ARCTIC ROH-DD Work Item IndexR3.doc

DOC document 122 KB Posted

Attached to
REGULAR OVERHAUL/DRYDOCK FOR USNS ARCTIC
Solicitation number
N32205-14-R-2000
Issued by

About this file

WI INDEX

View the file

Other files

File Type Posted
N32205-14-R-2000-0008.doc DOC document
USNS_ARCTIC_Amend_0005.doc DOC document
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
P0004_(Amendment_4).doc DOC document
P0002.doc DOC document
Q_ _A_USNS_ARCTIC_14-R-2000.docx DOCX document
SIGNED_J_A1.pdf PDF
DD Form 1423-1 SWI-017 Sep12.pdf PDF
DD Form 1423-1 SWI-901 Sep2012.pdf PDF
0408_A_UHF Transceiver Groom_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-016 14Sep12.pdf PDF
DD Form 1423-1 SWI-021 Sep12.pdf PDF
0108_A_Modifications for Load Line.docx DOCX document
DD Form 1423-1 SWI-013 Sep12.pdf PDF
DD Form 1423-1 SWI-011 T-AOE Sep12.pdf PDF
DD Form 1423-1 SWI-008 Sep12.pdf PDF
0910_A_ Main Propulsion Shafting_ARCTICROH14R1.doc DOC document
DD Form 1423-1 SWI-004 Sep12.pdf PDF
DD Form 1423-1 SWI-006 Sep12.pdf PDF
DD Form 1423-1 SWI-002.pdf PDF
DD Form 1423-1 SWI-023 Sep12.pdf PDF
0402_A_Radar Preventitive Maintenance_ARCTICROH14R2.doc DOC document
0406_A_Underwater Speed Log PM_ARCTICROH14R2.doc DOC document
USNS_ARCTIC_Amend_0003.doc DOC document
0404_A_ Antenna Preventative Maintance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-020 14Sep12.pdf PDF
DD Form 1423-1 SWI-014 Sep12.pdf PDF
DD Form 1423-1 SWI-022 Sep12.pdf PDF
0801_A_Ventilation System Cleaning —
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012 - ARCTICROH14R3.doc DOC document
DD Form 1423-1 SWI-010 Sep12.pdf PDF
Copy_of_J-3_Category_B_Items_123013.xls XLS spreadsheet
0407_A_OE-82C-WSC-1-V Antenna Group Maintenance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-012 Sep12.pdf PDF
DD Form 1423-1 SWI-007 Sep12.pdf PDF
DD Form 1423-1 SWI-019 Sep12.pdf PDF
DD Form 1423-1 SWI-003 Sep12.pdf PDF
DD Form 1423-1 SWI-018 Sep12.pdf PDF
DD Form 1423-1 SWI-015 Sep2012.pdf PDF
0405_A_TV-DTS and TV Distribution System PM_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-001 14Sep12.pdf PDF
DD Form 1423-1 SWI-024 Sep12.pdf PDF
0919_B_Replace Stern Tube Shaft Bearing LinersARCTICROH14R2.doc DOC document
WI_025_Attachment.pdf PDF
WI_1013_-_EQUIPMENT_INSPECTION_SPEC_ARCTICROH14R3.pdf PDF
Q_AND_A_FPR_N32205-14-R-2000.docx DOCX document
WI_024_Attachment.pdf PDF
Copy_of_USNS_Supply_Configuration_List.xls XLS spreadsheet
WI_1011_-_TROLLEY_STOWAGE_ARMS_MOD_ARCTICROH14R2.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC (T-AOE 8)

FY-14 Regular Overhaul/Dry-Docking

Work Item Index

SECTION 000 – GENERAL REQUIREMENTS

001
INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
“NSP”
002
TECHNICAL AND MANUFACTURER’S REPRESENTATIVES
“NSP”
003
APPROACH, BERTH AND MOORING REQUIREMENTS
“NSP”
004
TESTING AND QUALITY ASSURANCE
“NSP”
005
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
“NSP”
006
HEAVY WEATHER PLAN
“NSP”
007
COLD WEATHER PLAN
“NSP”
010
FURNISH OFFICE FOR OMT
‘A’
011
GENERAL SERVICES FOR THE SHIP
‘A’
012
TELEPHONE SERVICES
‘A’
013
PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS
‘A’
014
PREPARATION OF WEIGHT AND MOMENT REPORT
‘A’
015
INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
‘A’
016
FIRE PROTECTION AND SHIP’S SAFETY PROGRAM
‘A’
017
HANDLING SHIPS STORES
‘A’
018
DELIVERY AND REDELIVERY OF THE VESSEL
‘A’
019
SHIPBOARD ACCESS AND SECURITY
‘A’
020
GAS FREE CERTIFICATES
‘A’
021
CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES
‘A’
022
DOCK TRIALS AND SEA TRIALS
‘A’
023
HAZARDOUS WASTE DISPOSAL
‘A’
024
PHYSICAL SECURITY AT PRIVATE CONTRACTORS FACILITY
‘A’
025
PHYSICAL SECURITY AT PRIVATE CONTRACTORS FACILITY
‘B’
030
CONTINUATION OF SERVICES
‘B’

SECTION 100 – HULL STRUCTURE

101
ABS TANK INSPECTION AND TESTING
‘A’
102
STATION ELEVEN SLIDING PADEYE REMOVAL (T-ALT TAOE-225)
‘A’
103
MAIN MAST (FWD) PRESERVATION AND STEEL REPAIR
‘A’
104
FAS, RAS AND WEATHERDECK HANDRAIL REPLACEMENT
‘A’
105
SHIPYARD SUPPORT FOR ABS SURVEY
‘A’
106
WATERTIGHT DOOR & AIRLOCK INSTALL BETWEEN 2-533-1-T ACCESS TRUNK AND 2-546-1-L PASSAGE (T-ALT TAOE-205)
‘A’
107
7-330-2-FF/JJ TANK INTERIOR STRUCTURE PERMANENT REPAIR (ABS)
‘A’
108
MODIFICATIONS FOR ABS LOADLINE

SECTION 200 – MACHINERY, PROPULSION

201
MAIN REDUCTION GEAR LUBE OIL PURIFIER MODIFICATIONS (T-ALT TAOE-181)
‘A’
203
LINE SHAFT BEARING OPEN AND INSPECT
‘A’
204
LINE SHAFT BEARING - REBABBIT
‘B’

SECTION 300 – ELECTRICAL

301
DISTRIBUTION BREAKER CLEANING
‘A’
302
MULTIPLE CABLE TRANSIT REPAIRS
‘A’
303
WEATHER DECK ELECTRICAL WIRE STAND OFF REPLACEMENT
‘A’
304
STUFFING TUBE REPLACEMENT
‘A’

SECTION 400 – COMMUNICATION & NAVIGATION AIDS

402
RADAR PREVENTIVE MAINTENANCE
‘A’
404
ANTENNA PREVENTIVE MAINTENANCE
‘A’
405
TV-DTS AND TV DISTRIBUTION SYSTEM PM
‘A’
406
UNDERWATER SPEED LOG PM
‘A’
407
OE-82B/WSC-1(V) ANTENNA GROUP MAINTENANCE
‘A’
408
UHF TRANCIEVER GROOM
‘A’

SECTION 500 – MACHINERY, AUXILIARY

501
AUXILIARY BOILER INSPECTION (ABS)

‘A’

502
REPLACE 100 FEET OF SEAWATER PIPE
‘A’
503
MISCELLANEOUS EQUIPMENT AND MOTOR OVERHAUL
‘B’
504
LAGGING AND INSULATION REPAIRS
‘B’
505
CHT TANKS CLEANING, REPAIR AND PAINTING
‘A’
506
FWD AND AFT MSD V1 AND V2 TANKS CLEANING AND PAINTING
‘A’
507
ASSIST SHIPS FORCE
‘B’
508
JP5 MOTOR AND PUMP OVERHAUL
‘B’
509
DFM MOTOR AND PUMP OVERHAUL
‘A’
510
AUX STEAM RELIEF VALVE OVERHAUL AND TEST
‘A’
511
CHEMICAL CLEANING OF GENERAL SALTWATER SYSTEM
‘A’
512
PORT AND STBD RHIB DAVIT MAINTENANCE AND CERTIFICATION
‘A’

SECTION 600 – OUTFIT, FURNISHING & HABITABILITY

601
LIFERAFT ANNUAL CERTIFICATION
‘A’
602
ACCOMMODATION LADDER INSPECTION AND WEIGHT TEST
‘A’
603
GALLEY/SCULLERY EQUIPMENT MAINTENANCE
‘A’
605
HELO DECK REFINISHING
‘B’

SECTION 800 – HEATING, VENTILATION & AIR CONDITIONING

801
VENTILATION SYSTEM CLEANING (ANNUAL)
A

SECTION 900 – DRYDOCKING AND UNDOCKING

901
DRYDOCKING AND UNDOCKING
‘A’
902
DRYDOCKING AND UNDOCKING
‘B’
903
SEA VALVES
‘A’
904
SEA SUCTION AND DISCHARGE LINES (ABS)
‘A’
905
ANCHOR CHAIN AND LOCKER PAINTING & MARKING
‘A’
906
CLEAN, POLISH AND REPAIR PROPELLERS (ABS)
‘A’
907
RUDDERS AND STERN FRAME EXAMINATION (ABS)
‘A’
908
UNDERWATER HULL CLEANING AND PAINTING
‘A’
909
BLAST AND COAT TANKS
‘A’
910
MAIN PROPULSION SHAFTING
‘A’
911
ZINC RENEWAL
‘A’
912
HULL FREEBOARD CLEANING AND PAINTING
‘A’
913
CATHODIC PROTECTION SYSTEM MAINTENANCE
‘A’
914
BILGE KEEL EXAMINATION
‘A’
915
REPLACE STARBOARD BILGE KEEL
917
ULTRASONIC TESTING
‘A’
918
ULTRASONIC TESTING
‘B’
919
Replace Stern Tube Shaft Bearing Liners
“B”
920
SHELL PLATE WELDING AND REPAIR
“B”
921
STEEL RENEWAL
“B”
922
RESERVE FEED AND CONDENSATE TANK PAINTING
“B”

SECTION 1000 – UNREP GEAR

1001
HIGH PRESSURE AIR RELIEF VALVE CALIBRATION
“A”
1002
SLIDING BLOCK RUBBER BUMPERS
A
1003
UNREP WINCH CONTROLEX CABLE REPLACEMENT
A
1004
SLIDING BLOCK AND TRANSFER HEAD DRIVE CHAIN REPLACEMENT AND GUIDE RAIL REFURBISHMENT
A
1005
SLIDING BLOCK ELECTRIC MOTOR/BRAKE ASSEMBLY REFURBISHMENT
A
1006
STATION NO.6 PMDC MOTOR AND MOTOR CABLE MODIFICATIONS
A
1007
RESERVED
A
1008
STATION NO.6 TROLLEY MODIFICATIONS
A
1009
HEAT EXCHANGER AND CHILLER MODIFICATION
A
1011
STATION NO.6 TROLLEY STOWAGE ARMS MODIFICATIONS
A
1012
HIGHLINE, INHAUL AND OUTHAUL FLEET ANGLE COMPENSATOR SHAFT REPLACEMENT
A
1013
STATION NO.6 EQUIPMENT OPEN AND INSPECT
A
1014
STATION SIX LIGHTING IMPROVEMENT

ROH-DD INDEX- 4