This document provides a draft statement of work, labor categories, and evaluation factors for a planned indefinite delivery indefinite quantity contract solicitation for developmental and integrated project management support services. The Naval Air Warfare Center Aircraft Division requires support for strategic research and analysis, industry collaboration, training development, program implementation, supplier analysis, data management, integrated project management, earned value management, and integrated government scheduling. Key details include:

  • The effort is expected to result in a single-award IDIQ contract with a level of effort of 463,200 man-hours over five years.

  • The statement of work outlines requirements for strategic research, industry exchange, training, implementation, supplier analysis, data management, project management, earned value management, and scheduling support. Labor categories and qualifications are also defined.

  • Comments on the draft statement of work and sample task are due by March 16, 2018 but the document does not constitute a formal solicitation and the agency will not respond to questions. The planned solicitation release is in the third quarter of fiscal year 2018.

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to NAVAIR Cost Department (Developmental & Integrated Project Management/Schedule Development Support), newest first.
File Type Posted
P6_PRIME_Cost_Summary_Spreadsheet_Rev1.xls XLS spreadsheet
P1_Past_Performance_Information_Form_Rev1.pdf PDF
N00421-17-R-0060-0001.pdf PDF
P7_Subctr_Cost_Summary_Spreadsheet_Rev1.xls XLS spreadsheet
Attach_2_Data_Item_Transmittal_Form.pdf PDF
Exhibit_A_CDRL_A009_Attachment_Company_NDA.doc DOC document
P4_Composite_Labor_Rate_and_Fee_Worksheet.xlsx XLSX spreadsheet
Attach_4_Authorized_Subcontractors.pdf PDF
Attach_1_DD254_-_N00421-17-R-0060_BID_DD254_signed.pdf PDF
Attach_3__OCI_List.pdf PDF
P8-Annual_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Exhibit_A_CDRL_A010_Attachment_NDA_Individual.doc DOC document
Attach_6_-_COR_TBD.pdf PDF
P7_Subcontractor_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attach_7_-_CSP.pdf PDF
EXHIBIT_A_CDRLS_N00421-17-R-0060.pdf PDF
Attach_5_Authorized_Key_Personnel.pdf PDF
P1_Past_Performance_Information_Form.pdf PDF
P2_Contractor_Performance_Assessment_Questionnaire.pdf PDF
N00421-17-R-0060.pdf PDF
air_4_2_support_services_contract_SOW-DRAFTv11.pdf PDF
Streamlined_Section_M_-_4.2_Follow_on_V9.pdf PDF
Section_B_RFP.pdf PDF
Streamlined_Section_L_-_4.2_Follow_on_V11.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update information associated to the labor categories and to answ er questions.

1. CONTRACT ID CODE PAGE OF PAGES

U 1 43

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0042117R0060

X 9B. DATED (SEE ITEM 11)

01-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Aug-2018

CODE

NAVAL AIR WARFARE CENTER AD (PAX)

CODE 2.5.1.5

BLDG 441

21983 BUNDY ROAD

PATUXENT RIVER MD 20670

N00421 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0042117R0060

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

SECTION A

Section A - Solicitation/Contract Form

AMENDMENT 0002

The purpose of this amendment is to make revisions to the solicitation as outlined below and provide final responses to RFP questions.

Section C

- Paragraph 6.0 – o Experience and Educational Level Definitions for both the Journey man and Senior have been revised to add information about the degree requirements and to note that Senior level persons must have “at least” 10 years of experience instead of “over” 10 years.

o The experience/education substitution table has been revised, rewording the allowable substitutions.

Section L

- Paragraph 3.0 is hereby changed to read “Subcontractors and/or consultants shall provide the same information (including the Total Professional Compensation Plan), if available, as required for the prime contractor. For information not provided, the subcontractor and/or consultant shall provide a written explanation as to why the information was not provided, and may also submit any applicable supporting information. Subcontractor, consultant, and JV Team Members may submit all information separately or included in a sealed package along with prime contractor’s proposal.”

**All other terms and agreements remain unchanged**

** The closing date and time remain unchanged**

RFP Questions and Answers

49. There appears to be a discrepancy between the government’s answer to question #6 in the 22-Aug-

2018 Solicitation Amendment # N0042117R0060-0001 and the requirements that remain in Section 6.0 of the Statement of Work (SOW).

The answer to Question 6 states “There are no allowable substitution for personnel in a senior level category to be proposed without a degree” while the requirement in Section 6.0 of the SOW states

“Additionally, the following qualifications substitution chart provides standard experience/education substitution.” The chart referenced describes, “6 years’ additional work experience related to the labor category experience and functional description outlined below may be substituted for a Bachelor’s

Degree.” The chart referenced also states, “Bachelor’s Degree plus 4 years additional work experience related to the labor category experience and functional description outlined below bay be substituted for a

Master’s.”

The requirement in Section 6.0 of the SOW leads one to conclude that senior level personnel without a degree can have 6 years of experience substituted for a Bachelor’s degree and an addition 4 years of experience substituted for a master’s degree. On top of the senior level requirement of 10 years of experience, the total years of necessary experience for personnel without a degree would be 20 years.

Can the government please provide clarification to de-conflict the answer to question #6 and Section 6.0 of the SOW?

A. Question 6 asked: “Section C, Statement of Work, 6.0 Personnel Qualifications, p 18 includes a substitution chart with standard experience/education substitutions. Would the government please clarify how years of experience may be substituted for a person with no degrees who is bid for a Senior-level labor category? How many years of experience may be substituted if a person has no degree? In addition, would the government please confirm that a person with over 20 years of work experience related to the labor category experience and functional description outlined in the labor categories would be evaluated as meeting the requirements for a Senior-level labor category?”

The response to Question 6 was incorrect. The Offeror may substitute experience for education as outlined in Section C, paragraph 6.0. Therefore without any level or a relevant degree, a senior person would be required to have a minimum of at least 20 years of relevant work experience.

Section C, paragraph 6.0 is revised herein to outline this information. ALL other aspects of paragraph 6.0 must be met and in accordance with Section L, Part B, paragraph 1.3.2.4, the work experience and education must be readily or easily comparable, or proven to meet the qualifications.

50. Section 6.0 of the SOW defines education level as “a MA/MS degree in a relevant degree field, such as math, science, statistics, or engineering.” Given the tasking, SOW, can we assume degrees in Business or Management are relevant? If a degree is not specifically in math, science, statistics or engineering, how does the government evaluate and decide whether it is relevant (Section M)?

A. Section 6.0 of the SOW is revised herein with reference to the degree requirements. The

Government requires Non-Key personnel to have a degree in a relevant technical degree field, such as math, science, statistics, or engineering. The requirement for Key personnel is revised to allow for a relevant technical degree field, such as math, science, statistics, or engineering; or a degree in business or management.

In accordance with Section L, Part B, paragraph 1.3.2.4 “If the qualification (i.e., education, experience) does not readily or easily compare to the minimum qualification stated in the SOW, the Offeror has the burden of proof to show how proposed qualifications meet the minimum qualifications.” This would include demonstrating the relevancy of the degree.

51. Section L-3.3(c) requires offerors to provide the last three (3) years of actual indirect information.

Please confirm that if an offeror has had a change to it CAS Disclosure Statement such that it does not have three years of actual indirect information, a DCAA letter approving its bid indirect rates will suffice.

A. If the Offeror does not have three (3) years of actual indirect information, the offeror may provide supporting information for the rates along with the written explaination. Section L, paragraph 3.0 is revised herein to allow for the Offeror to submit this any supporting information.

End of Amendment 0002. (The above information will be removed at the time of award.)

AMENDMENT 0001

The purpose of this amendment is to make a revision to the solicitation as outlined below. All questions associated to the RFP are also addressed herein.

SF30

- Block 9 – The closing date and time are changed from August 31st at 10:00 a.m. to September 6th at 10:00 a.m. EST.

Section B

- B-1 Add the following language: “These rates are estimates and are used in the development of task order ceiling values. Invoicing will be based on actual costs incurred.”

- Remove the following tables:

Contract Minimum/Maximum Quantity and Contract Value

Delivery/Task Order Minimum/Maximum Quantity and Order Value

CLIN Delivery/Task Order Minimum/Maximum Quantity and CLIN Order Value

Section C

- Paragraph 15 has been deleted in its entirety and marked as “Reserved”.

- Paragraph 8.0 has been revised to add paragraphs 8.1 through 8.11..

Section D

- The following clauses, previously incorporated by reference, are hereby incorporated in full text:

NAVAIR Clause 5252.247-9507 Packaging and Marking of Reports Oct 2005

NAVAIR Clause 5252.247-9508 Prohibited Packaging Materials Jul 1998

Section G

- The following clause, previously incorporated by reference, is hereby incorporated in full text:

NAVAIR Clause 5252.242-9511 Contract Administration Data Nov 2017

Section H

- NAVAIR 5252.204-9505 – Change [fill-in name] and to “TBD”

- Delete NAVAIR 5252.242-9502 Technical Direction (NAVAIR)(MAY 2011)

Section J

- Replace the following attachments:

P1 Past Performance Information Form

P6 Prime Cost Summary Spreadsheet

P7 Subcontractor Cost Summary Spreadsheet

Section L

Part A

- Paragraph 3.0 is revised to include an Annex under Volume 2, Past Performance. This Annex shall be utilized to submit a full text copy of the P1 Past Performance Information Form.

Part B

- Paragraph 1.2.1 is revised herein to add 1.2.1.3 as “Reserved”.

- Paragraph 1.3 is revised herein to add the following: “Note: The Offeror is forewarned that it may receive a weakness if it proposes the predominance of a labor category using prospective or contingent hire employees and the evaluation team deems this a risk to successful performance.”

- Paragraph 1.3.1.1 is changed from: “…The total proposed labor mix and level of effort shall conform to that outlined in Section L, Paragraph 3.5.” to: “…The total proposed labor mix and level of effort shall conform to that outlined in Section L, Paragraph 3.6.2(a).”

- Paragraph 2.0 is revised herein to add the following language: “Due to the form’s printing limitations, the

Offerors shall utilize the Past Performance Annex to include an exact copy of the full text from the

“Contract Effort Description” block or other blocks as appropriate for reviewing the data.

- Paragraph 3.0 is revised herein to add the following: “Subcontractors and/or consultants shall provide the same information (including the Total Professional Compensation Plan), if available, as required for the prime contractor. For information not provided, the subcontractor and/or consultant shall provide a written explanation as to why the information was not provided. Subcontractor, consultant, and JV Team Members may submit all information separately or included in a sealed package along with prime contractor’s proposal.

- Paragraph 3.6.2 is revised herein to include subparagraphs (a) and (b) for each of the separate tables.

- Paragraph 3.6.3, has been updated to add the incumbent subcontractors/consultants.

**All other terms and agreements remain unchanged**

RFP Questions and Answers

1. Is it acceptable to refer the reviewer to a SOW response that is in a different section, specifically Management

Approach & Staffing Plan?

A: No. The Offeror’s written narrative should include all necessary information to form a complete response.

2. Page 76, 3.6.2 Labor Hours: The breakout of hours by SOW was for Informational Purposes Only. The staffing plan stated the total proposed labor mix and level of effort shall conform to that outlined in Section L, Paragraph 3.5. If the Labor Category/hours as outlined in the Place of Performance chart is adhere to, is proposing to a different SOW mix for those labor categories acceptable?

A: The reference to Section L, Part B, paragraph 1.3.1.1 is revised herein to read Section L, Paragraph 3.6.2

(a). Section L, Paragraph 3.6.2 is revised herein to include subparagraphs (a) and (b) for each of the separate tables. The labor categories and hours shall be proposed as outlined in the table in 3.6.2(a). The labor categories and hours by SOW area (3.6.2(b)) are for informational purposes only and Offerors should provide rationale as appropriate for their proposed staffing plan.

3. On page 2 of the P1 Past Performance Form (PDF), Demonstrated Systemic Improvement Information: Identify those demonstrated improvement actions taken to resolve any performance issues or problems. Describe the techniques, elements and tools used to correct issues and problems and if, applicable, how these techniques, elements and tools will be employed during performance of this requirement. Please clarify, that this includes those demonstrated improvement actions taken executing the SOW tasking/contract referenced.

A: Yes, the Demonstrated Systemic Improvement Information should be for those taken in executing the contract referenced for Past Performance.

4. Section B-1, p 3 states, “(1) For each proposed CPFF order, the contracting officer will provide the contractor with a letter including an enclosed DD1155 Task Order.” How many DD1155 Task Orders does the government anticipate releasing upon contract award?

A: It is unknown at this time how many orders will be released during the transition period. Currently there are over 40 work years being executed, and the Government is reviewing anticipated requirements to determine the appropriate structure of customers and fund types per task order.

5. Section B-1, p 3 contains the Estimated and Negotiated Composite Labor Rates table. Would the government please confirm that the rates contained in this table are for estimating purposes only and will not constitute rate caps for the resultant contract?

A: Section B-1 is revised herein to include language noting that the composite rates are estimates and are used in the development of task order ceilings. The contractor shall invoice based on actual costs incurred.

6. Section C, Statement of Work, 6.0 Personnel Qualifications, p 18 includes a substitution chart with standard experience/education substitutions. Would the government please clarify how years of experience may be substituted for a person with no degrees who is bid for a Senior-level labor category? How many years of experience may be substituted if a person has no degree? In addition, would the government please confirm that a person with over 20 years of work experience related to the labor category experience and functional description outlined in the labor categories would be evaluated as meeting the requirements for a Senior-level labor category?

A: There are no allowable substitution for personnel in a senior level category to be proposed without a degree.

7. Section L, Part A, 2.0 Proposal Format, p 64 specifies, “Paper: - Up to 8.5” x 11” for the main proposal - Up to

8.5” x 14” for attachments P6 and P7 only.” Would the government please revise this instruction to allow foldouts?

A: No. The instructions with reference to paper size remain unchanged.

8. Section L, Part A, 1.0 General, p 64 states, “Throughout these instructions, the Government defines a “principal subcontractor” as a subcontractor who provides at least 15% of the proposed total price/cost (excluding the

Offeror’ profit/fee) for the contract or provides one or more Key Personnel.” Would the government consider changing this requirement to exclude subcontractors that are providing Key Personnel but do not have at least

15% of the proposed total price/cost? Rationale: this will promote competition. Subcontractors, particularly small businesses, may have high quality staff with required expertise but not have relevant past performance from a size perspective. Further, ultimate responsibility for performance and quality on the contract lies with the prime contractor, whose past performance will be evaluated.

A: No. The Government will not change the definition of principal subcontractor.

9. Section L, Part A, 2.0 Proposal Format, pp 64-65 states, “The Offeror will provide two complete copy of the proposal to the Procuring Contracting Officer (PCO) as electronic files fully compatible with Microsoft Office

2010 and for information not supported by MS Office products, with the latest Adobe Acrobat reader on a CD-

ROM or DVD-ROM.” To avoid inadvertent formatting changes in Word documents when opened or printed on different computers, it is a best practice to submit proposal documents in pdf format. Would the government consider revising this instruction to allow offerers to submit any document not in Excel format in pdf? If not, would the government please clarify what it means by “information not supported by MS Office products?”

A: The RFP remains unchanged. Information not supported by MS Office products would generally be in PDF and supported by Adobe Acrobat Reader. This information could include items such as letters from DCAA or

DCMA, or certified payroll data, etc.

10. Section L, Part A, 3.0 Proposal Content and Volumes, p 65 states, “Page limitations for each volume, if any, are also specified in the table below; title and table of contents pages do not count towards the page limit.” Would the government please confirm that the letters of intent required in Section L, Part B, Workforce 1.3.2.1 for contingent key personnel and key personnel employed by subcontractors do not count against page count?

A: Per Section L, Part B, 1.3.2.1, “If the “Key” employee is a contingent hire, the Offeror shall submit a corresponding letter of intent in Volume 3.” Volume 3 does not have a page limit.

11. Section L, Part A, 3.0 Proposal Content and Volumes, p 65 specifies “no page limit” for Volume 2.0 Past

Performance. Will the government please clarify whether it desires completed P1-- Past Performance

Information Forms (PPIF) of unlimited length rather than concise descriptions within a specified page limit for each PPIF? Rationale: Setting a page limit for each PPIF reference is easier for reviewers and offerors, ensuring that only the most relevant information is presented.

A: Offerors shall use Attachment P1 in the format provided, including field size restrictions. The solicitation, Section L, Part A, paragraph 3.0 is revised herein to include an Annex under Volume 2, Past Performance. Part

B, paragraph 2.0 is revised herein to add the following language: “Due to the form’s printing limitations, the

Offerors shall utilize the Past Performance Annex to include an exact copy of the full text from the “Contract

Effort Description” block or other blocks as appropriate for reviewing the data.

12. Section L, Part B, 1.2.2 Transition Plan, p 68 states, “The services under this solicitation are vital to the

Government and must be continued without interruption. The Government anticipates a sixty (60) day transition period.” Would the government please clarify what level of staff an offeror needs to provide at the end of the transition period to transition the contract? Rationale: the full level of proposed FTEs may not be required to transition the work that is being performed on the last day of transition.

A: No specific information is available at this time; however, it is anticipated that the majority of the proposed labor hours would be awarded under Task Orders to start performance immediately upon completion of the transition period.

13. Section 1.2.1, p 68 lists six sub-sections; however, they are numbered 1, 2, 4, 5, 6, 7. Subsection 3 is missing.

Would the government please confirm that this is a mis-numbering and that there is not another subsection to which an offeror needs to respond?

A: Section L, Part B, paragraph 1.2.1 is revised herein to add 1.2.1.3 as “Reserved”.

14. Section L, Part B, 1.3 Workforce, p 69 states, “1.3.1.1 A staffing plan that addresses the roles and responsibilities of personnel proposed for this effort, including any proposed subcontractor, consultant, or teaming arrangements. The Offeror shall also state the availability of personnel, including subcontractors/consultants proposed for this effort, specifically describing the number of personnel that are readily available, contingent hires, and prospective hires. For current employees and contingent hires, the staffing plan shall address the current security clearance level held by each employee (specific names shall be included). For personnel who are not current employees or contingent hires, Offerors shall describe their plan for hiring qualified personnel. The total proposed labor mix and level of effort shall conform to that outlined in

Section L, Paragraph 3.5.” The government may desire and offerors may propose to have some incumbent staff rebadged to the new contract. How should an offeror profile and address rebadged staff in the Staffing Plan?

A: It is the Offerors discretion on how to address rebadging plans. In accordance with Section L, paragraph

1.3.1, “Offerors shall describe their plan for hiring qualified personnel.”

15. Section L, Part B, Workforce 1.3.2.1, p 69 states, “The Offeror shall submit a list of the Key Personnel along with resumes for each. The list shall include the SOW area(s) (paragraph 5.1, 5.5, or 5.8) each Project Analyst

(Senior) is proposed to support.” Would the government please confirm that this list does not count against page count?

A: The list does count against the page count for Volume 1.

16. Section L, Part B, 1.2.3 Small Business (SB) Utilization Strategy, p 69 states, “Offerors shall describe the complexity and variety of the work small firms are to perform, for each SB subcontractor specifically identified, the Offeror shall identify if the planned subcontract effort is considered to be of low, medium, or high complexity along with a brief rationale.” Would the government please clarify what criteria should be used to determine whether the work a subcontractor will perform is low, medium, or high complexity?

A: The Government is looking for the Offeror’s assessment and brief rationale of the complexity of the subcontractor’s efforts.

17. Section L, Part B, 2.0 Past Performance, p 70 states, “If a Contractor Performance Assessment Report (CPAR) exists for multiple years for the same contract/order, all periods of performance within the recency period specified above, for that contract/order, will be used for evaluation. In the event a CPAR does not exist for a past performance reference, the Offeror shall submit a Contractor Performance Assessment Questionnaire

(CPAQ), Attachment P2, to the Program Manager who is the Assessing Official.” Will the government please confirm that an offeror does not need to have CPARS for every year that a contract falls into the recency period, only that it must have CPARS for at least one of the years during which the contract falls into the recency period? Rationale: offerors do not have control over the number of available CPARS for their contracts. Further, offerors who have only completed one year of performance on their contracts will not have multiple years available to submit.

A: The Offeror is not required to have 5 years of performance under any given past performance reference.

The Offeror only needs to have performance within the 5-year period.

18. Section L, Part B, 2.0 Past Performance, p 70 states, “If a Contractor Performance Assessment Report (CPAR) exists for multiple years for the same contract/order, all periods of performance within the recency period specified above, for that contract/order, will be used for evaluation.” Will the government please confirm that it will access the CPARs rather than requiring submission of the CPARs as part of the proposal?

A: There is no requirement for the Offeror to submit the CPARs record. The Government will search for records as appropriate.

19. Section L, Part B, 3.3 (c), p 73 requires various information including DCAA point of contact, etc. for the prime contractor, subcontractors, and consultants. Consultants are generally subject matter experts bought using commercially-available hourly rates and generally would not have this type of information (i.e. DCAA point of contact). Would the government consider removing the requirement for consultants to provide the information contained in this section?

A: Section L, Part B, paragraph 3.0 is revised herein to require subcontractors and/or consultants, to provide the same information, if available, as required for the prime contractor. For information not provided, the subcontractor and/or consultant shall provide a written explanation as to why the information was not provided.

20. Section L, Part B, 3.5 Total Professional Compensation Plan, p 75 states, “The Offeror (prime and subcontractors/consultants) shall provide a Total Compensation Plan in accordance with FAR 52.222-46 for each proposed professional employee.” Would the government please confirm that only the offeror needs to submit their Total Professional Compensation Plan as is the normal practice? If subcontractors are required to submit, we recommend they be required to include their own Total Professional Compensation Plans in a sealed package submittal rather than being included in the prime’s proposal, due to the proprietary and sensitive nature of the information.

A: The Total Professional Compensation Plan is required by the prime Offeror and any subcontractors and/or consultants, if available. If subcontractors and/or consultants do not have a Total Professional Compensation

Plan they shall state this in their cost narrative. The Total Professional Compensation Plans submitted by the subcontractors and/or consultants may be submitted separately or included in a sealed package along with the prime contractor’s proposal.

21. Section L, Part B, 3.5, p 75 requires consultants to develop submit a professional compensation plan.

Consultants are generally subject matter experts bought using commercially-available hourly rates and generally would not have this type of information. Would the government consider removing the requirement for consultants to provide the information contained in this section?

A: See the answer to question 20.

22. Section L, Section 3.6.2, p 76 lists a table with levels of support by labor category for each SOW task area per contract year. The Project Analyst Senior hours for SOW 5.3 and 5.5 equate to 2.5 and 0.5 FTEs, respectively.

Further, the Operations Research Analyst Journey hours for SOW 5.1 and 5.5 equate to 0.5 and 0.5 FTEs, respectively. Would the Government please clarify if these 0.5 FTEs are intended to be performed by a single individual who supports both functions? Would the 0.5 FTEs in each labor category be co-located and is it feasible for them to be combined to a single FTE? Or is it the Government’s intent that the support for these

SOW paragraphs remain aligned solely to a single SOW paragraph and for the contractor to provide 0.5 FTEs?

A: The Offeror may propose an individual person to support more than one (1) SOW task area. In addition, the

Offeror is not restricted to bidding just full-time personnel. The SOW table is for informational purposes only to assist Offerors with an understanding of the magnitude of the effort by the SOW area. The table represents the Government’s current anticipated breakout; however, it does not necessarily depict actual requirements and locations that will be needed at the time of the Task Order awards. An IDIQ is utilized when the Government cannot predetermine the precise quantities of services that the Government will require during the contract period.

23. Section L, Part B, 3.6.4, p 77. Would the government please specify the exact percentages of support in each

SOW paragraph area (i.e. 5.7 and 5.8) the government desires for the Project Analyst (Journey) positions in

Lakehurst and Orlando? The current language is vague and states support “will primarily be related to SOW paragraphs 5.7 and 5.8.” Rationale: This information is critical to help contractors recruit the best individuals with the correct skill sets.

A: The Government anticipates the work to be split evenly between the SOW paragraphs. However, it does not necessarily depict actual requirements and locations that will be needed at the time of the Task Order awards. An IDIQ is utilized when the Government cannot predetermine the precise quantities of services that the Government will require during the contract period.

24. Section M, 2.0 Past Performance, p 83 states, “The Government will focus on information that demonstrates quality of performance relative to scope (SOW task areas), magnitude (size or dollar value), and complexity

(i.e. simultaneous operations or supporting multiple customers) of the procurement under consideration and relevance of the performance to the requirements of the SOW in Section C of the solicitation.” Would the government please confirm that an offeror only needs to establish past performance relevance against SOW sections 5.1, 5.5, and 5.8 in order to be evaluated as Relevant?

A: The entire SOW is relevant with reference to the scope of work.

25. Section M, Part B, 1.0 Technical, p 83 states, “The Government will evaluate the Offeror’s workforce based on the information provided as required by Section L of this solicitation.” To what extent does the employment status enter into this evaluation? For example, can prospective hires for non-key positions be evaluated as highly as contingent hires, and can contingent hires be evaluated as highly as current employees?

A: Section L, Part B, paragraph 1.3 is revised herein to add the following: “Note: The Offeror is forewarned that it may receive a weakness if it proposes the predominance of a labor category using prospective or contingent hire employees and the evaluation team deems this a risk to successful performance.”

26. Section L, Part B, 3.0 Price/Cost Proposal, section 3.6.3 states that the incumbent contractor is OMNITEC

Solutions. Would the government please identify the incumbent subcontractors?

A: Section L, Part B, paragraph 3.6.3 is revised herein to include the incumbent subcontractors/consultants.

27. Given the substantive nature of the questions and potential changes to the RFP, would the government please grant a two-week extension to 14 September 2018?

A: No, the Government will not grant a two-week extension. However, the closing date and time for this RFP is extended herein to 06 September 2018 at 10:00 a.m. EST.

28. Section L, Part B, 1.3 Workforce, p 69 states, “Contingent Hire” – An individual who has committed, under a signed letter of intent, to being employed by the Offeror with a stated salary, if the Offeror is awarded the contract.” Section L, Part B, 1.3.2 Key Personnel, p 69 states, “If the “Key” employee is a contingent hire, the

Offeror shall submit a corresponding letter of intent in Volume 3. The letter of intent is a separate written agreement signed by the potential employee(s) to work for the Offeror effective at contract award. Key personnel employed by subcontractors and other team members shall provide letters of intent either separately or included in the prime contractor’s submission of this document.” Would the government please confirm that the letter of intent submitted in Volume 3 of the proposal does not need to state the “Key” contingent hire’s salary?

A: Yes. Contingent hire letters shall contain the salary information. In accordance with Section L, Paragraph

1.3 “Contingent Hire” – An individual who has committed, under a signed letter of intent, to being employed by the Offeror with a stated salary, if the Offeror is awarded the contract. In accordance with Section L, Paragraph

3.3 (c) For key personnel contingent hires, the Offeror shall provide contingent offer letters outlining salary information for contingent hire employees.

29. Section 5.5.3 refers to developing and delivering analytics for bills of material and other supply chain related information.

a. To what extent will the contractor have access to specific GFI?

b. What data/systems access is included in that specific GFI?

c. With respect to analytics, is there a specific platform to be utilized?

d. What is the requirement for visualization?

e. Is there a requirement for prescriptive or predictive analytics?

A: a. The contractor will have access to the Supplier Management database that will contain the source BOM data.

b. Same as above answer. That is the main source, however, there are other sources that may be queried.

c. Analytics are typically performed with Microsoft Excel.

d. Transforming data into actionable information in a visual manner.

e. Yes, the requirement is for both prescriptive and predictive analytics. There are standard analytics that are performed; however, we are always looking for new and innovative and better ways to analyze the data in support of our customers.

30. Section 8.0 Security of the SOW states: "The contractor and the personnel shall have the capability to perform work up to the Secret level". Can personnel start on the contract with an Interim Secret clearance?

A: Yes, an interim security clearance is acceptable.

31. 1.2.1.3 is missing. Please confirm that there is no information missing from this list beyond the numbering discrepancy.

A: Section L, paragraph 1.2.1 is revised herein to add 1.2.1.3 as “Reserved”.

32. In reference to the Management Approach: page 68 1.2.1.1, Adequacy of corporate management and resources to support the technical requirements of the solicitation and ability to function as a viable and productive partner with the Government. To ensure an appropriate response, how is the Government defining “corporate management and resources” above.

A: The Government is seeking the Offerors’ assessment of their internal management structure and available resources.

33. The RFP states "The Contractor shall conduct analysis of program/project needs, acquisition strategy and program artifacts to identify and capture specific factors required to satisfy the 11 elements of CCA compliance listed in DoDI 5000.02, Enclosure 1, Table 10." It is unclear to which requirement(s) in section 5.0

(REQUIREMENTS) this pertains. Further DoDI 5000.02, Enclosure 1, Table 10 caption states "Table 10 summarizes the requirements levied on all programs that acquire IT, including NSS, at any ACAT level.

Amplifying guidance for CCA compliance is detailed in section 3 of Enclosure 11."

a. To what program/project does this CCA analysis refer?

b. To which requirement(s) in section 5.0 (REQUIREMENTS) does this analysis refer?

c. Per DoDI 5000.05, Enclosure 1, Table 10, what IT is being acquired in this solicitation?

A: Section C, paragraph 15.0 has been deleted in its entirety

34. The RFP states "Using Microsoft Word, the Contractor shall prepare a CCA compliance matrix following the organization and appearance of Table 10 with additional separate columns for the display of artifact: titles, date(s) of approval, page number(s) and paragraph or section number(s)." a. Under what deliverable/CDRL this to be delivered?

A. Section C, paragraph 15.0 has been deleted in its entirety.

35. The RFP states "All Information Technology systems or software/application development, modification or support shall be performed in accordance with Defense Business Transformation guidance (formerly Business

Management Modernization Program (BMMP)), Department of the Navy (DON)/NAVAIR Functional Area

Manager (FAM) Policies and Guidance, Network and Server Registration and Web Enablement mandates." It is unclear what IT systems or software/applications are required to be developed, modified or supported in this solicitation.

a. What systems or software/applications are required to be developed, modified or supported?

b. To which requirement(s) in section 5.0 (REQUIREMENTS) does this development, modification and support refer?

36. The RFP states "All Information Technology systems, software and website development, modification or support shall be performed in accordance with all applicable Federal, DoD, DON and NAVAIR policy, guidance, standards and strategies and should be integrated within the NAVAIR Enterprise portal and collaboration environment whenever possible. Any Web sites/servers hosted/located in Contractor facilities, or outside NAVAIR enclave, will transition to NAVAIR architecture and infrastructure in accordance with Legacy

Shutdown guidance." It is unclear what IT systems, software or websites are required to be developed, modified or supported in this solicitation.

a. What systems, software and websites are required to be developed, modified or supported?

b. To which requirement(s) in section 5.0 (REQUIREMENTS) does this development, modification and support refer?

c. What requirement(s) require web sites or servers to be hosted in a Contractor facility or outside NAVAIR enclave?

A: Section C, paragraph 15.0 has been deleted in its entirety.

37. The RFP states "The Contractor shall conduct investigation and analysis of acquisition program artifacts......"

a. What acquisition program requires the investigation and analysis?

b. To which requirement(s) in section 5.0 (REQUIREMENTS) does this investigation and analysis refer?

38. No SOW areas from 5.1 to 5.8, nor the Labor Categories speak to the efforts associated with Cybersecurity section (15.5). Can this section be removed from the RFP?

39. The RFP states "As a minimum, hardware, firmware, software, documentation (data deliverables) and/or

Information Technology (IT) services delivered by this contract shall be in compliance......"

a. What hardware, firmware, software, documentation (data deliverables) and/or Information Technology (IT) services are required to be delivered by this contract?

b. Under what deliverables/CDRLs are these to be delivered?

40. The RFP states "The Contractor shall conduct investigation and perform analysis including; criticality analysis, threat assessment and vulnerability assessments. All findings and recommendations shall be reported to the government in technical reviews and submitted as written reports or documents as listed in Contract Data

Requirements Lists."

a. To which requirement(s) in section 5.0 (REQUIREMENTS) do these investigations and analyses refer?

b. Under what deliverables/CDRLs are these to be delivered?

41. The RFP states "Information technology services shall only be performed by personnel who are qualified and certified in accordance with reference (d)."

a. Which labor categories, in section 6.0 (DEPARTMENT LEVEL SUPPORT/INTEGRATED PROJECT

MANAGEMENT LABOR CATEGORIES / PERSONNEL QUALIFICATIONS), are germane to paragraph

15.5.4?

42. Under IT Sections 15.5.5 through 15.5.8, to which requirement(s) in section 5.0 (REQUIREMENTS) do these investigations and analyses refer? Under what deliverables/CDRLs are these to be delivered?

43. Under Section 15.5.10, to what contractor IT are required to be connected to DoD or NAVAIR networks?

44. Attachment P1 (Past Performance Information Form) includes a block for PSC. Not all solicitations provided a

PSC. Will the Attachment P1 be acceptable if this block is empty?

A: Yes.

45. Attachment P1 (Past Performance Information Form) contract type drop down menu does not include T&M.

How shall we enter information for T&M contract type?

A: The Offerors may leave the drop down menu blank for T&M and add the contract type of T&M as applicable to the Project Title space.

46. The directions state on Attachments P6 and P7 “do not type in colored areas” while also referring to Column A, a colored area, as a cell that requires input. Could the Government clarify that offerors are intended to write the applicable LCAT titles in column A as potentially necessary?

A: Attachments P6 and P7 have been revised to remove the “Do not type in colored areas”. Offerors are reminded to follow the instructions outlined in the first tab of these Attachments.

47. Information entered in the text box on page 2 of 2 on Attachment P1 is automatically repeated in the text box of

Task/Delivery Order. May the offeror convert this form into a Word document as long as the original text is maintained?

A: The form has been replaced herein. The updated form does not have a separate block for the Task/Delivery

Order number. The order number should be included in the contract number block. The updated form does not repeat text in any text box.

48. Although the RFP states in Section B (B-1, B-2) that labor will be on a Cost Plus Fixed Fee basis, it has been our experience on other AIR 4.0 contracts that the use of composite rates in execution sets false ceilings at the task order level, so that task orders perform more like Time and Materials contracts. Past experience has shown that this hampers the flexibility of both customer and contractor in execution. Specifically, composite rates are based on the mean of all rates bid for each labor category instead of actual rates, and they do not provide differing rates for customer site versus contractor site, which are quite different. Will offerors execute the task orders on a cost-reimbursable basis?

A: Yes, Task Orders will be executed on a Cost Plus Fixed Fee basis for Labor and Cost basis for Other Direct

Costs. In addition, Section B-1 is revised herein to include language noting that the composite rates are estimates and used in the development of task order ceilings. The contractor shall invoice based on actual costs incurred.

End of Amendment 0001. (The above information will be removed at the time of award.)

POINTS OF CONTACT

CONTRACT SPECIALIST: Jaime Weber

TELEPHONE NUMBER: 301-342-4536

EMAIL ADDRESS: jaime.weber@navy.mil

CONTRACTING OFFICER: Melinda Stann

TELEPHONE NUMBER: 301-757-0008

EMAIL ADDRESS: melinda.stann@navy.mil

CONTRACTING OFFICER REPRESENTATIVE:

TO BE DETERMINED AT CONTRACT AWARD

SUMMARY

mailto:jaime.weber@navy.mil mailto:melinda.stann@navy

(1) This acquisition is a Full and Open Competition that will result in the placement of a Single Award Indefinite

Delivery/Indefinite Quantity (IDIQ) contract. This IDIQ contract vehicle will permit specific term task orders to be issued, based on the general tasking outlined in the Statement of Work (SOW).

(2) NAVAIR clause 5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT)(NAVAIR)(DEC 2012) will be included in all LOE Task Orders.

(3) The NAICS for this procurement is 541330.

(4) The Product Service Code (PSC) for this procurement is R425.

(5) The resulting Single Award IDIQ contract will have an ordering period of five (5) years.

(6) This contract will have cost-plus-fixed-fee (CPFF) and cost reimbursement (non-fee bearing) line items.

(7) Task Orders issued from this contract award will reflect CLINs by funding type.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SECTION C

Item 0001-0005 – The contractor shall provide SERVICES in accordance with the Statement of work (SOW) as detailed in individual task orders. Each task order will include a SOW that details which tasks within the scope of the basic contract that are to be performed.

Item 0011-0015 – The contractor shall provide TRAVEL & MATERIAL as follows: TRAVEL shall be provided in accordance the SOW and NAVAIR Clause 5252.232-9509. MATERIAL shall be provided in accordance with the

SOW and H Clause 5252.242-9515 “Restriction on The Direct Charging of Material.” ODC CLINs are Cost

Reimbursable (no fee).

Item 0021 – The DATA reports to be furnished hereunder shall be in accordance with Exhibit A, DD Form 1423, Contract Data Requirements Lists (CDRLs), and the SOW as required by the individual Task Order.

STATEMENT OF WORK

1.0 INTRODUCTION

The Naval Air Warfare Center Aircraft Division (NAWCAD) Cost Department, Code AIR-4.2, performs full life cycle Cost Estimating/Analysis and Integrated Project Management in support of naval aviation aircraft, weapons, and support systems for the Naval Air Systems Command (NAVAIR), NAVAIR Program

Executive Officers (PEOs), and Naval Air Warfare Centers (NAWCs). AIR-4.2 also performs specialized work in support of improving acquisition program planning and execution. This support is provided across the full program life cycle to include development, procurement efforts inclusive of any product improvement initiatives within the current performance envelope, and sustainment activities.

2.0 SCOPE

The primary areas of work under this contract fall within AIR-4.2’s tasking to perform work in support of improving the acquisition program planning and execution of Naval Aviation and joint programs, and its tasking to perform work in support of Integrated Project Management. These specific areas include:

Strategic Research and Analysis

Industry Collaborative Exchange

Enculturation

Strategic and Operational Implementation

Supplier Analysis and Management Support

Data Collection and Management

Integrated Project Management (IPM)

Earned Value Management (EVM)

Integrated Government Scheduling

The above cross all Department of Defense (DoD) acquisition phases and types.

3.0 APPLICABLE DOCUMENTS

Department of Defense Instruction 5000.2

Electronic Industries Alliance 748 (as of date of award or as specified in the task order): Earned Value

Management Systems 32 Guidelines

4.0 CONTRACT PROJECT MANAGEMENT

The Project Manager shall be the primary point of contact within the company for the contract and shall establish a working relationship with the Procurement Contracting Officer (PCO), Contracting Officer (KO), Contracting Officer’s Representative (COR), AIR-4.2 Lead Business Financial Manager (BFM) and

Contracts Specialist. The Project Manager is cognizant of the contract and aspects of the contract implementation within the prime Contractors’ organization. This role is not intended to circumvent company policy regarding communication. However, the Project Manager shall be cognizant, conversant, and up-to-date in the details of the contract. The Project Manager shall be the Governments source for financial and technical progress data and status. The Project Manager shall call upon other departments within the company for data and status and will maintain and report this data to the Government as required and in an accurate and timely manner.

The Project Manager shall provide processes for monitoring, tracking and reporting technical progress required by the monthly status reports for technical and financial progress. In addition, processes for the annual transition of contract years shall be established along with processes for adding, executing and removing tasks from the contract. A new process, when identified shall be established, executed and improved as required. The Project Manager shall provide reporting documents as specified by CDRLs A002 and A004.

Within 30 days of contract award, the Project Manager shall present a robust project management tool which tracks obligations and expenditures by customer, funding type, fiscal year, SOW paragraph, subcontractor and person. (CDRLs A002 and A004)

5.0 REQUIREMENTS

Upon contract execution, all support must be provided in accordance with the Federal, DoD, Navy, NAVAIR, Business Unit, and AIR-4.2 policies, processes and procedures. Additionally, all personnel supporting the

SOW must be proficient with the standard Microsoft Office Suite (e.g., Outlook, Word, Excel, and

PowerPoint).

5.1 Strategic Research & Analysis – (CLINs 0002, 0003, 0004, and 0005) (CDRLs A001, and A003 through A011) - The contractor shall perform research and analysis relating to the cost, schedule and technical performance of pre-acquisition, acquisition, production, and sustainment of Naval Aviation programs. This shall entail identification of cost, schedule and technical performance variables including, but not limited to, data sets and variables within the context of the Naval Aviation industrial environment. Areas of analysis include: design; development; manufacturing; supply chains;

contractor and subcontractor capabilities, capacities and relationships; and cost and schedule performance trends. More specifically, the contractor shall provide the following support services:

5.1.1 Perform assessments and provide decisional / actionable analysis of DoD prime contractors, their interdependencies, and trends.

5.1.2 Identify and provide strategic leverage points useful for improving program portfolio cost and schedule performance across Naval Aviation programs and contracts.

5.1.3 Design, develop and demonstrate portfolio-based data collection and analysis techniques aggregating multiple cost, schedule and technical data sources.

5.1.4 Identify systemic cost, schedule and technical performance issues in the Naval…