ARSS N00421-17-R-0036 Pre-Solicitation Conference Brief (Final) PAO Approval 02062012.pdf

PDF 2 MB Posted

Attached to
Airborne Range Support Services (ARSS), Contractor Air Services (CAS)
Solicitation number
N00421-17-R-0036
Issued by

View the file

Other files

File Type Posted
N0042117R0036 Question_Answers_ Responses.pdf PDF
N0042117R0036 Question Answers Table.pdf PDF
Attachment_2_N0042117R0036_Section_C_ Draft_12192019.pdf PDF
N0042117R0036_Request_For_Proposal_Draft_12192019.pdf PDF
N00421-17-R-0036_MODIFICATION.pdf PDF
N00421-17-R-0036_CONFORMED.pdf PDF
RFP_QA_Responses__07-18-2019.pdf PDF
Flight_Data_History_Contract_N00421-14-D-0023.pdf PDF
N00421-17-R-0036_MODIFICATION.pdf PDF
N00421-17-R-0036_CONFORMED_COPY.pdf PDF
N00421-17-R-0036_RFP_QA_Responses.pdf PDF
Attachment_6__Organizational_Conflict_of_Interest.docx DOCX document
CAS_ARSS_CDRL_A005_GFP.pdf PDF
Attachment_1_Contract_Security_Classification_Specification_.pdf PDF
Attachment_3_L_and_S_Band_Array_Dimensions.pdf PDF
CAS_ARSS_CDRL_A008_Test_Plans_and_Test_Procedures.pdf PDF
Attachment_7__Scheduled_GFP.pdf PDF
CAS_ARSS_CDRL_A002_Mgmt_Plan.pdf PDF
CAS_ARSS_CDRL_A004__Mthly_Status_Report.pdf PDF
Attachment_9__Past_Performance_Contract_Data.xlsx XLSX spreadsheet
Attachment_2_Raytheon_Ktech_Telemetry_System_(RTMS)_Capabilities_Interface_Reference_Document__(IRD).pdf PDF
Attachment_4__Quality_Assurance_Surveillance_Plan.docx DOCX document
Question_Form.xlsx XLSX spreadsheet
N00421-17-R-0036.pdf PDF
CAS_ARSS_CDRL_A003_Fuel_Chit.pdf PDF
CAS_ARSS_CDRL_A006_OPSEC.pdf PDF
Attachment_8__Identification_and_Assertion_of_Restrictions_on_the_Government's_Use,_Release,_or_Disclosure_of_Technical_Data.docx DOCX document
CAS_ARSS_CDRL_A001_Airworthiness.pdf PDF
Attachment_10__Past_Performance_Questionnaire.docx DOCX document
Attachment_5__DD_Form_250_Material_Inspection_and_Receiving_Report.pdf PDF
CAS_ARSS_CDRL_A007__Semiannual_PMR_Report.pdf PDF
N00421-17-R-0036_-_Third_Round_Q&As.pdf PDF
PWS_DRAFT_N00421_17_R-0036_for_CAS_ARSS.pdf PDF
Q&A_-_2nd_round_20180625.docx DOCX document
Q&A_-_2nd_round_20180625.docx DOCX document
Industry_Q&As_RE_One-on-one_Meetings,_5-6_MARCH_2018.docx DOCX document
CAS_PWS_ARSS_N00421_17_R-0036_Draft_for_FBO.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contracted Air Services (CAS)

Airborne Range Support Services

Pre-Solicitation Conference 15 January 2020

Presented to: Airborne Range Support Services Pre-Solicitation Conference

Presented by: Rhonda Link , Deputy CAS MFTL, PMA-226

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Schedule

• 0800-1100 – All Parties

Pre-Solicitation Brief

• 1200-Completion

One-on–Ones as scheduled

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Agenda

• Welcome, Disclaimers, Admin

• CAS Program Overview

• Contract Overview

• Source Selection Overview

• Draft Sections L & M

• Summary & Path Forward

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Welcome/ Ground Rules

• All attendees must sign in

• No electronic recording of presentation or discussion

• Please silence your cell phones

• Conference Classification: UNCLASSIFIED

• This pre-solicitation conference constitutes an informal exchange of information

Provides insight into Government plans

The information shared today represents the Government’s current intentions with regard to the subject acquisition; however, the Government’s intentions may change based on today’s discussion and any follow-on comments/questions

The remarks made by Government officials during this exchange should in no way be construed as a guarantee of the Government’s final course of action

• The formal solicitation, when issued, is the ONLY document that should be relied upon in determining the Government’s requirement

• Attendance list and briefing approved for release to the public will be posted on

SAM.GOV

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Purpose of Pre-Solicitation Conference

• Ensure common understanding between

Government and industry of the content of the

DRAFT Solicitation, with focus on Sections L and M

• Final opportunity for industry feedback prior to official RFP release

• All information released to date and during this conference is to be considered DRAFT and for information purposes only

• Internal source selection plans and procedures will not be discussed

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Purpose of One-on-One Communications

• One-on-Ones provide an opportunity for industry to present meaningful information to the Government regarding its potential solution to the requirements of the DRAFT Performance Based Work Statement

(PBWS) and evaluation criteria

• The Government is not interested in a “sales pitch”;

rather, industry will have an opportunity to provide feedback on the Government’s intentions

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Questions and Answers

• The Government may answer questions during the conference.

However, all questions may not be answered today due to time constraints

• Initial questions relating to the DRAFT documents should have been submitted in accordance with SAM.GOV release Instructions

• Additional questions must be submitted in writing to the Government via e-mail to sherona.thomas@navy.mil and david.silverstone@navy.mil by

12:00 Noon EST on 17 January 2020.

• Answers to relevant questions received will be posted at SAM.GOV.

(Exceptions: Any questions and answers which would divulge a potential Offeror’s competitive strategy/solutions will not be posted.)

• If necessary, related changes to documentation will be incorporated into the final RFP release.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Agenda

• Welcome, Disclaimers, Admin

• CAS Program Overview

• Contract Overview

• Source Selection Overview

• Draft Sections L & M

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

PEO(Common Systems)

BREAK

Presented By:

Mr. Brian Alexander

CAS MFTL

PMA-226

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

PEO(Common Systems)

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

PMA-226 manages and supports specialized and proven platforms & systems

Assigned responsibilities:

Adversary Aircraft

USN and USMC Adversary F-5 Squadrons

Naval Aviation Warfighting Development Center (NAWDC) F-16s

Contracted Aircraft Services (CAS) / Public Aircraft Operations (PAO)

US Naval Test Pilot School / Naval Postgraduate School (USN TPS / NPS / VX)

Out of Active Navy Inventory Aircraft (FMS)

(17) aircraft types in (9) Countries (F-5, F-16, T-38, UH-72, OH-58, U-6A, NU-1B, X-26A, C-26, O-2A, T-39D, UV-18, T-2, H-2, H-3, A-4, CN-235) and (11) platforms on NAVAIR contracts.

Program Manager

CAPT R.E. Flores

Deputy Program Manager

Mr. Andy Wilkinson

We make the Tip of the Spear Sharp NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

CAS Program Description

Benefits

Cost Effective

• Preserves precious Combat A/C FLE (e.g. F/A-18)

• High Value / Low Risk to DoN

• Don’t pay for non-flyable aircraft

• Risk Transfer

• No Sustainment Tail

• Fills divested capabilities (H-3, Banner Tow, Adversary)

• Rapid Response with prepared contract TOs

• Keep current with threat EW emulators

• Meet Fleet emergent requirements within capacity

• Small Agile Team

Contracted Air Services (CAS) provides cost effective:

• Fleet Training and Exercise

Support

• Acquisition Program Test and Evaluation Support

By providing:

• OPFOR (Air to Air, Air to

Surface, EW…)

• Air to Air Refueling

• Close Air Support for Training

• Range Support and Clearance

Fleet Demand for CAS Growing

• CNAF plans to buy available capacity when funds available

• New Efforts

• “4th Generation” Fighters

• Tanker Competition

• JSF Squadrons fielding plan requires additional CAS OPFOR support (Exec and

POM20)

• CAS contract for JTAC Generation

• TACAMO IFT

• Future UAS Threat Emulation

• Station SAR

The PMA-226 CAS Mission Acquisition

• PMA-226 works with Customers to determine Requirements: capability, capacity, location and scheduling

• Awards IDIQ type contracts through Naval Air Warfare Center Aircraft

Division Contracts (AD-2.5) and other agencies to deliver these services

• Manages execution of contracts to optimize performance and meet Fleet and T&E community needs

Airworthiness

• 23 Mar 2011, FAA published Notice of Policy Regarding Civil Aircraft

Operators providing contract support to Government Entities - Public Aircraft Operations (PAO)

“government entities are cautioned that public aircraft operations performed by civil operators create a significant transfer of liability to the contracting government entity, and that FAA oversight ceases.”

• To understand and mitigate liability and risk: DoD then Issued DoDD

5030.61 (May 2013) requires airworthiness assessment for all aircraft owned, leased, used, designed, or modified by DoD. Assessments to be done in accordance with Military Department policy

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

• Ready to Fight Tonight

• Capabilities and Capacity to Win the Future

Questions?

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Agenda

• Welcome, Disclaimers, Admin

• CAS Program Overview

• Contract Overview

• Source Selection Overview

• Draft Sections L & M

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Purpose of Pre-Solicitation Conference

BREAK

Presented By:

Joe Andrews CAS Program Analyst

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Contract Overview

• Section A - Solicitation/Contract Form

Single Award performance based, Indefinite Quantity

(IDIQ) contract

Firm –Fixed Price (FFP) and Cost type line items

Federal Acquisition Regulation (FAR) PART 15 Source

Selection

4-year, 364-day Ordering Period (FY20 –FY25) In

Compliance with 10 USC 2401

No Ordering Period Extension Options

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section B

CLINs Title Type Description Deliverable

0001 RS&C

Mission

Services

FFP Include mission flight time and all flight support costs, e.g. preflight aircraft inspection, aircrew cost, weather and navigation services, maintenance, CFE, support equipment, tools, materials, spare and replacement parts and any other airborne operating costs

(Service)

55,200 Flight

Minutes

0002 RS&C Ferry

Flight

Services

FFP A ferry mission is a flight flown at the direction of the

Government for the purpose of repositioning contractor aircraft.

(Service)

63,480 Flight

Minutes

0003 RS&C No

Fly/Standby

Days

FFP No Fly/Standby mission Day are for deployed aircrew during mission dates when no flight operations are flown during any calendar day

(Service)

120 Days

0004 RS&C Stand

Up Capability

FFP Proposed months to complete stand up are at the

Contractor's discretion based on its technical strategy, provided the proposed months comply with the not to exceed values.

(Service)

18 Months

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section B

CLINs Title Type Description Deliverable

0005 RS&C

Mission

Services

PMSR

Based

Aircraft

FFP Include mission flight time and all flight support costs, e.g. preflight aircraft inspection, aircrew cost, weather and navigation services, maintenance, CFE, support equipment, tools, materials, spare and replacement parts and any other airborne operating costs

(Service)

63,000 Flight

Minutes

0006 Ferry Flight

Services

PMSR Base

Aircraft

FFP A ferry mission is a flight flown at the direction of the

Government for the purpose of repositioning contractor aircraft.

(Service)

4,320 Flight

Minutes

0007 No

Fly/Standby

Days PMSR

Base Aircraft

FFP No Fly/Standby mission Day are for deployed aircrew during mission dates when no flight operations are flown during any calendar day

(Service)

192 Days

0008 RS&C Stand

Up Capability

PMSR

Forward

Based

Aircraft

FFP Proposed months to complete stand up are at the

Contractor's discretion based on its technical strategy, provided the proposed months comply with the not to exceed values.

18 Months

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section B

CLINs Title Type Description Deliverable

0009 TM Mission

Services

FFP Include mission flight time and all flight support costs, e.g.

preflight aircraft inspection, aircrew cost, weather and navigation services, maintenance, CFE, support equipment, tools, materials, spare and replacement parts and any other airborne operating costs

(Service)

6,900 Flight

Minutes

0010 TM Ferry

Flight

Services

FFP A ferry mission is a flight flown at the direction of the

Government for the purpose of repositioning contractor aircraft.

(Service)

8,970 Flight

Minutes

0011 TM No

Fly/Standby

Days

FFP No Fly/Standby mission Day are for deployed aircrew during mission dates when no flight operations are flown during any calendar day

(Service)

30 Days

0012 TM Stand

Up

Capability

FFP Proposed months to complete stand up are at the

Contractor's discretion based on its technical strategy, provided the proposed months comply with the not to exceed values.

(Service)

6 Months

0013 TM Mission

Planning &

Analysis

FFP For use when performing TM mission Planning and

Analysis in support of CAS, TM mission services.

Contractor shall provide TM system operators prior to and post deployment.

128 Hours

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section B

CLINs Title Type Description Deliverable

0014 Other Direct

Cost

COST Include travel and material cost, including travel cost associated with mission and crew briefings, GFP repair and replacement costs, airport fees and other costs.

(Service)

NTE

$2,300,000

0015 Advanced

Technology

Modification

Services

COST contractor may be required to perform aircraft modifications such as internal/external modifications, special provisioning, antenna mounting

(Service)

NTE

$2,500,000

0016 Administrative/

Technical Data

NSP The Contractor shall provide technical and administrative data in accordance with Section C and CDRL Exhibit A.

(Data)

1 Lot

0017 GFP Installation FFP For installation of GFP and Government provided mission equipment; and, cost of modifications to incorporate GFP and Government provided mission equipment not previously defined

(Services)

48,000

Minutes

0018 GFP Removal FFP For removal of GFP and Government provided mission equipment; and, cost of modifications to incorporate GFP and Government provided mission equipment not previously defined.

(Services)

48,000

Minutes

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

• Section C – PERFORMANCE-BASED WORK

STATEMENT (PBWS) Attachment 2

Provide FAA certified aircraft and personnel capable of providing the ARSS services.

4.1.1 RS&C Services

4.1.2 RS&C PMSR Based Aircraft

4.1.3 Airborne TM Services

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

4.1.1 RS&C Services

4.1.1.i RS&C

• The Contractor shall operate its aircraft under the direction of Range Control Officer

(RCO) or pre-mission instructions.

• The contractor shall provide two aircraft for simultaneous presentations for RS&C

Flights.

4.1.1.ii Range Certification

• For certification flights, NAVAIR project test plan policy applies. The offeror shall prepare a project test plan to compare platform performance characteristics against

PBWS requirements.

• The Navy’s project test plan policy is NAVAIRINST 3960.4C.

4.1.1.iii RS&C Target Identification and Communication

Systems

• The Contractor shall ensure aircraft with Target identification and communication systems will be used to clear the over water range at PMRF of approximately 640,000

Nautical Miles squared (NM2), and other areas as tasked. The Contractor shall make voice communication contact with surface vessels during missions. If voice communication is unsuccessful, the RS&C aircraft will descend to make a visual identification and transmit the identification information back to the RCO.

4.1.1.iv RS&C Aircraft Specifications and Requirements

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

Attribute

Basing

Simultaneous Presentations

Mission endurance

Response time to Scheduling

Availability

Ceiling/Visibility Minimums for Operation

Range Certification flight Complete (4.1.1.ii)

Airspeed

Pounce Capability

Takeoff/Landing Crosswind Limits

Persistence

Radar Coverage

Radar Coverage

Probability of Detection (First pass)

Target detection 3 NM

10 NM

2 N/A

Target Size 30 square meter target 150 square meter target N/A

PD Range 50 NM 80 NM N/A

Sea State 3 3 N/A

Surveillance Rate 8,000 NM2/hr. 12,000 NM /hr. N/A

Satellite Communications (SATCOM) No Yes N/A

Vessel Classification

Maritime VHF Radio

Very High Frequency (VHF) radios

Ultra High Frequency (UHF) radios

UHF and VHF backup (can be single dual band radios)

High Frequency (HF) radio

Frequency Modulation (FM) Maritime radio

Aircraft Global Positioning System (GPS)

Automatic Identification System (AIS)

Positional Accuracy of Track at Probability of Detection Probability of Detection (PD) Range

4.1.1.iv RS&C Aircraft Specifications and Requirements

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Yes

Two (2) Per Aircraft

Yes

Yes

Yes

Yes

N/A

N/A

N/A

N/A

90% 95%

No

Yes

Yes

Yes

Sweeps out to 80 Nautical Miles detection +/- 90 degrees from Flight Path N/A

80 NM wide sweep providing a 160 NM swath of coverage N/A

0.5 NM N/A

6 hrs. N/A

Aircraft Range N/AAbility to transit between Continental United States (CONUS) and Hawaii

N/A N/A

No Yes

15 knots (kts) 30kts

95% N/A

1000 ft/3 mi N/A

No N/A

Two (2) N/A

Six (6) hours N/A

N/A N/A

Threshold Objective

Contractors Facility N/A

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

4.1.2 RS&C Services PMSR Based Aircraft

4.1.2.i RS&C

• The Contractor shall operate its aircraft under the direction of

Range Control Officer (RCO) or pre-mission instructions.

• The contractor shall provide two aircraft for simultaneous presentations for RS&C Flights.

4.1.2.ii Range Certification

• For certification flights, NAVAIR project test plan policy applies.

The offeror shall prepare a project test plan to compare platform performance characteristics against PBWS requirements.

• The Navy’s project test plan policy is NAVAIRINST 3960.4C.

4.1.2.iii PMSR Aircraft Specification and Requirements

• The Contractor shall base aircraft within 50 NM from Point Mugu at a facility provided by the contractor on 1 OCT 2022 until the expiration date of the contract.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

Attribute

Basing

Inner Sea Range Outer Sea Range Inner Sea Range Outer Sea Range

One (1) aircraft One (1) aircraft N/A N/A

Mission endurance

Response time to scheduling

Availability

Ceiling/Visibility Minimums for Operation

Range Certification flight Complete (4.1.2.ii)

Airspeed

Pounce Capability

Takeoff/Landing Crosswind Limits

Inner Sea Range Outer Sea Range Inner Sea Range Outer Sea Range

4 hrs. 8 hrs. 6 hrs. 10 hrs.

Aircraft Range

RADAR Coverage

RADAR Coverage

Positional Accuracy of Track at Probability of Detection (PD) Range

Probability of Detection (First pass)

Inner Sea Range Outer Sea Range Inner Sea Range Outer Sea Range

Target detection 3 NM

10 NM

2 N/A N/A

Target Size N/A N/A N/A N/A

PD Range 20 NM 30 NM 25 NM 50 NM

Sea State 3 3 3 4

Surveillance Rate 2,000 NM /hr. 8,000 NM

/hr. 4,000 NM

/hr. 12,000 NM

/hr.

Satellite Communications (SATCOM)

Vessel Classification

Maritime VHF Radio

Very High Frequency (VHF) radios

Ultra High Frequency (UHF) radios

UHF and VHF backup (can be single dual band radios)

Inner Sea Range Outer Sea Range Inner Sea Range Outer Sea Range

No Yes Yes N/A

Frequency Modulation (FM) Maritime radio

Aircraft Global Positioning System (GPS)

Inner Sea Range Outer Sea Range Inner Sea Range Outer Sea Range

No Yes Yes N/A Automatic Identification System (AIS)

N/A N/A

High Frequency (HF) radio

N/A N/A

N/A N/A

Yes N/A

Yes N/A

Yes N/A

90% N/A

No Yes

No Yes

N/A N/A

N/A N/A

0.5 NM N/A

No Yes

15 knots (kts) 30kts

Persistence (Inner Sea Range)

N/A N/A

200ft / 0.5mi N/A

Yes N/A

N/A N/A

N/A N/A

Within 24 Hours of Notification to the CR N/A

95% 98%

Table 4-3 PMSR Aircraft Specification and Requirements

Threshold Objective

Contractor shall base one (1) aircraft within 50 NM from Point

Mugu at a facility provided by the contractor on 1 OCT 2022 until the expiration date of the contract

N/A

Simultaneous Presentations

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

4.1.3 Airborne TM Services

4.1.3.i Missile TM

• The Contractor shall operate its aircraft under the direction of Range Control Officer (RCO) or pre-mission instructions.

• The Contractor shall provide an aircraft to support TM events utilizing a Government

Furnished Property (GFP) TM system.

4.1.3.ii Raytheon Ktech Telemetry System ( RTMS)

• The Offeror shall provide a Test Plan and Test Plan Report to validate platform performance with required GFP to meet requirements

• The purpose of the tests is to certify capability of the TM system installed in contractor’s aircraft. This system will be tested on the ground and in flight by contractor personnel. The Navy’s project test plan policy is NAVAIRINST 3960.4C.

4.1.3.iii Aircraft Personnel

• The contractor shall provide flight crews that are trained, qualified, and scheduled IAW Tittle 14- Aeronautics and Space, CFR Part, 61, 141 and Part 135, Operating Requirements. (1) PIC, (1) SIC and (3) TM Mission Planning and Analysis operators

4.1.3.iv Communication

• Aircrew will communicate with the Test Conductor on an assigned VHF or UHF frequency designated by the Range

Officer.

4.1.3.v TM Aircraft Specification and Requirements ( Table 4.4)

4.1.3.vi TM GFP Installation (Table 4.5)

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

Attribute Threshold

TM Flights One (1) Aircraft

TM Stream S-band frequency, Pulse Code Modulation (PCM)/FM, with a data rate of at least 2.5

Megabits per second (Mbps) transmitted from a 5 watt transmitter on the missile

Bit Error Rate (BER) 1E-6 or better

Range 5 NM or greater

Geometry TM

TM from a missile transiting from the Florida Keys to Eglin AFB, FL at 0.75M and 15,000 feet

MSL can be relayed to TM receivers at Homestead AFB or Cape San Blas, FL for the entire transit

Reradiate Signal/Altitude

Reradiate a signal emanating from the surface for submarine-launched long-range, all-weather, and subsonic cruise missile. The Contractor shall ensure an threshold altitude of

25,000 ft. MSL and an objective altitude of 38,000 ft. MSL .

Time on Station 4 Hrs.

Power 115 VAC Mission Power to power the airborne telemetry system equipment.

VHF radios One (1) each

UHF radios One (1) each

UHF and VHF backup (can be dual band radios) One (1) each

HF radio Two (2) each

Aircraft GPS One (1) each

Table 4-4 TM Services Specification and Requirements

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

Raytheon Ktech Telemetry System (RTMS) One (1) each

Airborne pedestal One (1) each

Array antennas (L band and S band) One (1) each

Antenna Control Unit (ACU) One (1) each

TM equipment racks Three (3) each

TM operator seat Two (2) each

TM Recorder seat One (1) each

Carry on PIGS; Model 9601-DGS-LP, combined

Antenna/Battery Pack Model SN-LI-2AH ; Two Kwik Tec STD-

6C Suction Cup Tie Downs

One (1) each

Table 4-5 TM GFP Installation Requirements

The rack assembly consists of three populated racks, a plate to which the racks are pinned, and a pallet to which the pallet plate is attached. The racks are designed and fabricated by Platform Systems, Inc. and are all structurally the same. They are approximately

53.0” tall, 22.1” wide, and 33.5” deep. The racks are stiffened using diagonal struts (2 on each side of each rack). Appendix D Figure 1 shows the populated equipment racks. The racks will be referred to by numbers 1, 2, 3 reference Appendix D Figure 3, 4, 5). Rack #1 is the heaviest rack weighing approximately 388 lbs. and also has the highest vertical center of gravity (CG) location. Though the racks are tied together at the tops of the racks (reference Appendix D Figure 1), the final configuration shall depend on the contractors technical proposal. Raytheon Ktech Telemetry System (RTMS) Capabilities Interface Reference Document (IRD) is provided as

Attachment (3). L and S band array dimension provided as Attachment (4) http://www.nalresearch.com/files/Tracking%20Modems/9601-DGS-LP/9601-DGS-

LP%20SW%20Version%201.2.0/Manuals/Product%20Information%20Model%209601-DGS-LP.pdf

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

4.1.4 Aircraft Mission Profiles (Table 4-6)

The aircraft mission profiles below are representative of typical operations conducted in a RS&C and Airborne TM environment.

The Contractor shall provide aircraft capable of meeting the mission criteria provided below and IAW aircraft requirements in

PBWS. Specific RS&C and Airborne TM mission scenarios are subject to change based on the mission profiles at the request of the customer.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

Day 1 Depart contractor’s facility and ferry aircraft to PMRF Barking Sands, Kauai.

Day 2 Attend test exercise briefing/scheduling meeting

Day 3 No-Fly/Standby

Day 4 Fly mission rehearsal flight

Day 5 No-Fly/Standby

Day 6 No-Fly/Standby

Day 7 Fly RS&C mission

Day 8 No-Fly/Standby

Day 9 Back up flight date

Day 10 Back up flight date

Day 11 Return ferry to contractor’s facility

Typical duration of mission profiles are visually represented in Appendix C (PMSR

Outer and Inner Sea Range)

Short duration mission profile (estimated 20% of the time); Duration: 4 hours RS&C the hazard area; Number of aircraft: One (1)

Medium duration mission profile (estimated 20% of all required sorties); Duration: 4-

6 hours RS&C the hazard area (referenced as red hatched area in figure 3)

Number of aircraft: One. The Government may request in advance a second aircraft due to the size of the hazard area.

Max duration mission profile (estimated 60% of all required sorties); Duration: 6-10 hours RS&C the hazard area (referenced as yellow hatched area in figure 3)

Number of aircraft: Two (2).

Table 4-6 Aircraft Mission Profiles (Standard Day)

Aircraft Mission Profiles (STANDARD DAY)

PMRF Profile

PMSR Profile

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

4.2 Contract Administration

4.2.1 Contractors Progress, Status, and Management Report

(CDRL 0004)

4.2.2 Post Award Conference (PAC)

4.2.3 Program Management Reviews (PMR) and Report, Record of Meeting/Minutes (CDRL A007)

4.2.4 Contractor Management Plan ( CDRL A002)

4.2.5 Fixed Rate Fuel Management ( A0003)

4.2.6 Mishap Response Plan (MRP) for Accidents and Incident

Reporting

4.2.7 Waiver Requests

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

CDRL PBWS Title Requirement Data

A001 4.3, 4.3.1, 4.3.1.1, 4.3.1.2, 4.3.1.3, 6.1

Airworthiness Data / Ground and

Flight Operations Procedures

Data as outlined in DI-SAFT-81905A to include all required content and/or as tailored in the DD1423 Block 16.

A002 4.2.4, 5.3.5, 5.5

Management Plan and Standard

Operation Procedures

Data as outlined in DI-MGMT-80004A to include all required content and/or as tailored in the DD1423 Block 16.

A003 4.2.5.1 Fuel Chit Report Data as outlined in DI-MISC-81461 to include all required content and/or as tailored in the DD1423 Block 16.

A004 4.2.1, 6.3, 8.1

Contractor’s Progress, Status and Management Report

Data as outlined in DI-SAFT-81904 to include all required content and/or as tailored in the DD1423 Block 16.

A005 8.1 Government Furnished Property

Report

Data as outlined in DI-MGMT-80269 to include all required content and/or as tailored in the DD1423 Block 16.

A006 9.3 Operational Security Plan Data as outlined in DI-MGMT-81999 to include all required content and/or as tailored in the DD1423 Block 16.

A007 4.2.3 Program Management Reviews

(PMR) and Report, Record of

Meeting / Minutes

Data as outlined in DI-SAFT-81904 to include all required content and/or as tailored in the DD1423 Block 16.

A008 4.1.1.ii, 4.1.2.ii, 4.1.3.ii

Test Plan and Test Procedures Data as outlined in DI-SAFT-81704 to include all required content and/or as tailored in the DD1423 Block 16.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

4.3 Aircraft Certification (AC), Maintenance Practices

and Operating Procedures

4.3.1 FAA Airworthiness and Related Substantiation Data

(CDRL A001)

• 4.3.1.1 FAA Standard Airworthiness Certificates

• 4.3.1.2 FAA Special Airworthiness Certificates

• 4.3.1.3 NAVAIR Airworthiness

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

• Paragraph 5.0 Operational Requirements

5.1 Mission Planning

Under the Commander, NAVAIRSYSCOM, PMA-226 is the overall CAS Program Manager. Depending on the mission and the customer, PMA-226 will designate SO to execute administrative tasks such as mission scheduling and coordination, and invoice certification.

5.2 Basing

The Contractor shall ferry the aircraft to and from mission location with the exception of one aircraft based within 50 NM of Pt Mugu in support of PMSR.

• i. For PMRF the Contractor shall base aircraft at the contractor’s facility.

• ii. For PMSR the Contractor shall base one (1) aircraft within 50 NM from Point Mugu at a facility provided by the contractor.

• iii.For TM the contractor shall base aircraft at the contractor’s facility

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

5.3 Mission Coordination

5.3.1 Mishap Prevention and Aviation Safety Program

5.3.2 Aviation Safety Official

5.3.3 Transient Military Aircraft

5.3.4 Civil Aircraft Landing Permits

5.3.5 Maintenance Program

5.3.6 Aeronautical Regulations

5.3.7 General Deployments

5.4 Performance Metrics

5.5 Personnel Requirements

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

• Paragraph 6.0 Government Oversight

Government will conduct inspection of Contractor ground and flight operations procedures

• Paragraph 7.0 Training

The Government will not provide training on GFP.

Contractor shall provide training to the PIC on new or emergent GFP added during the period of performance.

The Contractor shall be responsible for training of replacement Pilot in Command.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

• Paragraph 8.0 Other Performance

Requirements

Government provided mission equipment will be identified and transferred to the Contractor for use in executing specific training scenarios as outlined by the

SO. The Government will not provide training on GFP.

Ensure that appropriate Technical Assistance

Agreements (TAAs) and/or applicable export licenses are in place

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section C PBWS

• Paragraph 9.0 Security

Contractor shall adhere to the Contract’s DD-254, Contract Security Classification Specification

Note: For this requirement, aircrew must have a SECRET clearance

Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and CUI and to control distribution of CUI in accordance with DOD

5220.22-M (NISPOM), and SECNAV M-5510.36.

OPSEC plan to safeguard, identify and protect Critical

Information

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section D

• Section D - Packaging and Marking CLINs 0001- 0015 – Packaging, packing, and marking are not applicable (N/A) to these items.

CLIN 0016 -The data to be furnished hereunder shall be packaged, packed, and marked IAW the NAVAIR clauses 5252.247-9507, 5252.247-9508, 5252.247- 9509, 5252.247-9514 and Exhibit A, as identified in the individual TO.

CLINs 0017 - 0018 – Packaging, packing, and marking are N/A to these items.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section E

• Section E - Inspection and Acceptance CLINs 0001 - 0015 – The services to be furnished hereunder shall be inspected and accepted IAW the QASP, (Attachment (5) under Section J), and NAVAIR clause 5252.246-9512, as identified in the individual TO.

CLIN 0016 – The data to be furnished hereunder shall be inspected and accepted IAW the NAVAIR clause 5252.246-9514 and Exhibit A, as identified in the individual TO.

CLINs 0017 – 0018 - The services to be furnished hereunder shall be inspected and accepted IAW the QASP, (Attachment (5) under Section J), and NAVAIR clause 5252.246-9512, as identified in the individual TO.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section F

• Section F - Deliveries or Performance As referred to in paragraph (b) of FAR 52.216-22 " Indefinite

Quantity" of this contract, the contract minimum quantity is

$100,000.00; which the Government intends to fund this minimum on the first task order; the maximum quantity is the ceiling value of the contract.

CLINs 0004 and 0008 –The POP shall not exceed 18 months and shall be identified in the individual TO. The Government intends to issue TO’s under CLIN 0004 and 0008 immediately after contract award. The Contractor shall complete the NAVAIR IFC and operational validation of required RS&C stand up capabilities IAW the PBWS. The Contractor shall provide a Full Operational

Capability (FOC) in 18 Months or less, from contract award. FOC consists of two RS&C aircraft, which includes one RS&C aircraft based at PMSR.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section F

CLIN 0012- The POP shall not exceed 6 months and shall be identified in the individual TO. The Government intends to issue

TO’s under CLIN 0012 immediately after contract award. The

Contractor shall complete the NAVAIR IFC and operational validation of required TM stand up capabilities IAW the PBWS. The

Contractor shall provide a Full Operational Capability (FOC) in 6

Months or less, from contract award. FOC consists of one TM aircraft

CLIN 0016 – The technical data shall be delivered IAW the applicable Contract Data Requirements List (CDRL), DD Form 1423

Exhibit A, as identified in the individual TO.

CLINs 0017 – The POP shall be identified in the individual TO. The

Government intends to issue a single TO under CLIN 0017 for installation of GFP.

CLINs 0018 – The POP shall be identified in the individual TO. The

Government intends to issue a single TO under CLIN 0018 for removal of GFP.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section G & H

• Section G - Contract Administration Data

• Section H - Special Contract Requirements

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section J

• Section J - List of Documents, Exhibits and

Other Attachments Exhibit A Contract Data Requirements List (A001 – A008)

Attachment 1 Contract Security Classification Specification- DD Form 254

Attachment 2 SECTION C PERFORMANCE-BASED WORK STATEMENT

(PBWS)

Attachment 3 Raytheon Ktech Telemetry System (RTMS) Capabilities

Attachment 4 L & S Band Array Dimensions

Attachment 5 Quality Assurance Surveillance Plan (QASP)

Attachment 6 DD Form 250 Material Inspection and Receiving Report

Attachment 7 Organizational Conflict of Interest

Attachment 8 Government Furnished Property

Attachment 9 Identification and Assertion of Restrictions on the 13 JUN 19

Government's Use, Release, or Disclosure of Technical Data

Attachment L1 Past Performance Contract Data

Attachment L2 Past Performance Questionnaire

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP – Section K

• Section K - Representations, Certifications and

Other Statements of Offerors

The Government contemplates award of an Single

Award Indefinite Delivery Indefinite Quantity (IDIQ) type contract with Firm Fixed Price (FFP), and Cost line items resulting from this solicitation.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Agenda

• Welcome, Disclaimers, Admin

• Program Overview & Requirements

• Contract Overview

• Source Selection Overview

• Draft Sections M

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Source Selection Overview

• Source Selection Objectives Choose the Contractor who provides the best value using the tradeoff methodology to the Government, all factors considered

Obtain through use of a comprehensive evaluation process, providing fair and consistent evaluation of proposals

SSA

SSEB CHAIR

SSEB Advisors

PAST

PERFORMANCE

ASSISTANT CHAIR

COST/PRICETECHNICAL PCO

Source Selection Overview

Source Selection Organization

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Source Selection Overview

Req’ts Developed Plan the Approach

• Acquisition

Strategy/Plan

• SSP

Market Research & Early Exchanges w/Industry

• SOO

• P-Spec

• Draft RFPs • One-on-ones • Industry Days • Tech. Library

Receive

Proposals

Compare

Proposals

Discussions w/ Offerors

(ENs)

Complete

Discussions

Evaluate

Proposals

Competitive

Range (or SSA Selects Source)

Past Perf

Technical Cost/

Price

Evaluate FPRs Request Final

Proposal Revision (FPRs)

Debrief

Contract

SSEB SSA

SSEB SSA

SSEB SSASSA SSEB

SSEB/L&M

Formal

RFP

Select Source

The Source Selection Process

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Source Selection Overview

• Source Selection Objectives

Understanding and following Sections L&M are the keys to developing a good proposal; a mutually beneficial goal for award

Proposal Instructions – Section L of the RFP:

Tells Offerors what to put in the proposal

Evaluation Factors and Criteria – Section M of the RFP:

Identifies what will be evaluated

Identifies relative order of importance of factors

Identifies emphasis areas

Proposals should use the same paragraph format as provided in Section L

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Source Selection Overview

• Section L - Instructions, Conditions and Notices to Bidders An “Offeror” is defined as the prime Contractor with its CAGE code identified in Block 15A on Standard Form (SF) 33, Solicitation, Offer, and Award

A “Joint Venture” (JV) is a partnership or teaming arrangement that is formed for the purpose of responding to this solicitation when the prime Contractor consists of more than one legal entity. “JV Team Members” are the entities that make up a Joint Venture

The term “entity” is used to mean any or all of the following: prime Contractor, JV, JV team members, any subcontractor, and corporate parent, division, subsidiary, or affiliate (e.g., any Contractor with a different CAGE Code/DUNS than the Offeror)

The following entities are defined as principal entities and only principal entities will be used in the past performance evaluations:

a) The prime Contractor;

b) JV Team Members;

c) other entities that are proposed to perform at least 20% of the proposed total price for the contract

Source Selection Overview

• General Proposal Preparation Guidance Demonstrate a thorough understanding of requirements, inherent risks, and sufficient resources to meet the requirements

Support your statements with facts, analysis and substantiating data to illustrate that you have a valid and practical solution for all requirements

Substantiate, don't simply make claims

Provide information to allow an independent assessment

Structure your proposal in accordance with Section L -Proposal Instructions

Be consistent from Volume to Volume

Provide clear and concise descriptions

Drawings & diagrams complement narratives, but don't replace them

Help the evaluator quickly find information

Is it clear and well organized?

Be attentive to all parts of the RFP

Requirements, PBWS

Evaluation Criteria and Proposal Instructions

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Source Selection Overview

• Typical Proposal Shortfalls Proposal Instructions are not followed

Information not provided in the way it was requested

Too little information

Statements in the proposal are not well supported

Not documenting assumptions

Not substantiating performance and/or claims

Proposals are not well organized

Does not follow Proposal Instructions structure –requires the evaluator search for the information

Past Performance POCs are not current

DUNS/CAGE Codes references do not match

Deficiencies -preclude award

Information provided does not support claims of compliance

Proposal is non-compliant to the requirements

SF-33 not signed

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP - Section L - General

• Proposal Content and Volumes Each volume shall contain the following information:

Cover and title page

Title of proposal and proposal number as applicable

Offeror’s name, address, and POC

RFP number

Proposal volume number

Copy number

Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements)

Use tabs and dividers

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP - Section L

Volume Number Volume Title Suggested

Page Limit

1 Technical See Below

Technical Element #1 Understanding of the Work 40

Technical Element #2 Capability Verification 20

Technical Element #3 Aircraft Performance Requirements 8

Technical Element #4 Airworthiness Data No Page Limit

Technical Element #5 Aircraft Support 20

Technical Element #6 Aircraft Availability 25

Technical Element #7 Personnel Resources 10

Technical Element #8 Small Business Utilization Strategy 5

2 PAST PERFORMANCE No Page Limit

3 PRICE No Page Limit

4 CONTRACT ADMINISTRATION No Page Limit

Proposal Content and Volumes

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP - Section L

Volume Number Volume Title Suggested

Page Limit

Annex 1 Small Business Subcontracting Plan As

Applicable

No Page

Limit

Annex 2 SOW/PBWS/TO/DO/PO for each referenced contract

No Page

Limit

Annex 3 Proof of Ownership or Lease or submit a bill of sale or lease contingent on award of the contract.

No Page

Limit

• Annexes are used to provide supporting data

• Annexes do not count toward the suggested page count for each Volume

Proposal Content and Volumes

Draft RFP - Section L

• Proposal Content and Volumes The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal.

Section L –

Proposal

Instructions

Government

SOW/PWS

Section M –

Evaluation

Factor

Section M –

Evaluation Factor

CLIN

Reference

1.0 Volume 1:

Technical

Technical

Element #1

Example: Para

4.2.1

Note: This column shall address all paragraphs in

Sections xx and xy of the

SOW/PBWS.

Part B: Specific

Instructions

Technical 1.0

Element #1

Provide reference to

Offeror’s Proposal

Volume I – Technical.

Example: Reference to appropriate page number in Offeror’s written proposal

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP - Section M Evaluation Factors - General

The Government intends to evaluate each proposal and award a contract without discussions to the responsible

Offeror whose offer, conforming to the solicitation, provides the greatest overall benefit to the Government, all factors considered.

Offerors are advised that proposals meeting the solicitation requirements with the lowest cost/price may not be selected for an award if award to a higher priced

Offeror is determined to be more beneficial to the

Government. However, the perceived benefits of the higher priced proposal must merit the additional price.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP - Section M Evaluation Factors - General

• Offerors are cautioned that their initial offer should contain the Offeror’s best terms from a technical, past performance and price standpoint.

• The Government reserves the right to conduct discussions and request proposal revisions if it is determined to be in the best interest of the

Government

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP - Section M Evaluation Factors

PAST

PERFORMANCE

(Performance Confidence Assessment

Rating)

Key: >more Important; >> Significantly More important

PRICE

TECHNICAL

(Combined technical/risk rating) =

Technical is significantly more important than Past Performance. All evaluation factors other than Price, when combined, are significantly more important than Price. Price is not the most important evaluation factor, but its degree of importance will increase commensurably with the degree of equality among different offeror's Technical and Past Performance proposals.

Total

Evaluated

Price

Order of Importance

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Draft RFP - Section M Evaluation Factors - General

• If the Government Conducts Discussions &

Requests Proposal Revisions:

Those Offerors included in the Competitive Range will enter into Discussions

Written (Evaluation Notices (ENs)) and Oral Discussions

• As a minimum, notification of deficiencies, uncertainties and significant weaknesses

• Ask for additional information

Proposal change pages where needed

• Helps to easily identify changes

• Minimizes work for the Final Proposal Revision (FPR)

Source Selection Summary

The Source Selection process will assure that each offeror’s proposal receives a fair and consistent evaluation.

Sections L&M are intended to help offerors provide the

Government with its best value solution and instruct them in preparing a proposal that will facilitate the

Government’s evaluation.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Agenda

• Welcome, Disclaimers, Admin

• Program Overview & Requirements

• Contract Overview

• Source Selection Overview

• Draft Sections L & M Technical

DRAFT RFP Section M: Technical

BREAK

Presented By:

Rhonda Link

FRS IPTL

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

The Government will evaluate the proposal to determine the Offeror's understanding of, approach to and ability to meet the solicitation requirements

The Government will assess the Offeror’s Technical Proposal with respect to its compliance with the solicitation requirements and the risk associated with the Offeror’s approach

The evaluation will include an assessment of the Offeror's proposed

1) Understanding of the Work

2) Capability Verification

3) Aircraft Performance Requirements

4) Airworthiness Data

5) Aircraft Support

6) Aircraft Availability

7) Personnel Resources

8) Small Business Utilization Strategy

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

A combined Technical/Risk Rating will be assigned

The combined Technical/Risk Rating assignments reflect the

Government’s assessment of the Offeror’s technical solution to meeting the Government’s requirement and potential for disruption of schedule, degradation of performance, the need to increase Government oversight, or the likelihood of unsuccessful contract performance

• Appreciably exceeding the threshold in requirements that are expressed with both a threshold and an objective can also potentially produce performance or operational benefits, but only up to the objective. Meeting the objective shall be considered a strength.

• Additionally, a proposal that provides the Government with a capability, service, or resource that is not specifically required, but benefits the Government, can have merit if it appreciably enhances performance and/or operations to benefit the

Government.

NAVAIR Public Release 2020-112. Distribution Statement A – “Approved for public release; distribution is unlimited”

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and…