Attach_8_-QASP_CSP.docx

DOCX document 88 KB Posted

Attached to
AIR-4. 11, N00421-16-R-0059 Technical and Engineering Services (TES) supporting AD-4. 11. 3
Solicitation number
N00421-16-R-0059
Issued by

About this file

QASP CSP

View the file

Other files

File Type Posted
N00421-16-R-0059_Amendment_0002_Modification.pdf PDF
N00421-16-R-0059_Amendment_0002_.pdf PDF
P7_Sub_Cost_Summary.xlsx XLSX spreadsheet
P6_Prime_Cost_Summary_Spreadsheet_(TES).xls XLS spreadsheet
P6_Prime_Cost_Summary_Spreadsheet_(TES).xls XLS spreadsheet
N00421-16-R-0059_RFP_Amendment_0001.pdf PDF
P7_Sub_Cost_Summary.xlsx XLSX spreadsheet
N00421-16-R-0059_Amendment_0001_-_Modification.pdf PDF
P4_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Exhibit_A__CDRLs_(TES).xlsx XLSX spreadsheet
Attach_8_-QASP_CSP.pdf PDF
Attach_5_Authorized_Subcontractors.docx DOCX document
P7_Sub_Cost_Summary.xlsx XLSX spreadsheet
Attach_4__OCI_List.docx DOCX document
Attach_7_-_COR_TBD.docx DOCX document
P4_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
P1_Past_Performance_Information_Form.pdf PDF
Attach_1_Wage_Determinations.docx DOCX document
P6_Prime_Cost_Summary_Spreadsheet_(TES).xls XLS spreadsheet
Attach_3_Data_Item_Transmittal_Form.docx DOCX document
N00421-16-R-0059_RFP.pdf PDF
P2_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_2_N00421-16-R-0059_BID_DD254_signed.pdf PDF
TES_Draft_RFP_Industry_10Oct2017.pdf PDF
P1_Past_Performance_Information_Form.pdf PDF
Attach_3_Data_Item_Transmittal_Form.docx DOCX document
P3_Reserved.docx DOCX document
P4_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
P2_Contractor_Performance_Assessment_Questionnaire.pdf PDF
EXHIBIT_A_-CDRLs.xlsx XLSX spreadsheet
Attachment_10_Data_Item_Transmittal_Acceptance_Rejection_Form.doc DOC document
Attach_9_-_Consolidated_GFP.xlsx XLSX spreadsheet
P6_Prime_Cost_Summary_Spreadsheet_(TES)_10.2.17.xls XLS spreadsheet
Attach_7_-_COR_TBD.docx DOCX document
Attach_4__OCI_List.docx DOCX document
Attach_5_Authorized_Subcontractors.docx DOCX document
P5_Reserved.docx DOCX document
P7_Sub_Cost_Summary_24JUL2017.xlsx XLSX spreadsheet
Attach_6_Authorized_Key_Personnel.doc DOC document
Attach_1_Wage_Determinations.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-16-R-0059 Enclosure (6) Quality Assurance Surveillance Plan and Contract Surveillance Plan for Technical and Engineering Services (TES)

1. Purpose

This requirement consists of both performance-based and non-performance-based orders; therefore, a Quality Assurance Surveillance Plan (QASP) and a Contract Surveillance Plan (CSP) are both required. The QASP/CSP is used to ensure that the contractor performs in accordance with the performance standards and definitions/metrics and the Government receives the quality of services called for in the contract.

This hybrid QASP/CSP is a Government developed and applied document used to ensure systematic quality assurance methods are used in the administration and surveillance of performance based and non-performance based tasking under the contract. The intent is to ensure the contractor performs in accordance with the performance based standards and definitions and non-performance based required Level of Effort (LOE), and the Government receives the quality of services called for in each Task Order (TO) Performance Work Statement (PWS)/Statement of Work (SOW).

This contract will leverage the SAIW Division’s core capabilities involving engineering and technical services to support the advanced research and development, systems engineering, and life-cycle support of electronics, communications, and information systems. The scope of the contract encompasses rapidly developed engineering designs for end products intended for immediate warfighter operational use, and may include strategic and tactical airborne, land-based, and mobile, sea-based surface and sub-surface, systems, subsystems and components. The following are representative of the programs, systems, and technology areas to which the requested engineering and technical services may be applied:

· Military and commercial radio communication systems

· Information and computer network systems

· Command and control systems

· Automatic identification technology systems

· Integrated document management systems

· Multimedia systems

· Embedded and stand-alone sensors systems

· Unmanned Aerial Systems

· Cyber Warfare offensive and defensive solutions

A properly executed QASP/CSP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this hybrid surveillance document is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the contract, which will be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP/CSP. The contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth in the contract and all resultant orders.

The hybrid QASP/CSP provides Government surveillance oversight of the contractor’s efforts to assure they are timely, effective, and delivering the results specified in the contract and each TO.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer (KO): A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)), and make related determinations and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.3. The ACO will be designated in the resulting contract. Contracting officers are designated via a written warrant that sets forth limitations of authority.

Contracting Officer Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Government Project Leads (GPL): The COR designates individual GPL to assist in administering of specific efforts under the contract.

5. Responsibilities

The following Government resources will have responsibility for the implementation of this hybrid QASP/CSP Surveillance Plan:

Contracting Officer (abbreviated KO): The KO (either the PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the KO that assures the contractor receives impartial, fair and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Contracting Officer Representative: The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.

Alternate Contracting Officer’s Representative: The ACOR assists the COR for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.

Government Project Leads: The GPLis responsible for assisting in administering of specific efforts under the contract. A GPL cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for advanced research and development, systems engineering, and life-cycle support of electronics, communications, and information systems services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed annually at the end of each ordering year. This evaluation will be one determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DOD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this hybrid QASP/CSP.

b. QASP/CSP: This document will be used by the COR, ACOR, and GPL in the technical administration of this contract. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the hybrid checklist provided herein.

7. Surveillance

Enclosures (1) through (3) set forth the performance standards, incentives, and surveillance methods for the contractor, the COR and GPL while enclosures (4) through (6) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation

In addition to providing reports to the KO, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Surveillance Activity Checklists. All such records will be maintained for the life of the contract. The COR will forward these records to the KO at termination or completion of the contract.

9. Enclosures

Enclosure (1): Quality Standards – In-Service Engineering by PWS (Performance Based)/SOW (Non-Performance Based) Enclosure (2): CDRL Data Quality Standards (Performance Based) Enclosure (3): Incentives Enclosure (4): Surveillance Activity Checklist – Level Of Effort & Performance Based Enclosure (5): Contract Surveillance by Contract Data Requirements Lists (Level of Effort & Performance Based) Enclosure (6): Annual Surveillance Summary

QUALITY STANDARDS – IN-SERVICE ENGINEERING BY PWS (PERFORMANCE BASED)

Required Service (Performance Requirements)
Standard (Performance Standards) / Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance (Quality Assurance)
Incentives
System Integration and Life-Cycle Support IAW PWS/SOW Para 3.3.3
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure 3
Cybersecurity IAW PWS/SOW Para 3.3.5
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure 3

QUALITY STANDARDS – IN-SERVICE ENGINEERING BY PWS (LEVEL OF EFFORT)

Required Service (Non-Performance (LOE) Requirements)
Standard (Performance Standards) / Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance (Quality Assurance)
Incentives
Concept and Technology Development IAW PWS/SOW Para 3.3.1
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure 3
System Development and Design IAW PWS/SOW Para 3.3.2
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure 3
System Integration and Life-Cycle Support IAW PWS/SOW Para 3.3.3
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure 3
Technical Management Support IAW PWS/SOW Para 3.3.4
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure 3
Cybersecurity IAW PWS/SOW Para 3.3.5
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure 3

Enclosure (1)

CDRL DATA QUALITY STANDARDS (PERFORMANCE BASED AND LEVEL OF EFFORT)

Description

Standard

AQL

Surveillance/ Method/Measure

Incentives

Scientific and Technical Reports Summary A001
Submission is in accordance with the Data Item Description (DID) cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Scientific and Technical Reports - Configuration Change Request Document A002
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Report, Record of Meeting/Minutes - Trip/Meeting Report/Conference Minutes/Agenda A003
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Development Plan (SDP) A004
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Financial Progress Reports A005
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Interface Design Description (IDD) A006
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL.
See Enclosure 3.
Software Test Report (STR) A007
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite
100% Inspection by COR, ACOR and/or GPL
See Enclosure 34.
Software User Manuals (SUM) A008
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Computer Software Product End Items - End Item Deliverable A009
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Test Plan - Validation Test Plan A010
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Test Procedure - Validation Test Procedure A011
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 43.
Test/Inspection Report - Validation Test Report A012
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Installation Control Drawings A013
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Report - Study/Services A014
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Information Report - Maintenance and Repair Documentation A015
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Product Drawings/Models & Associated Lists - Technical Documentation for Repair & Maintenance - Electronic Format A016
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Contract Performance Report (CPR) A017
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Security Test Plan A018
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Presentation Material A019
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Scientific and Technical Reports - Elements, Organization and Design A020
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Information Report -Project Close-Out Report A021
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Report - Study/Service - Integration/Installation Plan Report A022
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3
Change Control Strategy A023
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Operational Security (OPSEC) Plan A024
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.

Reserved A025

Segregation of Costs and Invoice Requirements Reporting A026
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable at each TO close. Must be on time, with no more than one revision per submission.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Status Report - Information Technology Personnel Security Report for NAVAIR Security A027
Submission is in accordance with the DID cited in the CDRL.
As an annual report, this deliverable must be on time and with no more than one revision per submission.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Requirements Specifications (SRS) A028
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Design Description (SDD) A029
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Development Status Report (SDSR) A030
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Software Test Plan (STP) A031
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3
Contractor’s Configuration Management Plan A032
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Configuration Audit Summary Report A033
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical and Management Work Plan - Program Plans for Implementation of SOW and TDLs A034
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Integrated Logistics Support Plan A035
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Logistics Management Information (LMI) Data Product A036
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Validation Report - Validation of Technical Manual Changes-Via Demonstration A037
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Training Conduct Support Document A038
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Inspection and Test Plan A039
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Technical Report - Study Services -Cost Feasibility Report A040
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Contractor's Risk Management Plan A041
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Quality System Plan Quality Management / Assurance Plan A042
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or GPL:
See Enclosure 3.
Detailed Project Schedule A043
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Detailed Task/Activity Estimate Report A044
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 43.
Intermediate Project Schedule A045
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Integrated Master Schedule A046
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
Status Report Information Technology Personnel Security Report for Contracting Officer Representative (COR) A047
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
System Security Administrator Operators Documentation A048
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.
NAVAIR Cybersecurity Implementation Plan A049
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or GPL
See Enclosure 3.

Enclosure (2)

INCENTIVES

The following incentives will apply to performance under this contract.

Assessment Period
Acceptable Performance Definition
How Measured
Incentives

Ordering Year 1:

Not more than one of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
End of the first assessment period using the CPARS format.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Ordering Year 2:
Not more than one of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
End of the second assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Ordering Year 3:
Two or more of the measurement areas rated “Very Good” or above. None rated below “Satisfactory”.
End of the third assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Ordering Year 4:
Two or more of the measurement areas rated “Very Good” or above. None of the measurement areas are below “Satisfactory”.
End of the fourth assessment period evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Ordering Year 5:
Two or more of the measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below.
End of the fifth assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory final CPARS rating.

Final CPAR Review

After completion of all TOs.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition` which will result in a marginal or unsatisfactory Final CPARS rating.

* The Government may not award additional tasking (orders) unless all regulatory requirements are met and the contractor meets the acceptable performance definition.

All PWS/SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.

Quality of Product or Service: Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule: Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control: Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under-run? If so, discuss the causes and contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business Relations: Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management: Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans.

Utilization of Small Business: The RFP and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting Program. Assess whether the contractor provided maximum practicable opportunity for Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned Small Businesses, HUBZone, Veteran Owned, Service Disabled Veteran Owned Small Business, and ANCs and Indian Tribes that are not Small Disadvantaged Businesses or Small Businesses) to participate in contract performance consistent with efficient performance of the contract. Evaluation will focus on the metrics of actual small business utilization as compared to the contract required targets.

Other areas: Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (>5%) below initial estimates, increased timeliness, or generally enhanced effectiveness of operations). Although a few areas require minor improvement, these areas are offset by superior performance in other areas. The few problems that do exist are insignificant in nature and have been noted, and the contractor has taken effective and quick corrective action.

Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (1-5%) below the initial estimates, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the contractor has taken satisfactory corrective action.

Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, costs are consistent with expectations, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by marginal performance in other areas.

Marginal: Performance does not meet the full intent of the contract requirements. The contractual performance of the task and subtask being assessed reflect a problem for which the contractor has not yet identified marginally corrective actions. Costs have exceeded estimates without reasonable justification. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Cost control efforts are nearly nonexistent. Corrective actions were not taken or were ineffective.

For Level of Effort TOs, hours delivered by each order as compared to the order required hours will be evaluated and will influence the ratings awarded above. Cost variances greater than 10% cannot earn an Exceptional or Very Good for Cost Control evaluation criteria.

N00421-16-R-0059 Enclosure (3) N00421-16-R-0059 Enclosure (3)

SURVEILLANCE ACTIVITY CHECKLIST – LEVEL OF EFFORT & PERFORMANCE BASED

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure 3.

QUARTERLY EVALUATION – BY PWS/SOW

Description
Surveillance Method/

Measure

Dates
Quality Assessment
Schedule Assessment
Cost Control Assessment
Business Relations Assessment
Management Assessment
Utilization of Small Business Assessment
Other Areas Assessment
3.3.1 Provide Concept and Technology Development support IAW PWS/SOW requirements.
100% Inspection by COR/ACOR and/or.GPL
3.3.2 Provide System Development and Design support IAW PWS/SOW requirements.
100% Inspection by COR/ACOR and/or GPL
3.3.3 Provide System Integration and Life-Cycle Support IAW PWS/SOW requirements.
100% Inspection by COR/ACOR and/or GPL
3.3.4 Provide Technical Management Support IAW PWS/SOW requirements.
100% Inspection by COR/ACOR and/or GPL
3.3.5 Provide Cybersecurity for Assessment and Authorization support IAW PWS/SOW requirements.
100% Inspection by COR/ACOR and/or GPL

Enclosure (4) N00421-16-R-0059 Enclosure (5)

QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LISTS

(CDRLs) Form DD 1423

Description
Surveillance Method / Measure
Dates Due
Dates Completed
No. Submittals
No. of Req’d Rework
Percentage On Time
Comments
Scientific and Technical Reports Summary A001
100% Inspection by COR/ACOR and/or GPL.
Scientific and Technical Reports - Configuration Change Request Document A002
100% Inspection by COR/ACOR and/or GPL.
Report, Record of Meeting/Minutes - Trip/Meeting Report/Conference Minutes/Agenda A003
100% Inspection by COR/ACOR and/or GPL.
Software Development Plan (SDP) A004
100% Inspection by COR/ACOR and/or GPL.
Financial Progress Reports A005
100% Inspection by COR/ACOR and/or GPL.
Interface Design Description (IDD) A006
100% Inspection by COR/ACOR and/or GPL
Software Test Report (STR) A007
100% Inspection by COR/ACOR and/or GPL.
Software User Manuals (SUM) A008
100% Inspection by COR/ACOR and/or GPL.
Computer Software Product End Items - End Item Deliverable A009
100% Inspection by COR/ACOR and/or GPL.
Test Plan - Validation Test Plan A010
100% Inspection by COR/ACOR and/or GPL.
Test Procedure - Validation Test Procedure A011
100% Inspection by COR/ACOR and/or GPL.
Test/Inspection Report - Validation Test Report A012
100% Inspection by COR/ACOR and/or GPL.
Installation Control Drawings A013
100% Inspection by COR/ACOR and/or GPL.
Technical Report - Study/Services A014
100% Inspection by COR/ACOR and/or GPL.
Technical Information Report - Maintenance and Repair Documentation A015
100% Inspection by COR/ACOR and/or GPL.
Product Drawings/Models & Associated Lists - Technical Documentation for Repair & Maintenance - Electronic Format A016
100% Inspection by COR/ACOR and/or GPL.
Contract Performance Report (CPR) A017
100% Inspection by COR/ACOR and/or GPL.
Security Test Plan A018
100% Inspection by COR/ACOR and/or GPL.
Presentation Material A019
100% Inspection by COR/ACOR and/or GPL.
Scientific and Technical Reports - Elements, Organization and Design A020
100% Inspection by COR/ACOR and/or GPL.
Technical Information Report -Project Close-Out Report A021
100% Inspection by COR/ACOR and/or GPL.
Technical Report - Study/Service - Integration/Installation Plan Report A022
100% Inspection by COR/ACOR and/or GPL.
Change Control Strategy A023
100% Inspection by COR/ACOR and/or GPL.
Operational Security (OPSEC) Plan A024
100% Inspection by COR/ACOR and/or GPL.

Reserved A025

Segregation of Costs and Invoice Requirements Reporting A026
100% Inspection by COR/ACOR and/or GPL.
Status Report - Information Technology Personnel Security Report for NAVAIR Security A027
100% Inspection by COR/ACOR and/or GPL.
Software Requirements Specifications (SRS) A028
100% Inspection by COR/ACOR and/or GPL.
Software Design Description (SDD) A029
100% Inspection by COR/ACOR and/or GPL.
Software Development Status Report (SDSR) A030
100% Inspection by COR/ACOR and/or GPL.
Software Test Plan (STP) A031
100% Inspection by COR/ACOR and/or GPL.
Contractor’s Configuration Management Plan A032
100% Inspection by COR/ACOR and/or GPL.
Configuration Audit Summary Report A033
100% Inspection by COR/ACOR and/or GPL.
Technical and Management Work Plan - Program Plans for Implementation of PWS/SOW and TDLs A034
100% Inspection by COR/ACOR and/or GPL.
Integrated Logistics Support Plan A035
100% Inspection by COR/ACOR and/or GPL.
Logistics Management Information (LMI) Data Product A036
100% Inspection by COR/ACOR and/or GPL.
Validation Report - Validation of Technical Manual Changes-Via Demonstration A037
100% Inspection by COR/ACOR and/or GPL.
Training Conduct Support Document A038
100% Inspection by COR/ACOR and/or GPL.
Inspection and Test Plan A039
100% Inspection by COR/ACOR and/or GPL.
Technical Report - Study Services -Cost Feasibility Report A040
100% Inspection by COR/ACOR and/or GPL.
Contractor's Risk Management Plan A041
100% Inspection by COR/ACOR and/or GPL.
Quality System Plan Quality Management / Assurance Plan A042
100% Inspection by COR/ACOR and/or GPL.
Detailed Project Schedule A043
100% Inspection by COR/ACOR and/or GPL.
Detailed Task/Activity Estimate Report A044
100% Inspection by COR/ACOR and/or GPL.
Intermediate Project Schedule A045
100% Inspection by COR/ACOR and/or GPL.
Integrated Master Schedule A046
100% Inspection by COR/ACOR and/or GPL.
Status Report Information Technology Personnel Security Report for Contracting Officer Representative (COR) A047
100% Inspection by COR/ACOR and/or GPL.
System Security Administrator Operators Documentation A048
100% Inspection by COR/ACOR and/or GPL.
NAVAIR Cybersecurity Implementation Plan A049
100% Inspection by COR/ACOR and/or GPL.
Metric Summary:
Current Period
Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision

Enclosure (5)

Annual Surveillance Summary

The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure (3). This assessment will be completed annually covering the previous 12 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Quarterly Ratings.
Schedule
Review of Quarterly Ratings.
Cost Control
Review Quarterly of Ratings.
Business Relations
Review of Quarterly Ratings.
Management
Review of Quarterly Ratings.
Utilization of Small Business
Review of Quarterly Ratings.
Other Areas
Review of Quarterly Ratings.

Annual Surveilance Completed By: _______________________

Date Completed: ________________