N00421-16-R-0059_RFP_Amendment_0001.pdf

PDF 2 MB Posted

Attached to
AIR-4. 11, N00421-16-R-0059 Technical and Engineering Services (TES) supporting AD-4. 11. 3
Solicitation number
N00421-16-R-0059
Issued by

About this file

N00421-16-R-0059 RFP Amendment 0001

View the file

Other files

File Type Posted
N00421-16-R-0059_Amendment_0002_Modification.pdf PDF
N00421-16-R-0059_Amendment_0002_.pdf PDF
P7_Sub_Cost_Summary.xlsx XLSX spreadsheet
P6_Prime_Cost_Summary_Spreadsheet_(TES).xls XLS spreadsheet
P6_Prime_Cost_Summary_Spreadsheet_(TES).xls XLS spreadsheet
P7_Sub_Cost_Summary.xlsx XLSX spreadsheet
N00421-16-R-0059_Amendment_0001_-_Modification.pdf PDF
P4_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Exhibit_A__CDRLs_(TES).xlsx XLSX spreadsheet
Attach_8_-QASP_CSP.pdf PDF
Attach_5_Authorized_Subcontractors.docx DOCX document
P7_Sub_Cost_Summary.xlsx XLSX spreadsheet
Attach_4__OCI_List.docx DOCX document
Attach_7_-_COR_TBD.docx DOCX document
P4_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
P1_Past_Performance_Information_Form.pdf PDF
Attach_1_Wage_Determinations.docx DOCX document
P6_Prime_Cost_Summary_Spreadsheet_(TES).xls XLS spreadsheet
Attach_3_Data_Item_Transmittal_Form.docx DOCX document
N00421-16-R-0059_RFP.pdf PDF
P2_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_2_N00421-16-R-0059_BID_DD254_signed.pdf PDF
TES_Draft_RFP_Industry_10Oct2017.pdf PDF
P1_Past_Performance_Information_Form.pdf PDF
Attach_3_Data_Item_Transmittal_Form.docx DOCX document
P3_Reserved.docx DOCX document
Attach_8_-QASP_CSP.docx DOCX document
P4_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
P2_Contractor_Performance_Assessment_Questionnaire.pdf PDF
EXHIBIT_A_-CDRLs.xlsx XLSX spreadsheet
Attachment_10_Data_Item_Transmittal_Acceptance_Rejection_Form.doc DOC document
Attach_9_-_Consolidated_GFP.xlsx XLSX spreadsheet
P6_Prime_Cost_Summary_Spreadsheet_(TES)_10.2.17.xls XLS spreadsheet
Attach_7_-_COR_TBD.docx DOCX document
Attach_4__OCI_List.docx DOCX document
Attach_5_Authorized_Subcontractors.docx DOCX document
P5_Reserved.docx DOCX document
P7_Sub_Cost_Summary_24JUL2017.xlsx XLSX spreadsheet
Attach_6_Authorized_Key_Personnel.doc DOC document
Attach_1_Wage_Determinations.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 12:00 PM local time 03 Jan 2018

X

A

X B

X C X D

EX

X

G

F 103 - 114

115 - 136

X H 137 - 143 brandon.reaser@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

1 143

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00421 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

N/A conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

BRANDON REASER 301-757-5779

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 6

7 - 19

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

20 - 54

55 - 62

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

63 - 64

65 - 67 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 68 - 72 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 73 - 87 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

88 - 101

PART II - CO NTRACT CLAUSES

NAVAL AIR WARFARE CENTER AD

CODE 2.5.1.3, BLDG 433, 47060 LILJENCRANTZ RO

PATUXENT RIVER MD 20670

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

30 Nov 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N00421-16-R-0059

Section A - Solicitation/Contract Form

GOVERNMENT POINT OF CONTACT

Contract Specialist: Brandon Reaser

Phone: 301-757-5779

E-mail: brandon.reaser@navy.mil

Contracting Officer: Carolyn Emmart

Phone: 301-757-4074

E-mail: carolyn.emmart@navy.mil

Procuring Contracting Officer: Thomas Stann

Phone: 301-757-0031

E-mail: thomas.stann@navy.mil

CONTRACT TYPE

The contract resulting from this solicitation will be a Cost-Plus-Fixed-Fee for Labor (Term and Completion) and

Cost Reimbursable for Other Direct Costs (Travel and Material), Single-Award Indefinite Delivery/Indefinite

Quantity.

ANTICIPATED NUMBER OF TASK ORDERS/CLINS

The following information is the Government’s best estimate and is provided for situational awareness only.

-CPFF LOE tasking demands may yield approximately 4 Task Orders (TOs) per year with 20 CLINs on each TO for a total of 80 CLINs. The total number of CLINs for the duration of the contract will be approximately 400 CLINs.

-CPFF Completion Tasking demands may yield appoximately 1 Task Order (TO) per year with 10 CLINs. The total number of CLINs for the duration of the contract will be approximately 50 CLINs.

NOTE: Proposal must remain valid after proposal submission in accordance with Section L, 3.1.1(e).

PRODUCT SERVICE CODE

The basic contract of this Single-Award Indefinite Delivery/Indefinite Quantity, Cost-Plus-Fixed-Fee and Cost

Reimbursable vehicle will have an associated Product Service Code (PSC) of AC63, Research and Development –

Defense Electronics and Communication Equipment – Advanced Development.

AMENDMENT #0001

Changes made to Solicitation N00421-16-R-0059 and responses to questions from industry via Amendment 0001 are outlined below. The proposal due date and time have not changed; all submissions shall be in accordance with

Block 9 of the Solicitation coverpage.

Questions and Answers

Q1: Due to the length and complexity of the SOW, and to ensure offerors have the space to thoroughly address each required element of the PWS/SOW Approach (per Section 1.1.1) and fully demonstrate the offeror’s understanding and capabilities, can the Government increase the respective page count from 30 pages to 40 pages for Section 1.1.1 (Understanding of the Work PWS/SOW Approach)?

mailto:brandon.reaser@navy.mil mailto:carolyn.emmart@navy.mil mailto:thomas.stann@navy.mil

A1: The page limit has been increased from 30 to 40 pages in Section L, L-1, Content of Proposals, Part A, 3.0

Proposal Content and Volumes, paragraph 3.3, volume 1, Section 1.1.1 (Understanding of the Work PWS/SOW

Approach) as of Amendment 0001.

Q2: On page 125, under 5252.209-9513 ORGANIZATIONAL CONFLICT OF INTEREST INSTRUCTIONS

(SERVICES) (NAVAIR)(JUN 1993), sub-clause (a) states, “In accordance with FAR 9.507-1, the potential conflict of interest for this solicitation in the Contracting

Officer's judgment would involve any prime contractor, subcontractor, co-sponsor, parties to a joint venture, consultant or other legal entity (1) who because of activities or relationships is unable to render impartial assistance or advice to the Government, or (2) whose objectivity in performing the contemplated contract work is or might otherwise be impaired, or (3) who has an unfair competitive advantage in regards to [Insert description of weapons system involved and contractor activities that are suspect, i.e., drafting specifications, planning requirements etc.].”

Will this sub-clause be completed upon award? If not, can the Government provide a description of weapons systems/activities of concern to permit an OCI review?

A2: 5252.209-9513 ORGANIZATIONAL CONFLICT OF INTEREST INSTRUCTIONS

(SERVICES)(NAVAIR)(JUN 1993), sub-clause (a) has been updated in Section L as of Amendment 0001.

Q3: On page 125, under 5252.209-9513 ORGANIZATIONAL CONFLICT OF INTEREST INSTRUCTIONS

(SERVICES) (NAVAIR)(JUN 1993), sub-clause (e) states, “Along with responses to this solicitation, offerors must either (1) submit the following information concerning any existing or planned contracts with, or interests in, the suppliers and/or equipment identified in Attachment [Insert attachment number]; ….”.

Can the Government confirm the reference attachment is Attachment 4, or provide the correct attachment number?

A3: 5252.209-9513 ORGANIZATIONAL CONFLICT OF INTEREST INSTRUCTIONS

(SERVICES)(NAVAIR)(JUN 1993), sub-clause (e) has been updated in Section L as of Amendment 0001.

Q4: Are you using the 2010 SOC definitions or the 2018 SOC definitions?

A4: The Government confirms use of the 2010 SOC definitions.

Q5: Can the offeror adjust formulas in Attachment P6 and P7 spreadsheets to ensure compliance with DCAA disclosures and estimating practices? For example, overhead is not being applied to direct labor plus fringe, and FCCM is a required field and when entered with zero the Grand Total Cost does not carry down.

A5: The offeror may adjust formulas in Attachment P6 and P7 spreadsheets to ensure compliance with DCAA disclosures and estimating prices.

Q6: Within the RFP, the requirement is to propose approximately 40 percent of the level of effort for each labor category at Government site and approximately 60 percent at the contractor site. Most offerors have different indirect rates for Government and contractor facilities along with a very specific disclosed practice for utilizing a Government-site cost center. A single individual, such as a Program Manager, can only be aligned to one cost center. Can the government confirm that the intent of providing our cost per RFP instructions is to assist in developing composite rates to support the new task order issuance process, and that during execution an individual will only be required to be billed in one cost center as per DCAA compliance requirements?

A6: The Government acknowledges that the intent of the Contractor providing fully burdened composite rates is to develop estimated labor ceilings to support new task order issuance and during execution. However, an individual will only be required to be billed in one cost center as per DCAA compliance requirements.

Q7: Who is the incumbent contractor?

A7: Please refer to Section L, L-1, Content of Proposals, Part B, 3.0 Volume 3: Price/Cost Proposal, 3.5

Government Furnished Information, subparagraph 3.5.4.

Q8: The current SCA Labor Category Qualifications do not list any education, certification, or experience requirements. From which source should the SCA Labor Category Qualification requirement for education, certification, and experience be derived?

A8: SCA Labor Category Qualifications have been mapped to the Office of Management and Budget’s (OMB)

Standard Occupational Classification (SOC).

Q9: The RFP only included off-site hours for the two new labor categories (Information Security Analyst

Junior and Engineer Junior), which changes the Government/Contractor site split to 39%/61%. This differs from the stated split of 40%/60% in Section 3.1.2.1. Can the percentages in Section 3.1.2.1 be updated, or can the hours for junior LCATS be adjusted to reflect the stated 40%/60% split?

A9: Section C, 3.0 REQUIREMENTS, paragraph 3.1.2, subparagraph 3.1.2.1 has been updated to reflect a split of

39%/61% between work performed at Government sites and work to be performed at the Contractor site as of

Amendment 0001.

Q10: For the Past Performance volume, it is not clear whether contracts that do not adhere explicitly to the magnitude relevancy factors provided will be considered in the evaluation. How will contracts exceeding the specified $100 million threshold be evaluated?

A10: The government will consider all contracts provided.

Q11: Are the 2 pages for each key resume in addition to the 10 page limit for the Workforce section?

A11: The Government confirms the 2 pages are for each Key Personnel resume in addition to the 10 page limit for the workforce section.

Q12: The planned award date is October 2018, but three dates provided in Section F under Delivery

Information all reference CLINs commencing earlier in 2018. Can the Government update the dates provided in Section F to fall within the anticipated periods of performance?

A12: Delivery Dates in Section F have been updated to fall within the anticipated periods of performance as of

Q13: There are multiple references to PWS/SOW Section 3.3.6. However, Section 3.3.6 does not exist in the

RFP. References include both performance-based tables on page 4 and both performance-based tables on page 121. Can the Government please confirm that Section 3.3.6 does not exist in the PWS/SOW and references to section 3.3.6 in the performance-based tables on page 4 and both performance-based tables on page 121 are in error?

A13: PWS/SOW Section 3.3.6 does not exist and has been removed from both (Performance Based) Section B, Composite Fully Burdened Rate tables and Section L, L-1, Content of Proposals, Part B, 3.0 Volume 3: Price/Cost

Proposal, paragraph 3.5.2 tables as of Amendment 0001.

Q14: There are multiple references to Section 3.3.1, “Concept and Technology Development,” that do not align with the updated “Requirements Decomposition” title on page 27 of the PWS. These references include

Section 1.1.1.1 on page 111 of the PWS; the Relevancy Factors table on page 129 of the PWS; the Quality

Standards table on page 5 of the QASP attachment; and the Quarterly Evaluation table on page 15 of the

QASP attachment. Can the Government adjust the RFP to address the inconsistency?

A14: The RFP has been revised to replace “Section 3.3.1, “Concept and Technology Development” with

“Requirements Decomposition” in Section L, L-1, Content of Proposals, Part B, 1.0 VOLUME 1: TECHNICAL, paragraph 1.1, subparagraph 1.1.1.1, Section M, M-1 Evaluation Factors For Award (Services), PART B, paragraph

2.0 Past Performance Relevance Factors Table, Attachment 8 – QASP, Enclosure (1): Quality Standards – In-

Service Engineering by PWS (Level of Effort) Table, and Attachment 8 – QASP, Enclosure (4): Surveillance

Activity Checklist – Level of Effort & Performance Based Table.

Q15: Several areas of the RFP reference that PWS/SOW sections 3.3.3 (System Integration and Life-Cycle

Support) and 3.3.5 (Cybersecurity) will be executed against CLINS 0008-0014 (completion CLINS).

However, the LCAT listing provided in Section L for pricing does not reflect LCATs normally associated with Systems Integration, Life Cycle Support or Cybersecurity work. Can the government evaluate if those

CLIN references are as intended or if the right LCATs are included in the LOE tables provided?

A15: The labor categories have been revised as shown in the B-1 Estimated Rates Performance Based OFF-SITE and ON-SITE tables, Attachment P6, Attachment P7, and Section L, L-1, Content of Proposals, Part B, 3.0 Volume

3: Price/Cost Proposal, paragraph 3.5.2 tables as of Amendment 0001.

Q16: On page 83, Clause 5252.228-9501 Liability Insurance (NAVAIR) (MAR 1999) paragraph (d) requires:

(d) Aircraft public and passenger liability: $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability; $200,000 per occurrence for property damage. Passenger bodily injury liability limits of $200,000 per passenger, multiplied by the number of seats or number of passengers, whichever is greater.

A16: Clause 5252.228-9501 Liability Insurance (NAVAIR) (MAR 1999) paragraph (d) has been updated in Section

H to reflect a removal of all values.

Q17: Section L requires each volume to be submitted in a separated binder, with tabs. The table provided appears to indicate Annexes be bundled in separate binders as well. Can the Government please confirm if a separate binder is requested for each annex, or should it be provided in the same binder as the corresponding volume for the annex.

A17: The Government requires a separate binder be used for each annex.

Q18: The RFP does not provide a requirement for an acronym list. Is an acronym list desired? If so, can provisions be made in the instruction such that the acronym list does not count against provided page limitations.

A18: Section L, L-1, Content of Proposals, Part A, Paragraph 3.2 has been updated to include acronym lists not counting towards the page limit.

Q19: The labor categories for Program/Project Analyst Journeyman and Senior both require a degree in a technical discipline. Given the function outlined for these labor categories, would the Government consider adding “Business Administration or a related Business field” as an acceptable degree for these two labor categories?

A19: “Business Discipline” has been added to both the Program/Project analyst Journeyman and Senior labor categories in Section C, PWS/SOW, paragraph 3.4.12(p) and paragraph 3.4.12(q) as an acceptable degree as of

Q20: Will the Government allow 10 pt. font for tables and graphics?

A20: As stated in Section L, Part A General Instructions, 2.0 Proposal Format, paragraph 2.1, Graphs and Tables shall be presented in no smaller than a 10 pt. font.

Additional Changes made by the Government:

1) Section B: Added B-2 Fee text for Non-Performance Based (Level of Effort) and Performance Based

(Completion) fee.

2) Section C, 3.0 REQUIREMENTS, paragraph 3.1.2, subparagraph 3.1.2.1 has been updated to reflect work performed at NAS Patuxent River at 4% as of Amendment 0001.

3) Section C: Business Discipline definition has been added to Section C, PWS/SOW, 3.0 Requirements, 3.4

Labor Category Definition, 3.4.5 Degree Majors, 3.4.5.3.

4) Section J: P3 (reference) was deleted.

5) Section J: Attachment P4 is updated to include additional instructions and an additional tab for contractor input of fee per hour and fee percentage.

6) Section J: Attachment P6 is revised to include additional labor categories under Completion CLINs 0008-0014

7) Section L: L-1, Content of Proposals, Part B, 3.0 Volume 3: Price/Cost Proposal, paragraph 3.3.3, subparagraph

3.3.3.1, 3.3.3.2, and 3.3.3.3 have been added.

8) All NAVAIR Clauses have been updated to full-text.

9) Section L: Clause 52.233-2, code 2.1.5.3 has been changed to 2.5.1.3.

10) Section M, M-1 Evaluation Factors For Award (Services), PART B, paragraph 2.0, is revised to include updated language pertaining to Past Performance evaluations.

Section B - Supplies or Services and Prices

B-1 ESTIMATED RATES

B-1 ESTIMATED AND NEGOTIATED LABOR RATES

This language is designed for use in conjunction with H-2 Issuance of Orders Using Streamlined Procedures

NAVAIR 5252.216-9540 (Variation) (Jul 2017). The below rates consist of composite fully burdened rates for each key and non-key labor categories, inclusive of fee. Fully burdened rates are defined as direct labor rates plus all applicable burdens, to include indirect rates, fee, and subcontractor pass-through costs where applicable. The rates below will be utilized when developing estimated labor ceilings for task orders by using the estimated hours per labor category multiplied by the composite rate. Invoicing will be based on actual costs incurred. Ceiling for Other

Direct Costs will be priced in accordance with the Government Estimate. Orders crossing multiple years will be estimated by the Government using the composite rates for each year in proportion to the period of performance of the order.

Non-Performance Based (PWS/SOW 3.3.1-3.3.5) OFF-SITE

COMPOSITE FULLY BURDENED RATES (regardless of clearance or whether or not Key) Labor Category Year 1 Year 2 Year 3 Year 4 Year 5

OFF-SITE (Contractor Facility)

10/29/2018-

10/30/2019**

10/29/2019-

10/30/2020**

10/29/2020-

10/30/2021**

10/29/2021-

10/30/2022**

10/29/2022-

10/30/2023**

Program/Project Analyst, Journeyman Program/Project Analyst, Senior Computer Programmer I (SCA) Computer Programmer II (SCA) Computer Programmer III (SCA) Drafter/CAD Operator II (SCA)

Electrical and Electronic Engineering Technician

(Electronics Technician Maintenance III) (SCA)

Electrical Engineer, Senior Mechanical Engineer, Senior Administrative Assistant (SCA) Information Security Analyst, Junior Information Security Analyst, Journeyman Information Security Analyst, Senior Logistician, Journeyman Manager/Operations Manager, Senior (Project Manager) Computer Network Architect, Journeyman Computer Network Architect, Senior Software Developer, Senior (Software Engineer, Senior) Computer Systems Analyst, Journeyman Computer Systems Analyst, Senior Engineer, Junior (Systems Engineer) Engineer, Journeyman (Systems Engineer) Engineer, Senior (Systems Engineer) Software Developer, Senior (Systems Specialist) Technical Writer (Technical Writer II) (SCA)

** Dates to be adjusted at contract award (SCA) Service Contract Act

Non-Performance Based (PWS/SOW 3.3.1-3.3.5) ON-SITE

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5

ON-SITE (St. Inigoes, MD) 10/29/2018- 10/29/2019- 10/29/2020- 10/29/2021- 10/29/2022-

10/30/2019** 10/30/2020** 10/30/2021** 10/30/2022** 10/30/2023**

Program/Project Analyst, Journeyman Program/Project Analyst, Senior Computer Programmer I (SCA) Computer Programmer II (SCA) Computer Programmer III (SCA) Drafter/CAD Operator II (SCA)

Administrative Assistant (SCA) Information Security Analyst, Journeyman Information Security Analyst, Senior Logistician, Journeyman Manager/Operations Manager, Senior (Project Manager) Computer Network Architect, Journeyman Computer Network Architect, Senior Software Developer, Senior (Software Engineer, Senior) Computer Systems Analyst, Journeyman Computer Systems Analyst, Senior Engineer, Journeyman (Systems Engineer) Engineer, Senior (Systems Engineer) Software Developer, Senior (Systems Specialist) Technical Writer (Technical Writer II) (SCA)

Performance Based (PWS/SOW 3.3.5) OFF-SITE

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5

OFF-SITE (Contractor Facility) 10/29/2018-

10/30/2019**

10/29/2019-

10/30/2020**

10/29/2020-

10/30/2021**

10/29/2021-

10/30/2022**

10/29/2022-

10/30/2023**

Program/Project Analyst, Journeyman Program/Project Analyst, Senior Computer Programmer I (SCA) Computer Programmer II (SCA) Computer Programmer III (SCA) Drafter/CAD Operator II (SCA)

Administrative Assistant (SCA) Information Security Analyst, Journeyman Information Security Analyst, Senior Logistician, Journeyman Manager/Operations Manager, Senior (Project Manager) Computer Network Architect, Journeyman Computer Network Architect, Senior Software Developer, Senior (Software Engineer, Senior) Computer Systems Analyst, Journeyman Computer Systems Analyst, Senior

Engineer, Journeyman (Systems Engineer) Engineer, Senior (Systems Engineer) Software Developer, Senior (Systems Specialist) Technical Writer (Technical Writer II) (SCA)

Performance Based (PWS/SOW 3.3.5) ON-SITE

Labor Category Year 1 Year 2 Year 3 Year 4 Year 5

ON-SITE (St. Inigoes, MD) 10/29/2018- 10/30/2019**

10/29/2019- 10/30/2020**

10/29/2020- 10/30/2021**

10/29/2021- 10/30/2022**

10/29/2022- 10/30/2023**

Program/Project Analyst, Journeyman Program/Project Analyst, Senior Computer Programmer I (SCA) Computer Programmer II (SCA) Computer Programmer III (SCA) Drafter/CAD Operator II (SCA)

Administrative Assistant (SCA) Information Security Analyst, Journeyman Information Security Analyst, Senior Logistician, Journeyman Manager/Operations Manager, Senior (Project Manager) Computer Network Architect, Journeyman Computer Network Architect, Senior Software Developer, Senior (Software Engineer, Senior) Computer Systems Analyst, Journeyman Computer Systems Analyst, Senior Engineer, Journeyman (Systems Engineer) Engineer, Senior (Systems Engineer) Software Developer, Senior (Systems Specialist) Technical Writer (Technical Writer II) (SCA)

SECTION B

NSP only for Basic Contract and will be separately priced at the Task Order level.

B-2 FEE

Non-Performance Based (Level of Effort) - For non-performance based level of effort tasks the composite rates from B-1 will be used to develop the total estimated cost plus fixed fee. Fixed fee will be calculated based on fee per hour. The fee per hour is the total fee proposed for all periods divided by the total number of hours for all periods (830,400). The non-performance based fee per hour is $_______.

Performance Based (Completion) - For performance based (completion) tasks the composite rates from B-1 will be used to develop the total estimated cost plus fixed fee. Fixed fee will be calculated based on the percentage of total fee proposed for all periods divided by the total proposed cost for all periods. The performance based (completion) fee percentage is _____%.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot

Labor in support of the PWS/SOW - Term

CPFF

Services in accordance with Section C, Performance Work Statement

(PWS)/Statement of Work (SOW) paragraph 3.3.1, 3.3.2, 3.3.4, and 3.3.5.

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

Labor - RDT&E - Term

Not separately priced (NSP) from CLIN 0001.

Labor - FMS - Term

Labor - Other - Term

Labor - WCF - Term

Labor - O&M - Term

Labor - Procurement - Term

0008 1 Lot

Labor in support of the SOW - Completion

Services in accordance with Section C, Performance Work Statement

(PWS)/Statement of Work (SOW) paragraph 3.3.3 and 3.3.5.

Labor - RDT&E - Completion

Not separately priced (NSP) from CLIN 0008

Labor - FMS - Completion

Labor - Other - Completion

Not separately priced (NSP) from CLIN 0008.

Labor - WCF - Completion

Labor - O&M - Completion

Labor - Procurement - Completion

0015 1 Lot ODC in support of CLIN 0001 & 0008

COST

Other Direct Costs (ODCs) in support of CLIN 0001 & 0008 in accordance with

PWS/SOW Paragraph 3.1.5. Other Direct Costs (ODCs) and Section H, H-1

5252.242.9515 Restriction on the Direct Charging of Material (Variation)(Nov

2017) and 5252.232-9509 Travel Approval and Reimbursement Procedures.

ODC - RDT&E

COST

Other Direct Costs (ODCs). Not separately priced (NSP) from CLIN 0015.

ODC - FMS

ODC - Other

ODC - WCF

ODC - O&M

ODC - Procurement

Data in support of Labor and ODC CLINs

Not separately priced (NSP) Technical Data IAW PWS/SOW in Section C.

CLAUSES INCORPORATED BY FULL TEXT

Man-Hours

CPFF Non-Performance Based/LOE (CLIN 0001-0007)

The Government estimate is 830,400 man-hours for the entire work effort (5 years) for CPFF Non-Performance

Based/LOE tasking. A work year is defined as 1920 hours exclusive of holidays and leave.

CPFF Performance Based/Completion (CLIN 0008-0014)

The Government estimate is 52,800 man-hours for the entire work effort (5 years) for CPFF Performance

Based/Completion tasking. A work year is defined as 1920 hours exclusive of holidays and leave.

The Government estimate (inclusive of CPFF Non-performance Based/LOE and CPFF Performance

Based/Completion) for the entire effort is 883,200 man-hours.

5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT)(VARIATION)(NAVAIR)(JUL 2017)

(a) The level of effort estimated to be ordered during the term of this contract is 830,400 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor is as follows:

CLIN TOTAL Labor Hours

0001 830,400

(b) The estimated level of effort for each individual order will be established at the task order level.

(c) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.

(d) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:

(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or

52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort specified in paragraph above, at no increase in the fee of the order; or

(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.

(e) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.

(f) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.

Section C - Descriptions and Specifications

STATEMENT OF WORK

Section C - Descriptions and Specifications

Items 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and 0014– The contractor shall provide services in accordance with the Section C, Performance Work Statement (PWS)/Statement of Work

(SOW). Contract services shall be performed in accordance with the Performance Work Statement (PWS)/Statement of Work (SOW) as detailed in individual task orders. The task order Performance Work Statement

(PWS)/Statement of Work (SOW) will detail tasks that fall within the scope of the basic contract.

Items 0015, 0016, 0017, 0018, 0019, 0020, and 0021– The contractor shall provide ODCs in accordance with the

Section C , Performance Work Statement (PWS)/Statement of Work (SOW) and Clause H-1 5252.242-9515

Restriction On The Direct Charging Of Material (Variation) (Nov 2017) and 5252.232-9509 Travel Approval and

Reimbursement Procedures (NAVAIR)(OCT 2013).

Item 0022– The data to be furnished hereunder shall be in accordance with Exhibit A, DD Form 1423, Contract

Data Requirements List (CDRL), and the Section C, Performance Work Statement (PWS)/Statement of Work

(SOW).

Performance Work Statement (PWS)/ Statement of Work (SOW) for Technical Engineering Services

(TES)

1.0 SCOPE

The Ship & Air Integrated Warfare (SAIW) Division, Naval Air Warfare Center Aircraft Division (NAWCAD)

4.11.3, provides engineering and technical services to support the advanced research and development, systems engineering, and life-cycle support of electronics, communications, and information systems. These services are provided in response to tasking from Department of Defense (DoD), and other U.S. Government organizations.

Efforts span the entire systems and equipment life cycle from initial needs assessment to sustainment and disposal.

The SAIW Division is the lead design agent, organic Lead System Integrator (oLSI), and product manager to various DoD and Department of Homeland Security (DHS) sponsors for the integration (work associated with the rapid development, design, procurement, production, and installation of a system or change to a system, where system could represent a rapid prototype supporting proof of concept, initial production units, full rate production units, or fielded units), test, production, and support of the various systems detailed below. Many of these systems involve operational development due to the warfighter’s rapid response requirements. The SAIW Division is integrally involved in the design, production, and support of the end items. This Performance Work Statement

(PWS)/Statement of Work (SOW) includes advanced research and development support, engineering and technical support, quality management support, cybersecurity services, and technical management support of final end item products. The scope of this effort encompasses rapidly developed engineering designs for end products intended for immediate warfighter operational use, and may include C5ISR systems, subsystems and components of strategic and tactical airborne, land-based, and mobile, sea-based surface and sub-surface platforms. The following are representative of the programs, systems, and technology areas to which the requested engineering and technical services may be applied:

Military and commercial radio communication systems

Information and computer network systems

Command and control systems

Automatic identification technology systems

Integrated document management systems

Multimedia systems

Embedded and stand-alone sensors systems

Unmanned Aerial Systems

Cyber security solutions

2.0 APPLICABLE DOCUMENTS

2.1 DoD Specifications

2.1.1 DoD 5220.22 National Industrial Security Program Operating Manual

2.1.2 DoDD 8140.01 Cyberspace Workforce Management

2.1.3 DoDI 8500.01 Cybersecurity

2.1.4 DoDI 8510.01 Risk Management Framework (RMF) for DoD Information Technology (IT)

2.1.5 DoDD 5230.24 Distribution Statements on Technical Documents

2.2 DoD Standards

2.2.1 Joint Technical Architecture (JTA)

2.2.2 DoD Standard Practice for System Safety (MIL-STD-882E, May 2012)

2.2.3 MIL-STD-31000A, Technical Data Packages

2.2.4 MIL-STD-100G, Engineering Drawing Practices

2.3 Other Government Documents

2.3.1 Federal Communications Commission (FCC)

2.3.2 NAVSEA Source Approval Request (SAR) for Ships’ Critical Safety Items

2.3.3 SECNAV Manual M-5216.5, Department of the Navy Correspondence Manual

2.3.4 OPNAVINST 4790.4E, Ship's Maintenance And Material Management (3-M) System Policy Naval

Systems Engineering Guide, October 2004

2.3.5 Electronic Industries Alliance (EIA) 632 Standard- Processes for Engineering a System

2.3.6 DoD 5220.22-M, National Industrial Security Program Operating Manual

2.3.7 OPNAVINST 3432.1A, Operations Security Plan

2.3.8 NAVSEA 0900-LP-095-2010, Ship Construction Tests and Trials Manual

2.3.9 NAVSEA 0900-LP-095-6010, Planning Guide Total Ship Test Program for Ship Production

2.3.10 DAO 201-39, Radio Frequency Management

2.3.11 NAWCADINST 5510.1A, NAVAIRWARCENACDIV Information, Personnel and Industrial Security

Program Manual

2.3.12 NAVAIRINST 3960.4C, Project Test Plan Policy And Guide For Testing Air Vehicles, Air Vehicle

Weapons, And Air Vehicle Installed Systems

2.3.13 NAVAIRINST 4355.19D, Systems Engineering Technical Review Process

2.3.14 NAVAIRINST 5239.3, NAVAIR Information Assurance Workforce Improvement Program

2.3.15 NAWCADINST 7320.1B, NAVAIRWARCENACDIV Property Management Process for Minor Property and Class 3 and Class 4 Plant Property

2.3.16 CNSSI 1253 Security Categorization and Control Selection for National Security Systems

2.3.17 CNSSI 4009 Committee on National Security Systems (CNSS) Glossary

2.3.18 Federal Information Security Management Act (FISMA) Title III

2.3.19 FIPS 199 Standards for Security Categorization of Federal Information and Information Systems

2.3.20 ICD 503: Intelligence Community Information Technology Systems Security Risk Management

Certification and Accreditation

2.3.21 NIST SP 800-30 Guide for Conducting Risk Assessments

2.3.22 NIST SP 800-34 Contingency Planning Guide for Federal Information Systems

2.3.23 NIST SP 800-37 Guide for Applying the Risk Management Framework to Federal Information Systems: A

Security Life Cycle Approach

2.3.24 NIST SP 800-53 Assessing Security and Privacy Controls in Federal Information Systems and

Organizations

2.3.25 NIST SP 800-53A Assessing Security and Privacy Controls in Federal Information Systems and

Organizations

2.3.26 NIST SP 800-59 Guideline for Identifying an Information System as a National Security System

2.3.27 NIST SP 800-60 Guide for Mapping Types of Information and Information Systems to Security Categories

2.3.28 NIST SP 800-137 Information Security Continuous Monitoring (ISCM) for Federal Information Systems and Organizations.

2.3.29 NAVAIR SWP4000-001 Cyber Risk Assessment Methodology Standard Work Package

2.3.30 NAVAIR SWP-726-007 RMF Step 1

2.3.31 NAVAIR SWP-726-008 RMF Step 2

2.3.32 NAVAIR SWP-726-009 RMF Step 3

2.3.33 NAVAIR SWP-726-010 RMF Step 4

2.3.34 NAVAIR SWP-726-005 RMF Step 5

2.4 Industry Documents

2.4.1 American National Standards Institute (ANSI)

2.4.2 Society of Mechanical Engineering (ASME) Standards

2.4.3 Association of Public-Safety Communications Officials – International (APCO) – Standards

2.4.4 Electronic Components Industry Association (ECIA), (e.g. Recommended Standards RS Series)

2.4.5 European Telecommunications Standards Institute (ETSI)

2.4.6 Institute of Electrical and Electronic Engineers (IEEE)

2.4.7 International Standards Organization (ISO)

2.4.8 International Telecommunications Satellite Organization (ITSO)

2.4.9 International Telecommunications Union (ITU), formerly the CCITT

2.4.10 National Institutes of Standards and Technology (NIST)

2.4.11 Telecommunications Industry Association (TIA)

2.4.12 ASME Y14.100-2013, Engineering Drawing Practices

3.0 REQUIREMENTS

3.1 General Requirements

3.1.1 Compatibility

The Contractor shall maintain the capability to prepare documents and software packages compatible with the

Government IT environment through the security classification specified on the DD254 (Attachment 2). The current operating environment required for this contract includes:

Microsoft Windows 10

Microsoft Project 2010

Microsoft Office Professional Plus 2010

Adobe Acrobat XI (reader)

Internet access

The Contractor shall maintain the ability to interface with and transfer data to and from requiring office software applications and their upgraded versions. The Contractor shall maintain state-of the-art virus software and ensure that all media are virus free when delivered. The Contractor shall be capable of Internet and LAN communications with the SAIW Division. Contractor personnel shall be capable of maintaining real-time communications, both voice and data transfer capabilities, with the SAIW Division during working hours whether at Contractor work site or on travel.

3.1.2 Work Location and Facilities

3.1.2.1 Work Location: Approximately 39 percent of work will be performed at Government sites and 61 percent of work to be performed at Contractor site. Government site(s) include NAS Patuxent River

(4%), and Webster Field Annex, St Inigoes, Maryland (35%). Contractors performing on-site support will be provided access to workspaces, telephones, printers, facsimile machines, copy machines, shredders, computers, and network access including web servers and applicable databases or other applications necessary to carry out assigned tasks. The geographic location of the

Contractor’s primary facility with respect to NAWCAD 4.11.3, NAS Patuxent River, Webster Field

Annex is not dictated, but an office location within a fifty (50) mile driving distance of the

Government Program Office location at NAWCAD 4.11.3, NAS Patuxent River, Webster Field

Annex, St Inigoes, Maryland is mandatory.

3.1.2.2 Meeting and Conference Support: The Contractor shall have the capability to locate and secure conference room facilities for conducting meetings at a classification level up to Secret. The conference room should hold a minimum of ten (10) persons and have VTC capability (non-GFE).

The conference room shall contain sufficient equipment to conduct meetings with presentations. The conference room shall have projectors and/or TV displays, computer(s) with compatible software as required in Paragraph 3.1.1 and telephone(s). The conference room location shall be within a fifty

(50) mile driving distance of the Government Program Office location at NAWCAD 4.11.3, NAS

Patuxent River, Webster Field Annex, St. Inigoes, maryland is mandatory.

3.1.2.3 Industrial Support Facilities: The Contractor shall provide sufficient industrial space on an indirect cost basis, for the storage, integration, and testing of electronic equipment and systems associated with assigned projects. The Government estimates that approximately 6,000 square feet are required at contract award and that up to 15,000 square feet will be required during contract execution. The space shall be configured to meet requirements for receiving, material receipt inspection, equipment testing, storage awaiting buildup, a buildup area (including foundation, cabinet, and cable buildup), storage awaiting integration and testing, and storage of completed systems. The space shall be capable of sustaining a controlled environment consistent with the storage, assembly, and operation of electronic equipment. The contractor shall have an approved Property Management System and adequately protect Government property. The Contractor shall furnish and equip the facility to meet requirements. The Contractor’s industrial support facility shall be within a fifty (50) mile driving distance of the Government Program Office location at NAWCAD 4.11.3, NAS Patuxent River, Webster Field Annex, St Inigoes, Maryland. Cost of the facility shall not be a direct cost to the

Government. The Government will not take possession of the facility at contract termination.

3.1.2.4 Government Spaces: The Government has the ability to provide approximately 36 spaces (34 Term and 2 Completion FTE) at it’s St. Inigoes facility to support this effort.

3.1.3 Contract Status Reporting

3.1.3.1 Monthly Progress and Financial Status Report: The Contractor shall provide a progress and financial status report in accordance with the Contract Data Requirement List. (CDRL A005)

The report shall include work accomplished since submittal of the last report, both monthly and cumulative man-hour labor costs expended by labor category and material and travel costs. The purpose of this report is to provide the SAIW Division with the current financial status of the contract at the Contract Line Item Number (CLIN) and TO levels. When applicable, this report shall include prior year(s) expenditures.

3.1.3.2 Reserved.

3.1.3.3 Technical Progress Reports: The Contractor shall prepare and deliver a technical progress report as a supplement to each Standard Form 1034 presented for payment. (CDRL A017)

3.1.3.4 Segregation of Costs and Invoices Requirements: To support invoice reviews, the Contractor shall report costs in the prescribed format. (CDRL A026)

3.1.3.5 Project/TO Report: The Contractor shall provide a report after completing the requirements of each

TO, as well as for the overall contract. (CDRL A021)

3.1.3.6 Travel Reporting and Monitoring: The Contractor shall report all travel costs in the monthly status report, and shall monitor all travel costs to ensure each TO is not exceeded. (CDRL A003)

3.1.4 Work Schedule to include Compressed Work Schedule (CWS), overtime, holidays, and installation closure.

3.1.4.1 Work Schedule: The Contractor shall provide the required services and staffing coverage during normal working hours. Normal working hours are usually 8.5 hours (including a 30-minute lunch break), from 0730 to 1600 each Monday through Friday (except on the legal holidays specified in paragraph 3.1.4.1.2). Some supported Government offices have flexibility to start as early as

0600/0630 and end as late as 1800, Monday –Friday.

3.1.4.1.1 Compressed Work Schedule (CWS): CWS is an alternative work schedule to the traditional five

8.5 hour workdays (which includes a 30-minute lunch) worked per week. Under a CWS schedule, an employee completes the following schedule within a two-week period of time: eight weekdays are worked at 9.5 hours each (which includes a 30-minute lunch), one weekday is alternately worked as

8.5 hours (which includes a 30-minute lunch) and one weekday is not worked by the employee. The result is 80 hours worked every two weeks, with 44 work hours one week and 36 work hours the other.

The Contractor may allow its employees to work a CWS schedule provided the requirements of this PWS/SOW are met. If the Contractor chooses to allow its employees to work a CWS schedule in support of this contract, any additional costs associated with the implementation of the CWS schedule vice the standard schedule are unallowable costs under this contract and will not be reimbursed by the Government. Additionally, the CWS schedule shall not prevent Contractor employees from providing necessary staffing and services coverage when required by the

Government. The overall schedule must be provided to the ACOR/COR.

3.1.4.1.2 Holidays: The Government observes the following holidays:

New Year’s Day, January 1

Martin Luther King’s Birthday, the third Monday in January

President’s Birthday, the third Monday in February

Memorial Day, the last Monday in May

Independence Day, July 4

Labor Day, the first Monday in September

Columbus Day, the second Monday in October

Veteran’s Day, November 11

Thanksgiving Day, the fourth Thursday in November

Christmas Day, December 25

With the exception of the events in section 3.1.4.1.3 below, the contractor is permitted to observe the above

Holidays in accordance with its corporate policy.

3.1.4.1.3 Installation Closure: When Federal employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or any other Government facility related problem that prevents Federal personnel from working at the Government facility, contractor personnel assigned to work at that facility in support of such Federal employees shall follow their parent company’s policies.

While generally contractor personnel may not perform work on-site at a Government facility without oversight from

Federal personnel, in very limited circumstances, work being performed by contractor personnel may be deemed mission essential and performance of such mission essential work may be authorized to continue at the Government facility despite the facility being otherwise closed for normal operations. The circumstances permitting work being performed by contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant

Contracting Officer must concur with any determination that work being performed by contractor personnel is mission essential.

3.1.4.1.4 Overtime: Overtime cannot be charged directly to the contract unless first approved in writing by the Chief of the Contracting Office.

3.1.5 Other Direct Costs (ODCs): The COR and Contracting Officer approval shall be obtained prior to the purchase of any material in accordance with NAVAIR Clause 5252.242-9515 Restrictions on the

Direct Charging of Material (Variation)(Nov 2017) or travel expenses in accordance with NAVAIR

Clause 5252.232-9509 Travel Approval and Reimbursement Procedures (NAVAIR)(OCT 2013).

3.1.5.1 Travel: Travel will be allowable only when it is essential to the performance of the tasks detailed in

Section 3.3. Reimbursement for travel performed shall be in accordance with the Department of

Defense Joint Travel Regulation (http://www.defensetravel.dod.mil/site/travelreg.cfm) and NAVAIR

Clause 5252.232-9509 Travel Approval and Reimursement Procedures (NAVAIR)(OCT 2013). The

COR shall approve all travel performed in support of this contract prior to the commencement of the travel. Travel may include general and administrative expenses, but shall not include profit.

Temporary travel to other locations in support of program tasking is required. If required, temporary travel locations include CONUS and OCONUS locations. These lists are not all inclusive as locations may change over the life of the contract. (CDRL A003)

3.1.5.1.1 CONUS: CONUS locations may include, but are not limited to, St. Inigoes, MD, Newport, VT, Weslaco, TX, McAllen, TX, Rio Grande City, TX, Brackettville, TX, Uvalde, TX, Zapata, TX, Laredo, TX, Alamogordo, NM, Blaine, WA, Eureka, MT, Harrisburg, PA, Norfolk, VA, Mayport, FL, St Louis, MO, Hood River, OR, Tucson, AZ, San Diego, CA, Quantico, VA, Washington, D.C., Dallas, TX, Detroit, MI, Jacksonville, FL and Tampa, FL.

3.1.5.1.2 OCONUS: OCONUS locations may include, but are not limited to, Sasebo, Japan, Aguadilla, Puerto Rico, and other countries in Europe, the Middle East, Asia, and Africa. OCONUS travel shall be conducted IAW DFAR clause 252.225-7040, and the requirements set forth in the TO.

3.1.5.1.3 Synchronized Pre-Deployment & Operational Tracker (SPOT) and Letter of Authorization

(LOA): The Contractor may travel in U.S. Central Command locations. In accordance with Clauses

252.225-7040 and 5152.225-5908, SPOT enables the validation of Contractors authorized to accompany the Force (CAAF), (i.e. Contractor personnel associated with specific contracts and subcontracts), their authorization and eligibility for access to specific DoD facilities, and their eligibility for specific Government-Furnished Support (GFS). The Contractor shall initiate a Letter of Authorization (LOA) for each prospective traveler. The Contractor shall use the SPOT link, https://spot.dmdc.mil to enter and maintain data with respect to traveling/deployment personnel and to generate LOAs.

http://www.defensetravel.dod.mil/site/travelreg.cfm https://spot.dmdc.mil/

3.1.5.1.4 Local Travel Reimbursement: Reimbursement of personal travel to-and-from NAWCAD 4.11.3, NAS Patuxent River, Webster Field Annex and the Contractor’s facility and the surrounding area, by the Contractor or subcontractor located within 50 miles of the base, shall not be authorized.

3.1.5.2 Material: All incidental materiel purchases will be approved per the clause "Restriction on the

Direct Charging of Material (NAVAIR 5252.242-9515 Variation) (Nov 2017)" Any material provided by the Contractor is subject to the requirements of the Federal Acquisition Regulation

(FAR), the Defense Federal Acquisition Regulation Supplement (DFARS), and applicable

Department of the Navy regulations and instructions. All materials not depleted during the performance of this contract shall become Government property upon completion of this contract.

The Contractor shall transfer all materials not depleted to the COR by way of Material Inspection and Receiving Report (DD Form 250). Other Direct Charges may include general and administrative expenses but shall not include profit.

The costs of general purpose business expenses required for the conduct of the Contractor’s normal business operations are not an allowable direct cost in the performance of this contract.

General purpose business expenses include, but are not limited to, the cost for items such as telephones and telephone charges, reproduction machines, word processing equipment, personal computers and other office equipment and office supplies.

3.1.6 Subcontractors: Provisions stated herein shall be clearly and effectively communicated to all subcontractors providing support under this contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.