0402_A_Radar Preventitive Maintenance_ARCTICROH14R2.doc

DOC document 45 KB Posted

Attached to
REGULAR OVERHAUL/DRYDOCK FOR USNS ARCTIC
Solicitation number
N32205-14-R-2000
Issued by

About this file

WI 402

View the file

Other files

File Type Posted
N32205-14-R-2000-0008.doc DOC document
USNS_ARCTIC_Amend_0005.doc DOC document
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
Copy_of_J_-_2_Category_A_Items_-_USNS_ARCTIC_2014.xlsx XLSX spreadsheet
P0004_(Amendment_4).doc DOC document
P0002.doc DOC document
Q_ _A_USNS_ARCTIC_14-R-2000.docx DOCX document
SIGNED_J_A1.pdf PDF
DD Form 1423-1 SWI-017 Sep12.pdf PDF
DD Form 1423-1 SWI-901 Sep2012.pdf PDF
0408_A_UHF Transceiver Groom_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-016 14Sep12.pdf PDF
DD Form 1423-1 SWI-021 Sep12.pdf PDF
0108_A_Modifications for Load Line.docx DOCX document
DD Form 1423-1 SWI-013 Sep12.pdf PDF
DD Form 1423-1 SWI-011 T-AOE Sep12.pdf PDF
DD Form 1423-1 SWI-008 Sep12.pdf PDF
0910_A_ Main Propulsion Shafting_ARCTICROH14R1.doc DOC document
DD Form 1423-1 SWI-004 Sep12.pdf PDF
DD Form 1423-1 SWI-006 Sep12.pdf PDF
DD Form 1423-1 SWI-002.pdf PDF
ARCTIC ROH-DD Work Item IndexR3.doc DOC document
DD Form 1423-1 SWI-023 Sep12.pdf PDF
0406_A_Underwater Speed Log PM_ARCTICROH14R2.doc DOC document
USNS_ARCTIC_Amend_0003.doc DOC document
0404_A_ Antenna Preventative Maintance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-020 14Sep12.pdf PDF
DD Form 1423-1 SWI-014 Sep12.pdf PDF
DD Form 1423-1 SWI-022 Sep12.pdf PDF
0801_A_Ventilation System Cleaning —
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS REV OCT 2012 - ARCTICROH14R3.doc DOC document
DD Form 1423-1 SWI-010 Sep12.pdf PDF
Copy_of_J-3_Category_B_Items_123013.xls XLS spreadsheet
0407_A_OE-82C-WSC-1-V Antenna Group Maintenance_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-012 Sep12.pdf PDF
DD Form 1423-1 SWI-007 Sep12.pdf PDF
DD Form 1423-1 SWI-019 Sep12.pdf PDF
DD Form 1423-1 SWI-003 Sep12.pdf PDF
DD Form 1423-1 SWI-018 Sep12.pdf PDF
DD Form 1423-1 SWI-015 Sep2012.pdf PDF
0405_A_TV-DTS and TV Distribution System PM_ARCTICROH14R2.doc DOC document
DD Form 1423-1 SWI-001 14Sep12.pdf PDF
DD Form 1423-1 SWI-024 Sep12.pdf PDF
0919_B_Replace Stern Tube Shaft Bearing LinersARCTICROH14R2.doc DOC document
WI_025_Attachment.pdf PDF
WI_1013_-_EQUIPMENT_INSPECTION_SPEC_ARCTICROH14R3.pdf PDF
Q_AND_A_FPR_N32205-14-R-2000.docx DOCX document
WI_024_Attachment.pdf PDF
Copy_of_USNS_Supply_Configuration_List.xls XLS spreadsheet
WI_1011_-_TROLLEY_STOWAGE_ARMS_MOD_ARCTICROH14R2.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE 8)

COMMUNICATION & NAVIGATIONAL AIDS RFP NO. N32205-14-R-2000

Ammendmant 1

ITEM NO. 402 CATEGORY “A” MSC/N6442/ALD/JB

RADAR PREVENTATIVE MAINTENANCE

1.0 ABSTRACT:

1.1 This item describes the requirement to perform RADAR Preventative maintenance on FAR-2117/3CM radar system.

2.0 REFERENCES:

2.1 Furuno Service Manual Marine Radar model FAR-2107 / 2807 series.

2.2 MIL-STD-1310G Standard methods for the grounding and bonding of Electrical and Electronic Equipment.

2.3 DOD-STD-2003-1(NAVY) Electric Plant Installation Standard Methods for Surface Ships and Submarines

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity:

Description
Quantity
Location
3CM Antenna/ Pedestal/ MTR/ Display
1
Bridge/ Mast

3.2 Item Description/ Manufacturer’s Data:

Model
Frequency
Output
FAR-2827
X-Band – 9410 MHz
25 kW

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR's including but not limited to GTR's 1-7, 22, 23, 24, 28 and 29.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 The contractor shall comply with all requirements of equipment tag out program as established by COMSCINST 3540.6, as amended, Section 15.2.2, Engineering Operations and Maintenance Manual. The Chief Engineer is to administer the program. Prior to the start of work, the contractor shall contact the MSCREP and/or the Chief Engineer to coordinate the implementation of the Tag-Out Program for the entire performance period of this item. The prime contractor shall be responsible for compliance by both prime and subcontractor personnel

7.0 STATEMENT OF WORK REQUIRED:

7.1 Contractor shall furnish the following material:

7.1.1 Magnetrons: One (1) each 3cm RADAR Unit.

7.1.2 OEM Replacement Door Gaskets

7.1.3 OEM Approved gear box lube

7.1.4 The contractor shall provide any additional materials not otherwise specified and all labor including crane and rigging services to perform maintenance and installation services necessary under this tasking.

7.2 Arrangements/Outfitting: None Additional

7.2.1 Structural: Perform a visual check of all foundation mounting bolts, nuts and washers, insuring they are correctly installed and tight.

7.3 Mechanical/Fluids:

7.3.1 Change out gearbox lube.

7.4 Electrical: None Additional

7.5 Electronics:

7.5.1 Provide the services of a qualified FURUNO Technical Representative to complete the maintenance requirements detailed in chapter six of Reference 2.1 using References 2.2 and 2.3 for guidance.

7.5.2 The manufacturer’s representative shall replace with new the 3 CM radar magnetron and perform associated alignments of the MTR to ensure operation meets manufacturer’s specifications. Turn over removed magnetrons to the MSCREP for disposal.

7.5.3 The contractor shall inspect the condition of the antenna pedestal and note the condition of rubber gaskets; covers; connections; internal wiring and external hardware. Submit a list of discrepancies to the MSCREP for action.

7.5.4 Contractor shall replace external bond straps and ensure proper weatherproofing of external bond straps and electrical connections.

7.5.5 Manufacturer’s rep shall perform any and all other system tests and adjustments to ensure full and complete operation of the radar in accordance with manufacturer’s performance specifications. All alignments/ adjustments under power shall be performed while ship is on its own power.

7.5.6 (CHECKPOINT) Upon completion of tests and adjustments demonstrate satisfactory operation of the ship's radar systems to the CHENG (or ships ET), Captain, CHMATE or Navigator and MSCREP.

7.6 Preparation of Drawings/Documentation: None Additional

7.7 Inspection/Test:

7.7.1 The contractor shall engage the services of a qualified manufacturer's Representative to ride the ship for sea trials to demonstrate an operational system at sea.

7.8 Painting: None Additional

7.9 Marking: None Additional

7.10 Manufacturers Representative:

7.10.1 The contractor shall engage the services of qualified representative for FURUNO series radar systemsto perform all work in this spec item and absorb all costs for same.

8.0 GENERAL REQUIREMENTS: None Additional

402-1