0408_A_UHF Transceiver Groom_ARCTICROH14R2.doc

DOC document 59 KB Posted

Attached to
REGULAR OVERHAUL/DRYDOCK FOR USNS ARCTIC
Solicitation number
N32205-14-R-2000
Issued by

About this file

WI 408

View the file

Other files

File Type Posted
N32205-14-R-2000-0008.doc DOC document
USNS_ARCTIC_Amend_0005.doc DOC document
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
P0004_(Amendment_4).doc DOC document
P0002.doc DOC document
Q_ _A_USNS_ARCTIC_14-R-2000.docx DOCX document
SIGNED_J_A1.pdf PDF
DD Form 1423-1 SWI-017 Sep12.pdf PDF
DD Form 1423-1 SWI-901 Sep2012.pdf PDF
DD Form 1423-1 SWI-016 14Sep12.pdf PDF
DD Form 1423-1 SWI-021 Sep12.pdf PDF
0108_A_Modifications for Load Line.docx DOCX document
DD Form 1423-1 SWI-013 Sep12.pdf PDF
DD Form 1423-1 SWI-011 T-AOE Sep12.pdf PDF
DD Form 1423-1 SWI-008 Sep12.pdf PDF
0910_A_ Main Propulsion Shafting_ARCTICROH14R1.doc DOC document
DD Form 1423-1 SWI-004 Sep12.pdf PDF
DD Form 1423-1 SWI-006 Sep12.pdf PDF
DD Form 1423-1 SWI-002.pdf PDF
ARCTIC ROH-DD Work Item IndexR3.doc DOC document
DD Form 1423-1 SWI-023 Sep12.pdf PDF
0402_A_Radar Preventitive Maintenance_ARCTICROH14R2.doc DOC document
0406_A_Underwater Speed Log PM_ARCTICROH14R2.doc DOC document
USNS_ARCTIC_Amend_0003.doc DOC document
0404_A_ Antenna Preventative Maintance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-020 14Sep12.pdf PDF
DD Form 1423-1 SWI-014 Sep12.pdf PDF
DD Form 1423-1 SWI-022 Sep12.pdf PDF
0801_A_Ventilation System Cleaning —
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012 - ARCTICROH14R3.doc DOC document
DD Form 1423-1 SWI-010 Sep12.pdf PDF
Copy_of_J-3_Category_B_Items_123013.xls XLS spreadsheet
0407_A_OE-82C-WSC-1-V Antenna Group Maintenance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-012 Sep12.pdf PDF
DD Form 1423-1 SWI-007 Sep12.pdf PDF
DD Form 1423-1 SWI-019 Sep12.pdf PDF
DD Form 1423-1 SWI-003 Sep12.pdf PDF
DD Form 1423-1 SWI-018 Sep12.pdf PDF
DD Form 1423-1 SWI-015 Sep2012.pdf PDF
0405_A_TV-DTS and TV Distribution System PM_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-001 14Sep12.pdf PDF
DD Form 1423-1 SWI-024 Sep12.pdf PDF
0919_B_Replace Stern Tube Shaft Bearing LinersARCTICROH14R2.doc DOC document
WI_025_Attachment.pdf PDF
WI_1013_-_EQUIPMENT_INSPECTION_SPEC_ARCTICROH14R3.pdf PDF
Q_AND_A_FPR_N32205-14-R-2000.docx DOCX document
WI_024_Attachment.pdf PDF
Copy_of_USNS_Supply_Configuration_List.xls XLS spreadsheet
WI_1011_-_TROLLEY_STOWAGE_ARMS_MOD_ARCTICROH14R2.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX F. Work Item Format Example (with format guidance)

USNS BUTTE

(T-AE 27)

SECTION TITLE

RFP NO. N62387-95-R-3003

13 April, 2014

ITEM NO. XXX

Category "A"

XXXX/LAST NAME/MSC TPOC

(XXXX = LOE company initials)

TITLE OF DISCRETE WORK TASK

USNS ARCTIC

(T-AOE 8)

COMMUNICATION & NAVIGATIONAL AIDS RFP NO. N32205-14-2000

Ammendmant 001

ITEM NO. 408

CATEGORY "A"

MSC/N642/ALD/JB

UHF TRANSCEIVER GROOM

1.0 ABSTRACT:

1.1 This Work Item describes the preventive maintenance, testing, and alignment or “groom” of the three (3)RT-1107(V)3/WSC-3 and Five (5) RT-1107(V)7/WSC-3 UHF SATCOM/LOS Transceivers, and two (2) OA-9123/SRC antenna couplers.

2.0 REFERENCES:

2.1 RT-1107 (V) /WSC-3 TECHNICAL MANUAL No. EE131-BC-OMP-010/ANWSC-3 Chapters One through Eight (Less chpt.5); (Available Onboard Ship)

2.2 OA-9123/SRC Antenna Coupler Group Technical Manual No. EE-111-DA-OMI

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity:

3.1.1 Location: Radio Transmitter Room

3.1.2 Quantity:

ITEM
QTY
RT-1107 (V) 3/WSC-3 (SATCOM) TRANSCEIVER
3
RT-1107 (V) 7/WSC-3 (LOS) TRANSCEIVER
5
OA-9123/SRC Antenna Coupler
2

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1-7,22,23,24, 28 and 29.

5.2 The contractor shall submit security clearances to the MSCREP prior to the commencement of work for all personnel requiring access to the secure processing center (Radio room).

5.3 All tests, alignments, and troubleshooting for this item shall be conducted aboard the ship.

5.4 The contractor performing this spec item shall be expected to have in his possession the necessary (CALIBRATED) electronic test equipment and tools necessary for all maintenance and troubleshooting. The contractor shall not utilize ship’s force tools or equipment.

5.5 The requirements of this tasking and all work items contained within the task shall not be considered satisfactorily completed until all required data sheets, enclosures, and a signed copy of ship’s acceptance has been delivered to the MSC technical representative.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Arrangements/Outfitting: None

7.2 Structural: None

7.3 Mechanical/Fluids: None

7.4 Electrical: None

7.5 Electronics:

7.5.1 Perform maintenance procedures listed below to the AN/WSC-3 Transceivers and OA-9123 Couplers. Perform preventative maintenance tests/alignments in accordance with Reference 2.1; Chapter 4 and corrective maintenance procedures in accordance with Chapter 6. Perform and record preliminary testing data and post alignment testing data on a test data sheet to be provided upon completion to the MSC technical representative.

a. Clean case/modules exterior.

b. Clean air filters.

c. Check, test, adjust internal frequency standard.

d. Check, test, align VCXO.

e. Test and align RT unit IF Level.

f. Check Data IF level (SATCOM Only).

g. Check/adjust detected PSK data level. (SATCOM Only)

h. Check/adjust detected FSK data level. (SATCOM Only)

i. Check VSWR level.

j. Check RT unit power supply level.

k. Check receiver AM sensitivity.

l. Check receiver FM sensitivity.

m. Check & adjust Transmitter AM output.

n. Check & adjust Transmitter FM output.

o. Check & adjust BITE Meter voltage.

p. Test overall operation of Radio Transceiver.

7.5.2 Report any faulty modules to the MSCREP verbally as soon as discovered. Provide a written report to the MSCREP within 48 hours of discovery with NSN and estimated cost.

7.6 Preparation of Drawings: None

7.7 Inspection/Tests:

7.7.1 (CHECKPOINT) Demonstrate satisfactory operation of the AN/WSC-3 Radio transceivers, to the MSCREP upon completion of all alignments and repairs.

7.8 Painting: None

7.9 Marking: None

7.10 Manufacturer's Representative:

7.10.1 The following are suggested and qualified contractors authorized to perform the work outlined in this work specification item. Other vendors may be considered if they provide the MSC Electronics Representative with a letter and certificate of formal school training or proof of equivalent training for the AN/WSC-3 (SATCOM and LOS), and meet security clearance criteria prior to the start of this contract.

8.0 GENERAL REQUIREMENTS: None Additional

XXX-1

F-1 408-4

File details come from the government source that posted it. Updated .