This is a pricing template (Exhibit B - Rate Table) for the MSC Technical Library Management Services contract, a Request for Quotation (RFQ) solicitation issued by the Department of the Navy Military Sealift Command. The template is structured to capture labor costs (regular and overtime), travel expenses, and material costs across a base period of 10 months (10/01/2026 – 7/31/2027) and four 12-month option years, plus a 6-month extension. Quoters must populate hourly labor rates for seven position categories based at Naval Station Norfolk: Engineering Tech VI with Drafting Experience (1 person), Engineering Technician Level V with Drafting Experience (3 people), First Line Supervisor/Librarian (1 person), Media Specialist III (2 people), Media Specialist II (2 people), Media Specialist I (2 people), and Library IT Systems Administrator (1 person). Regular labor is estimated at 160 hours per month per person, with overtime hours varying by position (5–20 hours monthly). The template includes an automatic escalation mechanism allowing contractors to input an annual labor rate increase percentage rather than accepting yearly SCA Wage Determination increases.
Travel costs are estimated at 8 trips annually to eight locations (Singapore, Guam, South Korea, Spain, Portland OR, Charleston SC, San Diego CA, and Mobile AL), with 3 contractors per trip at 10 days each; contractors must price cost-per-person inclusive of airfare, lodging, per diem, and transportation. The material section captures three cost categories: consumables, software tools, and licenses. All cells are rounded to the nearest dollar per Section L requirements, and formulas automatically calculate period totals and contract value from entered rates. This is an 8(a) small business set-aside, with the RFQ due 08/28/2026. The rate table is the final version (REV 3, issued 08/21/2026) that quoters must use for submission; previous revisions have been superseded.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Instruction: This is the summary page, all values below contain a formula and will automatically update with prices derived in the corresponding tabs. Do not edit amounts on this page. Instructions are included on each tab. All cells have been rounded to the nearest dollar. | ||||||
| 10/01/2026 - 7/31/2027 | 8/01/2027 - 7/31/2028 | 8/01/2028 - 7/31/2029 | 8/01/2029 - 7/31/2030 | 8/01/2030 - 7/31/2031 | 8/01/2031 - 1/31/2032 | |
| Base Period | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | 6 Month Ext | |
| Dollar Value | Dollar Value | Dollar Value | Dollar Value | Dollar Value | Dollar Value | |
| Regular Labor/Period | $0 | $0 | $0 | $0 | $0 | $0 |
Overtime Labor/Period $0 $0 $0 $0 $0 $0
Travel/Period $0 $0 $0 $0 $0 $0
Material/Period $0 $0 $0 $0 $0 $0
Contract Total/Period $0 $0 $0 $0 $0 $0
| Contract Total Value | $0 | |
| Key: | ||
| Blue - Heading - Do not change | ||
| Grey - Contains Formula/Link - Do not manually enter | ||
| Yellow - Manually Enter |
Regular Labor Estimate
| Instructions: Input hourly labor rate in column B. If escalation rate is desired (opting out of yearly SCA Wage Determination Applicable Increases), input amount in cell C16. Totals in columns E-I will automatically populate, accounting for the escalation rate. The last column (column J - 6 month extension) does not have a formula. Please enter amounts accordingly. | |||||||||
| Billet | Regular Labor Rate | Number Of People | Number of Hours/Month | 10/01/2026 - 7/31/2027 | 8/01/2027 - 7/31/2028 | 8/01/2028 - 7/31/2029 | 8/01/2029 - 7/31/2030 | 8/01/2030 - 7/31/2031 | 8/01/2031 - 1/31/2032 |
| 10 months | 12 months | 12 months | 12 months | 12 months | 6 months | ||||
| Norfolk-Engineering Tech VI with Drafting Experience | $0 | 1 | 160 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Engineering Technician Level V with Drafting Experience | $0 | 3 | 160 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-First Line Supervisor/Librarian | $0 | 1 | 160 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Media Specialist III | $0 | 2 | 160 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Media Specialist II: | $0 | 2 | 160 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Media Specialist I: | $0 | 2 | 160 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Library IT Systems Administrator | $0 | 1 | 160 | $0 | $0 | $0 | $0 | $0 | $0 |
Regular Labor Total $0 $0 $0 $0 $0 $0
Labor Rate Increase per Year 0%
| Key: |
| Blue - Heading - Do not change |
| Grey - Contains Formula/Link - Do not manually enter |
| Yellow - Manually Enter |
Overtime Estimate
| Instructions: Input hourly labor rate in column B. If escalation rate is desired (opting out of yearly SCA Wage Determination Applicable Increases), input amount in cell C17. Totals in columns E-I will automatically populate, accounting for the escalation rate. The last column (column J - 6 month extension) does not have a formula. Please enter amounts accordingly. | |||||||||
| Billet | OT Rate | Number Of People | Hours/Month | 10/01/2026 - 7/31/2027 | 8/01/2027 - 7/31/2028 | 8/01/2028 - 7/31/2029 | 8/01/2029 - 7/31/2030 | 8/01/2030 - 7/31/2031 | 8/01/2031 - 1/31/2032 |
| 10 months | 12 months | 12 months | 12 months | 12 months | 6 months | ||||
| Norfolk-Engineering Tech VI with Drafting Experience | $0 | 1 | 5 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Engineering Technician Level V with Drafting Experience | $0 | 3 | 5 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-First Line Supervisor/Librarian | $0 | 1 | 15 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Media Specialist III | $0 | 2 | 15 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Media Specialist II: | $0 | 2 | 20 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Media Specialist I: | $0 | 2 | 20 | $0 | $0 | $0 | $0 | $0 | $0 |
| Norfolk-Library IT Systems Administrator | $0 | 1 | 5 | $0 | $0 | $0 | $0 | $0 | $0 |
Overtime Total $0 $0 $0 $0 $0 $0
Labor Rate Increase per Year 0%
| Key: |
| Blue - Heading - Do not change |
| Grey - Contains Formula/Link - Do not manually enter |
| Yellow - Manually Enter |
Travel Estimate Instructions: 8 trips are estimated yearly, with each location below visited once per year (subject to ship availability). Each trip is estimated at 10 days, with 3 contractors attending per trip. Please only price column C using base period pricing- each cost per person shall be inclusive of all travel expenses such as airfare, lodging, per diem, travel labor rates, transportation, etc. Once filled out, totals will automatically calculate for the base period. If escalation is desired, please enter in cell E15. The increase will automatically be applied to the yearly rates following the base period.
Column I (6-month extension) has a formula in cell I12 for half the option period 4 total price to account for an estimated 4 trips due to the shorter period of performance.
| Number of people | Cost per person | Base Period 10/01/2026 - 7/31/2027 | Option Period 1 8/01/2027 - 7/31/2028 | Option Period 2 8/01/2028 - 7/31/2029 | Option Period 3 8/01/2029 - 7/31/2030 | Option Period 4 8/01/2030 - 7/31/2031 | Six Month Extension 8/01/2031 - 1/31/2032 | |
| Singapore | 3 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Guam | 3 | $0 | $0 | $0 | $0 | $0 | $0 | |
| South Korea | 3 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Spain | 3 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Portland, OR | 3 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Charleston, SC | 3 | $0 | $0 | $0 | $0 | $0 | $0 | |
| San Diego, CA | 3 | $0 | $0 | $0 | $0 | $0 | $0 | |
| Mobile, AL | 3 | $0 | $0 | $0 | $0 | $0 | $0 |
Total $0 $0 $0 $0 $0 $0
Travel Cost Increase Per Year 0%
| Travel Total | $0 | |
| Key: | ||
| Blue - Heading - Do not change | ||
| Grey - Contains Formula/Link - Do not manually enter | ||
| Yellow - Manually Enter |
Material
| 10/01/2026 - 7/31/2027 | 8/01/2027 - 7/31/2028 | 8/01/2028 - 7/31/2029 | 8/01/2029 - 7/31/2030 | 8/01/2030 - 7/31/2031 | 8/01/2031 - 1/31/2032 | |
| Base Period | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | 6 Month Ext | |
| Dollar Value | Dollar Value | Dollar Value | Dollar Value | Dollar Value | Dollar Value | |
| Consumables | $0 | $0 | $0 | $0 | $0 | $0 |
| Software Tools | $0 | $0 | $0 | $0 | $0 | $0 |
| Licenses | $0 | $0 | $0 | $0 | $0 | $0 |
| Material/Period | $0 | $0 | $0 | $0 | $0 | $0 |
| Key: | ||||||
| Blue - Heading - Do not change | ||||||
| Grey - Contains Formula/Link - Do not manually enter | ||||||
| Yellow - Manually Enter |
File details come from the government source that posted it. Updated .