CDRL_A016_(Project_Planning_Report).pdf

PDF 278 KB Posted

Attached to
Synthetic Signature Generation (SSG) Trainers
Solicitation number
N0016719R0002
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) for a federal contract. The CDRL requires a monthly Project Planning Report detailing planned expenditures by project, task, sponsor, contract line item or subline item. It must be submitted electronically in MS Word or PDF format to the Contracting Officer's Representative and Technical Point of Contact. The first submission is due 45 days after contract award, with subsequent submissions due by the 1st of each month. The report is classified as Unclassified//FOUO and distribution is limited to the Department of Defense and U.S. DoD contractors for administrative or operational use. The related federal contract opportunity notice indicates a pre-solicitation for Synthetic Signature Generation trainers with the Naval Sea Systems Command, correcting an incorrect solicitation number from a prior synopsis.

CDRL A016 (Project Planning Report)

View the file

Other files

File Type Posted
N0016719R0002_Amendment_0004.pdf PDF
N0016719R0002_Amendment_0004_Conform_Copy.pdf PDF
Attachment_14_-_Key_Personnel_Qualifications_REVISED_12_20_18.docx DOCX document
N00167-19-R-0002__Conformed.pdf PDF
Attachment_1_-_Revised_DD254.pdf PDF
N00167-19-R-0002_AMENDMENT_0003.pdf PDF
N0016719R0002_0002.pdf PDF
Attachment_14_-_Key_Personnel_Qualifications_REVISED_11_20_18.docx DOCX document
N0016719R0002_0001.pdf PDF
Attachment_19_-_Government_LOE_Table_REVISED_11_16_18.docx DOCX document
Attachment_14_-_Key_Personnel_Qualifications_REVISED_11_16_18.docx DOCX document
Attachment_10_-_QASP.docx DOCX document
Attachment_21_-_Sample_Indirect_Rate_Supporting_Documentation.xls XLS spreadsheet
Attachment_2_-_OPNAV_INSTRUCTION_3502.5B.pdf PDF
CDRL_A004_(MtgAgenda).pdf PDF
CDRL_A019_Software_Version_Description_(SVD).pdf PDF
Attachment_19_-_Government_LOE_Table.docx DOCX document
Attachment_15_-_Staffing_Plan_(No_Cost).xlsx XLSX spreadsheet
CDRL_A017_(SCRM).pdf PDF
CDRL_A001_(Contract_Progress).pdf PDF
CDRL_A018_(Phase_Out_Transition_Plan).pdf PDF
CDRL_A009_(Software_Req._Specification_SRS).pdf PDF
Attachment_12_-_Subcontracting_Plan_Coversheet.docx DOCX document
Attachment_4_-_MIL-STD-31000A.pdf PDF
Attachment_9_-_CARDEROCKDIVINST_5510.12.pdf PDF
Attachment_1_-_DD254_Attachment_SCG_ID_List.pdf PDF
N00167-19-R-0002.pdf PDF
CDRL_A012_(Test_Procedure).pdf PDF
Attachment_18_-_TO_0001_SOW.doc DOC document
Attachment_14_-_Key_Personnel_Qualifications.docx DOCX document
Attachment_17_-_Past_Performance_Questionnaire.doc DOC document
Attachment_11_-_GFP_List.pdf PDF
CDRL_A005_(Presentation_Material).pdf PDF
Attachment_7_-_NAVSEANOTE_2200.pdf PDF
CDRL_A008_(SystemSubsystem_Spec._(SSS).pdf PDF
CDRL_A011_(Software_Product_Specification_(SPS).pdf PDF
CDRL_A006_(MtgMins).pdf PDF
CDRL_A013_(TestInspecton_Report).pdf PDF
Attachment_20_-__Direct_Labor_Rate_Substantiation.xls XLS spreadsheet
Attachment_1_-_Signed_DD254.pdf PDF
Attachment_16_-_Previous_Contracting_Efforts.doc DOC document
Attachment_1_-_DD254_Attachment_IRCCO__007-18_001.jpg JPG image
CDRL_A014_(SitePrep-InstallPlan).pdf PDF
Attachment_3_-_OPNAV_INSTRUCTION_11102.2.pdf PDF
Attachment_13_-_Cost_Summary_Format.xls XLS spreadsheet
CDRL_A003_(Technical_Report_-_Task_Mgt_Plan).pdf PDF
Attachment_6_-_NAVSEAINST_2200.1.pdf PDF
CDRL_A015_(Tecnical_Data_Package).pdf PDF
Attachment_5_-_857001m.pdf PDF
CDRL_A002_(Technical_Report).pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A016
title: Funds and Man-Hours Expenditure Report
sub: Project Planning Report (PPR)
auth: DI-FNCL-80331A
ref: SOW, 6.3
req_ofc: NSWCCD 7340
dd250: LT
appcode: A*
dist: D*
freq: MNTHLY*
asof: EOM
firstsub: 45 DAC*
subsub: SEE BLK 16
addressee1: COR
draft1:
reg1: 1
repro1:
addressee2: TPOC
draft2:
reg2: 1
repro2:
addressee3: PM
draft3:
reg3: 1
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 3
total_repro: 0
remarks: BLOCK 4: This report is an addendum to CDRL A001 and clarifies Paragraph 3.1.3.f. for planned expenditures. These are best represented by Project, Task, Sponsor, CLIN or SLIN.

BLOCK 8: Approval required after initial submission to ensure content provided is acceptable.

BLOCK 9: This data item shall be marked as Unclassified//FOUO. Distribution authorized to DoD and U.S DoD Contractors for Administrative or Operational use (May 2007). Other request shall be referred to the COR.

BLOCK 10: This report shall be submitted on the 1st of each month.

BLOCK 12: First submission shall be 45 days after the first full accounting month after contract award and there after the report shall be submitted every month on the 1st.

BLOCK 13: Each submission shall be on the 1st of each month.

BLOCK 14: This data item shall be submitted electronically in MS Word or PDF File format.

group:
total_price:
prep_name: GABIEL LEDESMA
line_item: 0003
exhibit: A
xtdp: Off
xtm: Off
othercat: MGMT
system: Signature Simulation & Training System
ctr_no: N00167-18-R-0004
contr: TBD
remarksb:
Page2:
Reset:
2018-08-27T13:14:18-0400
LEDESMA.GABRIEL.GIOVANNY.1284980456
prep_date: 20180827
app_by: KIERSTEN JOHNSON
2018-08-27T13:19:11-0400
JOHNSON.KIERSTEN.M.1385248500
app_date: 20180827
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .