P7_Sub_Cost_Summary_24JUL2017.xlsx
XLSX spreadsheet 102 KB Posted
- Attached to
- AIR-4. 11, N00421-16-R-0059 Technical and Engineering Services (TES) supporting AD-4. 11. 3
- Solicitation number
- N00421-16-R-0059
About this file
Subcontractor Cost Summary Spreadsheet
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions |
| (Please note that the cells referenced below correspond to the Cost Type sheets. The Summary sheet is numbered slightly differently. ) |
| Contractor: |
| On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated. |
| On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in. |
| Worksheets should be prepared for the entire FIVE (5) YEAR ORDERING PERIOD. The Year 1 TAB is provided. The Offerors will be required to add Tabs for Years 2 through 5 for each subsequent year of the ordering period. The tabs should be labeled to match the Year (e.g. Year 1, Year 2, etc.). THE OFFEROR MUST ALSO PROVIDE A CUMULATIVE SUMMARY SHEET OF ALL YEARS (1-5) AND ADD THIS AS A SEPARATE TAB CALLED "SUMMARY". |
| Every worksheet should have items 1 and 2 completed. |
| The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| Within the work sheet any cell colored "blue" contains a formula that should not be edited. |
| All dollar figures shall be carried out no further than two decimal places. Values with additional decimal places shall not be used within any calculations. |
| In Cell B2, enter the period of performance calendar dates. (ex: 1 Jan 09 - 31 Dec 09). Enter the period of performance calendar dates for all option years in the corresponding cells for each period of performance. Type "SUMMARY" in the period of performance cell for that section of the spreadsheet. |
| In column A, starting at row 5, the Government Labor Categories from the Historical Information should have been inserted. In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. However, if it is not comparable, utilize the "not comparable" row. The Offeror is not required to utilize the Government's labor categories. However, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. |
| In column C, the Offeror should insert a "CF" if the worker will be performing at the Contractor's facility or a "O" if it will be performing onsite in Government spaces. |
| In column D, for the contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the contractor is proposing its own employees or contingency hires--it does not include any subcontractors.) No input is required by the Offeror in this column. |
| In column E, for the individual subcontractor workforce, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| In column F, enter the name of the proposed individual for that position. |
| In column G: |
| (a) enter the unburdened labor rate for each individual (e.g. rows 5-50) |
| (b) In Cell G53 the contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| (c) In Cell G54 the contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank. |
| (d) In Cell G57, the contractor should insert its overhead rate for work performed at the contractor's facility. |
| (e) In Cell G58, the contractor should insert its overhead rate for work performed at the Client/Government's facility. |
| (f) In Cell G61, the contractor should insert its G&A rate being applied for work being performed at the Client/Government's facility. |
| (g) In Cell G62, the contractor should insert its G&A rate being applied for work being performed at the contractor's facility. |
| (g) In Cell G67, the contractor should insert the fixed fee rate applied to its cost. |
| In column H: |
| (a) enter the hours associated with individual labor category for CLIN 0101 (e.g., rows 5-43). |
| Column H automatically calculated the total hours for all the CLINS. |
| Column K is a summation of the costs. |
| If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the contractor is only utilizing sixteen of the labor categories in rows 5-43, then the rows concerning the reamining nineteen categories would be hidden. |
| When submitting this file, the instructions may be deleted. |
Term Year 1
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 7/13/18-7/12/19 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | f | John Doe | $ 5.00 | 50 | $ 250.00 | $ 250.00 | |
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior *(Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 50 | $250.00 | $250.00 | ||||||
| Base | |||||||||
| fringe fulltime | 1.00% | $250.00 | $2.50 | $2.50 | |||||
| fringe part time | 2.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $2.50 | $2.50 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 3.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 4.00% | $250.00 | $10.00 | $10.00 | |||||
| subtotal | $10.00 | $10.00 | |||||||
| G&A | |||||||||
| Contractor site | 1.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 2.00% | $260.00 | $5.20 | $5.20 | |||||
| subtotal | $ 5.20 | $ 5.20 | |||||||
| FCCOM | 0.10% | $267.70 | $ 0.27 | $ 0.27 | |||||
| Total Labor without profit | $267.97 | ||||||||
| Fee/Profit | 0.0% | $ - 0 | $ - 0 | ||||||
| Fee/Profit Pool | $ - 0 | $ - 0 |
| Grand Total Cost | $ 0.27 | $ 0.27 | |
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | 250.0 | $ 0.27 | $ 0.27 |
Grand Total Services $ 0.27
Solicitation N00421-16-R-0059, Attachment P6 CPFF LOE Year 1
Term Year 2
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 7/14/19-7/12/20 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | f | John Doe | $ 5.00 | 50 | $ 250.00 | $ 250.00 | |
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior *(Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 50 | $250.00 | $250.00 | ||||||
| Base | |||||||||
| fringe fulltime | 1.00% | $250.00 | $2.50 | $2.50 | |||||
| fringe part time | 2.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $2.50 | $2.50 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 3.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 4.00% | $250.00 | $10.00 | $10.00 | |||||
| subtotal | $10.00 | $10.00 | |||||||
| G&A | |||||||||
| Contractor site | 1.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 2.00% | $260.00 | $5.20 | $5.20 | |||||
| subtotal | $ 5.20 | $ 5.20 | |||||||
| FCCOM | 0.10% | $267.70 | $ 0.27 | $ 0.27 | |||||
| Total Labor without profit | $267.97 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ 0.27 | $ 0.27 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ 0.27 | $ 0.27 |
Grand Total Services $ 0.27
CPFF LOE Year 2
Term Year 3
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 7/13/20-7/12/21 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | f | John Doe | $ 5.00 | 50 | $ 250.00 | $ 250.00 | |
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior *(Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 50 | $250.00 | $250.00 | ||||||
| Base | |||||||||
| fringe fulltime | 1.00% | $250.00 | $2.50 | $2.50 | |||||
| fringe part time | 2.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $2.50 | $2.50 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 3.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 4.00% | $250.00 | $10.00 | $10.00 | |||||
| subtotal | $10.00 | $10.00 | |||||||
| G&A | |||||||||
| Contractor site | 1.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 2.00% | $260.00 | $5.20 | $5.20 | |||||
| subtotal | $ 5.20 | $ 5.20 | |||||||
| FCCOM | 0.10% | $267.70 | $ 0.27 | $ 0.27 | |||||
| Total Labor without profit | $267.97 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ 0.27 | $ 0.27 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ 0.27 | $ 0.27 |
Grand Total Services $ 0.27
CPFF LOE Year 3
Term Year 4
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 7/13/21-7/12/22 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | f | John Doe | $ 5.00 | 50 | $ 250.00 | $ 250.00 | |
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior *(Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 50 | $250.00 | $250.00 | ||||||
| Base | |||||||||
| fringe fulltime | 1.00% | $250.00 | $2.50 | $2.50 | |||||
| fringe part time | 2.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $2.50 | $2.50 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 3.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 4.00% | $250.00 | $10.00 | $10.00 | |||||
| subtotal | $10.00 | $10.00 | |||||||
| G&A | |||||||||
| Contractor site | 1.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 2.00% | $260.00 | $5.20 | $5.20 | |||||
| subtotal | $ 5.20 | $ 5.20 | |||||||
| FCCOM | 0.10% | $267.70 | $ 0.27 | $ 0.27 | |||||
| Total Labor without profit | $267.97 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ 0.27 | $ 0.27 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ 0.27 | $ 0.27 |
Grand Total Services $ 0.27
CPFF LOE Year 4
Term Year 5
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 7/13/22-7/12/23 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | f | John Doe | $ 5.00 | 50 | $ 250.00 | $ 250.00 | |
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Program/Project Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer I (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Programmer III (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Drafter/CAD Operator II (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Electrical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Mechanical Engineer, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Information Security Analyst, Senior *(Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistician, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Network Architect, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Software Engineer, Senior) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Computer Systems Analyst, Senior * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Journeyman (Systems Engineer) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineer, Senior (Systems Engineer) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer, Senior (Systems Specialist) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 50 | $250.00 | $250.00 | ||||||
| Base | |||||||||
| fringe fulltime | 1.00% | $250.00 | $2.50 | $2.50 | |||||
| fringe part time | 2.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $2.50 | $2.50 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 3.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 4.00% | $250.00 | $10.00 | $10.00 | |||||
| subtotal | $10.00 | $10.00 | |||||||
| G&A | |||||||||
| Contractor site | 1.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 2.00% | $260.00 | $5.20 | $5.20 | |||||
| subtotal | $ 5.20 | $ 5.20 | |||||||
| FCCOM | 0.10% | $267.70 | $ 0.27 | $ 0.27 | |||||
| Total Labor without profit | $267.97 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ 0.27 | $ 0.27 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ 0.27 | $ 0.27 |
Grand Total Services $ 0.27
CPFF LOE Year 5
Term Summary
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||
| Period of Performance: | 7/13/18-7/12/23 | CLIN | 0001 | |||||
| Services | Contractor | |||||||
| Government Labor Category (* = Key) | Proposed Category | site | year 1 | year 2 | year 3 | year 4 | year 5 | TOTAL |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $1,250.00 |
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Program/Project Analyst, Senior * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Program/Project Analyst, Senior * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Programmer I (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Programmer I (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Programmer II (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Programmer II (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Programmer III (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Programmer III (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Drafter/CAD Operator II (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Drafter/CAD Operator II (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Electrical and Electronic Engineering Technician (Electronics Technician Maintenance III) (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Electrical Engineer, Senior * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Electrical Engineer, Senior * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Mechanical Engineer, Senior * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Mechanical Engineer, Senior * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Administrative Assistant (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Administrative Assistant (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Information Security Analyst, Journeyman (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Information Security Analyst, Journeyman (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Information Security Analyst, Senior * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Information Security Analyst, Senior *(Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Logistician, Journeyman (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Logistician, Journeyman (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Network Architect, Journeyman (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Network Architect, Journeyman (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Network Architect, Senior * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Network Architect, Senior * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Software Developer, Senior (Software Engineer, Senior) * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Software Developer, Senior (Software Engineer, Senior) * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Systems Analyst, Journeyman (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Systems Analyst, Journeyman (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Systems Analyst, Senior * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Systems Analyst, Senior * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Engineer, Journeyman (Systems Engineer) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Engineer, Journeyman (Systems Engineer) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Engineer, Senior (Systems Engineer) * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Engineer, Senior (Systems Engineer) * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Software Developer, Senior (Systems Specialist) * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Software Developer, Senior (Systems Specialist) * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| subtotal | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $1,250.00 |
| fringe fulltime | ||||||
| fringe part time | ||||||
| subtotal | $0.00 | |||||
| Overhead | ||||||
| Contractor site | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OnSite Government | $10.00 | $10.00 | $10.00 | $0.00 | $10.00 | $40.00 |
| subtotal | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $50.00 |
| G&A | ||||||
| Contractor site | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OnSite Government | $5.20 | $5.20 | $5.20 | $5.20 | $5.20 | $26.00 |
| subtotal | $5.20 | $5.20 | $5.20 | $5.20 | $5.20 | $26.00 |
| FCCOM | $0.27 | $0.27 | $0.27 | $0.27 | $0.27 | $1.34 |
| Total Labor | $267.97 | $267.97 | $267.97 | $267.97 | $267.97 | $1,339.84 |
Completion Year 1
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 7/13/18-7/12/19 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | ||
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | ||||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | ||||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | ||||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | ||||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | ||||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | ||||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | ||||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||
| Base | |||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| Onsite Government | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| G&A | |||||||||
| Contractor site | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $39,936.00 | $ - 0 | $ - 0 | |||||
| Total Labor without profit | $39,936.00 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ - 0 | $ - 0 |
Grand Total Services $ - 0
CPFF Completion Year 1
Completion Year 2
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 7/13/19-7/12/20 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | ||
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | ||||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | ||||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||
| Base | |||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| Onsite Government | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| G&A | |||||||||
| Contractor site | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $39,936.00 | $ - 0 | $ - 0 | |||||
| Total Labor without profit | $39,936.00 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ - 0 | $ - 0 |
Grand Total Services $ - 0
CPFF Completion Year 2
Completion Year 3
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 7/13/20-7/12/21 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | ||
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | ||||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||
| Base | |||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| Onsite Government | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| G&A | |||||||||
| Contractor site | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $39,936.00 | $ - 0 | $ - 0 | |||||
| Total Labor without profit | $39,936.00 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ - 0 | $ - 0 |
Grand Total Services $ - 0
CPFF Completion Year 3
Completion Year 4
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 11/2/2021 - 11/1/2022 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | ||
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | ||||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||
| Base | |||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| Onsite Government | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| G&A | |||||||||
| Contractor site | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $39,936.00 | $ - 0 | $ - 0 | |||||
| Total Labor without profit | $39,936.00 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ - 0 | $ - 0 |
Grand Total Services $ - 0
CPFF Completion Year 4
Completion Year 5
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||
| Period of Performance: | 11/2/2022 - 11/1/2023 | CLIN | 0001 | ||||||
| Services | Contractor | hrs | subtotal | ||||||
| Government Labor Category (* = Key) | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Total | |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | John Doe | $ 20.80 | 1920 | $ 39,936.00 | $ 39,936.00 | ||
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Administrative Assistant (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | 1,920.0 | $ 39,936.00 | $ 39,936.00 | ||||||
| Base | |||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| Overhead | Base | ||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| Onsite Government | 0.00% | $ - 0 | $ - 0 | $ - 0 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| G&A | |||||||||
| Contractor site | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| OnSite Government | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| subtotal | $ - 0 | $ - 0 | |||||||
| FCCOM | 0.00% | $39,936.00 | $ - 0 | $ - 0 | |||||
| Total Labor without profit | $39,936.00 | ||||||||
| Grand Total Cost | $ - 0 | $ - 0 | |||||||
| Grand Total Fixed Fee Pool | $ - 0 | $ - 0 | |||||||
| Grand Total Subcontractor Labor Cost Plus Fee/Profit | -0 | $ - 0 | $ - 0 |
Grand Total Services $ - 0
CPFF Completion Year 5
Completion Summary
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||
| Period of Performance: | 7/13/18-7/12/23 | CLIN | 0001 | |||||
| Services | Contractor | |||||||
| Government Labor Category (* = Key) | Proposed Category | site | year 1 | year 2 | year 3 | year 4 | year 5 | TOTAL |
| Program/Project Analyst, Journeyman (Onsite) | Example Category | O | $39,936.00 | $39,936.00 | $39,936.00 | $39,936.00 | $39,936.00 | $199,680.00 |
| Program/Project Analyst, Journeyman (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Administrative Assistant (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Administrative Assistant (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Manager/Operations Manager, Senior (Project Manager) * (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Manager/Operations Manager, Senior (Project Manager) * (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Technical Writer (Technical Writer II) (SCA) (Onsite) | O | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Technical Writer (Technical Writer II) (SCA) (Contractor Facility) | CF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| subtotal | $39,936.00 | $39,936.00 | $39,936.00 | $39,936.00 | $39,936.00 | $199,680.00 |
| fringe fulltime | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| fringe part time | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| subtotal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Overhead | ||||||
| Contractor site | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OnSite Government | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| subtotal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| G&A | ||||||
| Contractor site | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OnSite Government | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| subtotal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| FCCOM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Labor | $39,936.00 | $39,936.00 | $39,936.00 | $39,936.00 | $39,936.00 | $199,680.00 |