N00421-16-R-0059
Quality Assurance Surveillance Plan and Contract Surveillance Plan for
Technical and Engineering Services (TES)
1. Purpose
This requirement consists of both performance-based and non-performance-based orders;
therefore, a Quality Assurance Surveillance Plan (QASP) and a Contract Surveillance Plan
(CSP) are both required. The QASP/CSP is used to ensure that the contractor performs in accordance with the performance standards and definitions/metrics and the Government receives the quality of services called for in the contract.
This hybrid QASP/CSP is a Government developed and applied document used to ensure systematic quality assurance methods are used in the administration and surveillance of performance based and non-performance based tasking under the contract. The intent is to ensure the contractor performs in accordance with the performance based standards and definitions and non-performance based required Level of Effort (LOE), and the Government receives the quality of services called for in each Task Order (TO) Performance Work Statement
(PWS)/Statement of Work (SOW).
This contract will leverage the SAIW Division’s core capabilities involving engineering and technical services to support the advanced research and development, systems engineering, and life-cycle support of electronics, communications, and information systems. The scope of the contract encompasses rapidly developed engineering designs for end products intended for immediate warfighter operational use, and may include strategic and tactical airborne, land-based, and mobile, sea-based surface and sub-surface, systems, subsystems and components.
The following are representative of the programs, systems, and technology areas to which the requested engineering and technical services may be applied:
Military and commercial radio communication systems
Information and computer network systems
Command and control systems
Automatic identification technology systems
Integrated document management systems
Multimedia systems
Embedded and stand-alone sensors systems
Unmanned Aerial Systems
Cyber Warfare offensive and defensive solutions
A properly executed QASP/CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this hybrid surveillance document is provided under Contract Section E
– Inspection and Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the contract, which will be executed by the
Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP/CSP. The contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth in the contract and all resultant orders.
The hybrid QASP/CSP provides Government surveillance oversight of the contractor’s efforts to assure they are timely, effective, and delivering the results specified in the contract and each TO.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer (KO): A person duly appointed with the authority to enter into a contract
(Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts
(Administrative Contracting Officer (ACO)), and make related determinations and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.3. The ACO will be designated in the resulting contract. Contracting officers are designated via a written warrant that sets forth limitations of authority.
Contracting Officer Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Government Project Leads (GPL): The COR designates individual GPL to assist in administering of specific efforts under the contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this hybrid QASP/CSP Surveillance Plan:
Contracting Officer (abbreviated KO): The KO (either the PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the KO that assures the contractor receives impartial, fair and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Contracting Officer Representative: The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The
COR is not empowered to make any contractual commitments or to authorize any changes on the
Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.
Alternate Contracting Officer’s Representative: The ACOR assists the COR for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.
Government Project Leads: The GPLis responsible for assisting in administering of specific efforts under the contract. A GPL cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for advanced research and development, systems engineering, and life-cycle support of electronics, communications, and information systems services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed annually at the end of each ordering year. This evaluation will be one determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other important areas for this procurement. Some of the monitoring methods to be used will be
Government observation, review of reports, customer feedback, and review of Contract Data
Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DOD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this hybrid QASP/CSP.
b. QASP/CSP: This document will be used by the COR, ACOR, and GPL in the technical administration of this contract. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the hybrid checklist provided herein.
7. Surveillance
Enclosures (1) through (3) set forth the performance standards, incentives, and surveillance methods for the contractor, the COR and GPL while enclosures (4) through (6) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Surveillance Activity Checklists. All such records will be maintained for the life of the contract. The COR will forward these records to the KO at termination or completion of the contract.
9. Enclosures
Enclosure (1): Quality Standards – In-Service Engineering by PWS (Performance Based)/SOW
(Non-Performance Based)
Enclosure (2): CDRL Data Quality Standards (Performance Based)
Enclosure (3): Incentives
Enclosure (4): Surveillance Activity Checklist – Level Of Effort & Performance Based
Enclosure (5): Contract Surveillance by Contract Data Requirements Lists (Level of Effort &
Performance Based)
Enclosure (6): Annual Surveillance Summary
Enclosure (1)
QUALITY STANDARDS – IN-SERVICE ENGINEERING BY PWS
(PERFORMANCE BASED)
Required
Service
(Performance
Requirements)
Standard (Performance
Standards) / Maximum Allowable
Degree of Deviation Requirement
(AQL)
Method of
Surveillance
(Quality
Assurance)
Incentives
System
Integration and
Life-Cycle
Support IAW
PWS/SOW
Para 3.3.3
Based upon feedback from the
Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
Metrics are provided in the TO
SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See
Enclosure
Cybersecurity
IAW
PWS/SOW
Para 3.3.5
Based upon feedback from the
Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
Metrics are provided in the TO
SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See
Enclosure
QUALITY STANDARDS – IN-SERVICE ENGINEERING BY PWS (LEVEL OF
EFFORT)
Required
Service (Non-
Performance
(LOE)
Requirements)
Standard (Performance
Standards) / Maximum Allowable
Degree of Deviation Requirement
(AQL)
Method of
Surveillance
(Quality
Assurance)
Concept and
Technology
Development
IAW
PWS/SOW
Para 3.3.1
Based upon feedback from the
Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
Metrics are provided in the TO
SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See
Enclosure
System
Development and Design
IAW
PWS/SOW
Para 3.3.2
Based upon feedback from the
Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
Metrics are provided in the TO
SOW and will be used as a Baseline
100% Inspection by COR/ACOR and/or GPL.
See
Enclosure (1) in the evaluation.
System
Integration and
Life-Cycle
Support IAW
PWS/SOW
Para 3.3.3
Based upon feedback from the
Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
Metrics are provided in the TO
SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See
Enclosure
Technical
Management
Support IAW
PWS/SOW
Para 3.3.4
Based upon feedback from the
Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
Metrics are provided in the TO
SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See
Enclosure
Cybersecurity
IAW
PWS/SOW
Para 3.3.5
Based upon feedback from the
Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
Metrics are provided in the TO
SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See
Enclosure (2)
CDRL DATA QUALITY STANDARDS (PERFORMANCE BASED AND LEVEL
OF EFFORT)
Description
Standard
AQL
Surveillance/
Method/Measure
Scientific and Technical Reports
Summary A001
Submission is in accordance with the
Data Item Description
(DID) cited in the
CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Scientific and
Technical Reports - Configuration Change
Request Document
A002
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Report, Record of Meeting/Minutes -
Trip/Meeting
Report/Conference Minutes/Agenda A003
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Development
Plan (SDP) A004
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Financial Progress
Reports A005
Submission is in accordance with the format detailed in BLK
16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Interface Design Description (IDD)
A006
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL.
See Enclosure 3.
Software Test Report
(STR) A007
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite
100% Inspection by COR, ACOR and/or GPL
See Enclosure
34.
Software User Manuals
(SUM) A008
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Computer Software
Product End Items - End Item Deliverable
A009
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Test Plan - Validation
Test Plan A010
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Test Procedure -
Validation Test
Procedure A011
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure
43.
Test/Inspection Report
- Validation Test
Report A012
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Installation Control
Drawings A013
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Report -
Study/Services A014
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Information
Report - Maintenance and Repair
Documentation A015
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Product Drawings/Models &
Associated Lists -
Technical
Documentation for
Repair & Maintenance
- Electronic Format A016
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Contract Performance
Report (CPR) A017
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Security Test Plan
A018
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Presentation Material
A019
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Scientific and Technical Reports -
Elements, Organization and Design A020
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Information
Report -Project Close-
Out Report A021
Submission is in accordance with the
DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Report - Study/Service -
Integration/Installation
Plan Report A022
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3
Change Control
Strategy A023
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Operational Security
(OPSEC) Plan A024
Submission is in accordance with the
DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Reserved A025
Segregation of Costs and Invoice
Requirements Reporting A026
Submission is in accordance with the
DID cited in the CDRL.
A one-time deliverable at each
TO close. Must be on time, with no more than one revision per submission.
100% Inspection by COR, Status Report -
Information Technology Personnel
Security Report for
NAVAIR Security A027
Submission is in accordance with the DID cited in the CDRL.
As an annual report, this deliverable must be on time and with no more than one revision per submission.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Requirements
Specifications (SRS)
A028
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Design
Description (SDD) A029
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Development
Status Report (SDSR) A030
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Test Plan
(STP) A031
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3
Contractor’s Configuration
Management Plan
A032
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Configuration Audit
Summary Report A033
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical and
Management Work Plan - Program Plans for Implementation of
SOW and TDLs A034
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Integrated Logistics Support Plan A035
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Logistics Management
Information (LMI)
Data Product A036
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Validation Report -
Validation of
Technical Manual Changes-Via
Demonstration A037
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Training Conduct
Support Document
A038
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Inspection and Test
Plan A039
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Report -
Study Services -Cost
Feasibility Report A040
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, Contractor's Risk
Management Plan A041
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Quality System Plan
Quality Management / Assurance Plan A042
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or GPL:
See Enclosure 3.
Detailed Project
Schedule A043
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Detailed Task/Activity
Estimate Report A044
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure
43.
Intermediate Project Schedule A045
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Integrated Master Schedule A046
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
System Security
Administrator
Operators Documentation A047
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
NAVAIR
Cybersecurity Implementation Plan
A048
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Transition Out Plan
A049
Submission is in accordance with the
DID cited in the CDRL.
95% of required deliverable provided on time. No more than
1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, Enclosure (3)
INCENTIVES
The following incentives will apply to performance under this contract.
Assessment Period Acceptable
Performance
Definition
How Measured Incentives
Ordering Year 1:
Not more than one of the measurement areas rated below
“Satisfactory”.
None of the measurement areas are rated below
“Marginal”.
End of the first assessment period using the CPARS format.
(+) Meet the acceptable performance definition as a condition for additional tasking.*
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
Ordering Year 2: Not more than one of the measurement areas rated below
“Satisfactory”.
None of the measurement areas are rated below
“Marginal”.
End of the second assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
Ordering Year 3: Two or more of the measurement areas rated “Very Good” or above. None rated below
“Satisfactory”.
End of the third assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
Ordering Year 4: Two or more of the measurement areas rated “Very Good” or above. None of
End of the fourth assessment period evaluation using the
CPARS format
(+) Meet the acceptable performance definition as a the measurement areas are below
“Satisfactory”.
covering the previous 12 months.
condition for additional tasking.*
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
Ordering Year 5: Two or more of the measurement areas rated “Very Good” or “Exceptional”.
None of the measurement areas are rated “Marginal” or below.
End of the fifth assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better
Final CPARS rating.
(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory final CPARS rating.
Final CPAR Review After completion of all TOs.
(+) Meet the acceptable performance definition as a condition for satisfactory or better
Final CPARS rating.
(-) Does not meet the acceptable performance definition` which will result in a marginal or unsatisfactory Final
CPARS rating.
* The Government may not award additional tasking (orders) unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All PWS/SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.
Quality of Product or Service: Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives.
Assess how successfully the contractor meets program quality.
Schedule: Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control: Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations: Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management: Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans.
Utilization of Small Business: The RFP and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting
Program. Assess whether the contractor provided maximum practicable opportunity for
Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes)
(including Small Disadvantaged Businesses (which also includes ANCs and Indian
Tribes), Women Owned Small Businesses, HUBZone, Veteran Owned, Service Disabled
Veteran Owned Small Business, and ANCs and Indian Tribes that are not Small
Disadvantaged Businesses or Small Businesses) to participate in contract performance consistent with efficient performance of the contract. Evaluation will focus on the metrics of actual small business utilization as compared to the contract required targets.
Other areas: Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (>5%) below initial estimates, increased timeliness, or generally enhanced effectiveness of operations). Although a few areas require minor improvement, these areas are offset by superior performance in other areas.
The few problems that do exist are insignificant in nature and have been noted, and the contractor has taken effective and quick corrective action.
Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (1-5%) below the initial estimates, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor has taken satisfactory corrective action.
Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the
Government (e.g., improved quality, costs are consistent with expectations, responsiveness, increased timeliness, or generally enhanced effectiveness of operations).
Although there are some areas of very good or excellent performance, these are more or less offset by marginal performance in other areas.
Marginal: Performance does not meet the full intent of the contract requirements. The contractual performance of the task and subtask being assessed reflect a problem for which the contractor has not yet identified marginally corrective actions. Costs have exceeded estimates without reasonable justification. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Cost control efforts are nearly nonexistent. Corrective actions were not taken or were ineffective.
For Level of Effort TOs, hours delivered by each order as compared to the order required hours will be evaluated and will influence the ratings awarded above. Cost variances greater than 10% cannot earn an Exceptional or Very Good for Cost Control evaluation criteria.
Enclosure (4)
SURVEILLANCE ACTIVITY CHECKLIST – LEVEL OF EFFORT & PERFORMANCE BASED
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of
Small Business, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure 3.
QUARTERLY EVALUATION – BY PWS/SOW
Description
Surveillance
Method/
Measure
Dates Quality
Assessment
Schedule
Assessment
Cost Control
Assessment
Business Relations
Assessment Management
Assessment
Utilization of
Small Business
Assessment
Other Areas
Assessment
3.3.1 Provide
Concept and
Technology
Development support IAW
PWS/SOW
requirements.
100% Inspection by COR/ACOR and/or.GPL
3.3.2 Provide
System
Development and
Design support
IAW PWS/SOW
requirements.
100% Inspection and/or GPL
3.3.3 Provide
System Integration and Life-Cycle
Support IAW
PWS/SOW
requirements.
100% Inspection
3.3.4 Provide
Technical
Management
Support IAW
PWS/SOW
requirements.
100% Inspection
3.3.5 Provide
Cybersecurity for
Assessment and
Authorization support IAW
PWS/SOW
requirements.
100% Inspection
Enclosure (5)
QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LISTS
(CDRLs) Form DD 1423
Description Surveillance Method / Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Scientific and Technical Reports
Summary A001
100% Inspection by COR/ACOR and/or GPL.
Scientific and Technical Reports -
Configuration Change Request
Document A002
Report, Record of
Meeting/Minutes - Trip/Meeting
Report/Conference
Minutes/Agenda A003
Software Development Plan (SDP)
A004
Financial Progress Reports A005 100% Inspection by COR/ACOR
Interface Design Description (IDD)
A006
Software Test Report (STR) A007 100% Inspection by COR/ACOR
Software User Manuals (SUM)
A008
Computer Software Product End
Items - End Item Deliverable A009
Test Plan - Validation Test Plan
A010
Test Procedure - Validation Test
Procedure A011
Test/Inspection Report - Validation
Test Report A012
Installation Control Drawings
A013
Technical Report - Study/Services
A014
Technical Information Report -
Maintenance and Repair
Documentation A015
Product Drawings/Models &
Associated Lists - Technical
Documentation for Repair &
Maintenance - Electronic Format
A016
Contract Performance Report
(CPR) A017
100% Inspection by
COR/ACOR and/or GPL.
Security Test Plan A018 100% Inspection by
Presentation Material A019 100% Inspection by
Scientific and Technical
Reports - Elements, Organization and Design A020
Technical Information Report -
Project Close-Out Report A021
Technical Report -
Study/Service -
Integration/Installation Plan
Report A022
Change Control Strategy A023 100% Inspection by
Operational Security (OPSEC)
Plan A024
Reserved A025
Segregation of Costs and
Invoice Requirements
Reporting A026
Status Report - Information
Technology Personnel Security
Report for NAVAIR Security
A027
Software Requirements
Specifications (SRS) A028
Software Design Description
(SDD) A029
Software Development Status
Report (SDSR) A030
Software Test Plan (STP) A031 100% Inspection by
Contractor’s Configuration
Management Plan A032
Configuration Audit Summary
Report A033
Technical and Management
Work Plan - Program Plans for
Implementation of PWS/SOW and TDLs A034
Integrated Logistics Support
Plan A035
Logistics Management
Information (LMI) Data
Product A036
Validation Report - Validation of Technical Manual Changes-
Via Demonstration A037
Training Conduct Support
Document A038
Inspection and Test Plan A039 100% Inspection by
Metric Summary: Current Period Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision
Technical Report - Study
Services -Cost Feasibility
Report A040
Contractor's Risk Management
Plan A041
Quality System Plan Quality
Management / Assurance Plan
A042
Detailed Project Schedule A043 100% Inspection by
Detailed Task/Activity Estimate
Report A044
Intermediate Project Schedule
A045
Integrated Master Schedule
A046
Status Report Information
Technology Personnel Security
Report for Contracting Officer
Representative (COR) A047
System Security Administrator
Operators Documentation A048
NAVAIR Cybersecurity
Implementation Plan A049
Enclosure (6)
Annual Surveillance Summary
The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure (3). This assessment will be completed annually covering the previous 12 months.
Description Surveillance
Method/
Measure
Date
Planned
Date
Completed
Summary
Rating/Results
Quality of
Product or Service
Review of Quarterly
Ratings.
Schedule
Cost Control Review Quarterly of
Business Relations
Management
Utilization of
Small Business
Other Areas
Annual Surveilance Completed By: _______________________
Date Completed: ________________