N00421-18-R-0036 Industry Q & A/Government Responses Thursday, May 31, 2018
| Industry Question |
| Government Answer |
| 1 |
| Is the AUTOCAT system a specific requirement, or may a more capable and newer system be installed by the contractor? |
This is not a specific system. A more capable and new system can be installed by the contractor. The AUTOCAT system consists of two URC-200 radios with electrical power supplied through the aircraft's 28VDC electrical system.
| 2 |
| For the telemetry tomahawk relay, it appears that all equipment is provided as GFP. |
| a. | Is this correct? |
| b. | If yes, will any or all of the equipment be transferred to the contractor for permanent installation on the host aircraft? |
| c. | If not, what equipment will be permanently installed during the duration of the contract. |
| d. | Will any non-permanent equipment be stored by the contractor during periods of inactivity? |
| e. | What are the size, weight, power requirements, and physical mounting requirements of the equipment? |
a. Yes
b. Yes
c. Only the Telemetry (TM) equipment is permanently installed on aircraft for the duration of the contract.
d. PMRF Iridium GPS.
e. The TM equipment is installed in 3 racks with identical dimensions (22 inches in Width, 54.75 inches in Height, 33.5 inches in Depth. The racks will be mounted on the floor of the aircraft. The power capacity required for the TM system is about 4.8kVA (or 4363 Watts), operating on 115VAC, 60 Hz. Pedestal antenna in the nose of the aircraft. The specifications for GFP systems will be provided.
| 3 |
| For the Air Force Weapon Telemetry/Flight Termination requirement, will there be any GFP? |
| a. | Will the Tomahawk equipment satisfy the requirement, or is a different system needed and required to be procured and installed by the contractor? |
| b. | If so, are there additional specifications available to design the system for optimum performance? |
Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS.
| 4 |
| For the target carriage &/or launch, does max launch quantity of four (4) apply to both the BQM models or just the -74? |
| Target launch and carriage is no longer a requirement in this solicitation and has been removed from the PWS. |
| 5 |
| What is the minimum number / quantity of aircraft required to be required simultaneously under this contract, i.e. five (5) or can some of the aircraft be co-utilized between the sites? |
| Two (2) simultaneous Range Clearing aircraft with one having telemetry or two (2) Range Clearing and one (1) Telemetry. |
| 6 | |
| What are the projected number of BQM-34 missions per year or the number flown per year over the past five (5) years? | |
| a. | How many of the above missions carried 3 or more BQM-34’s per flight/mission? |
| Target launch and carriage is no longer a requirement in this solicitation and has been removed from the PWS. |
| 7 | |
| What are the projected number of BQM-74 missions per year or the number flown per year over the past five (5) years? | |
| a. | How many of the above missions carried 3 or more BQM-34’s per flight/mission? |
| Target launch and carriage is no longer a requirement in this solicitation and has been removed from the PWS. |
| 8 |
| What type(s) of aircraft have been utilized over past 5 years to carry / launch the BQM-34 & 74 targets? |
| Target launch and carriage is no longer a requirement in this solicitation and has been removed from the PWS. |
| 9 |
| What are the projected number of annual flight hours for each type of mission, i.e. Range Clearing (PWS 3.1.1), PMSR (PWS 3.1.3), Telemetry Tomahawk (PWS 3.2.1), Air Force Weapon Telemetry/Flight Termination (PWS 3.3.1), and Airborne Target Launch (PWS 3.4.1)? |
| The projected number of flight hours for each type of mission will be specified in the final solicitation. Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 10 |
| Please provide detailed exterior drawings, to include dimensions, of the BQM-34 & the BQM-74 targets and their launch adapters. |
| Target launch and carriage is no longer a requirement in this solicitation and has been removed from the PWS. |
| 11 |
| Please provide the electrical and structural/physical interface documents between the launch aircraft and the BQM-34 & the BQM-74 targets, together with their respective/relevant launch adapters. |
| Target launch and carriage is no longer a requirement in this solicitation and has been removed from the PWS. |
| 12 |
| Ref PWS paragraph 3.7 – Please provide a detailed description for the typical deployment schedule for each type / location of mission, i.e. average number of deployments per year, average number of deployment days per deployment, etc. Note: Since there will not separate CLINs incorporated in this solicitation for travel and/or aircrew non-flying status, nor aircraft daily rates, there will be no incentive for the Government to every release the aircraft once deployed nor to ferry the aircraft back to its home base. Based on the Government’s abuse of the above on at least one other CAS contract, conscientious bidders would have to assume that the aircraft would remain deployed and thus would require the contractor to budget/bid the costs to establish operations/pilots and maintenance facilities at each of the three OPAREAS sited for this contract which will cost the Government much more than if the Government included separate CLINs for the travel reimbursements, non-flying &/or aircraft daily rates as has traditionally been done for CAS contracts for the past 38 years. Furthermore, based on the above the aircraft (especially the PMRF aircraft) effectively become exclusive use/lease to the Government since it is likely that the Government will never pay the contractor to ferry their aircraft back to their home base. |
| The expected travel will be specified in the final solicitation. |
There will be a separate Ferry CLIN.
The CLIN structure is being restructured and will be specified in the final solicitation.
| 13 |
| Ref PWS paragraph 7.5 – Please provide the maximum value per aircraft / mission type of the GFP and CAP that the contractor will be required to insure. |
| 5252.228-9501 | LIABILITY INSURANCE (NAVAIR) (MAR 1999) |
| The following types of insurance are required in accordance with the clause entitled, FAR 52.228-5, "Insurance--Work on a Government Installation and shall be maintained in the minimum amounts shown: | |
| (a) Comprehensive General Liability: $500,000 per person and $500,000 per accident for bodily injury. | |
| (b) Automobile Insurance: $200,000 per person and $500,000 per accident for bodily injury and $500,000 per accident for property damage. | |
| (c) Standard Workman's Compensation and Employer's Liability Insurance (or, where maritime employment is involved, Longshoremen's and Harbor Worker's Compensation Insurance) in the minimum amount of $100,000. | |
| (d) Aircraft public and passenger liability: $500,000 per person and $1,000,000 per occurrence for bodily injury, other than passenger liability; $1,000,000 per occurrence for property damage. Passenger bodily injury liability limits of $500,000 per passenger, multiplied by the number of seats or number of passengers, whichever is greater. |
-52.245-2 Government Property (Fixed Price Contracts) MAY 2004
(3) The Contractor shall be responsible for loss or destruction of, or damage to, the Government property provided under this contract (including expenses incidental to such loss, destruction, or damage)--The risk was expressly required to be insured under this contract.
The insurance requirements for 52.245-2 Government Property will be determined based on the value of the GFP provided to the contractor.
| 14 |
| Ref PWS paragraph 8.4.6 – This paragraph specifies that the contractor is required to have the capability to send or receive secure fax’s and/or conduct secure communications and/or other requirements for COMSEC. Therefore, the solicitation/contract/PWS wording should conform to the requirements set forth in OPNAVINST 2221.5D - RELEASE OF COMSEC MATERIAL TO CONTRACTORS? |
| The DoD 5220.22-M NISPOM is the higher level document that reflects this requirement. |
| 15 |
| Draft SOW page 3 Table 3-3 describes the radar specifications. |
a. Question – Can the required airborne radar be provided as GFP to the contractor under page 3 paragraph 3.1.2.3?
No, it is not the intent for the government to provide the radar as GFP.
| 16 |
| Draft SOW page 4 Table 3-4 says one range surveillance aircraft will be based within 50 NM of NAS Pt Mugu. |
a. Question – Will the Government provide full-time aircraft basing support (i.e. admin facilities, hangar/ramp space, etc.) similar to other Commercial Air Services contracts at NAS Pt Mugu?
The Government is attempting to obtain full time ramp space for one aircraft at NAS Pt. Mugu, but have not confirmed availability at the time of this posting.
| 17 |
| Draft SOW page 4 Table 3-5 says the Autonomous Radar Track Downlink attribute is an Objective. |
a. Question – What are the Autonomous Radar Track Downlink system requirements?
Requirement is currently removed from the PWS.
| 18 |
| Draft SOW page 8 Section 3.3 discusses the Air Force Weapon Telemetry/Flight Termination system. |
a. Question – Is this Air Force Weapon Telemetry/Flight Termination system a separate telemetry system and in addition to the Telemetry Tomahawk system defined in Section 3.2?
Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS.
| 19 |
| Draft SOW page 10 paragraph 3.4 and page 17 paragraph 3.7.4 discuss Airborne Target Launch requirements. PMA-226 e-mail dated 21 February 2018 removed the Airborne Target Launch requirement from this SOW. |
a. Question – Are there any additional airborne target launch related paragraphs removed from the draft SOW?
Target launch and carriage is no longer a requirement in this solicitation and has been removed from the PWS.
| 20 |
| Page 9 paragraph 3.3.1.1, 5th requirement states, “The Contractor shall provide raw, decrypted, best-source JASSM (JASSM-ER) TM according to the Telemetry Standards, IRIG Standard 106-17 Chapter 10 dated July 2017 to the JASSM (JASSM-ER) CTF representative.” |
Question -- Where is the JASSM CTF representative located during these missions?
Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS.
| 21 |
| PWS page 7; Table 3-10; Altitude: Question: What is the reason for 38K Feet? |
| The requirement for 38K is to relay from target to ground station due to the large distance between the target and ground station approximately 500nmi. |
| 22 |
| Why is there no IR requirements for the range clearing? |
| Visual surveillance only needed at this time. |
| 23 |
| Is 95% availability Correct? |
| Per QASP enclosure (1) the performance Standards are as follows: |
Provide the prescribed aircraft and required crew 90% of the time for each ready for tasking mission 100% = Exceptional 95% = Very Good 90% = Satisfactory 87%-89% Marginal < 87% Unsatisfactory
| 24 |
| What is the average time the contractor is notified for a mission event? |
| The average time the contractor is notified by a mission event is between 15-30 days. |
| 25 |
| Is APS-127 a preference? What are the specifications for radar requirements? |
| The PWS has been updated for clarification. |
| 26 |
| Request specifications for the current TM system. |
| The Government will post the specifications for GFP. |
| 27 |
| Can there be concurrent missions at the same time? |
| Yes, however, the Government scheduler will work with the customers to alleviate scheduling conflicts. |
| 28 |
| Is there a place to house the AC at Pt. Mugu? |
| The Government is attempting to obtain full time ramp space for one aircraft at NAS Pt. Mugu, but have not confirmed availability at the time of this posting. |
| 29 |
| Is 180 days still the goal to have AC ready after contract award? |
| Yes, it is the goal to have the AC ready 180 days after contract award. |
| 30 |
| PWS Page 23, 4.4.2.2.2 (D): Is Tactical fighter jet required experience for a pilot? |
| No, the PWS was updated to reflect the requirement. |
| 31 |
| Page 3 Table 3.1.2.1: Table 3-3: Why 100 miles when 80 is posted in table above? |
| The PWS table was updated to reflect the requirement of 80 NM. |
| 32 |
| Page 3 Table 3.1.2.1: Table 3-3: Why wide sweep pf 263 degrees? |
| The PWS table was updated to reflect the requirement of 160 NM swath. |
| 33 |
| Request specification on AUTOCAT system; frequencies needed. |
| The AUTOCAT system consists of two URC-200 radios with electrical power supplied through the aircraft's 28VDC electrical system. Typical use of AUTOCAT is with UHF and VHF frequencies. Specifications will be provided. |
| 34 |
| Do the TM operators need to talk to each other during a mission? |
| Yes, there are 4 TM operators. The operators include an Antenna Operator, Mission Commander/Communications Operator, RF Receive/Record Operator and a KAOS/ACU Operator. |
| 35 |
| Is TM equipment permanently mounted? |
| Yes, the TM equipment is permanently mounted. |
| 36 |
| Is there training provided for the TM system? |
| No. The vendor is required to ensure the operators are trained to use the equipment. |
| 37 |
| Is TM data encrypted? |
| Yes, the TM data is encrypted. |
| 38 |
| Need definition of the data stream for Tomahawk |
| The TM data stream is polarized |
(linear or circular) data streams at lower and upper L-band (1435 to 1850 MHz) or S-band (2200 to 2400 MHz) with most modulation types, typically Pulse Code Modulation/Frequency Modulation (PCM/FM) and Shaped Offset Quadrature Phase-Shift Keying (SOQPSK-TG) up to 40 Mbps.
| 39 |
| What are the size of array antennas (L and S band) |
| L band is 23.2 in by 30.9 in. S band is 24.1 in by 30.9 in. |
| 40 |
| Need specifications on SATCOM. Is it voice or data or just comm? Who pays the usage fee? |
| Voice only, Government will pay usage fee per ODC CLIN. |
| 41 |
| Will there be COMSEC equipment and who will provide this? |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 42 |
| Will the AC on this contract be exclusive use? |
| No |
| 43 |
| Page 3; 3.1.2.2; Can dual band radios be used vice two each radios? |
| Yes, PWS updated to reflect requirement. |
| 44 |
| 3.1.2.3; Will there be carry on TM equipment? |
| No, PWS updated to reflect requirement. |
| 45 |
| Will Government provide a space at Pt. Mugu for required AC? |
| The Government is attempting to obtain full time ramp space for one aircraft at NAS Pt. Mugu, but have not confirmed availability at the time of this posting. |
| 46 |
| 3.2.1; Will MDA be tasking? |
| Yes, Briefings will be held at Pt. Mugu. |
| 47 |
| 3.3.1 Can current TM equipment support AF? |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 48 |
| Who will be in the seat to enact the FTS? |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 49 |
| Who will provide the encryption equipment for the JASSM and HARM data? |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 50 |
| Is the AF requiring Range surveillance also? |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 51 |
| Can Pt. Mugu provide the fuel service? |
| Yes |
| 52 |
| Is SIPR required for contractor? |
| Currently not required. |
| 53 |
| Who will handle the keying material for the AF requirements? |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 54 |
| Who will fund the AF upgrade requirements to the TM system? |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 55 |
| 3.1.2.2; Why two radios? |
| Redundancy |
| 56 |
| Will you make the FTS determination in AC or the ground? Is this a single channel? |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 57 |
| Request a scenario for the Tomahawk mission. |
| Pre Deployment Activities |
System Check TM and RERAD System Test Antenna Motion Test Communications Test Deployment Travel to test site Discuss Test Schedule 1100-1600 Range Surveillance 1200 On Station (~4 hrs) 1230 Target Launch Perform TM (~2.5 hrs) 1630 Mission Ends
| 58 |
| Table 3-11; Do we still want two simultaneous weapons? This will require two FTS channels. |
| Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS. |
| 59 |
| Page 7; Can ground stations accept C band down link? |
| Yes |
| 60 |
| Table 3-4; Vessel Classification; what is the desired method of classification IR or not? |
| Visual |
| 61 |
| For radar specifications, do we want a better radar or a faster plane? |
| Speed and radar (range effectiveness) that provides efficient range clearance are desired. |
| 62 |
| Could ATAC/Sierra Nevada use their current footprint to house ARSS aircraft at Pt Mugu? |
| The Government is attempting to obtain full time ramp space for one aircraft at NAS Pt. Mugu, but have not confirmed availability at the time of this posting. |
| 63 |
| How many AC does the Government envision for this effort? |
| The Government envisions vendors have sufficient aircraft to cover simultaneous missions. |
| 64 |
| Can this be a MAC contract? |
| Not planned at this time |
| 65 |
| VLDS, can contract provide this if they have it? |
| Yes, the contractor may propose. |
| 66 |
| What is the Government’s expectation on the overall number of aircraft required? |
Does the Government expect the contractor to have enough aircraft to fly missions concurrently from PMSR and PMRF at the same time this will require at least 3-4 aircraft?
For example, VX-30 has a 3 NP3D’s and 3 C-130’s can support both mission areas. Is this expected?
3-5
The Government will work with customers to schedule around conflicts.
Not expected.
| 67 |
| Is this expected to be a small business set-aside under NAICS 481219? |
No, full and open competition.
| 68 |
| Will this be competed Best Value or LPTA? |
Best Value.
| 69 |
| There is no mention of the EO/IR requirement—just radar. Does the Navy anticipate this requirement being a part of the final RFP? |
Carry on PMRF Telemetry units (provided by Pt. Mugu)
Does the Government anticipate this to be Roll On/Roll Off equipment or will it be permanently integrated with the aircraft?
Will additional technical specifications of the required modification be provided with the final RFP?
No requirement for EO/IR at this time.
There is no carry on TM equipment. PWS updated to reflect the discrepancy.
The TM equipment will be permanently installed.
The specifications for the GFP systems will be provided.
| 70 |
| Can the PMRF aircraft be CONUS/Pt Mugu or is it expected that it will be separately based in Hawaii? |
PMSR requirement calls for aircraft to be homeported at contractor facility within 50 nm of Point Mugu. So for all PMRF operations contractor aircraft will transit from homeport CONUS with 50 nm of Point Mugu?
No separate basing in Hawaii is required.
The Government is attempting to obtain full time ramp space for one aircraft at NAS Pt. Mugu, but have not confirmed availability at the time of this posting.
| 71 |
| 3.1.3.5 PMSR Certification |
Will the cost of these test flights be included in CLIN 0001?
Flight tests will be directed by task order and billed against the flight minute CLIN.
| 72 |
| 3.2.1 Telemetry Tomahawk/Requirements |
Will the Government provide additional technical specifications on the GFP required telemetry modifications as part of the final RFP?
Will the Ktech interface control documents and specs be released by the Government or should bidders contact Raytheon on their own?
Reradiate a signal emanating from the surface for submarine-launched long-range, all- weather, and subsonic cruise missile. The Contractor shall ensure an altitude of at least 38K feet.
Can the Government affirm that the expectation is for the aircraft to fly at an altitude of 38,000 feet? If so, how frequently?
The specifications for the GFP systems will be provided.
38,000 Feet is required and past history indicates twice per year.
| 72 |
| 3.5 Typical Mission Profiles |
Does the Government ever anticipate that concurrent missions will be held at both PMRF and PMSR?
Yes, this can occur, however, the Government scheduler will schedule around conflicts.
| 74 |
| 3.7 Contract Line Item Number (CLINs) Descriptions |
Can the Government provide the past history such as mission type, number of missions, and average or projected annual hours of range clearing missions for PMRF and PMSR?
What is the average number of ship contacts cleared off the PMRF and PMSR per mission? (This is important to get an understanding of variables impacting pricing such as tactical search area requirements and engine performance at low altitude).
The CLIN numbers will be provided under the appropriate paragraphs in the PWS to reflect what performance is required.
No history on number of ships cleared via pounce.
| 75 |
| 4.2.2.9 Accident Costs |
Can it be clarified that the Contractor will only cover those costs in which it is found responsible for the damage?
The contractor will cover those costs in which it is found responsible for.
| 76 |
| 8.0 Security |
Will the DD254 be included in the Draft RFP?
Other than what is described in Section 8.0 (Security) are there any other special security requirements for the basing of the PMSR aircraft?
The DD254 will be provided. No other security requirements required at this time.
| 77 |
| 3.1.2 PMRF Aircraft Specifications |
1) Confirm that the maximum altitude requirement is 25,000’ MSL?
2) Confirm that the 2000 nm range requirement is solely for the purpose of ferrying the aircraft from the mainland United States to Hawaii?
3) Is the airspeed requirement in True Airspeed?
4) Do both surveillance aircraft at PMRF require a 2000 nm range with standard fuel, or can a shorter-range aircraft be used in conjunction with one long range aircraft (after using temporary ferry tanks to reposition)?
1. Confirmed 25,000 MSL
2. A few missions have required 2000+ nm
3. Yes
4. PMRF has used both AC, one doing 2000+ and the other an 1800 nm profile. Both AC require 2000nm
| 78 |
| 3.1.2.1 Radar Specifications |
1) Confirm that a 360-degree radar sweep is preferred?
The PWS has been updated to reflect a range coverage of 80 NM wide sweep providing a 160 NM swath for coverage.
| 79 |
| 3.1.2.2 PMRF Aircraft Requirements |
1) Can the VHF/UHF and Marine FM radio capabilities be combined into dual or triple band radios?
2) Can over the horizon target datalink chat/Satcom replace one HF requirement?
3) Is Autocat relay UHF only?
4) Is Autocat relay required only as a standalone mission? Or combined with radar and/or TM/FTS?
5) Are any secure communications required on board including Autocat relay?
1. The PWS has been updated with requirement, yes.
2. Yes
3. UHF and VHF
4. Combined
5. No
| 80 |
| 3.1.3 PMSR Aircraft Specifications and Requirements |
1) Does the one aircraft require concurrent TM and radar capability or can the aircraft be reconfigured between missions?
2) Does AIS and/or pounce capability suffice for the vessel classification requirement?
3) Are their times when two aircraft will be required at PMRF at the same time two aircraft will be required at PMSR?
1. No, the aircraft is not required to be concurrent for TM and radar. No, the aircraft may not have the time to be reconfigured between missions.
2. This would be an Objective but not a Threshold.
3. Yes
| 81 |
| 3.2.1 Tomahawk Requirements |
1) Can you clarify the “Range” requirement of 5 nm in the table? Is that minimum uplink margin for telemetry?
2) What is the basis for the 38,000’ altitude requirement? Assuming appropriate link margins are obtained with TM antenna performance and downlink range with the Homestead or Cape San Blas sites, are lower maximum altitudes allowed?
3) Is the Tomahawk’s planned maximum speed for this profile 0.75 Mach at 15,000’?
4) Are the Homestead and Cape San Blas TM tracking sites C-band capable to support aircraft downlink?
5) What is the antenna size, geometry and mounting scheme for the GFE TM antenna system?
1. 5 nm up to 100 nm
2. 38,000’ is required but lower altitudes are used also.
3. Yes
4. Unknown by the customer L band is 23.2 in by 30.9 in. S band is 24.1 in by 30.9 in.
5. GFP specifications will be provided.
| 82 |
| 3.3.1 USAF Weapon TM/FTS Requirements |
1) Is the 500 nm maximum range requirement imply the distance from the Range FTS source to the target via aircraft relay? That would require an altitude higher than the 30,000’ requirement?
2) Is dual channel FTS relay required for the multiple weapon scenario?
3) Is an on-board initiated command-destruct capability required? Is that in addition to the FTS relay systems or separately?
4) Is any FTS equipment GFE?
Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS.
| 83 |
| 3.3.1.1 JASSM-ER & 3.3.1.2 HARM |
1) Confirm that all USAF weapons will have C-band TM only?
2) What is the antenna size, geometry and mounting scheme for the CFE TM antenna system?
3) What is the required C-band weapon uplink TM range?
4) Do JASSM and HARM only require command-destruct from the aircraft or is FTS relay required also?
Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS.
| 84 |
| 4.4.2.2.2 Piot Requirements |
1) Is the 700 hours of tactical jet pilot experience only applicable to missions requiring those types of target surrogate aircraft?
The requirement has been removed from the PWS.
| 85 |
| General |
1) Can you confirm that USN telemetry frequency requirements will be different? USAF is C-band uplink only and USN is S-band uplink only?
USN TM frequency is S and L band uplink and USAF TM frequency is C band uplink.
Air Force TM and FTS is no longer a requirement in this solicitation and has been removed from the PWS.
File details come from the government source that posted it.