Streamlined_Section_M_-_4.2_Follow_on_V9.pdf
PDF 147 KB Posted
- Attached to
- NAVAIR Cost Department (Developmental & Integrated Project Management/Schedule Development Support) Federal contract opportunity
- Solicitation number
- N00421-17-R-0060
About this file
This document provides guidance for the evaluation of proposals submitted in response to a solicitation seeking cost estimating and integrated project management support services. Key details include:
-
The solicitation will result in an indefinite delivery indefinite quantity contract with a single award for 463,200 man-hours over five years to provide cost estimating, analysis, and integrated project management support to the Naval Air Systems Command and Naval Air Warfare Centers. Services include strategic research, industry collaboration, data management, earned value management, and integrated government scheduling.
-
Proposals will be evaluated on technical approach, past performance, and price, with technical being most important. Technical ratings will consider understanding of requirements, management approach, and workforce. Past performance will assess recency, relevancy and quality. Price will be evaluated for realism and reasonableness. Comments on the draft statement of work and sample task were due by March 16, 2018, with award anticipated in the third quarter of fiscal year 2018.
Draft Section M
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M - (1) EVALUATION FACTORS FOR AWARD (SERVICES) (5 Feb 2018)
PART A: GENERAL INFORMATION
1.0 GENERAL
The Government expects to select one Offeror whose proposal offers the “best value” to the Government using the trade-off method. "Best value" means the expected outcome of an acquisition that, in the
Government's estimation, provides the greatest overall benefit(s) in response to the requirement. The
Offeror is advised that the lowest priced proposal meeting the solicitation requirements may not be selected for an award if award to a higher priced Offeror is determined to be more beneficial to the Government.
However, the perceived benefits of the higher priced proposal must merit the additional price.
2.0 EVALUATION PROCESS
For the Technical factor/sub factors, a combined Technical/Risk rating will be assigned. This method reflects whether the proposal meets or does not meet the minimum requirements along with an assessment of the strengths, weaknesses, significant weaknesses, and deficiencies of the proposal to determine the combined Technical/Risk rating. The benefit to the Government associated with assessed strengths along with technical risk will be considered in determining whether the Offeror’s proposal rises to a level of being thorough or exceptional. Assessment of technical risk considers potential for disruption of schedule, increase in costs, degradation of performance, the need to increase Government oversight, or the likelihood of unsuccessful contract performance. Offerors are advised that during the evaluation process, a technical factor with an “Unacceptable” Technical/Risk Rating may result in the entire proposal being found unacceptable and eliminated from the competition.
Under Past Performance, the Government will evaluate recent performance to determine how well an
Offeror has performed work similar to the work required by the solicitation. When proposals are received from joint ventures, specifically formed by the Offeror to propose on a particular acquisition, the past performance evaluation will consider each individual JV team member’s relevant past performance. After evaluating the Offeror’s past performance information, a Performance Confidence Assessment Rating will be assigned. More relevant past performance will typically be a stronger predictor of future success and have more influence on the Performance Confidence Assessment Rating than past performance of lesser relevance. In the case of an Offeror without a record of relevant past performance, the Offeror will receive a Performance Confidence Assessment Rating of “Unknown Confidence (Neutral)” which is considered a
“Neutral” rating.
3.0 EVALUATION FACTORS FOR AWARD
Proposals will be evaluated using the factors and sub factors, listed below in descending order of importance:
1) TECHNICAL
a) Understanding of the Work
b) Management Approach
c) Workforce
2) PAST PERFORMANCE
3) PRICE/COST
Technical is more important than Past Performance, Past Performance is more important than Price/Cost, Technical and Past Performance factors, when combined, are significantly more important than Price/Cost.
Price/Cost is not the most important evaluation factor, but its degree of importance will increase commensurably with the degree of equality among different Offeror’s Technical and Past Performance proposals.
The proposal must demonstrate to the Government’s satisfaction that the offeror will provide a quality service that will ensure the successful accomplishment of the solicitation requirements and overall program objectives. If deemed appropriate by the Government, proposal information provided for one factor may be used to assess other factors. In addition, the offeror’s technical proposal will be reviewed to determine if it is consistent with the price/cost proposal and reflects a clear understanding of the scope of work necessary to meet the solicitation requirements.
PART B: SPECIFIC INFORMATION
1.0 TECHNICAL
The evaluation will include an assessment of the following:
a) Understanding of the Work
b) Management Approach
c) Workforce
The Government will evaluate the offeror’s proposal to determine the Offeror understands of approach to, and ability to meet the solicitation requirements. The Government will assess the offeror’s Technical proposal with respect to its compliance with the solicitation requirements and the risk associated with the offeror's approach. The evaluation will also include an assessment of the following:
Understanding of the Work: The Government will evaluate the Offeror’s understanding of the work, based on the sample task and the oral presentation. The Government will evaluate the Sample Task and
Statement of Work Approach responses for clarity, completeness and the extent to which the proposal will ensure successful accomplishment of the tasks described in the Statement of Work (SOW) and the
Offeror’s capability to meet requirements based upon the information provided in response to the instructions provided in Section L. All proposals will be evaluated for compliance with the terms, conditions, and requirements set forth in the solicitation. Failure to address each of the areas identified in
Section L will impact the resulting evaluation ratings and a deficiency or lack of responses to factors and/or sub factors may be used as a basis for eliminating a proposal from further consideration.
Management Approach: The Government will evaluate the Offeror’s proposed management approach based on the information provided as required by Section L of this solicitation. The Government will evaluate the proposed management approach to determine the Offeror understands the contract requirements, the soundness of the approach to meeting those requirements, the ability to plan, manage, staff, and execute the contract, and the extent to which the proposed processes and procedures ensure successful accomplishment of the tasks described in the SOW.
Prospective Offerors are forewarned that utilization of excessive principal subcontracting/team members will be considered as additional proposal risk. Excessive principal subcontracting/team members is considered as any Offeror whose team includes more than 20% subcontractor team members.
The Offeror’s strategy for utilizing Small Business, Small Disadvantaged Business, Women-Owned Small
Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disable Veteran-Owned
Small Business concerns compliance with any minimum required Small Business goals as identified in
Section L, as well as its consistency with the proposed Small Business Subcontracting Plan (if applicable) will be evaluated. The Government will evaluate the Offeror’s SB utilization plan based on the information provided as required by Section L of this solicitation. Offeror’s must demonstrate that at least 15% of the total proposed contract value represents subcontract awards to Small Business Concerns. The Government will evaluate the Offeror’s small business subcontracting plan as compliant or not compliant.
Workforce: The Government will evaluate the Offeror’s workforce based on the information provided as required by Section L of this solicitation. The Government will evaluate all proposed key personnel and the supporting information to determine how well the Offeror is suited to perform the tasks under the SOW.
In addition, personnel will be evaluated on labor qualifications that the Offeror proposes to utilize in the performance of this effort.
2.0 PAST PERFORMANCE
There are three aspects to the past performance evaluation: recency, relevancy, and quality. The first aspect of the past performance is to evaluate the recency of the Offeror’s past performance being evaluated. Past performance will be considered recent if the contract/order has been performed within five (5) years of the solicitation release date. Past Performance that is not recent will not be considered in the evaluation.
The second aspect of the past performance evaluation is to evaluate how relevant the Past Performance being evaluated is to the requirements of this solicitation. The Government will use the following aspects to determine relevancy for this evaluation:
The relevancy criteria should cover only the most important areas of the solicitation requirement in terms of service / support (scope), complexity and dollar value or Labor amounts (magnitude). The intent is for the complexity and magnitude (dollar or work year requirements) to be as similar as possible. Although scope, complexity, and magnitude are generally different aspects of relevancy, that does not preclude considering the same contract attribute covering more than one aspect.
The third aspect of the past performance evaluation is to evaluate the overall quality of the Offeror’s recent relevant, past performance. The Government will evaluate the Offeror, principal subcontractors, and JV team members performance and focus its evaluation on the following areas: 1) meeting technical requirements, i.e., the quality of technical performance; 2) meeting schedule requirements, e.g., on time or late delivery; 3) controlling contract cost; 4) managing the contracted effort; 5) utilization of small business; 6) regulatory compliance, and 7) the demonstrated systemic improvement actions taken to resolve past problems. A separate quality rating will not be assigned, rather the past performance confidence assessment rating is based on the Offeror’s overall record of past performance taking into account the recency, relevancy, and quality of performance.
3.0 PRICE/COST
Cost Reimbursement CLINs:
Except for otherwise unacceptable proposals when awarding on initial proposals, the Government will perform a cost realism analysis to determine the most probable cost (MPC) for each applicable Offeror’s proposal. Cost realism analysis is the process of independently reviewing and evaluating specific elements of each Offeror’s proposed cost to determine whether the proposed cost is realistic for the work to be performed and are consistent with the unique methods of performance and materials described in the
Offeror’s technical proposal. In conducting its cost realism evaluation, the Government may review the prospective Offeror’s proposed labor categories and compare the proposed rate to the average labor rate in industry or other similar rates within the same demographic zone where the work is to be performed.
Pertinent cost information, including but not limited to DCAA-recommended rates for such costs as direct labor, overhead, G&A, etc., as necessary and appropriate, will be used to arrive at the Government determination of the MPC for the performance of this contract. In addition, adjustments to the cost portion of the offer may be made to include Government costs required to accomplish the Offeror’s proposed approach (e.g., additional Government-Furnished Property/Government-Furnished Information required by the Offeror to implement its approach) with the exception of those costs to the Government that are equal to all Offerors. The MPC is an Offeror’s total cost, including fee, and any additional adjustments the
Government has determined necessary to make the proposed cost realistic for all periods. The Government will use the results of its cost realism analysis to determine the MPC of performance for each Offeror. The
MPC may differ from the proposed cost. The higher of the MPC or proposed cost will be used for purposes of evaluation to determine the best value. Contract awarded value, however, will be based upon the successful Offeror’s proposed costs.
Unrealistically low costs or inconsistencies between the technical and cost proposals may be assessed as proposal risk and could be considered weaknesses under the technical factor. Therefore, any inconsistency, whether real or apparent, between the technical proposal and cost proposal should be explained in the narrative section of the cost/price proposal.
Total Professional Employee Compensation Plan:
The Government will evaluate the Offeror’s Total Compensation Plan in accordance with FAR 52.222-46.
In accordance with FAR 15.404-1(b) (2), various price analysis techniques and procedures will be employed to ensure the prices being proposed for this requirement are fair and reasonable. To assist in the overall determination of price reasonableness, the Government will identify all instances where a proposed fully burdened labor cost exceeds $300K annually per employee. This also applies to a fully burdened subcontractor employee labor cost, inclusive of the prime contractor’s pass-through burden. An exceeded tripwire may ultimately be determined unreasonable absent justification.
Overall Summary Level for all CLINs
Normally, competition establishes price reasonableness. In limited situations, additional analysis will be required by the Government to determine reasonableness. If, after receipt of a proposal, the Contracting
Officer determines that adequate price competition does not exist and a determination is made that none of the exceptions in FAR 15.403-1(b) apply, the Offeror may be required to provide certified cost and pricing data in accordance with FAR 15.403-4.
Prospective Offerors are forewarned that if there are discrepancies between Section B, Attachments (P6) and (P7), and Volume 3 Narrative, Section B prevails.
PART C: EVALUATION RATING AND RISK ASSESSMENT DEFINITIONS
The definitions below will be used by the Government when assessing solicitation compliance and the expected results of the Offeror's proposed approach. The appropriate adjectival rating will be assigned to each factor and subfactor, as required. The Government will utilize a combined technical/risk rating for this effort.
1.0 TECHNICAL EVALUATION RATINGS
Combined Technical/Risk Ratings: The combined technical/risk assignments are provided in the tables below.
COMBINED TECHNICAL/RISK RATING
Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate
COMBINED TECHNICAL/RISK RATING
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
The table below provides the risk rating descriptions:
Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
2.0 PAST PERFORMANCE RELEVANCY RATINGS
Past Performance Relevancy Ratings: More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.
Rating Definition
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
3.0 PERFORMANCE CONFIDENCE ASSESSMENT RATINGS
The Government will employ the Past Performance Acceptable/Unacceptable Rating Method described in the table below. In the case of an Offeror without a record of recent relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown or neutral past performance. In the context of acceptable/unacceptable, a neutral rating shall be considered “acceptable.”
Performance Confidence Assessment Rating: Performance Confidence Assessment rating assignments reflect the Government’s confidence that the Offeror will successfully perform the solicitation’s requirements based on the Offeror’s recent and relevant past performance record.
PERFORMANCE CONFIDENCE ASSESSMENT RATINGS
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the
Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the
Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the
Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the
Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral) No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
4.0 OTHER DEFINITIONS
Strengths: An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
(FAR15.001)
Significant Weakness: A flaw that appreciably increases the risk of unsuccessful contract performance.
(FAR 15.001)
Deficiency: a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increase the risk of unsuccessful contract performance to an unacceptable level. (FAR 15.001)
Recency: as it pertains to past performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.
Relevancy: as it pertains to past performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.
Risk: as it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.
5252.215-9511 COST REALISM (OCT 2007) (NAVAIR)
(a) All efforts proposed on a cost reimbursement basis shall be evaluated using cost realism. Cost realism analysis is conducted to determine what the Government should realistically expect to pay for the proposed effort, the offeror's understanding of the work and the offeror's ability to perform the work. Any understatement or overstatement of costs, whether in labor hours, labor rates, overhead rates and other direct costs may be considered a reflection of a lack of understanding of the work required and may be considered in the technical analysis, which could affect the technical rating or risk assessment.
(b) An offeror's proposal is presumed to represent his best efforts to respond to the solicitation. Any inconsistency, whether real or apparent, between promised performance and cost/price should be explained in the proposal. For example, if the intended use of new and innovative production techniques is the basis for an abnormally low estimate, the nature of these techniques and their impact on cost should be explained. Additionally, if a corporate policy has been made to absorb certain costs, the offeror shall fully identify and explain those company investments. The resulting contract shall include a clause indicating that those costs will not be allowable.