N0017821R4410 QA 19.pdf
PDF 84 KB Posted
- Solicitation number
- N00178-21-R-4410
About this file
This document contains questions and answers related to a solicitation for Gun Weapon Systems components. The solicitation seeks manufacturing samples and associated inspection documentation from offerors for Gun Weapon System components such as ammunition handling systems, gun mounts, and integration kits. The inspection data required by Section M.3.1.1 of the solicitation, including characteristics of conformances and inspection sheets identifying feature locations, tolerances, dimensions, and amounts out of tolerance, must be printed and delivered with the manufacturing sample.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0017821R4410 QA 20.pdf | ||
| N0017821R4410 QA 15-18.pdf | ||
| N0017821R4410-A00001.pdf | ||
| N0017821R4410 QA 14.pdf | ||
| N0017821R4410 QA 13.pdf | ||
| N0017821R4410 QA 8-12.pdf | ||
| N0017821R4410 QA 6-7.pdf | ||
| N0017821R4410 QA 5.pdf | ||
| N0017821R4410 QA 4.pdf | ||
| N0017821R4410 QA 1-3.pdf | ||
| Manufacturing Sample Receipt.pdf | ||
| N0017821R4410.pdf | ||
| N0017821R4410 CDRLs.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00178-21-R-4410 Gun Weapon Systems (GWS) Components
Questions and Answers
PLEASE NOTE that the Manufacturing Sample instruction is provided only to those Offerors that successfully complete the Solicitation instructions at L.2.2.1.A.
Q19. What documentation is expected with the sample part and how should the documentation be sent?
Section M.3.1 details what should be included in the inspection data, but it’s unclear if this data should be sent with the sample or supplied electronically.
A19. The requirements stated at M.3.1.1 of the Solicitation, including the Characteristic of Conformances (COCs) per DOD-STD-2101 and inspection sheets identifying the location, tolerance, actual dimension, and amount out of tolerance, if applicable, of the required COC feature, are required. Documentation shall be printed by the Offeror and delivered to the Government packaged with the Manufacturing Sample.
[End of Q&A]
File details come from the government source that posted it. Updated .