This file is a Questions and Answers document addressing inquiries regarding a federal contract solicitation for engineering services related to ship habitability modernization on the TSV 4 vessel at Colonna's Shipyard.
The requirement involves preparing as-built drawings in F-size NAVSEA redline format and a Bill of Materials (BOM) to support Government planning for habitability upgrades to messing and berthing spaces. The contractor shall document 15 specified habitability compartments including the galley, officers' and crew messes, staterooms, and crew berthing areas, along with associated sanitary spaces. Deliverables include a Draft Drawing Package and Draft BOM due at 40 calendar days after award, and a Final Drawing Package and Final BOM due at 61 calendar days after award. The contractor must prepare an installation-ready design package with planning-level replacement options for furniture, fixtures, appliances, and equipment, including estimated costs, labor-hours, lead times, and procurement/delivery/installation schedules for prospective replacement items. Scope exclusions include HVAC and distributive systems (except visible equipment and interfaces), flooring, ceiling tile, lighting, life safety systems, doors, windows, ABS regulatory review, and any removal or restoration work. The vessel will be located at Colonna's Shipyard until December 15, 2026, then move to JEBLC Pier 11 or 12; contractor visits are unlimited but must be coordinated through the Project Engineer. Site visit attendance requires valid government-issued identification, hard hat, safety glasses, and steel-toe shoes, with badge issuance at Colonna's Pass Office at 0930 EST on the visit date. Award under this engineering RFQ will not automatically preclude competition on a future production solicitation, though the Government reserves the right to address any organizational conflicts of interest. No specific anticipated award date has been provided. The Government will provide applicable technical manuals and reference drawings; PDF format is acceptable for electronic deliverables, and no native CAD files are required.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
1. Q: Can you advise on badge pickup procedures and timing for each date? We have also sent the Colonna access list to Colonna's Shipyard as the form instructs
A: Please see amendment 2. On the day of the site visit, all attendees shall meet at the Colonna’s Pass Office at 0930 EST for issuance of access badges by Colonna’s personnel. The site visit POC will meet all attendees at the Pass Office and escort them to the site visit location. The Pass Office is located directly across the street from the Colonna’s Main Shipyard entrance. Attendees shall present a valid form of government-issued identification (driver’s license, passport, or state identification card) to obtain access.
2. Q: Please also confirm the visit date and time and provide any applicable check-in, identification, or personal protective equipment instructions.
A: Please see the solicitation for full site visit details. IAW the solicitation, “perspective vendors shall attend at least one (1) of the two (2) site visits.” “Prospective vendors shall notify the points of contact (POCs) identified of the site-visit date(s) they intend to attend by 4:00 PM EST on 10/22/2026.” In reference to PPE, amendment 1 states “all personnel attending the site visit shall be required to have a hard hat, safety glasses and steel toe safety shoes in order to attend the site visit.” Amendment 2 states “On the day of the site visit, all attendees shall meet at the Colonna’s Pass Office at 0930 EST for issuance of access badges by Colonna’s personnel. The site visit POC will meet all attendees at the Pass Office and escort them to the site visit location. The Pass Office is located directly across the street from the Colonna’s Main Shipyard entrance. Attendees shall present a valid form of government-issued identification (driver’s license, passport, or state identification card) to obtain access.”
3. Q: The current RFQ is limited to engineering services and development of the drawing package, with a separate RFQ anticipated for the subsequent production effort, including material procurement, removals, and installations. Please confirm whether award of the engineering RFQ would preclude the successful offeror from proposing on or receiving an award under the subsequent production RFQ, including any restrictions related to organizational conflicts of interest (OCI).
A: Award under the current RFQ will not, by itself, automatically preclude the successful offeror from competing for a future production requirement. The Government anticipates reviewing and approving the drawings, specifications, and BOM developed under this effort before their use in any subsequent production solicitation. To the extent a future production solicitation is issued, the Government intends to provide the applicable Government-approved technical requirements to prospective offerors on an equal basis. The Government reserves the right to evaluate and address any OCI identified in connection with a future production solicitation in accordance with applicable procurement regulations.
4. Q: What is the anticipated award date?
A: The Government cannot provide a specific anticipated award date at this time.
5. Q: Can you please confirm that bulkheads will not be relocated?
A: Confirmed. Bulkheads will not be relocated under this requirement.
6. Q: Do you expect that the refit will include redesign of the spaces, especially the galley, or just updated replacements in kind?
A: Updated replace in kind where available.
7. Q: Can you please confirm the number of crew to be accommodated will not change?
A: Space 1-19-1, will go from 3 person bunks to a 2 person bunk, no need for a bunk bed as it presently has.
8. Q: Can you please confirm that flooring is not part of this solicitation?
A: Confirmed flooring is not part of the requirement.
9. Q: Can you please confirm whether ceiling tile and lighting are part of this solicitation?
A: Confirmed ceiling and lights are not part of this requirement.
10. Q: Can you please specify whether the deliverables will need additional review by ABS or other regulatory body. –
A: ABS does not require review.
11. Q: Can you please confirm that life safety outfit is not part of this solicitation?
A: Confirmed life Safety is not part of this requirement.
12. Q: Can you please confirm that doors and windows are not part of this scope?
A: confirmed doors and windows not part of this requirement.
13. Q: Is a cost estimate or lead time identification part of the deliverables for this solicitation?
A: Yes see 2.3 of SOW.
14. Q: Scope – Spaces. Based on the ship check, the offeror understands the habitability spaces to be documented under SOW Section 2.2 to be: the Galley; Officers' Mess (1-33-2); Crew Mess (1-19-2);
Steward SR (1-19-1); Crew WR (1-15-1); Chief Engineer SR/Office (02-17-2); Master's Office (02- 17-1); Chief Mate Off/SR (02-27-2); EMO Off/SR (02-27-1); 2nd & 3rd Mate (02-25-2); OIC SR (02-34-2); Crew Berths (01-34-2, 01-27-2, 01-27-1); and COMM & BOS'N (01-19-1), including the sanitary spaces within each compartment. Please confirm this list is complete and correct, and that all other compartments (including the laundry, hospital/sick bay, passageways, and Navy communications spaces) are excluded.
A: The listed spaces are correct, with the following additions and clarification: the Master’s Stateroom, Transient crew berthing (2-29-0, 2-34-1 & 2-32-2) and associated sanitary spaces are also included. The 2nd & 3rd Mate compartment number is 01-19-2, the label above the door is incorrect. Confirmed laundry, hospital/sick bay, passageways, and Navy communications spaces are excluded.
15. Q: Scope – Compartment Identification. Please clarify the following: (a) two crew berths were both identified as compartment 01-34-2; please provide the correct compartment number for each; (b) the Galley does not appear to have its own compartment number; please provide the number to be used on the drawings; and (c) is the Master's stateroom within the scope of this requirement, and if so, what is its compartment number?
A: (a) crew berths are 01-34-1 and 01-34-2 label above door is correct; (b) Galley space 1-28-2
(c) Yes, the Master’s stateroom is within the scope of this requirement (02-17-1).
16. Q: Scope – HVAC and Distributive Systems. Government representatives stated verbally during the ship check that HVAC is excluded from this requirement. Please confirm in writing that detailed documentation, assessment, and modernization estimating of HVAC, electrical, plumbing, and other distributive systems are excluded, except for visible equipment and the interfaces necessary to document the specified habitability spaces.
A: Confirmed HVAC and Distributive Systems are excluded from this requirement.
17. Q: Drawing Requirements. SOW Section 2.2.2 requires F-size NAVSEA format. Does the Government require redlines of existing drawings that reflect as-built conditions, or development of completely new F-size drawings? If new drawings are required, will the Government provide the NAVSEA title block/sheet template and drawing numbers?
A: Redline
18. Q: As-Built Versus Modernization Design. Please confirm that the scope is limited to as-built drawings and an as-built Bill of Materials, excluding modernization design, new equipment selection, and proposed replacement configurations. Do the estimated cost, labor-hour, lead-time, and procurement/delivery/installation schedule requirements of SOW Sections 2.3.5 through 2.3.8 apply to the existing as-built items, or to prospective modernization activities?
A: The contractor shall prepare as-built drawings of actual shipboard conditions and develop a BOM to support Government planning for habitability upgrades. The contractor may identify planning-level replacement options for applicable furniture, fixtures, appliances, and equipment.
The estimated cost, labor-hour, lead-time, and procurement/delivery/installation schedule requirements in SOW Sections 2.3.5 through 2.3.8 apply to prospective replacement items or upgrade options identified in the BOM, as applicable. Detailed modernization design, fabrication design, installation-ready design, procurement, removal, installation, or shipboard modification is not required.
19. Q: BOM Pricing Basis. If the estimates in SOW Section 2.3 apply to replacement items, should the BOM price new commercial equivalents or like-for-like items? Is a labor rate or wage determination specified for the estimated installation labor-hours?
A: New price new commercial equivalents; No
20. Q: Q7: Deliverable Content – Specifications. A Government answer posted to prior questions refers to "drawings, specifications, and BOM" being reviewed before use in a subsequent production solicitation. The SOW identifies only a drawing package and a BOM. Are written specifications a required deliverable? Will the BOM be used directly as the basis for the future production solicitation?
A: IAW with section 6 of the SOW, the deliverables include Draft Drawing Package and Draft BOM and Final Drawing Package and Final BOM.
21. Q: Level of Detail. SOW Section 2.2.3.1 requires "each component detail, as applicable." Does this mean arrangement-level information (location, size, make/model, utility connections) or dimensioned fabrication and installation detail? Does the Government have an expected number of drawing sheets?
A: Include all information as stated above. The government does not have an expected number of drawing sheets. Red Line of existing drawing is required, not new drawing.
22. Q: Government-Furnished Reference Drawings. A. Please confirm which revisions of the Section 3 reference drawings govern for TSV 4. B. The provided Galley Arrangement 1230-001-651 appears to apply to other hulls and the SOW cites revision G; C. the Furniture and Fixture drawing 1230-001- 640 is cited as revision D. D. Please also provide 1230-003-621_C (Chief Engineer State Room) and 5988996 (General Arrangement Above Main Deck), which were not in the package, and E. confirm whether 1230-001-528 and 1260-001-528 are the same drawing.
A:
A. Same class of ship, changed to reflect H, drawing provided.
B. Same class of ship. Changed to rev F, drawing provided
C. Provided
D. 612-4838874_A Chief Engineer State Room – dwg number changed and provided.1230-002- 601_D - GENERAL ARRANGEMENT ABOVE UPPER LEVEL & MAIN DECK dwg number changed and provided.
E. Same drawing, 3.12 deleted.
23. Q: Native Files and Electronic Deliverable Format. Will the Government provide native CAD files of the reference drawings at award? SOW Sections 2.7 and 6.0 require two electronic files of the final deliverable. Are native CAD files required, or is PDF acceptable?
A: No. PDF is acceptable
24. Q: Technical Manuals and Technical History. SOW Section 2.1 refers to applicable technical manuals and available technical history. Please identify and provide these at award, including electrical panel schedules, alteration records, equipment manuals, and fire suppression system data.
A: The Government will make available applicable technical manuals and technical history in its possession that are relevant to this requirement, subject to access to availability after award.
25. Q: Concealed Conditions. Must conditions above overheads, behind bulkheads, or beneath furnishings and deck coverings be documented? If so, will the Government provide access without contractor-performed removal or restoration?
A: Yes, document all conditions as stated. Removal/restoration is not within scope of this requirement.
26. Q: Hazardous Materials and Access Requirements. Are there known or suspected asbestos-containing materials (for example, vinyl asbestos tile deck covering) or other hazardous materials in the specified spaces? Are there training, PPE, or other requirements for contractor personnel accessing these spaces?
A: There is no install or removal during this SOW, therefore hazardous samples not warranted at this time.
27. Q: Vessel Availability and Access During Performance. Please confirm TSV 4's anticipated location and operational status during the performance period. After award, will the contractor have shipboard access to verify conditions? If so, please state the number of visits, access windows, escort, and badging requirements.
A: Vessel will be located at Colonnas shipyard until 15 DEC 2026. There is a possibility of this being extended. Once the vessel leaves the current location, it will be pier side at JEBLC, Pier 11 or 12; Yes. Visits are unlimited but must be coordinated through PE.
28. Q: Delivery Schedule. SOW Sections 2.5 and 2.6 require the draft at 40 calendar days and the final at 61 calendar days after award, while Section F lists a delivery date of 08 Jan 2027. Which governs? What Government review turnaround time is anticipated for the draft submittal?
A: The CLIN description states “TSV4 NARR MESSING AND BERTHING MODERNIZA
***** Please see SOW for delivery address***” The SOW is correct. The government procurement writing system requires us to add a date. The final delivery date will be updated 61 days after award when the award is issued.
29. Q: Follow-On Requirements. Is this documentation intended to support a planned future habitability availability? Does that schedule impose any interim deliverables or additional milestones beyond those in the SOW?
A: The drawing package and BOM are intended to support Government planning for habitability upgrades. No additional contractor deliverables or interim milestones are required beyond those identified in the SOW. The Government makes no representation regarding a future production requirement or future availability schedule.
30. Q: Applicable Codes and References. SOW Section 2.4 refers to local laws, ordinances, sanitary codes, and minimum sanitary standards "identified by the Government." Please identify them. Are the references in SOW Sections 3.16 through 3.19 (MIL-STD-2003, MIL-STD-777, S9086-RK- STM-010, and the GSO) required for this effort, and will the Government provide them?
A: The tech manuals mentioned have requirements related to install and removal of related equipment, adhere to those requirements per each reference. References will be provided.
31. Q: Controlled Information. Will the drawings and BOM be marked as Controlled Unclassified Information or Covered Defense Information requiring safeguarding under DFARS 252.204-7012? Is DoD SAFE the only approved method for transmitting draft and final deliverables?
A: None of the requirement is CUI or CDI.
32. Q: Are we expected to prepare a complete, installation-ready design package, including selection and specifications for proposed new furniture, fixtures, and equipment, attachment details, and affected system connections? Or are planning/guidance drawings sufficient, with final specifications and installation details developed by the shipyard or installation contractor?
A: Yes, prepare installation-ready design package.
33. Q: Is the intent to retain some existing furniture and equipment, or remove and replace all items in the affected spaces? Will the Government identify which items should be retained, relocated, or replaced, or will these decisions be based on recommendations developed by the engineering contractor during the project?
A: Remove and replace all items in the affected spaces.
34. Q: Is the intent to change the existing room layouts? If so, we assume no modifications to the vessel’s primary structure will be required and that layout changes will be limited to nonstructural joiner bulkheads and ceilings. Please confirm this understanding.
A: The government is open to change the existing room layouts if plan utilizes space more effectively. No primary structure modifications shall be required.
35. Q: Is the intent to introduce a completely new toilet module?
A: New toilet but goal is to maintain the same footprint for the toilet, if possible.