank

Description

100% Capacity

(gals) Area

(sqft) Arrival

Condition

Fwd CHT Tank

Aft CHT Tank

Fwd MSD V1Tank

Aft MSD V1 Tank #1

Aft MSD V1 Tank #2

Fwd MSD V2 Tank

Aft MSD V2 Tank #1

Aft MSD V2 Tank #2

-
-

Description

95% Capacity

(gals) Area

(sqft) Arrival

Condition

SSDG Fuel Oil Service Tank

SSDG Fuel Oil Service Tank

Auxiliary Fuel Service Tank

Auxiliary Fuel Service Tank

Contaminated Fuel Stlg Tank

Auxiliary Fuel Service Tank

Auxiliary Fuel Service Tank

Fuel Tank

Fuel Tank

Fuel Tank

Fuel Tank

Fuel Tank

Fuel Tank

Fuel Tank

Fuel Service Tank

Fuel Service Tank

Fuel Tank

Fuel Tank

Fuel Tank

Fuel Tank

Fuel Service Tank

Fuel Service Tank

Lube Oil Tanks

Description
Tank Location
95% Capacity

(gals) Area

(sqft) Arrival

Condition

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Settling Tank

Lube Oil Settling Tank

Lube Oil Settling Tank

Lube Oil Settling Tank

Lube Oil Settling Tank

Lube Oil Storage Tank

Lube Oil Storage Tank

Lube Oil Settling Tank

Lube Oil Settling Tank

Lube Oil Settling Tank

Lube Oil Settling Tank

Lube Oil Settling Tank

Red. Gear Lube Oil Sump MMR1

Red. Gear Lube Oil Sump MMR2

Ship JP-5 Tanks

Description
Tank Location
95% Capacity

(gals) Area

(sqft) Arrival

Condition

JP-5 Service Tank

JP-5 Service Tank

Miscellaneous Tanks

Description
Tank Location
95% Capacity

(gals) Area

(sqft) Arrival

Condition

Used Oil Tank

Chain Locker Sump

Waste Water Drn Ctlg Tank #1

SSDG Used Oil Stlg Tank #2

Prpln Gtrb Waste Drn Stlg Tank #1

Oily Waste Drain Cltg Tank

Prpln Gtrb Waste Drn Ctlg Tank #2

SSDG Used Oil Stlg Tank #3

Waste Water Drn Ctlg Tank #2

Oily Waste Holding Tank

Waste Oil Tank

OWDC Tank

OWDC Tank

Em Gs Trbn Fuel Tank

Em Gs Trbn Fuel Tank

Cofferdams

Description
Tank Location
Area

(sqft)

Cofferdam

Cofferdam

Misc. Spaces

Description
Tank Location
Area

(sqft)

MMR #1 Bilge

MMR #2 Bilge

Shaft Alley

JP-5 Pump Room Bilge

DFM Pump Room Bilge

AMR Bilge

AMR Pump Room Bilge

Elevator Trunk Pit #1
-
-
Elevator Trunk Pit #2
-
-
Elevator Trunk Pit #3
-
-
Elevator Trunk Pit #4
-
-
Elevator Trunk Pit #5
-
-
Elevator Trunk Pit #6
-
-
Elevator Trunk Pit #7
-
-
Conveyor Pit #1
-
-
Conveyor Pit #2
-
-
Conveyor Pit #3
-
-
Conveyor Pit #4
-
-

DSN-450 Doppler Speed Log Xdcr Trunk

AN/UQN-4 Xdcr & Underwater Log Trunk

Chain Locker

Forward CHT Space

Aft CHT Space

Forward MSD Space

Aft MSD Space

Voids

Description
Location
Area

(sqft)

Void (Und. NSSMS Dir)

Void (KP)

Void (KP)

Void (KP)

Void (KP)

Void (KP)

Void (KP)

Void (KP)

Void (KP)

Void (KP)

Void (KP)

Void (KP)

Void

Void

Void

Void

021-4