Attachment_L-8_PMA262-266_FOPR.docx

DOCX document 181 KB Posted

Attached to
PEO (U&W) Program Management (PM) Support
Solicitation number
N00421-18-R-0008
Issued by

About this file

Attachment L-8 PMA262-266 FOPR

View the file

Other files

File Type Posted
N00421-18-R-0008_Amendment_5.docx DOCX document
Formal_RFP_Q&A_1-16-18.pdf PDF
Formal_RFP_Q&A_1-10-18.pdf PDF
N00421-18-R-0008_Amendment_4.docx DOCX document
Formal_RFP_Question_and_Answer_Rev3.pdf PDF
Formal_RFP_Question_Tracker_Amendment_3.pdf PDF
N00421-17-R-0028_Amendment_3.docx DOCX document
Attachment_L-8_PMA262-266_FOPR_Amend_3.docx DOCX document
Attachment_L-9_PMA262-266_SOW_Amend_3.docx DOCX document
N00421-18-R-0008_Amendment_2.docx DOCX document
Attachment_L-3_Relevant_Experience_Project_Template_Amend_2.docx DOCX document
Attachment_L-2_(W)_SSWS_Amend_2.xlsx XLSX spreadsheet
Formal_RFP_Question_&A_FedBizOpps_Post_rev_1.pdf PDF
Attachment_L-1_(U)_SSWS_Amend_2.xlsx XLSX spreadsheet
Attachment_L-1_(U)_SSWS_Amend_1.xlsx XLSX spreadsheet
Attachment_L-15_PMA263_SOW_Amend_1.docx DOCX document
Attachment_L-13_PMA_262-266_Fully_Burdened_Labor_Rates_Amend_1.xlsx XLSX spreadsheet
Attachment_L-2_(W)_SSWS_Amend_1.xlsx XLSX spreadsheet
Formal_RFP_Question_&A_FedBizOpps_Post.pdf PDF
Attachment_L-9_PMA262-266_SOW_Amend_1.docx DOCX document
N00421-18-R-0008_Amendment_1.docx DOCX document
Attachment_L-3_Relevant_Experience_Project_Template_Amend_1.docx DOCX document
Attachment_L-8_PMA262-266_FOPR_Amend_1.docx DOCX document
Attachment_L-14_PMA-263_FOPR_Amend_1.docx DOCX document
Attachment_L-19_-_Fully_Burdened_Rates_Amend_1.xlsx XLSX spreadsheet
Draft_RFP_N00421-18-R-0028_Q&A.xlsx XLSX spreadsheet
Attachment_J-4_-_IDIQ_MAC_Min_Guarantee_TO_Draft.docx DOCX document
Attachment_L-18_263_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attachment_L-2_(W)_SSWS.xlsx XLSX spreadsheet
Attachment_L-14_PMA-263_FOPR.docx DOCX document
Attachment_J-5_-_IDIQ_MAC_OCI.doc DOC document
Attachment_J-3_-_IDIQ_MAC_DD254-Final.pdf PDF
Attachment_L-16_-_PMA263_CDRLs.pdf PDF
Attachment_L-10_PMA262-266_CDRLs.pdf PDF
Attachment_L-9_PMA262-266_SOW.docx DOCX document
Attachment_L-12_262-266_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attachment_L-15_PMA263_SOW.docx DOCX document
Attachment_L-19_-_Fully_Burdened_Rates.xlsx XLSX spreadsheet
Attachment_L-6_-_Fully_Burdened_Rates.xlsx XLSX spreadsheet
Attachment_L-5_IDIQ-MAC_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attachment_J-1_-_(U)_SOW.docx DOCX document
Attachment_L-11_PMA262-266_DD254-Final.pdf PDF
Attachment_L-4_FPDS-NG.docx DOCX document
Attachment_L-3_Relevant_Experience_Project_Template.docx DOCX document
Attachment_L-13_PMA_262-266_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
N00019-18-R-0008.pdf PDF
Attachment_J-2_-_(W)_SOW.docx DOCX document
Attachment_L-1_(U)_SSWS.xlsx XLSX spreadsheet
Attachment_L-17_PMA263_DD254.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-18-R-0008

PMA262/266 Fair Opportunity Proposal Request (FOPR)

Section A - Solicitation/Contract Form

POINT OF CONTACT

Contracting Specialist Teresa R. Mellies

AIR-2.4.2.2.4

Phone: (301) 757-7052 Email: Teresa.Mellies@navy.mil

Procuring Contracting Officer Christin Simpson

AIR-2.4.2.2

Phone: (301) 757-3532 Email: Christin.Simpson@navy.mil

This PMA262/266 requirement is a competitive acquisition under the PEO U&W IDIQ/MAC for Unmanned Systems utilizing FAR 16.505 Fair Opportunity proposal procedures. An Offeror must be an Unmanned Systems MAC holder to compete for this T.O.

The Product Service Code (PSC) for this requirement is R408.

The resulting task order will be issued in accordance with the terms and conditions of the PEO U&W IDIQ MAC.

All provisions and clauses included in the basic contract will apply to the task order. Only clauses and provisions requiring fill-ins, or unique to the resulting task order, have been included by reference and in full text herein.

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

LABOR –APN

CPFF

PMA 262 AIRCRAFT PROCUREMENT, NAVY SERVICES IN ACCORDANCE WITH (IAW) SECTION C SOW FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

LABOR - O&M,N

PMA 262 OPERATION AND MAINTENANCE, NAVY SERVICES IAW SECTION C SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

LABOR - RDT&E

PMA 262 RESEARCH, DEVELOPMENT, TEST, AND EVALUATION SERVICES IAW SECTION C SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

FMS

PMA 262 FOREIGN MILITARY SALES SERVICES IAW SECTION C SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

PMA 262 FOR SERVICES IN ACCORDANCE WITH THE SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

LABOR –APN

PMA 266 AIRCRAFT PROCUREMENT, NAVY SERVICES IN ACCORDANCE WITH (IAW) SECTION C SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

LABOR - O&M,N

PMA 266 OPERATION AND MAINTENANCE, NAVY SERVICES IAW SECTION C SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

LABOR - RDT&E

PMA 266 RESEARCH, DEVELOPMENT, TEST, AND EVALUATION SERVICES IAW SECTION C SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

FMS

PMA 266 FOREIGN MILITARY SALES SERVICES IAW SECTION C SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

PMA 266 FOR SERVICES IN ACCORDANCE WITH THE SOW

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

MATERIAL - APN

COST

PMA 262 AIRCRAFT PROCUREMENT, NAVY MATERIAL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

MATERIAL - O&M,N

PMA 262 OPERATION AND MAINTENANCE, NAVY MATERIAL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

MATERIAL - RDT&E

PMA 262 RESEARCH, DEVELOPMENT, TEST, AND EVALUATION MATERIAL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

MATERIAL - FMS

PMA 262 FOREIGN MILITARY SALES MATERIAL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

TRAVEL - APN

PMA 262 AIRCRAFT PROCUREMENT, NAVY TRAVEL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

TRAVEL - O&M,N

PMA 262 OPERATION AND MAINTENANCE, NAVY TRAVEL IN SUPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

TRAVEL - RDT&E

PMA 262 RESEARCH, DEVELOPMENT, TEST, AND EVALUATION TRAVEL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

TRAVEL - FMS

PMA 262 FOREIGN MILITARY SALES TRAVEL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

PMA 262 FOR ODC IN ACCORDANCE WITH THE SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

MATERIAL - APN

PMA 266 AIRCRAFT PROCUREMENT, NAVY MATERIAL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

MATERIAL - O&M,N

PMA 266 OPERATION AND MAINTENANCE, NAVY MATERIAL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

MATERIAL - RDT&E

PMA 266 RESEARCH, DEVELOPMENT, TEST, AND EVALUATION MATERIAL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

MATERIAL - FMS

PMA 266 FOREIGN MILITARY SALES MATERIAL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

TRAVEL - APN

PMA 266 AIRCRAFT PROCUREMENT, NAVY TRAVEL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

TRAVEL - O&M,N

PMA 266 OPERATION AND MAINTENANCE, NAVY TRAVEL IN SUPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

TRAVEL - RDT&E

PMA 266 RESEARCH, DEVELOPMENT, TEST, AND EVALUATION TRAVEL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

TRAVEL - FMS

PMA 266 FOREIGN MILITARY SALES TRAVEL IN SUPPORT OF LABOR IAW SECTION C SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

PMA 266 FOR ODC IN ACCORDANCE WITH THE SOW

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

NSP

TECHNICAL DATA

DATA IN SUPPORT OF CLINS 0001-0028

NOT SEPARATELY PRICED (NSP)

NET AMT
NSP
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR –APN

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - O&M,N

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - RDT&E

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
FMS

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR –APN

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - O&M,N

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - RDT&E

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
FMS

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TECHNICAL DATA

TECHNICAL DATA IN SUPPORT OF CLINs 1001-1028

NET AMT
NSP
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR –APN

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - O&M,N

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - RDT&E

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
FMS

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR –APN

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - O&M,N

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - RDT&E

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
FMS

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TECHNICAL DATA

TECHNICAL DATA IN SUPPORT OF CLINs 2001-2028

NET AMT
NSP
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR –APN

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - O&M,N

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - RDT&E

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
FMS

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR –APN

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - O&M,N

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - RDT&E

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
FMS

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TECHNICAL DATA

TECHNICAL DATA IN SUPPORT OF CLINs 3001-3028

NET AMT
NSP
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR –APN

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - O&M,N

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - RDT&E

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
FMS

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR –APN

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - O&M,N

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
LABOR - RDT&E

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
FMS

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
MATERIAL – FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - APN

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - O&M,N

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - RDT&E

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TRAVEL - FMS

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
OPTION - 15% INCREASED CAPACITY

COST

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
TECHNICAL DATA

TECHNICAL DATA IN SUPPORT OF CLINS 4001-4028

NET AMT
NSP

Section C – Descriptions and Specifications

Items 0001–0003 and Option Items 1001–1003, 2001–2003, 3001-3003, and 4001-4003 – The services to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Item 0004 and Option Item 1004, 2004, 3004, and 4004 – The services to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Item 0005 and Option Item 1005, 2005, 3005, and 4005 – The services to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Items 0006–0008 and Option Items 1006–1008, 2006–2008, 3006-3008, and 4006-4008 – The services to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Item 0009 and Option Item 1009, 2009, 3009, and 4009 – The services to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Item 0010 and Option Item 1010, 2010, 3010, and 4010 – The services to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Items 0011–0014 and Option Items 1011–1014, 2011–2014, 3011-3014, and 4011-4014 – The material to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Items 0015–0018 and Option Items 1015–1018, 2015–2018, 3015-3018, and 4015-4018 – Travel to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Item 0019 and Option Item 1019, 2019, 3019, and 4019 – The services to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Items 0020–0023 and Option Items 1020–1023, 2020–2023, 3020-3023, and 4020-4023 – The material to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Items 0024–0027 and Option Items 1024–1027, 2024–2027, 3024-3027, and 4024-4027 – Travel to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Item 0028 and Option Item 1028, 2028, 3028, and 4028 – The services to be furnished hereunder shall be in accordance with Section J, Attachment 1 Statement of Work.

Item 0029 and Option Item 1029, 2029, 3029, and 4029 – The technical data to be furnished hereunder shall be supplied in accordance with Exhibit A, Contract Data Requirements List (CDRL) DD Form 1423 as applicable.

All Provisions and Clauses of Section C of the basic contract apply to this Task Order unless otherwise specified in the Task Order, in addition to the following:

5252.211-9503LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012)
(a) The level of effort estimated to be ordered during the term of this contract/order is 717,120 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in the contract/order. The estimated composition of the total man-hours of direct labor by option year is as follows:
Base Period121,920
Option Period I148,800
Option Period II148,800
Option Period III148,800
Option Period IV148,800

Total Hours 717,120

(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period; the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.
(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.
(e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.
5252.211-9509INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL (NAVAIR)(OCT 2005)
The Contractor's Technical Proposal Number TBD – Enter technical proposal number, dated TBD – Enter document date, and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a “Specification” but the Government's Specification shall take precedence over the Contractor's technical proposal.

Section D - Packaging and Marking

Items 0001–0003 and Option Items 1001–1003, 2001–2003, 3001-3003, and 4001-4003 – Packing and Marking are not applicable to these items.

Item 0004 and Option Item 1004, 2004, 3004, and 4004 – Packing and Marking are not applicable to these items.

Item 0005 and Option Item 1005, 2005, 3005, and 4005 – Packing and Marking are not applicable to these items.

Items 0006–0008 and Option Items 1006–1008, 2006–2008, 3006-3008, and 4006-4008 – Packing and Marking are not applicable to these items.

Item 0009 and Option Item 1009, 2009, 3009, and 4009 – Packing and Marking are not applicable to these items.

Item 0010 and Option Item 1010, 2010, 3010, and 4010 – Packing and Marking are not applicable to these items.

Items 0011–0014 and Option Items 1011–1014, 2011–2014, 3011-3014, and 4011-4014 – Packing and Marking are not applicable to these items.

Items 0015–0016 and Option Items 1015–1018, 2015–2018, 3015-3018, and 4015-4018 – Packing and Marking are not applicable to these items.

Item 0019 and Option Item 1019, 2019, 3019, and 4019 – Packing and Marking are not applicable to these items.

Items 0018–0020 and Option Items 1020–1023, 2020–2023, 3020-3023, and 4020-4023 – Packing and Marking are not applicable to these items.

Items 0024–0027 and Option Items 1024–1027, 2024–2027, 3024-3027, and 4024-4027 – Packing and Marking are not applicable to these items.

Item 0028 and Option Item 1028, 2028, 3028, and 4028 – Packing and Marking are not applicable to these items.

Item 0029 and Option Item 1029, 2029, 3029, and 4029 – The technical data to be furnished hereunder shall be supplied in accordance with Exhibit A, Contract Data Requirements List (CDRL) DD Form 1423 as applicable.

All Provisions and Clauses of Section D of the basic contract apply to this Task Order unless otherwise specified in the Task Order.

Section E - Inspection and Acceptance

Items 0001–0003 and Option Items 1001–1003, 2001–2003, 3001-3003, and 4001-4003 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Item 0004 and Option Item 1004, 2004, 3004, and 4004 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Item 0005 and Option Item 1005, 2005, 3005, and 4005 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Items 0006–0008 and Option Items 1006–1008, 2006–2008, 3006-3008, and 4006-4008 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Item 0009 and Option Item 1009, 2009, 3009, and 4009 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Item 0010 and Option Item 1010, 2010, 3010, and 4010 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Items 0011–0014 and Option Items 1011–1014, 2011–2014, 3011-3014, and 4011-4014 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Items 0015–0018 and Option Items 1015–1018, 2015–2018, 3015-3018, and 4015-4018 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Item 0019 and Option Item 1019, 2019, 3019, and 4019 – Packing and Marking are not applicable to these items.

Items 0020–0023 and Option Items 1010–1023, 2020–2023, 3020-3023, and 4020-4023 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Items 0024–0027 and Option Items 1024–1027, 2024–2027, 3024-3027, and 4024-4027 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Item 0028 and Option Item 1028, 2028, 3028, and 4028 – The Government will utilize the Surveillance Activity Checklist (SAC), Section J, Attachment 3 to ensure Contractor compliance with contract requirements, inclusive of terms and conditions, in accordance with the SOW in Section J, Attachment 1. The Checklist defines that this evaluation and acceptance will become part of the annual Contractor Performance Assessment Reporting System (CPARS). The Contractor may obtain more information regarding the CPARS process at http://www.cpars.csd.disa.mil.

Item 0029 and Option Item 1029, 2029, 3029, and 4029 – The technical data to be furnished hereunder shall be supplied in accordance with Exhibit A, Contract Data Requirements List (CDRL) DD Form 1423 as applicable.

All Provisions and Clauses of Section E of the basic contract apply to this Task Order unless otherwise specified in the Task Order.

Section F - Deliveries or Performance The periods of performance for the following Items are as follows:

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0002
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0003
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0004
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0005
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0006
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0007
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0008
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0009
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0010
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0011
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0012
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0013
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0014
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0015
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0016
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0017
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0018
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0019
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0020
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0021
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0022
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0023
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0024
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0025
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0026
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0027
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0028
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
0029
POP 29-AUG-2018 TO

28-AUG-2019

N/A
N/A
1001
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1002
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1003
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1004
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1005
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1006
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1007
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1008
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1009
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1010
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1011
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1012
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1013
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1014
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1015
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1016
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1017
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1018
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1019
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1020
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1021
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1022
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1023
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1024
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1025
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1026
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1027
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1028
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
1029
POP 29-AUG-2019 TO

28-AUG-2020

N/A
N/A
2001
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2002
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2003
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2004
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2005
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2006
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2007
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2008
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2009
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2010
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2011
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2012
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2013
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2014
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2015
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2016
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2017
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2018
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2019
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2020
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2021
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2022
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2023
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2024
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2025
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2026
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2027
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2028
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
2029
POP 29-AUG-2020 TO

28-AUG-2021

N/A
N/A
3001
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3002
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3003
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3004
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3005
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3006
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3007
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3008
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3009
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3010
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3011
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3012
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3013
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3014
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3015
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3016
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3017
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3018
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3019
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3020
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3021
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3022
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3023
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3024
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3025
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3026
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3027
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3028
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
3029
POP 29-AUG-2021 TO

28-AUG-2022

N/A
N/A
4001
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4002
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4003
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4004
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4005
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4006
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4007
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4008
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4009
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4010
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4011
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4012
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4013
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4014
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4015
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4016
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4017
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4018
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4019
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4020
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4021
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4022
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4023
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4024
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4025
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4026
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4027
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4028
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A
4029
POP 29-AUG-2022 TO

28-AUG-2023

N/A
N/A

All Provisions and Clauses of Section F of the basic contract apply to this Task Order unless otherwise specified in the Task Order, in addition to the following:

5252.211-9507PERIOD OF PERFORMANCE (NAVAIR) (MAR 1999)
(a) The contract shall commence on Date of Award and shall continue for a period of twelve (12) months. However, the period of performance may be extended in accordance with the option provisions contained herein.
(b) If FAR Clause 52.216-18, “Ordering”, is incorporated into this contract, then the period in which the Government can issue orders under the contract will be extended at the exercise of an option, and extended to the end of that option period.

Section G - Contract Administration Data All Provisions and Clauses of Section G of the basic contract apply to this Task Order unless otherwise specified in the Task Order.

Section H - Special Contract Requirements All Provisions and Clauses of Section H of the basic contract apply to this Task Order unless otherwise specified in the Task Order, in addition to the following:

H-1 OPTION TO INCREASE CAPACITY WITHIN PERIOD OF PERFORMANCE (OCT 2017)

(a) The task order includes an option associated with each period of performance for an increase in capacity not to exceed fifteen percent (15%) of the total dollars of the Labor and ODC CLINs within the respective term. This option may be exercised at the Government’s discretion, if the Government determines a need for an increase in the level of effort, to be provided by the contractor, due to increase in-scope program requirements.

(b) The use of this option does not provide an extension to the length of time of the current term, nor shall the entire task order exceed 5 years in duration.

(c) The Government may exercise an option for increased capacity within the period of performance without obligation to exercise succeeding year option(s).

(d) The exercise of an option for increased capacity within the period of performance may be accomplished anytime during the task order performance, but not later than thirty (30) calendar days prior to the expiration of the task order.

(e) The Government will be required to give the contractor a preliminary written notice of its intent to exercise the option for increased capacity within the period of performance. The contractor shall be required to use the same hourly rates or Department of Labor hourly rates established for the current term.

(f) An increased capacity option CLIN cannot exceed 15% of the CLIN it supports during the current term.

5252.232-9516ALLOTMENT OF FUNDS - INCREMENTALLY FUNDED COST-REIMBURSEMENT CONTRACT OTHER THAN COST-SHARING CONTRACT (JUL 1985)
For the purposes of paragraph (b) of the "Limitation of Funds" clause of this contract-
(a) the amount available for payment and allotted to this incrementally funded contract is:
Funded Cost$ See Section J, Attachment 4
Funded Fee$ See Section J, Attachment 4
(b) the items covered by such amount are Item(s) See Section J, Attachment 4; and
(c) the period of performance for which it is estimated the allotted amount will cover is See Section J, Attachment 4.

Section I - Contract Clauses All Provisions and Clauses of Section I of the basic contract apply to this Task Order unless otherwise specified in the Task Order.

Section J – List of Documents, Exhibits, and Other Attachments

Document Type
Description
Exhibit A
CDRLs
Attachment 1
SOW
Attachment 2
DD254
Attachment 3
SAC
Attachment 4
T.O. Ceiling Spreadsheet*
Attachment 5
COR Nomination Letter*

*To be provided at time of award.

Section K - Representations, Certifications and Other Statements of Offerors All Provisions and Clauses of Section K of the basic contract apply to this Task Order unless otherwise specified in the Task Order.

Section L - Instructions, Conditions and Notices to Bidders

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Cost Plus Fixed Fee contract resulting from this solicitation.

5252.215-9503 ANTICIPATED AWARD DATE (NAVAIR) (FEB 1995)

The anticipated award date for this requirement is 01 October 2018; however, it will be evaluated as part of the MAC. This information is provided for use as a basis for schedules and burden (labor, overheads, G&A, etc.) mid-point calculations.

The transition period is from 01 Jan 2019 to 31 January 2019. The estimated period of performance commences on 01 Feburary 2019. Please note that there is no CLIN associated with the transition period, as the Government will not be reimbursing the contractor for costs associated with transition efforts. Transition costs cannot be charged directly to the government as the incumbent contractor is still performing the tasking under the previous task order during this timeframe.

1. INSTRUCTIONS FOR RESPONSES

A. Fair Opportunity. This is a competitive fair opportunity selection conducted in accordance with Federal Acquisition Regulation (FAR) Part 16.505(b)(1) and 5252.216-9507 FAIR OPPORTUNITY PROCEDURES. Orders placed under FAR 16.505 Indefinite-Delivery Indefinite-Quantity (IDIQ) contracts are not subject to FAR 15.3 procedures. Accordingly, issuance of an order under this Fair Opportunity Order Request (FOPR), should an award be made, shall follow the ordering procedures outlined in FAR 16.505, as supplemented herein.

B. Terms and Conditions. The proposal submitted in response to this FOPR must be in compliance with the terms and conditions of the PEO (U&W) MAC IDIQ, the PMA 262/266 Statement of Work (SOW), and the requirements as stated in the FOPR. All provisions and clauses included in the basic contract will apply to the task order. Non-conformance with these instructions may result in an unfavorable proposal evaluation, or being deemed ineligible for award.

C. Exceptions. Offerors must clearly identify any exception to MAC IDIQ, PMA 262/266 SOW, and FOPR terms and conditions and must provide complete supporting rationale. Exception information, if any, shall be provided within Volume 2. The Government reserves the right to determine any such exceptions are unacceptable. Any exception determined unacceptable by the Government may result in the Offeror’s proposal being determined ineligible for award without further exchanges with the Offeror. If no exceptions are taken, include a statement stating so within the Volume 2.

D. Errors and omissions. If an Offeror believes that the requirements in these instructions contain an error or omission the Offeror shall immediately notify the PCO, Christin Simpson at christin.simpson@navy.mil , in writing with supporting rationale as well as the remedies the Offeror is asking the PCO to consider as related to the error or omission.

E. Clarity. It is the Offeror’s responsibility to draft a logical, understandable proposal in accordance with the information requested herein. The Offeror’s proposal shall contain all pertinent information in sufficient detail so that the Government is able to meaningfully evaluate the Offeror’s proposal. An Offeror’s proposal must demonstrate that the Offeror understands the requirements.

F. Quality. Offerors should note that any general statement, or statements, that the Offeror will satisfy a requirement or provide a particular feature without providing a valid and practical solution or sufficient supporting rationale thereby explaining how the requirement or feature will be met or implemented are generally viewed as inadequate and may impact the Government’s ability to assess such unsupported claims or statements and as a result may adversely impact the assessment of the Offeror’s proposal, and could result in the Offeror being removed from consideration for award. Unsupported claims or statements that the Offeror understands the requirements and risks, unsupported claims or statements that the Offeror can or will comply with requirements, and unsupported statements that merely paraphrase the requirements are generally inadequate and may impact the Government’s ability to assess such statements and as a result may adversely impact the assessment of Offeror’s proposal. Unsupported claims or statements such as “best commercial practices will be used,” “standard procedures will be used,” or “well-known techniques will be employed” are generally inadequate and may impact the Government’s ability to assess such statements and may adversely impact the assessment of the Offeror’s proposal if those statements are used without adequate definition, explanation, or supporting rationale

G. Proposal Format, Packaging, and Delivery. Offeror’s must submit their written response in two separate volumes – technical and cost/price. Volumes should be submitted as follows:

· Volume 1 – Technical: 1 Original and 3 Copies with 1 CD-ROM

· Volume 2 - Cost/Price: 1 Original and 1 Copy with 1 CD-ROM

Use letter-sized (8-1/2 X 11”) pages, single-spaced, with one inch (1”) margins. One page equals one side of a sheet of paper. Any pages in excess of the page limitations imposed on the technical submission herein will not be considered. Each CD-ROM is to be labeled for content and the Offeror’s name. If a discrepancy exists between the original paper copy of the submission and the disk copy, the paper copy will take precedence. Cost format spreadsheet shall be in Microsoft Excel format with a file name extension of .xlsx.

Number the pages consecutively and use a 12-point font size (no reduction permitted), excluding Attachment L-12, in Calibri, Arial or Times New Roman font. 10-point font size (no reduction permitted) and single spacing is acceptable for any tables, graphics, and illustrations (which are permitted); however, do not submit an abundance of information in chart format. The page limitations shown below do not include any “front matter” information such as a cover letter, table of contents, and definitions, or acronyms. Any technical or cost/pricing information submitted within the “front matter” will not be considered. Photographs, pictures, or hyperlinks are not permitted. No ZIP files or fold out pages.

The Offeror should present proposal information in a manner that facilitates a one-to-one comparison between the information presented and this FOPR’s instructions. Proposal information must be structured such that its paragraph number/letter is identical to the FOPR paragraph number to which it is responding, although the Offeror may add lower tier subparagraphs. The Offeror must provide reasons it will not provide information for a particular paragraph.

Volume Number
Section
Title
Recommended Page Count
1.0
Technical Submission
1.1
Understanding of the Work
7 pages Maximum, exclusive of Key Personnel Resumes
1.2
Key Personnel Resumes
2 pages maximum per Resume and Signed Letters of Commitment
2.0
Offer Letter and Signed SF33
2.1
Cost/Price Submission
No page limit

Completed Section B

Cost Spreadsheets

Other Cost Information

Each volume shall contain the following information:

· Cover and title page

· Title of submission and submission number as applicable

· Offeror’s name, address, and POC

· RFP number

· Submission volume number

· Copy number

· Use tabs and dividers

In order to compete for this task order, a proposal submission must be submitted no later than the date and time specified in Block 9 of the SF 33 of the Solicitation N00421-18-R-0008. Offerors shall provide all submissions via the United States Postal Service or through a commercial carrier using the address provided below. Submissions shall not be provided by facsimile or electronically via email.

Naval Air Systems Command Code: AIR-2.4.2.2.4 (Teresa R. Mellies / John Cappello) 47123 Buse Road, Building 2272 Patuxent River, MD 20670

Hand carried submissions may be delivered to the address above, attention Teresa R. Mellies and John Cappello.

Naval Air Systems Command Code: AIR-2.4.2.2.4, Room 256 47123 Buse Road, Building 2272 Patuxent River, MD 20670

VOLUME 1: TECHNICAL

1.0 TECHNICAL PROPOSAL CONTENT

NOTE: This volume shall not contain any reference to cost or price aspects of the offer.

Contractors must address the following elements:

1.1 Understanding of the Work

1.2 Key Personnel Resumes

The Offeror shall provide all information and data required to conduct a thorough and complete technical evaluation.

The Offeror shall address the following in the submission:

1.1 TECHNICAL SUB-FACTOR: UNDERSTANDING OF THE WORK

The Offeror…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.