This Statement of Work (SOW) is for Task Order 001 of the Focused Radio Frequency Optimized Signal Transference (FROST) contract from the Naval Research Laboratory (NRL), with solicitation number N00173-25-R-0007. The 36-month task order (one base year plus two option years) requires advanced RF engineering and research to develop systems for transmitting and measuring precise RF signals to spacecraft and airborne platforms, with capabilities ranging from VLF (3-30 kHz) through EHF (30-300 GHz) frequencies and power levels up to 1,000,000 kW.
The contractor must provide RF engineering, hardware/software development, electronics design, network administration, and optical systems support for both fixed and mobile ground terminal systems using antennas from 1 meter to 150 feet in diameter. Key deliverables include technical status reports, design documentation, safety analysis, and testing/training materials. The anticipated level of effort is 328,230 total labor hours across 14 labor categories, with $30M allocated for materials and $1.5M for travel over the three years. The work requires extensive CONUS/OCONUS travel to remote locations and Top Secret/SCI clearance access. The contractor must coordinate with NRL and other agencies while ensuring compliance with RF safety standards, security requirements, and configuration management processes.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Naval Research Laboratory 4555 Overlook Avenue SW
Washington DC, 20375-5329 Code 8140
Statement of Work (SOW) For
Focused Radio Frequency Optimized Signal Transference (FROST)
Task Order 001
SOLICITATION: N00173-25-R-0007 ATTACHMENT 10
Table of Contents
1.0 Task Order Scope
2.0 Requirements
2.1 Technical Requirements (CDRL A001, A004)
3.1.1 RF Engineering and Technical Development (CDRL A001, A004)
3.1.2 Hardware (CDRL A001, A004)
3.1.3 Electronics (CDRL A001, A004, A006)
3.1.4 Software Design, Development, Test and Integration (CDRL A001, A004)
3.1.5 Networks and Accreditation (CDRL A001, A004)
3.1.6 RF Mobile Communications (CDRL A001, A004)
3.1.7 Optical (CDRL A001, A004)
3.1.8 System Plans and Documentation (CDRL A001, A004)
3.1.9 Interface Control Documents (ICD) (CDRL A001, A004)
3.1.10 Operations Documentation Development (CDRL A001, A004)
3.1.11 Testing and Training (CDRL A001, A004)
2.2 Travel (CDRL A001, A002)
2.3 Meetings and Reviews (CDRL A001, A004)
2.4 Security (CDRL A001, A007)
3.0 Deliverables
3.1 Technical Status Report
3.2 Contract Status and Labor Report
3.3 Financial Program Management Report
3.4 Technical Data and Documentation
3.5 Patent Report
3.6 System Safety Hazard Analysis Report
3.7 Accident Incident Report
3.8 Final Report
1.0 Task Order Scope
The specific objectives for Task Order 001 will be focused on advancing the RF research and development performed under TERFS (N00173-20-C-2011) and acquiring long lead items required to expand the capabilities and integrate into previously delivered or currently in use by the government.
Period of performance for this Task Order 001 is 36 months consisting of one base year with two option years.
The anticipated level of effort includes:
Labor Categories TO-1 Base TO-1 OY1 TO-1 OY2
Total Hours Labor Hrs. Labor Hrs. Labor Hrs.
SR SYSTEMS ENGINEER 19,200 19,200 19,200 57,600
SR ELECTRICAL/RF ENGINEER 11,520 11,520 11,520 34,560
MID ELECTRICAL/RF ENGINEER 7,680 7,680 7,680 23,040
SR FIELD ENGINEER 7,680 7,680 7,680 23,040
MID FIELD ENGINEER 1,920 1,920 1,920 5,760
SR COMPUTER SCIENTIST 9,600 9,600 9,600 28,800
MID COMPUTER SCIENTIST 1,920 1,920 1,920 5,760
SR TEST ENGINEER 5,760 5,760 5,760 17,280
MID TEST ENGINEER 5,760 5,760 5,760 17,280
SR ELECTRONICS TECHNICIAN 9,600 9,600 9,600 28,800
MID ELECTRONICS TECHNICIAN 3,840 3,840 3,840 11,520
SR PROJECT SPECIALIST 9,600 9,600 9,600 28,800
SR NETWORK ENGINEER 11,520 11,520 11,520 34,560
MID NETWORK ENGINEER 3,840 3,840 3,840 11,520
328,230
The anticipated support includes:
Support Categories
TO-1 Base TO-1 OY1 TO-1 OY2 Total
Materials $10,000,000 $10,000,000 $10,000,000 $30,000,000 Travel $ 500,000 $ 500,000 $ 500,000 $ 1,500,000
2.0 Requirements
The Government will provide facilities, and will also consider the use of contractor provided facilities, either owned or procured for this contract, when needed, for field or laboratory experiments, and for assembling, testing, calibrating, and using hardware developed or purchased under this SOW. Government facilities may also include US military or government installations where NCST systems are located, deployed or operating worldwide.
The Contractor shall perform work assignments and provide all necessary personnel to accomplish the technical actives detailed within this SOW (CDRLs A001, A002).
The contractor shall provide management oversight to deliver the science and engineering expertise and products described herein (CDRLs A002, A003, A006, A007 and A008). The contractor shall provide the logistics, procurement resources, and facilities necessary to purchase, house, control, and report on the equipment, materials, supplies, and software required for the performance of the efforts defined herein.
Because the successful performance of this SOW requires close coordination, meetings, and interaction with NRL, other Government, military, scientific, academic, and private sector organizations, the contractor shall establish the appropriate non-disclosure agreements as needed to ensure acceptable and continuous interface support.
The contractor shall provide personnel and material resources to support technical exchange meetings and system reviews which many include but are not limited to:
• System Requirement Reviews (SRRs)
• Preliminary Design Reviews (PDRs)
• Critical Design Reviews (CDRs)
• Test Readiness Reviews (TRRs)
• Scientific or Engineering conferences.
The contractor shall present technical results and other conclusions at these meetings. The contractor shall also participate in periodic and informal working group meetings and discussions related the technical activities detailed within this SOW (CDRL A004).
The performance of this contract may result in achievements worthy of publication via scientific and/or technical periodicals. All publications resulting from these tasks, as well as presentations to entities other than NRL shall be approved for released through the NRL information pre-release approval process. All publications resulting from these tasks which also involve external research sponsors funding, personnel or equipment shall also be approved through the relevant sponsor’s pre-release approval process. The Contractor must receive all requested and required approvals prior to the release of any publication submissions or drafts. Achievements worthy of patent consideration shall also be identified (CDRL A005).
2.1 Technical Requirements (CDRL A001, A004)
The Contractor shall perform advanced RF engineering tasks to research proposed RF generation systems and its affects on the operations of DoD satellites and airborne platforms. These RF generation systems provide transmission and receive capability across a wide radio frequency spectrum ranging from DC (direct current) to light and a broad range of power levels up to and including 1,000,000 kW.
The Contractor shall characterize specified large apertures (60ft to 150ft) to ensure precise RF performance for RF energy transmission. In some cases, the Contractor will need SCI access to review the ephemeris data. Further details on security clearance requirements including the number and type of clearances required will be described in the contract DD254.
The Contractor shall modify existing RF ground terminal systems or devices to accommodate technical advances which may include the discovery of new anomalies, advanced mitigation techniques or to accommodate new spacecraft.
3.1.1 RF Engineering and Technical Development (CDRL A001, A004) The Contractor shall recommend and develop techniques to detect and predict performance of large apertures that are used across the frequency spectrum. Performance prediction may include photogrammetry modeling, extrapolation of near-field signal sampling, celestial and mathematical transformations or other innovative techniques.
The contractor shall develop or utilize existing mitigation techniques adapted/improved to greatly reduce or eliminate the adverse impacts of space anomalies on RF signals targeted to space and airborne platforms. Mitigation techniques may include advanced signal compensating algorithms or avoidance techniques for predicted or detected anomalies. Novel techniques and approaches are encouraged and may be further explored and developed with the government’s concurrence.
Fixed and transportable antenna systems have been developed for this ongoing effort. The contractor shall ensure backwards compatibility and perform regression testing to ensure current developments move the research forward without negatively impacting current capabilities.
The Contractor shall evaluate the condition of legacy or existing equipment. This R&D effort has progressed beyond lifecycle expectancy of many individual components while technology and cyber security requirements have evolved. The Contractor shall advise the government of equipment that may be insecure, no longer be technically adequate or serviceable and recommend options, updates or upgrades. With government concurrence and approval, equipment refreshes or replacements shall be incorporated into the design and scheduled to coincide with FROST development, installation and integration testing to maximize efficiency.
The Contractor shall inform NRL of changes and proposed changes to frequency spectrum allocations administered by the Federal Communications Commission (FCC) and the National Telecommunications and Information Administration (NTIA) in accordance with the “Manual of Regulations and Procedures for Federal Radio Frequency Management” (September 2017, as amended) and “Naval Telecommunications Procedures, Navy Electromagnetic Spectrum (EMS)
Guide”, NTP 6E (April 2011) . The Contractor shall test for potential interference with U.S.
Navy space systems by proposed frequency spectrum allocation changes or shared spectrum using advanced RF techniques.
3.1.2 Hardware (CDRL A001, A004)
The Contractor shall design, develop, test and integrate hardware for RF ground terminal systems to include but not limited to:
• antenna control
• signal source
• phase noise test sets
• precision pointing systems.
The RF ground terminal systems shall be used to mitigate the effects of space anomalies and ensure the generation and measurement of precise, accurate signals for spacecraft and airborne calibration. Hardware systems include small and large aperture antennas as small as one meter and as large as 150 ft. in diameter.
RF ground terminals may be in any stage of the system lifecycle. Additionally, some ground terminals may include repurposed antennas being transferred to the Navy “as-is” or those being moved to a new location. The Contractor shall provide solutions and recommendations for upgrading existing components and infrastructure to ensure the successful integration of FROST systems.
In some instances, the hardware design exists. In this scenario the Contractor shall implement NRL-provided hardware designs and complete the development effort through test and integration.
3.1.3 Electronics (CDRL A001, A004, A006)
The Contractor shall develop the electronic designs given a set of design specifications.
Many designs will require functional and operational compatibility with the current power and environmental limitations. The RF ground terminal systems operate across the entire radio spectrum from VLF (Very Low Frequency) range (3-30 kHz) including maritime and aeronautical navigation through EHF (Extremely High Frequency) range (30-300 GHz) including satellite and radio astronomy frequencies.
The Contractor shall apply knowledge of the frequency spectrum to RF anomaly system design, to include, but not limited to, system safety to mitigate RF energy hazards per MIL-STD-882E.
The Contractor shall incorporate safety restrictions including but not limited to those identified in FCC OET Bulletin 65 into the system design.
In some instances the electronics design exists. In this scenario the Contractor shall implement NRL-provided electronics designs and complete the development effort through test and integration.
3.1.4 Software Design, Development, Test and Integration (CDRL A001, A004) The Contractor shall design develop and maintain software for RF ground terminal systems to ensure the generation and measurement of precise, accurate signals for spacecraft and airborne calibration. The required software may be used in new, modified, or upgraded weather and RF systems. Software shall be designed using industry standards and best practices to ensure software maintainability and reliability. Geographic Information System data shall be integrated into RF ground terminal systems using OGC (Open Geospatial Consortium) standards to ensure interoperability.
The Contractor shall conduct object-oriented analysis and design of instrument control systems.
The Contractor shall create or update software development specifications to integrate anomaly mitigation into command and control of components required for the calibration of new or existing spacecraft. New and modified software shall comply with provided system and design documents to ensure interoperability with existing software and legacy hardware.
The Contractor shall implement NRL-provided software designs and complete the development effort through test and integration.
3.1.5 Networks and Accreditation (CDRL A001, A004)
The Contractor shall design, develop, and maintain digital networks used as part of the RF and anomaly detection, prediction and mitigation systems. These networks may connect RF systems and devices using uncommon protocols and complex configurations. DoD networks are working toward “Zero Trust Architecture” compliance therefore design, development and maintenance shall not introduce new tools or network segments that would impede compliance including but not limited to the use of insecure ports, protocols or services.
Some of these networks provide high to low communications. The Contractor shall comply with and conform to information and cyber security regulations and limitations including security classifications and those concerning high to low communication restrictions.
3.1.6 RF Mobile Communications (CDRL A001, A004)
The Contractor shall design and develop or modify specialized, secure RF mobile communication systems. Some mobile RF system hardware may be dictated by the specific project and some may be developed or recommended by the Contractor.
The Contractor may be asked to retrofit designed systems to previously procured units. The Contractor shall present solutions and recommendations for the retrofit design. With government concurrence and approval, the contractor shall develop, test and integrate the retrofit design.
The Contractor shall develop secure communication and interface software for RF mobile communication systems. These systems work in conjunction with the above-mentioned new and retrofit systems.
3.1.7 Optical (CDRL A001, A004)
In some instances the pulse generation may exceed the radio frequency range and enter the optical frequency ranges. For these tests optical test and generation equipment is utilized. This equipment may include but is not limited to telescopes and lasers.
The Contractor shall design, develop and maintain systems, hardware and software for optical ground terminal systems to ensure the generation and measurement of precise, accurate signals for spacecraft and airborne calibration. Optical ground terminal systems may be fixed, temporary (proof-of-concept) or mobile (transportable) units.
The Contractor shall install, integrate and maintain optical equipment required to perform optical frequency ground terminal calibrations of objects in space.
The Contractor shall comply with laser safety policies including the notification of nearby airfields prior to laser tests and usage. The Contractor shall advise the government of any recommendations to improve or update site policies, particularly related to the novel use and introduction of optical devices, to ensure personnel safety.
3.1.8 System Plans and Documentation (CDRL A001, A004)
The Contractor shall develop and modify system plans and documentation. Documentation may include drawings (I.E. Visio, AutoCAD) to ensure clarity of design and to aid technical understanding.
The Contractor shall utilize industry accepted formatting for the technical documentation type as appropriate. Common documentation types may include but are not limited to:
• Memo for the Record
• System Specifications
• Project Schedules
• Test Plans and Test Reports
• Drawings o Architectural o Electrical o Interconnect (Rack and elevation detail)
• Accreditation documentation o System Security Plan o PPS (Ports, Protocols and Services)
The Contractor shall comply with local configuration control (CM) processes and procedures when introducing new documents to the baseline and when modifying existing, controlled document artifacts.
Documents and drawings may be modified and delivered iteratively during a development lifecycle.
3.1.9 Interface Control Documents (ICD) (CDRL A001, A004)
The Contractor shall develop, update and maintain internal and external Interface Control Documents (ICD’s) which specify interface requirements for designed hardware and software.
The Contractor shall participate, when invited by the government, in technical exchanges with internal or external customers to coordinate potential additions or changes to interconnection.
Additionally, the Contractor shall assist internal and external customers utilizing the ICD data to create approved interconnections via the published interconnection points.
The Contractor shall comply with local CM policies and procedures when introducing or updating ICDs including submitting draft documents for stakeholder reviews and Configuration Control Board (CCB) approvals.
3.1.10 Operations Documentation Development (CDRL A001, A004) The Contractor shall develop, update and maintain engineering, logistics, and operations documentation for operators and maintainers of all systems developed. Updates and modifications of published documents shall comply with local CM policies and procedures.
3.1.11 Testing and Training (CDRL A001, A004)
The Contractor shall develop and execute test plans to ensure smooth integration of system additions, upgrades or modifications while adhering to local CM policies and procedures. The depth and detail of the testing plan (I.E. full system, sample, or regression testing) shall commensurate with the current milestone.
The Contractor shall develop and execute Certification Test Plans (CTPs) required as BOE (Body of Evidence) for accreditation assessments of networked devices. These test plans may require the execution of specific tools (I.E. Tenable Nessus Scans) which require the submission of specific resulting reports generated by the tool (I.E. Compliance and Vulnerability Reports).
The Contractor shall analyze and forecast the performance of existing and future systems.
The Contractor shall provide end-user training for systems incorporated into an operational baseline. Training materials required include are but not limited to:
• System User Guide
• Concept of Operations (ConOp)
• Wiki information pages
• FAQ (Frequently Asked Questions)
• How-to instructions
The Contractor’s onsite personnel shall complete required training prior to published due dates.
This training may include but is not limited to:
• Cyber Awareness Challenge required annually for all personnel accessing government furnished computers or accounts.
• RF Safety Hazards
• Combatting Trafficking in Persons
• Security related training
• Local training requirements
Contractor personnel providing Safety Training or performing collateral duties as a local safety officer shall attend required and/or specialized training prior to performing specific functions which may include:
• Completing the Competent Persons Fall Protection Training required to facilitate User Fall Protection training for personnel working aloft.
• CPR and First Aid Instructor training required to facilitate CPR and/or First Aid courses for personnel working with electronics or in remote locations with limited access to emergency services.
2.2 Travel (CDRL A001, A002)
Travel to CONUS and OCONUS antenna sites for collaborative and comparative analysis is required to perform research tasks including but not limited to: configure, observe, analyze and record research testing and results. CONUS and OCONUS travel is required for members of the research team to be physically present at various antennas within the global NRL antenna system to conduct precision testing simultaneously in real-time, to be able to monitor results, ensure accurate outputs, and verify data for future analysis.
Considerable travel, both CONUS and OCONUS, is required. Travel may include remote or isolated locations with limited comfort, health care or travel (i.e. bi-weekly flights in or out of certain areas) resources available.
The Contractor personnel and management shall coordinate all travel with the Government PM to ensure all required travel requests and documentation are submitted within the required timelines prior to travel.
The Contractor shall verify that all pre-shipped hardware and materials necessary to perform the prescribed activities have arrived at the travel location prior to executing the related leg of a travel itinerary.
Contractor personnel shall participate in any travel related training programs which may include but are not limited to:
• Motor Vehicle Operation (when required by host country laws)
• Anti-Terrorism Level One
2.3 Meetings and Reviews (CDRL A001, A004)
The Contractor shall provide the appropriate personnel to participate in requirements reviews, design reviews, and technical interchange meetings for each development program.
The Contractor shall record minutes of key meetings, reviews and technical interchanges which include government approvals including but not limited to design, schedule, milestone acceptance and action items.
2.4 Security (CDRL A001, A007)
Access to classified Top Secret/SCI technical data may be required in the performance of the contract. The number and type of clearances required will be described in the contract DD254.
Contractor Key Personnel who require access to TS/SCI material shall possess a final DoD granted Top Secret security clearance with the eligibility of SCI at time of proposal submission in order to ensure the ability to minimally staff a cleared transition team.
Detailed security requirements are delineated in the issued DD254 relevant to this contract. The Contractor shall ensure that all classified material is handled in accordance with the issued DD 254, the National Security program Operating Manual (NISPOM) (DoD 5220.22M and all NRL and applicable Security Program Guides/Directives.
Contractor personnel providing access control and security related tasking must have a favorably adjudicated DoD Tier 5 investigation, a final Top Secret security clearance and written approval of the MRC Security Manager.
Contractor personnel that require elevated system privileges (i.e. root or administrator level access) will also be required to meet IAT Level II or Level III training and certification requirements IAW DoDM 8140.03. Privileged User (PU) accounts can only be authorized for those meeting the associated DoDD 8140.01 requirements.
3.0 Deliverables
The Contractor shall provide NRL with the following deliverable items in accordance with the relevant Contract Data Requirements List (CDRL) items.
3.1 Technical Status Report
The Contractor shall provide a Technical Status Report (CDRL A001). The Contractor shall provide highlights of significant actions that occurred during the reporting period relative to contract performance. Significant actions include any that will impact, or have impacted, the projected performance, cost or schedule of the program effort.
The Contractor shall provide information on planned technical deliveries, meetings and schedules versus actual activities performed. Actual and projected schedule changes shall be reported along with their actual and projected impact on overall contract performance. The Contractor shall provide details on the progress of each contract task or item including hardware and software design, development, configuration management, quality control, integration and test and/or other actions needed to fulfill contract requirements. The status of materials, data items, and subcontracting must also be reported. Government Furnished Equipment (GFE) inventory changes (added to or removed from the contract) during the reporting period shall be identified.
The Contractor shall advise of all travel performed in support of the SOW. Travel completed during the report period will be included as well as requested or required travel projected for the next four reporting periods.
The Contractor shall identify any technical or contractual problems and issues. Proposed resolution(s) shall be presented. Each subsequent report shall include an update of any previously reported unresolved problems until final resolution is presented as a completed task.
3.2 Contract Status and Labor Report
The Contractor shall provide a Contract Status and Labor Report (CDRL A002). The Contractor shall provide contract and sub-contracts status and labor levels. Labor hours expended during the reporting period shall be reported per person (as identified by name rather than employee or billet number), per WBS activity by the contractor an all sub-contractors. Labor hours expended per labor category during the reporting period shall also be provided. In the case where that there exists a one-to-one correlation between the by-name labor and related labor category these data items may be combined as one table or report item as long as all required items are clearly identified and included in the Monthly Contract Status and Labor Report.
The Contractor shall summarize all contract maintenance tasks including contract modifications completed during the reporting period.
The Contractor shall provide a single line stating the discrete, total number of contractors and sub-contractors performing on the contract for any number of labor hours greater than zero during the reporting period.
The Contractor shall identify contractual or labor problems and issues. Proposed resolution(s) shall be presented. Each subsequent report shall include an update of any previously reported unresolved problems until final resolution is presented as a completed task.
3.3 Financial Program Management Report
The Contractor shall provide a Financial Program Management Report (CDRL A003). The Contractor shall provide information on contract and sub-contracts financial and funding levels.
The cost data shall include current month as well as cumulative totals for funding, invoiced expenditures, commitments and balances.
The Contractor shall provide a breakdown of costs relative to each Accounting Classification Reference Number (ACRN), Work Breakdown Structure (WBS) and completed for all Contract Line Items (CLIN) including labor, material, Other Direct Charges (ODCs), and travel.
3.4 Technical Data and Documentation
The Contractor shall provide a Technical Data and Documentation Deliverable (CDRL A004).
The Contractor shall provide all technical data and documentation developed pursuant to the SOW. The data and documentation shall be delivered no later than 15 days following the conclusion of the relevant milestone to include but limited to:
• Design Reviews.
• Acceptance or Integration Tests.
• Military Exercise Events.
• Baseline Upgrades.
Where DoD, NRL or sponsor policy differ from the CDRL submission dates the DoD, NRL or sponsor policies will take precedence. In the instance that the above policies are vague, imprecise or extend beyond the end of the contract period of performance the CDRL A004 deliverable deadlines remain in place. I.E. The NCST Configuration Management Plan (CMP) may require design documents to be delivered at the time of a Change Request (CR) submittal in order to facilitate a Configuration Control Board (CCB) review necessary to achieve the required approval to implement. Meanwhile CDRL A004 would require design documents to be delivered no later than 15 days following the implementation milestone. The CMP requirement for delivery takes precedence.
The Contractor shall deliver all outstanding technical data and documents within 15 days of the end of the contract. The end of the contact period of performance shall be considered the final project milestone for the purpose of CDRL A004.
3.5 Patent Report
The Contractor shall perform internal, quarterly reviews to evaluate the research and development activities for potential patent opportunities. The Contractor shall provide a Patent Report (CDRL A005) that documents and summarizes any research product that is eligible for patent submission or consideration.
3.6 System Safety Hazard Analysis Report
The Contractor shall provide a System Safety Hazard Analysis Report (CDRL A006) that Identifies potential safety hazards specific to a project or deployment.
3.7 Accident Incident Report
The Contractor shall provide an Accident Incident Report (CDRL A007) to report the occurrence of incidents resulting in any one or more of the following:
• personnel injury.
• property damage.
• security violation.
• other significant incidents.
The Contractor shall provide a summary of what happened in the incident in accordance with DI- MGMT-82118. The distribution of reports concerning security violation incidents shall include the Security Manger. The distribution of reports concerning safety incidents (personal injury, property damage and other significant incidents) shall include the Safety Officer.
The Contractor shall include actions and corrective actions that have been or will be taken to prevent re-occurrence of the incident or accident, the timeline for performing all actions and corrective actions, as well as associated work orders that will be used to track the cost.
3.8 Final Report
The Contractor shall provide a Final Report (CDRL A008) at the end of the contract performance period. The Contractor shall provide a comprehensive final report that summaries all the scientific objectives, findings, and recommendations, research development, and other efforts performed and the results.
The Contractor shall include a final GFE inventory. The disposition (returned, transferred, disposal or lost/stolen) and condition of each inventoried item shall be recorded.
This RF research and development program has been a multi-year effort consisting of several iterations of follow-on contracts. In the event that there is any incomplete research or development at the end of the contract period of performance the Contractor shall provide the detailed status to include but not limited to the work completed, progress to date, specific tasks incomplete, obstacles or technical issues encountered and recommended next steps.
| 1.0 Task Order Scope |
| 2.0 Requirements |
| 2.1 Technical Requirements (CDRL A001, A004) |
| 3.1.1 RF Engineering and Technical Development (CDRL A001, A004) |
| 3.1.2 Hardware (CDRL A001, A004) |
| 3.1.3 Electronics (CDRL A001, A004, A006) |
| 3.1.4 Software Design, Development, Test and Integration (CDRL A001, A004) |
| 3.1.5 Networks and Accreditation (CDRL A001, A004) |
| 3.1.6 RF Mobile Communications (CDRL A001, A004) |
| 3.1.7 Optical (CDRL A001, A004) |
| 3.1.8 System Plans and Documentation (CDRL A001, A004) |
| 3.1.9 Interface Control Documents (ICD) (CDRL A001, A004) |
| 3.1.10 Operations Documentation Development (CDRL A001, A004) |
| 3.1.11 Testing and Training (CDRL A001, A004) |
| 2.2 Travel (CDRL A001, A002) |
| 2.3 Meetings and Reviews (CDRL A001, A004) |
| 2.4 Security (CDRL A001, A007) |
| 3.0 Deliverables |
| 3.1 Technical Status Report |
| 3.2 Contract Status and Labor Report |
| 3.3 Financial Program Management Report |
| 3.4 Technical Data and Documentation |
| 3.5 Patent Report |
| 3.6 System Safety Hazard Analysis Report |
| 3.7 Accident Incident Report |
| 3.8 Final Report |