1.03 NAR Upgrade Design Drawings SOW 10-6 1.pdf

PDF 173 KB Posted

Attached to
TSV4 NARR MESSING AND MODERNIZATION
Solicitation number
N0018927QL008
Issued by

About this file

This is a Statement of Work (SOW) for the development of a drawing package and Bill of Materials (BOM) to support habitability upgrades to the TSV4 Narragansett, a naval vessel located at Joint Expeditionary Base Little Creek–Fort Story in Virginia Beach, Virginia. The contractor shall assess existing conditions and develop vessel-wide drawings for the galley, messing, berthing of each stateroom, and associated sanitary spaces based on actual shipboard conditions verified during a mandatory ship check. The drawings must be prepared in F-size NAVSEA format and depict the arrangement, location, and configuration of applicable furniture, fixtures, appliances, and equipment, including berths, lockers, desks, wardrobes, chairs, showers, mess tables, galley equipment (toasters, coffee makers, refrigerators, griddles, ranges, exhaust hoods), food waste disposals, counters, shelves, and sinks showing system layout and component details.

The contractor shall also provide a comprehensive BOM identifying item descriptions, quantities, proposed vessel locations, manufacturer and part numbers, estimated unit and total costs, material lead times, estimated labor hours, and procurement/delivery/installation schedules. The draft drawing package and BOM must be submitted electronically no later than 40 calendar days after contract award, with the government providing consolidated comments for incorporation. Final deliverables—consisting of two electronic files and two full-size paper copies of both the drawing package and BOM—are due by 3:00 p.m. Eastern Time, 61 calendar days after contract award, to be delivered to 1320 Barnstable County Road, Building 3090, Virginia Beach, VA 23459, with electronic submission via DoDsafe. The work scope excludes procurement, fabrication, removal, installation, or modification of shipboard components. The Technical Point of Contact is Veal Pope at (757) 971-5762, and the contractor shall participate in weekly progress meetings on Wednesdays throughout the performance period.

View the file

Other files

File Type Posted
Questions_and_Answers 2.pdf PDF
S9086 RK STM 010_6_Chapter 505 Piping Systems.PDF PDF
1230 001 651_H Galley Equipment Arrangement 4842978_H.pdf PDF
S9AA0 AB GOS 010_12_ General Specifications for Overhaul of Surface Ships.pdf PDF
MIL STD 777F_CHG 2 Schedule of Piping Valves Fittings and Associated.pdf PDF
1230 001 640_F Furniture Fixture 4842682_F.pdf PDF
1230 002 601_D Upper Level and Main Deck.pdf PDF
612 4838874_A Chief Engineer State Room.pdf PDF
MIL STD 2003_5B Electric Plant Installation Standard Methods for Surface Ships and Submarines.pdf PDF
Questions and Answers LM.docx DOCX document
Questions and Answers.docx DOCX document
Solicitation Amendment N0018927QL0080004 SF 30.pdf PDF
Solicitation Amendment - N0018927QL0080004 Conformed Copy.pdf PDF
Questions and Answers 23 October.docx DOCX document
Solicitation Amendment N0018927QL0080003 SF 30.pdf PDF
Solicitation Amendment - N0018927QL0080003 conformed.pdf PDF
Solicitation Amendment N0018927QL0080002 SF 30 (1).pdf PDF
Solicitation Amendment - N0018927QL0080002.pdf PDF
Solicitation Amendment N0018927QL0080001 SF 30.pdf PDF
Solicitation Amendment - N0018927QL0080001.pdf PDF
SECNAV 5512_1 June 2026.pdf PDF
COLONNA ACCESS LIST FOR NARRAGANSETT TSV-4.xlsx XLSX spreadsheet
1230-001-512_E HVAC Diagram.pdf PDF
555-5986693_C Galley Fire Supression Foam System.pdf PDF
MIL-STD-2003_5B - Electric Plant Installation Standard Methods for Surface Ships and Submarines.pdf PDF
1230-001-651_I Galley Equipment Arrangement 4842686_I.PDF PDF
1230-005-320_F Elect PWR Sys Deck Plan Foc_sle Deck and Above.pdf PDF
1230-001-640_F Furniture Fixture 4842682_F.pdf PDF
1260-001-528_E Plumbing and Interior Deck Drains Piping Diagram.PDF PDF
1230-001-634_G Deck Covering Schedule.pdf PDF
4839447_B General Arrangement Drawing.PDF PDF
1230-001-533_H Potwater Piping.pdf PDF
QUESTIONS AND ANSWERS.docx DOCX document
1230-005-512_C Vent SYS Main Deck.pdf PDF
1230-001-644_H Plumbing _ Fixture List.pdf PDF
1230-003-601_- Chief Eng Office19.pdf PDF
S9086-RK-STM-010_6_-Chapter 505 Piping Systems.PDF PDF
1230-001-641_- Officer Mess Room.pdf PDF
1230-007-512_E Vent System Upper Deck.pdf PDF
MIL-STD-777F_CHG-2 - Schedule of Piping Valves Fittings and Associated.pdf PDF
S9AA0-AB-GOS-010_12_- General Specifications for Overhaul of Surface Ships.pdf PDF
Site Visit Template Final 1.docx DOCX document
Solicitation - N0018927QL008.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

TSV4 NARRAGANSETT HABITABILITY DRAWING PACKAGE AND BILL OF

MATERIAL DEVELOPMENT

1. OBJECTIVE

The Contractor shall develop a drawing package and Bill of Materials (BOM) to support habitability upgrades to the messing, berthing, stateroom, and sanitary spaces aboard TSV4 Narragansett, located at Joint Expeditionary Base Little Creek–Fort Story, Pier 1, Virginia Beach, Virginia.

This requirement does not include procurement, fabrication, removal, installation, or modification of shipboard furniture, equipment, piping, electrical systems, or other shipboard components. This requirement is limited to assessment, drawing-package development, and BOM development.

2. SCOPE:

2.1 The Contractor shall use the mandatory ship check, Government-furnished drawings, applicable technical manuals, and available technical history to verify existing shipboard conditions and develop the required drawing package. The Contractor shall identify discrepancies between available reference drawings and actual shipboard conditions when observed during the ship check or development of the drawing package.

2.2 Drawing Package Requirements

The Contractor shall develop vessel wide drawings for galley, messing, and berthing of each stateroom, and associated sanitary space aboard the Narragansett. The package shall:

2.2.1 Be based on actual shipboard conditions verified during the ship check.

2.2.2 Be prepared in F-size NAVSEA format.

2.2.3 Depict the arrangement, location, and configuration of applicable furniture, fixtures, appliances, and equipment.

2.2.3.1 Including: berth, locker, desk, wardrobe, armchair, recliner, lounge chair, sofa, locker, shower and shower door, mess table, chair, bread toaster, coffee maker, refrigerator, griddle, range with oven, vent exhaust hood, refrigerator/freezer, food waste disposal, counter with and without cabinet, counter with shelves & drawers, condiment shelf, fountain juice machine, and sink showing system layout, location, equipment location each component detail, as applicable.

2.2.4 Include sufficient details to support Government planning for habitability upgrades.

2.2.5 Incorporate Government comments provided during draft review.

2.3 Bill of Materials

The Contractor shall provide a BOM supporting the drawing package. The BOM shall identify, at a minimum, the following information for each item, as applicable:

2.3.1 Item Description

2.3.2 Quantity

2.3.3 Proposed location aboard the vessel

2.3.4 Manufacturer and part number, as applicable.

2.3.5 Estimated unit and/or total cost

2.3.6 Material lead time

2.3.7 Estimated labor-hour

2.3.8 Estimated schedule for procurement, delivery, and installation.

2.4 The Contractor shall prepare the drawing package and BOM consistent with the references identified in Section 3.0 and with applicable local laws, ordinances, sanitary codes, and minimum sanitary standards identified by the Government.

2.5 The Contractor shall submit the draft drawing package and draft BOM for Government review no later than 40 calendar days after contract award. The Government will provide consolidated comments on the draft submittal. The Contractor shall incorporate applicable Government comments into the final drawing package and final BOM.

2.6 The Contractor shall submit the final drawing package and BOM no later than 3:00 p.m.

Eastern Time, 61 calendar days after contract award.

2.7 The contractor shall provide two (2) electronic files and two (2) full-size paper copies for final deliverable.

3. REFERENCES:

3.1 NAVSEA Standard Items: (FY-26 ch 1)

3.2 4839447_- GENERAL ARRANGEMENT FOC’SLE DECK & ABOVE

3.3 5988996_- 1230-002-601_D - GENERAL ARRANGEMENT ABOVE UPPER

LEVEL & MAIN DECK

3.4 1260-001-528_E Plumbing and Interior Deck Drains Piping Diagram

3.5 1230-001-634_G DECK COVERING SCHEDULE

3.6 1230-001-640_D F Furniture Fixture

3.7 1230-001-641_Officer Mess Room

3.8 1230-001-644_H Plumbing and Fixture List

3.9 1230-003-601 – Chief Engineer Office

3.10 1230-003-621_C 612-4838874_A Chief Engineer State Room

3.11 1230-001-651_G H Galley Arrangement & Details

3.12 1230-001-528_E Plumbing and Interior drains Duplicate 3.4

3.13 1230-001-533_H Potable Water System Piping Diagram

3.14 1230-001-512_E HVAC Diagram

3.15 555-5986693_B Fixed Foam Fire Suppression System Galley Main Dk Fr 28-33

3.16 MIL-STD-2003, Electric Plant Installation Standard Methods for

Surface Ships and Submarines

3.17 MIL-STD-777 Rev F, CH 2Schedule of Piping, Valves, Fittings, and Associated

Piping Components for Naval Surface Ships

3.18 S9086-RK-STM-010 Rev 6, Chapter 505 Piping Systems

3.19 S9AA0-AB-GOS-010, General Specifications for Overhaul of Surface Ships

(GSO)

4. SHIP CHECK (SITE VISIT):

Details on the ship check aboard TSV4 Narragansett will be provided in the solicitation. The purpose of the ship check is to allow prospective contractors to observe, measure, and become familiar with the existing conditions, layout, configuration, access limitations, and dimensions of the messing, berthing, stateroom, and sanitary spaces associated with this requirement.

5. CONFERENCES AND MEETINGS:

Contractor personnel shall participate in meetings, as needed, throughout the performance of this task. The Government anticipates holding weekly progress meetings on Wednesdays, unless otherwise coordinated with the Contractor. Meetings may be conducted virtually, by telephone, aboard the vessel, or at a government facility. The Technical Point of Contact (TPOC) will provide notice of meetings in advance. The Contractor may also request a meeting by arrangement through the TPOC.

SECTION 6.0 PERIOD OF PERFORMANCE AND DELVIERYABLES:

The period of performance shall begin on the date of contract award and end 61 calendar days after contract award. The following table summarizes the required deliverables and delivery dates.

Deliverable Required Format Date Required Draft Drawing Package and Draft BOM

Electronic draft No later than 40 calendar days after contract award

Final Drawing Package and Final BOM

Two (2) electronic files and two (2) full-size paper copies of each deliverable

No later than 3:00 p.m.

Eastern Time, 61 calendar days after contract award

Delivery Location.

The contractor shall deliver the final hard copies to:

1320 Barnstable County Road, Building 3090 Virginia Beach, VA 23459

The Contractor shall submit electronic deliverables via DoDsafe.

The TPOC will provide the Contractor with a DoD SAFE request at least one (1) business day before each applicable delivery date identified in the table above.

SECTION 7.0 – MARMC POINT OF CONTACT (POC):

The TPOC for this order: Veal Pope (757) 971-5762

1. OBJECTIVE
The Contractor shall develop a drawing package and Bill of Materials (BOM) to support habitability upgrades to the messing, berthing, stateroom, and sanitary spaces aboard TSV4 Narragansett, located at Joint Expeditionary Base Little Creek–Fort Story,...
This requirement does not include procurement, fabrication, removal, installation, or modification of shipboard furniture, equipment, piping, electrical systems, or other shipboard components. This requirement is limited to assessment, drawing-package...