This document is a summary of changes to solicitation N00024-22-R-4403 for the USS TRIPOLI (LHA 7) FY23 Selected Restricted Availability.

The solicitation requires the execution of maintenance, modernization, and repair of the USS TRIPOLI, to be completed by a single contractor at a West Coast facility. Key changes include revising option exercise dates in Section I and proposal due dates in Section L. Section B was updated to include pricing terms. Section L provides instructions for an electronic proposal submission due by August 19, 2022, including requirements for past performance evaluations, production scheduling, and technical eligibility factors. A single fixed-price contract award is expected in December 2022 to perform the 12-month availability beginning March 2023.

View the file

Other files

File Type Posted
USS TRIPOLI (LHA 7) FY23 SRA A0008_Conformed.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA A0008.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA PPI_7.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA A0007 Conformed.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA A0006_Conformed.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA A0006.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA PPI_6.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA Conformed_A0005.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA PPI_5.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA PPI_3-4.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA_A0005.pdf PDF
USS TRIPOLI Attachment S-7 Proposal Assessment Rev_1.xlsx XLSX spreadsheet
USS TRIPOLI Attachment J-10 20 Percent Open and Inspect Milestone Reports Due Rev_1.xlsx XLSX spreadsheet
USS TRIPOLI (LHA 7) FY23 SRA_A0004.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA Conformed_A0004.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA Conformed_A0003.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA_A0003.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA PPI_2.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA Conformed_A0002.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA_A0002.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA PPI_1.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA_A0001.pdf PDF
USS TRIPOLI (LHA 7) FY23 SRA Conformed_A0001.pdf PDF
USS TRIPOLI Attachment J-8 Government Furnished Material List Rev_1.xlsx XLSX spreadsheet
USS TRIPOLI Attachment J-10 20 Percent Open and Inspect Milestone Reports Due.xlsx XLSX spreadsheet
USS TRIPOLI Attachment J-5 Quality Assurance Surveillance Plan.docx DOCX document
USS TRIPOLI Attachment S-9 Past Performance Questionnaire.docx DOCX document
(USS TRIPOLI) CDRL Exhibit A.pdf PDF
USS TRIPOLI Attachment S-3 Pre-Proposal Information Form.xlsx XLSX spreadsheet
USS TRIPOLI Attachment J-7 IPTD Events and SMR.docx DOCX document
USS TRIPOLI Attachment S-2 Past Performance CPARS References.docx DOCX document
USS TRIPOLI FY23 SRA Solicitation.pdf PDF
USS TRIPOLI Attachment J-8 Government Furnished Material List.xlsx XLSX spreadsheet
(USS TRIPOLI) CDRL Exhibit C.pdf PDF
(USS TRIPOLI) CDRL Exhibit B.pdf PDF
USS TRIPOLI Attachment S-7 Proposal Assessment.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002422FR62115

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this solicitation amendment is to:

1) Incorporate changes to Section I, latest option exercise dates.

2) Incorporate changes to Section L, proposal due dates.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002422R4403

X 9B. DATED (SEE ITEM 11)

14-Jun-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Aug-2022

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002422R4403

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

REVISED SUMMARY OF CHANGES

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.217-7 VAR II OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989)

(NAVSEA VARIATION II) (OCT 2018)

(a) By written notice to the Contractor, the Contracting Officer may exercise, if at all, any of the Option Items identified in Section B and require the Contractor to provide, within the performance period specified in Section F, the work described in Section C for such Option(s) Item(s) at the estimated cost and base fee set forth in Section B. The option(s) may be exercised after the Contractor’s receipt of the Specification Work Package prepared in accordance with the procedures stated in Section C, but in any event, the Option(s) shall be exercised, if at all, on or before the following dates:

FISCAL YEAR ITEM LATES OPTION EXERCISE DATE

FY23 0008-0043 14 February 2023

FY23 0051, 0063,

0070-0072 31 October 2023

FY23 0062 16 February 2024

FY23 0044, 0045,

0052-0061, 0064-0069, 0073-0086

16 February 2024

(b) The exercise of any item identified under Section B as an Option Item shall also extend the period of performance for the Contract Data Requirements List, DD 1423, Exhibit(s) A, B, & C and the Provisioning Documentation, Exhibit(s) N/A.

(End of clause)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L - INSTRUCTIONS

Section L - Instructions, Conditions and Notices to Bidders

SECTION L - INSTRUCTIONS

INSTRUCTIONS TO OFFERORS

I. INTRODUCTION

A. This solicitation is a Request for Proposals (RFP) that will result in the award of a single Firm-Fixed-Price contract to complete the USS TRIPOLI (LHA 7) SELECTED RESTRICTED AVAILABILITY

(SRA).

B. The Government intends to award a single Fixed-Price contract to the Offeror whose proposal represents the Best Value to the Government, utilizing trade off source selection procedures in accordance with FAR 15.101-1 and Section M of this solicitation.

C. ALL INQUIRIES shall be made in writing and directed to CDR Jonathan Pagnucco, Contracting Officer, and Derek Shirley, Contract Specialist, at derek.s.shirley.civ@us.navy.mil, and jonathan.p.pagnucco.mil@us.navy.mil, respectively. To ensure the Government is able to adequately address and respond to Offeror pre-proposal information (PPI) via amendment, it is requested contractors submit no more than four sets of controlled questions.

The first controlled set of questions shall be submitted on or before 21 June 2022 before 11:59 pm, local time, Washington, DC. The second set of controlled questions shall be submitted on or before 28 June 2022, before 11:59 pm, local time, Washington DC. The third set of controlled questions shall be submitted on or before 05 July 2022 before 11:59 pm, local time, Washington DC. The fourth set of controlled questions shall be submitted on or before 12 July 2022 before 11:59 pm, local time, Washington DC. Each set of questions shall be submitted together in one attachment via email properly titled, “Contractor Name - Submission No. X (1, 2, or 3) as of date XX/XX/XXXX.” Solicitation questions should reference the solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation. Proposal due date shall not be extended solely on the basis of more than one request, extensive questioning, or requests received after this date and time.

Controlled Set of Bidders Questions Due Date Set 1 21 June 2022 Set 2 28 June 2022 Set 3 05 July 2022 Set 4 12 July 2022

Offerors shall not submit comments, questions, or inquiries to any Government representative other than the Contracting Officer and Contract Specialist identified herein.

Information contained in the Government’s responses to bidder’s question shall not supersede any information contained in the solicitation (including amendments). In the event of a discrepancy between a response to a bidder’s question and the content of the solicitation, the solicitation shall take precedence.

The Government reserves the right to not answer any more than four sets of PPI requests per contractor, in accordance with the deadlines identified herein.

D. Estimated Award Date: The Government anticipates making an award in December 2022.

E. Potential Prime Offeror’s Negative Response: The Government requests a negative response from any potential Prime Offeror who, after reviewing this solicitation, does not intend on submitting a proposal.

Negative response are to be delivered to the Contracting Officer and Contract Specialist listed above NLT seven (7) business dates after solicitation release.

II. INSTRUCTIONS FOR THE SUBMISSION OF OFFERS

A. Proposal Due Date:

1. All copies of proposals (Volumes I & II) shall be received by the Government via DoD SAFE no later than 19 August 2022 at 1400, local time, Washington DC. Only electronic submittal of proposals via DoD SAFE will be permitted. Offerors shall notify the Contracting Officer and Contract Specialist requesting a pick-up request no later than three (3) business days (16 August 2022) prior to the proposal deadline. Late proposals WILL NOT be considered. Partial proposals or attachments WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.

a) Offerors must provide a proposal valid for at least 180 calendar days (08 February 2023) from the proposal due date (19 August 2022). (Complete block 12 of the Standard Form (SF-33).

B. Directions for Electronic Submission of Proposals:

1. Offerors are instructed to submit proposals electronically via the DoD SAFE application located at https://safe.apps.mil.

2. Offerors wishing to submit a proposal in response to this notification shall notify the Contracting Officer and Contract Specialist noted as points of contact (POCs) on this solicitation no later than three

(3) business days prior to the proposal deadline of this solicitation and no earlier than 14 calendar days prior to the proposal deadline. The Offeror shall provide its name and e-mail as contact information so the Government can generate a pick-up request from the DoD SAFE application to be sent to the Offeror, which is valid for 14 calendar days. Upon notification from the Offeror, either the Contract Officer or Contract Specialist will send a DoD SAFE pick-up request. The Offeror shall submit its proposal, and provide email confirmation of its submission to all POCs identified in paragraph I(D) above.

3. Offerors shall address their package with the RFP number and Offeror’s company name. Offerors shall click the “Confirm Delivery” button within the DoD SAFE app in order to receive a confirmation of pick up by the Government. The DoD SAFE system records the time that files are submitted for transmission. The Offeror is responsible for ensuring that it drops off its proposals and generates a drop-off time prior to the proposal submission date and time. In the event of a dispute of proposal time submission, the pick-up e-mail with the system-generated drop off time within the body of the e-mail shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1.

4. Proposals must be submitted as one .zip file per ship/proposal, formatted so that each Volume 1 Price

Volume and each Volume 2 Technical Volume are submitted in separate file folders clearly marked.

Each Volume shall be formatted with separate files submitted for each Factor

5. All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The proposal shall have separate files. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable. No fields or documents shall be password protected. If files are compressed, the necessary decompression program must be included.

6. Proposal volumes shall be structured as follows:

Proposal Volume Title

USS TRIPOLI

TRI-1 USS TRIPOLI Price Volume TRI-2 USS TRIPOLI Technical Volume

III. GENERAL INFORMATION

A. Ship Checks:

1. The USS TRIPOLI (LHA 7) will not be available for ship check prior to the proposal submission due date. Potential Offerors may inspect the USS MAKIN ISLAND (LHD 8) in San Diego, CA, from 26 July 2022 to 28 July 2022.

2. To schedule a ship check, Offerors shall email a "Request for Ship Check" to CDR Jonathan Pagnucco and Derek Shirley at jonathan.p.pagnucco.mil@us.navy.mil and derek.s.shirley.civ@us.navy.mil, respectively. Due to the ship location, additional information will be provided upon request.

3. Participants will be subject to security, safety, and other applicable regulations established by

Southwest Regional Maintenance Center (SWRMC) and ship’s Commanding Officers. Contractors conducting SWRMC related work efforts must visit SWRMC security website for latest forms and instructions at:

a) http://www.navsea.navy.mil/Home/RMC/SWRMC/Visitor-Information/

b) https://www.cnic.navy.mil/regions/SWRMC/installations/ns_SWRMC/om/pass_and_id.html

B. Specifications and Associated Reference Documentation:

1. Upon request, the Government will provide the Specification Package Work Items and Work Item References.

2. Offerors may request solicitation attachments by submitting a request to:

a) CDR Jonathan Pagnucco at jonathan.p.pagnucco.mil@us.navy.mil, and

b) Derek Shirley at derek.s.shirley.civ@us.navy.mil

3. Additional work item references not already in the possession of the Offerors, commercially available, listed under 52.211-2, are available through the following websites:

a) https://jedmics.net/

b) https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx

c) https://nsedr.nnsy.navy.mil//

C. Alteration of Solicitation

1. Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

D. Proposal Information

1. Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, Offerors are advised conclusory statements regarding an Offeror’s experience such as: “the Offeror understands”, “the Offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors shall provide specific and concise information to validate all assertions.

E. Amendments

1. The Government may revise the solicitation at any time by means of an Amendment. It is an Offeror’s responsibility to ensure it is accessing the SAM.gov website to view potential amendments and procurement notifications for this solicitation.

F. Teaming Arrangements

1. Proposals must be submitted by one (1) Prime Contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a Prime Contractor with a unique Commercial and Government Entity (CAGE) code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), Offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.

G. One-bid Situation

1. If the Government receives only one bid for solicitation N00024-22-R-4403, the Government reserves the right to require certified cost or pricing data in accordance with DFARS 252.215-7008. As identified by the Contracting Officer, additional cost or pricing data will be required in order to determine whether proposed pricing is fair and reasonable or to comply with the statutory requirements of certified cost or pricing data in accordance with 10 USC 2306(a) and FAR 15.403-4. The Offeror agrees to provide any additional data requested within 30 days of notification.

H. Notification of Use of Navy Support Contractors for Official Contract Files

1. NAVSEA currently utilizes support contractors from Serco-IPS Corporation, DELTA Resources, Inc. (a wholly owned subsidiary of VT Group Holdings, Inc.), and Herren Associates Inc. to manage official contract files, including the official file supporting this procurement. NAVSEA may, without further notice, enter into contracts with other contractors for file management services as describe in NAVSEA Standard Text L-204-H003. Please refer to NAVSEA Standard Text L-204-H003 for further details.

IV. PROPOSAL FORMAT

A. To facilitate efficiency and consistency in proposal evaluation the following is mandatory. PROPOSALS

WHICH DO NOT FOLLOW THIS DIRECTION MAY BE REJECTED AS NON-RESPONSIVE

AND THUS INELIGIBLE FOR AWARD. NON-RESPONSIVE PROPOSALS WILL NOT BE

EVALUATED.

B. Electronic Proposals: All proposals shall be submitted via DoD SAFE as outlined above. Pages shall be formatted to 8.5 x 11 inch paper with one inch margins. The text used shall be Times New Roman with a minimum of 12 point font. Any revisions to Offerors’ proposals (if required) shall be submitted in two (2) forms: (1) a final clean revised document; and (2) a redlined document outlining the Offeror’s changes. The Contracting Officer reserves the right to provide any additional instructions regarding revisions to Offerors’ proposals via letter. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section L, paragraph V where required.

C. Page Limits:

1. Volume I (TRI-1)

a) Factor 1 – Price: No page limitation with the exception of the cover letter which shall not exceed three (3) pages.

2. Volume II (TRI-2)

a) Factor 1: Technical Eligibility - No page limitation

b) Factor 2: Production Schedule - No page limitation

(1) Emphasis Area A (Manpower): No page limitation, with the exception of the narrative which shall not exceed 20 pages

(2) Emphasis Area B (Physical Resource Capacity): No page limitation, with the exception of the narrative which shall not exceed 10 pages

(3) Emphasis Area C (Production Schedule): No page limitation

c) Factor 3: Past Performance - No page limitation

V. PROPOSAL CONTENT

A. VOLUME I

Price Proposal: The price proposal shall not contain non-price factor information.

1. Factor 1: Price: The price proposal shall be comprised of the following documentation:

a) Cover Letter,

b) Signed SF 33 with all amendments acknowledged,

c) Small Business Subcontracting plan per FAR Part 19 (large businesses only),

d) Any Joint Venture / teaming agreements (if applicable),

e) Completed Attachment J-4 and Solicitation Section B carrying forward information from Attachment

J-4, as applicable, containing:

(1) Work Item Pricing for all Base and Option Items,

(2) Daily Extension Rates,

(3) Inter-port Differential (IPD),

(4) Fully Burdened Ship Repair Labor & Material Burden Rate, New Work & Growth Reservation,

(5) Government Provided Pier Differential (if applicable)

f) Completed Execution Milestones and Key Event Dates (Attachment J-3).

g) Completed Proposal Assessment (Attachment S-7).

2. Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the Offeror shall include the following in the cover letter:

a) Identification of all enclosures included with the proposal,

b) CAGE and System for Award Management (SAM) Unique Entity Identifier (UEI) numbers for the

Prime contractor,

c) Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).

d) Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more.

e) For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook

(Attachment J-4) provide an explanation as to why. In addition, if applicable:

(1) For any WI with a total value of zero labor hours proposed (prime and subcontractor combined)

(although material is proposed), provide an explanation as to why.

(2) For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.

3. Standard Form 33 (SF-33): As part of the price proposal package, the Offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.

4. Small Business Subcontracting Plan (SBSP):

a. An Offeror shall submit a SBSP outlining its strategy for maintaining compliance with FAR

52.219-9 for the duration of the USS TRIPOLI availability, which includes:

i. A subcontracting goal of 25 percent of an Offeror’s total contracting dollars utilizing small disadvantaged businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUB-Zone small businesses. Note, the 25 percent goal is inclusive of the congressionally mandated five percent (5%) goal for small disadvantaged business concerns.

ii. Offerors must provide rationale for any proposed plan which does not meet the following thresholds (as applied to total contract dollars):

(1) 25 percent of prime contracts for small businesses;

(2) Five percent of prime and subcontracts for women-owned small businesses;

(3) Five percent of prime contracts and subcontracts for small disadvantaged businesses;

(4) Three percent of prime contracts and subcontracts for HUBZone small businesses;

and

(5) Three percent of prime and subcontracts for service-disabled veteran-owned small businesses.

iii. In addition, Offerors must provide explanation for any SBSP which fails to address all requirements outlined in FAR 52.219-9.

iv. A SBSP is NOT REQUIRED from a small business concern.

5. Completed Solicitation Section B and Pricing Workbook (Attachment J-4):

a) Offerors must propose on all contract line items (CLINs) including all base and option CLINs, complete Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED),” complete Section B “NOTE D: SCHEDULE OF DAILY

RATES FOR PIERSIDE (FULLY BURDENED) FOR PURPOSES OF A COMPENSABLE

EXTENSION TO THE DELIVERY DATE,” and complete all tabs of Pricing Workbook (Attachment J-4) to be considered responsive.

b) The Offeror shall submit prices using the Pricing Workbook (Attachment J-4) for all Tabs, including:

Work Item Index, Daily Extension Rates, Fully Burdened Ship Repair Labor Rate & Material Burden Rates and Total Proposed Evaluated Pricing in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN. If there is a discrepancy between the two, the CLIN price shall govern.

The Pricing Workbook (Attachment J-4) Fully Burdened Ship Repair Labor Rate and Material Burden Rate must match the rates provided in the Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED).” If there is a discrepancy between the two, the Section B Fully Burdened Ship Repair Labor Rate and Material Burden Rate shall govern.

c) Offerors shall insert pricing in all yellow shaded fields in the pricing workbook (Attachment J-4).

6. Inter-port Differential (IPD)

a) The IPD applicable to the USS TRIPOLI (LHA 7) FY23 SRA must be included in all offers and reflects the costs incurred by the Navy to accomplish an availability at a port other than the homeport.

The following chart provides the values to be included in all Offerors’ price proposals to determine the Offeror’s total evaluated price.

Location Differential

San Diego, CA $32,593 Seattle, WA $3,129,998 Portland, OR $6,953,060 Vallejo, CA $2,828,355

b) An Offeror whose location is not listed in the above Government provided port differential tables shall submit a bidder’s question requesting a Government provided port differential be calculated for the Offeror’s proposed location for the USS TRIPOLI (LHA 7) FY23 SRA.

7. Government Provided Pier Differential

a) The Government provided pier differential must be included in all offers proposing to use a Government provided pier in lieu of a contractor owned pier and is calculated using average electricity and water consumption, as well as sewage and oily waste disposal. The following chart provides the values to be included in offerors’ price proposals, as applicable, to determine the offeror’s total evaluated price:

Location Differential

San Diego, CA $2,584,626

b) Any awardee proposing to use Government-provided pier space shall be responsible to provide temporary services to satisfy Work Specification 992-11-010 required to complete USS TRIPOLI FY23 SRA at Naval Station San Diego, including but not limited to the requirements of S0570-AC-CCM- 010/8010 Rev 3/A, Industrial Ship Safety Manual for Fire Prevention and Response

B. VOLUME II

Non-Price Proposal: Do not include cost or price information in this volume. The non-price proposal shall be comprised of three (3) factors, as follows:

1. Non-Price Factor 1 – Technical Eligibility: Offerors must provide the following to demonstrate eligibility for Award (There is no page limit associated with this Factor):

a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier intended to be used for the proposed availability and indicates that the pier meet the minimum characteristics identified in Attachment S-5.

b) Provide a completed Execution Milestones & Key Event Dates (Attachment J-3) and a signed letter identifying and confirming ownership of a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’milestones as outlined in the Execution Milestones & Key Event Dates (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing a subcontractor for physical resources (pier), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier from the ‘Availability Start’ through ‘Contract Complete’ milestone as outlined in the Execution Milestones & Key Events (Attachment J-3) is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed pier facilities, whether owned by the offeror or subcontractor, must be accessible by the USS TRIPOLI (LHA 7) without any modification to the vessel.

2. Non-Price Factor 2 –Production Schedule:

Offerors must demonstrate their ability to provide an executable schedule to complete the solicited requirements:

(1) Production Schedule: Develop a Production Schedule in accordance with the following requirements:

a) Include Key Events, Milestones, tests.

b) Schedule each Work Item to the Work Activity level, listing the planned start and planned completion dates, and durations for each Work Activity.

c) Assign each Work Activity with the appropriate predecessor and successor relationships within the contractor’s scheduling software that establish the logic relationship between schedule Work Activities. Each activity must have at least one predecessor and one successor, with the exception of the Key Event Start Availability (which may have no predecessors) and the Key Event Complete Availability (which may have no successors).

Each Key Event and Work Activity may have more than one predecessor and more than one successor. The preferred relationships between linked predecessor and successor activities is Finish-to-Start. The use of scheduling Lags and Leads should be minimized.

d) Assign appropriate predecessor relationships to each Key Event and Milestone(s) to ensure there is an accurate logical progression through all work activities leading to their assigned Key Event and Milestone(s), ensure milestones are linked to the Key Events they support, and ensure the Production Schedule supports accurate prediction of Key Event and Milestone(s) attainment.

e) Assign appropriate predecessor and successor relationships between the Work Activities conducted on the same component, or in the same location but under differing Work

Items, to ensure all related Work Activities across all Work Items are interdependently linked together.

f) Schedule production work and preliminary inspections generating reports required by Attachment J-10 that could result in a change in work to be accomplished or additional material to be procured to support reporting no later than the first 20 percent of the availability duration.

(2) Provide an export of the Production Schedule data elements in a sortable/filterable spreadsheet format compatible with Microsoft Excel. Include the following minimum data elements for each Work Activity in the schedule, as appropriate:

a) Work Item Number (as appropriate): 4-E specification Work Item number.

b) Work Activity Identifier: Numerical designator identifying the Work Activity within the

Work Breakdown Structure (WBS).

c) Title: Descriptive title of Work Item and Work Activity.

d) Key Event: Key Event applicable to the Work Activity.

e) Milestone (as appropriate): Milestone applicable to the Work Activity.

f) System (as appropriate): System(s) affected.

g) Component (as appropriate): Component Unit (For example: tank, valve, motor, pump).

h) Location: Work location/compartment number.

i) Executing Activity: ID specific organization: Prime Contractor, Sub-Contractor.

j) Baseline Start: The date identified in the Production Schedule when the contractor plans to start the Work Activity.

k) Baseline Finish: The date identified in the Production Schedule when the contractor plans to finish the Work Activity.

l) Early Start: Software determined date. The earliest point in time that a Work Activity may start based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.

m) Early Finish: Software determined date. The earliest point in time that a Work Activity may complete based on the Production Schedule network logic and any other schedule constraints. Early finish dates may change as the availability progresses.

n) Late Start: Software determined date. The latest point in time that a Work Activity may begin without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.

o) Late Finish: Software determined date. The latest point in time that a Work Activity may be completed without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.

p) Duration: The total number of work periods required to complete a Work Activity.

q) Calendar Identification: Number of scheduled workdays per week.

r) Total Float: The total number of workdays that the Contractor can delay a Work Activity without affecting the project finish date.

s) Predecessor: A Work Activity or Key Event that immediately precedes one or more

Work Activities or Key Events with a direct tie in the Total Project Network.

t) Successor: A Work Activity or Key Event that immediately follows one or more Work

Activities or Key Events with a direct tie in the Total Project Network.

u) Constraints: Constraints used as applicable to Work Item or Work Activity. This may be provided within the predecessor or successor field.

(3) Provide the Proposed Production Schedule in the Native Software file.

(4) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows all work item activities, milestones and key events within the Production Schedule.

(5) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows only Critical Path and Controlling Work Items at the Work Activity level and assigned Key Events and/or Milestones.

a) Critical Path: That sequence of Work Activities which forms the work and test chain of the longest duration, and directly affects the completion of the availability. Factors that influence when a Work Activity is on the Critical Path include: time duration required for the Work Activity, space limitations, manpower available, and the predecessor/successor relationships between Work Activities. The Critical Path is determined by automated schedule analysis and will include any sequential set of Work Activities forming the longest chain of events extending throughout the schedule and which has the least Total Float.

b) Controlling Work Items: Those Work Items which include activities that are on the critical path of the Production Schedule, which, by virtue of scope, material requirements, complexity, or other considerations, have the significant potential for impact on the scheduled project Key Events or completion of the availability.

(6) The Offeror shall provide a narrative to explain their Production Schedule. The narrative shall address the following:

a) Describe critical float paths and identify the work items that the Offeror estimates as the most critical and pose the most risk.

b) Demonstrate how the Offeror has scheduled the performance of all work items included in the Availability work package (including both Base and Option items) so as to permit the contract scope increases described in Section B, Note F (all growth work identified in this solicitation) without causing delay or disruption to the work required by the aforementioned work items, to any other Government contract, or to any other work in progress for the Government.

3. Non-Price Factor 3 – Past Performance:

Offerors may provide past performance information for up to five (5) previous contracts. If the offeror has not completed any contracts as a prime contractor, within three (3) years of the date of the initial solicitation’s posting to SAM.gov, information regarding the offeror’s performance with regard to subcontracts and/or commercial contracts may be submitted. Offerors shall complete Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS) References for each of the contracts provided where CPARS contract data is available.

If CPARS data is not available for a contract, Offerors shall provide Attachment S-9 Past Performance Questionnaire (PPQ).

Where the offeror does not have recent or relevant past performance information, the Offeror shall affirmatively state that it does not have recent and relevant past performance information for the Government to consider.

If the Offeror does not have CPARS and is required to submit Attachment S-9, the Offeror shall submit a request to their customers to complete the Past Performance Questionnaires (PPQs) NLT 30 days prior to the closing date of this solicitation. The Offerors request to their customer shall include the request to submit completed PPQs to CDR Jonathan Pagnucco, Contracting Officer, jonathan.p.pagnucco.mil@us.navy.mil, and Derek Shirley, Contract Specialist, derek.s.shirley.civ@us.navy.mil, prior to the closing date of this solicitation.

NOTE: The Government reserves the right to use the contract information provided in the offeror’s proposal to obtain data from other sources, such as the Contractor Performance Assessment Reporting System (CPARS) database and from the points of contact identified by the offeror in its proposal.

Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.

CLAUSES INCORPORATED BY REFERENCE

52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-17 Ownership or Control of Offeror AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017

52.207-1 Notice Of Standard Competition MAY 2006 52.215-1 Instructions to Offerors--Competitive Acquisition DEC 2021 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation FEB 1999 52.233-2 Service Of Protest SEP 2006 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.215-7008 Only One Offer JUL 2019 252.215-7009 Proposal Adequacy Checklist JAN 2014 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

252.227-7017 Identification and Assertion of Use, Release, or Disclosure Restrictions

JAN 2011

252.246-7006 Warranty Tracking of Serialized Items MAR 2016

CLAUSES INCORPORATED BY FULL TEXT

52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM DESCRIPTIONS

LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION INFORMATION SYSTEM

(ASSIST) (JUL 2021)

(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(1) ASSIST (https://assist.dla.mil/online/start/);

(2) Quick Search (http://quicksearch.dla.mil/).

(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--

(1) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);

(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone

(215) 697-2667/2179, Facsimile (215) 697-1462.

(End of provision)

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

CDR Jonathan Pagnucco Naval Sea Systems Command 1333 Isaac Hull Avenue, SE Washington, DC 20376

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far

252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,

DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)

The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:

CDR Jonathan Pagnucco at jonathan.p.pagnucco.mil@us.navy.mil Derek Shirley at derek.s.shirley.civ@us.navy.mil

Include the number of the solicitation and the title and number of the specification, standard, plan, drawing, or other pertinent document.

L-204-H003 NOTIFICATION OF USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT

FILES (NAVSEA) (APR 2019)

(a) NAVSEA may use a contractor to manage official contract files hereinafter referred to as "the support contractor", including the official file supporting this procurement. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File management services consist of any of the following:

secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file management services are acquired will contain a requirement that

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the offeror may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed Protected Information, for the unauthorized duplication, release, or disclosure of such Protected Information.

(c) Submission of a proposal will be considered as consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file management support contractor for the limited purpose of executing its file support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Offerors are free to enter into separate non-disclosure agreements with the file support contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the files or otherwise encumber the government.

L-209-H009 NOTIFICATION OF POTENTIAL ORGANIZATIONAL OR PERSONAL CONFLICT(S) OF

INTEREST (NAVSEA) (APR 2022)

(a) Offerors are reminded that certain existing contractual arrangements may preclude, restrict or limit participation, in whole or in part, either as a subcontractor or as a prime contractor under this competitive procurement. Of primary concern are those contractual arrangements in which the Offeror provides support to Program Office PMS 407, SEA 21, CNRMC, or related laboratories (if applicable), in support of operation of the office or any of its programs. General guidance may be found in FAR 9.505; however, this guidance is not all-inclusive. The Offeror's attention is directed to the "Organizational Conflict of Interest" (OCI) or similar requirement which may be contained in current or completed contract(s) which prohibits the prime or subcontractor from providing certain supplies or services to the Government as described above during the period of the current "support" contract(s) or for a period after completion of the "support" contract(s). Notwithstanding the existence or non-existence of an OCI or similar requirement in current or completed contract(s), the Offeror shall comply with FAR subpart 9.5 and identify whether an OCI exists and not rely solely on the presence of an OCI or similar requirement.

(b) Offerors also are reminded that certain potential conflicts of interest may arise where an Offeror has unequal access to nonpublic information about a competitor that may provide the Offeror with an unfair competitive advantage and preclude, restrict or limit participation, in whole or in part, either of the individual, subcontractor or prime contractor under this competitive procurement. For example, a potential conflict may arise if former Department of Navy employee(s), subcontractors, or teaming partners of the Offeror may have gained access to nonpublic information about a competitor through participation in previous or ongoing performance or during the solicitation development/source selection process associated with this competitive procurement, and then participates in the formation of the Offeror’s proposal. Other potential conflicts of interest may arise where either the former Department of Navy employee(s), subcontractors, or teaming partners of the Offeror under this competitive procurement set the ground rules for competition; for example, by drafting specifications or assisting in the drafting of the statement of work. General guidance may be found in FAR 3.101 and 9.505; however, this guidance is not all-inclusive.

(c) If an Offeror identifies a potential conflict of interest that exists at any tier, that Offeror is requested to notify the Contracting Officer within 14 days of the date of this solicitation. The Offeror shall provide: (1) the contract or previous source selection’s solicitation number and name and phone number of the Contracting Officer for the contract which gives rise to a potential conflict of interest; (2) a copy of the requirement; (3) the statement of work and technical instruction from the existing contract, as applicable; (4) a brief description of the type of work to be performed by each subcontractor under the competitive procurement; (5) a brief description of the individual’s, subcontractor’s, or teaming partner’s unequal access to nonpublic information about a competitor, which may lead to a conflict of interest in the formation of the Offeror’s proposal, or establishment of ground rules for this competitive procurement, as applicable; (6) an OCI mitigation plan, as applicable; and (7) any additional information the Contracting Officer should consider in making a determination of whether a conflict of interest exists. The Government may independently verify the information received from the Offeror. The requirement to identify potential conflicts of interest as outlined herein continues until contract award. Notwithstanding the above, the Government reserves the right to determine whether a conflict of interest exists based on any information received from any source.

(d) The Government will notify an Offeror of any conflict of interest within 14 days of receipt of all required information. Those Offerors deemed to have a conflict of interest may be ineligible for award. Failure to provide the information in a timely manner does not waive the Government's rights to make a conflict of interest determination. The Offeror is notified that if it expends time and money on proposal preparation, such expenditure is at its own risk regardless of whether the Government determines a personal or organizational conflict of interest does or does not exist.

(e) Any potential prime contractor which proposes an individual, subcontractor, or teaming partner later determined to have a conflict of interest and deemed ineligible to participate in the current competition, may not be granted the opportunity to revise its proposal to remove the ineligible individual, subcontractor or teaming partner. The Government reserves the right to determine which Offerors remain in the competitive range through the normal source selection process.

(f) If the Offeror determines that a potential organizational and/or personal conflict of interest does not exist at any tier, the Offeror shall include a statement to that effect in its response to this solicitation.

L-219-H001 SUBMISSION OF SMALL BUSINESS SUBCONTRACTING PLAN (NAVSEA) (JAN 2021)

Offeror shall submit as part of its proposal a subcontracting plan in accordance with the clause entitled "Small Business Subcontracting Plan" (FAR 52.219-9). The plan shall include a five percent (5%) goal for small disadvantaged business concerns or a detailed explanation as to why the goal cannot be included in the plan.

(End of Summary of Changes)