N00024-21-R-4490_Amendment 0003_Conformed.pdf

PDF 1 MB Posted

Attached to
Amendment 0009 - USS IWO JIMA (LHD 7) and USS MITSCHER (DDG 57) Docking Selected Restricted Availability (DSRA)
Solicitation number
N00024-21-R-4490
Issued by

About this file

This document summarizes a federal contract solicitation for docking selected restricted availability for two Navy ships. The solicitation seeks contractors to perform maintenance, modernization, and repair work on the USS Mitscher (DDG 57) and USS Iwo Jima (LHD 7) during their FY22 docking selected restricted availabilities. Contractors must have capable piers and facilities for the applicable ship classes. The work will be competed coast-wide but will not be set aside for small businesses. Interested parties must register in SAM to participate. Proposals are due in October 2021 and work is scheduled to begin in January 2022 at contractor facilities on the East Coast. The solicitation and attachments provide specification packages, work plans, schedules and other requirements for the availabilities but will not be posted to SAM. The Navy anticipates making two separate contract awards by October 2021.

View the file

Other files

File Type Posted
USS IWO JIMA_QA 7.xlsx XLSX spreadsheet
USS MITSCHER_QA 5.xlsx XLSX spreadsheet
USS IWO JIMA_QA 6.xlsx XLSX spreadsheet
N00024-21-R-4490-A0009.pdf PDF
N00024-21-R-4490-A0009 Conformed.pdf PDF
(USS IWO) Attachment J-4A Pricing Workbook (E5) - 6Aug21.xlsx XLSX spreadsheet
21-R-4490 Amendment 0008 Conformed.pdf PDF
21-R-4490 Amendment 0008.pdf PDF
21-R-4490 Amendment 0007 Conformed.pdf PDF
21-R-4490 Amendment 0007.pdf PDF
USS IWO JIMA_QA 5.xlsx XLSX spreadsheet
USS MITSCHER_QA 4.xlsx XLSX spreadsheet
USS IWO JIMA_QA 4.xlsx XLSX spreadsheet
USS MITSCHER_QA 3.xlsx XLSX spreadsheet
N00024-21-R-4490 Amendment 0006 Conformed.pdf PDF
N00024-21-R-4490 Amendment 0006.pdf PDF
N00024-21-R-4490 Amendment 0005.pdf PDF
USS IWO JIMA_QA 3.xlsx XLSX spreadsheet
N00024-21-R-4490 Amendment 0005 Conformed.pdf PDF
N00024-21-R-4490_Amendment 0004_Conformed.pdf PDF
N00024-21-R-4490_Amendment 0004.pdf PDF
USS IWO JIMA_QA 2.xlsx XLSX spreadsheet
N00024-21-R-4490_Amendment 0003.pdf PDF
USS MITSCHER_QA 2.xlsx XLSX spreadsheet
N00024-21-R-4490_Amendment 0002_Conformed.pdf PDF
USS IWO JIMA_QA 1.xlsx XLSX spreadsheet
N00024-21-R-4490_Amendment 0002.pdf PDF
USS MITSCHER_QA 1.xlsx XLSX spreadsheet
N00024-21-R-4490 Amendment 0001.pdf PDF
N00024-21-R-4490 Amendment 0001 Conformed.pdf PDF
N00024-21-R-4490.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 217 - 228

229 - 245 H 246 - 251

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 251

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 129

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

130 - 164

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

166 - 170 171 - 182

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 183 - 193 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

194 - 214

PART II - CONTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

215 - 216

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

08 Jun 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002421R4490

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

1 Lot

AVAILABILITY PREPARATION - USS IWO JIMA

FFP

The Contractor shall provide all labor, materials, facilities, supervision and equipment to meet the requirements outlined in Section C – Statement of Work, paragraph 9. All work shall be completed in accordance with all applicable local, State, Federal and Navy rules and regulations; whether they are explicitly written/referenced in this SF33 or not.

FOB: Destination

PSC CD: J998

NET AMT

ADVANCED MATERIAL PROCUREMENT - USS IWO

FFP

The Contractor shall provide all labor, materials, facilities, supervision and equipment to meet the requirements outlined in Section C – Statement of Work, paragraph 10. All work shall be completed in accordance with all applicable local, State, Federal and Navy rules and regulations; whether they are explicitly written/referenced in this SF33 or not.

OPTION TYCOM Work Items

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

CDRL Placeholder

RESERVED

OPTION PMS 407 - 15BH0 1B5B OMN

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION PMS 407 - 15BW8 1B5B OMN

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION PMS 407 - OPN

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION Prorations

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION TYCOM Repair Items (Grp 1)

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION TYCOM Repair Items (Grp 2)

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION TYCOM Repair Items (Grp 3)

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION BTRP-S0241 Installation; accomplish

FFP

Troop Living Space Habitability Project (BTRP-S0241) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION BENL-S9909 Installation; accomplish

FFP

Crew Living Space Habitability Project (BENL-S9909) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION BTRP-S9910 Installation; accomplish

FFP

Troop Living Space Habitability Project (BTRP-S9910) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION BTRP-S9950 Installation; accomplish

FFP

Troop Living Space Habitability Project (BTRP-S9950) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HENL-S0420 Installation; accomplish

FFP

Crew Sanitary Space Habitability Project (HENL-S0420) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HENL-S1083 Installation; accomplish

FFP

Crew Sanitary Space Habitability Project (HENL-S1083) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HENL-S1084 Installation; accomplish

FFP

Crew Sanitary Space Habitability Project (HENL-S1084) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HTRP-S1085 Installation; accomplish

FFP

Troop Sanitary Space Habitability Project (HTRP-S1085) Installation; accomplish

(OPTION ITEMS)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HTRP-S1086 Installation; accomplish

FFP

Troop Sanitary Space Habitability Project (HTRP-S1086) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HTRP-S9685 Installation; accomplish

FFP

Troop Sanitary Space Habitability Project (HTRP-S9685) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HENL-S9911 Installation; accomplish

FFP

Crew Sanitary Space Habitability Project (HENL-S9911) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HTRP-S9912 Installation; accomplish

FFP

Troop Sanitary Space Habitability Project (HTRP-S9912) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION Messing&Berthing Barge Electric Temp Svc

FFP

Messing and Berthing Barge Electric Temporary Service in Contractor Plant;

provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 95267K, Moriah AAS AIT

FFP

ShipAlt LHD1-95267K, Moriah Aviation Land/Launch Enclave (AAS), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 85742K, NSSMS MK57 MOD14 (OCP2), AIT

FFP

ShipAlt LHD1-85742K, NSSMS MK57 MOD14 (OCP2), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 86033K, MOS MOD, AIT

FFP

ShipAlt LHD1-86033K, MOS MOD, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 92014K, ICOP FULL INFRAS USMC T, AIT

FFP

ShipAlt LHD1-92014K, ICOP FULL INFRAS USMC T, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 93526K, GPNTS(V)8, AIT

FFP

ShipAlt LHD1-93526K, GPNTS(V)8, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 93698K, EPLRS Tri-Band Antenna, AIT

FFP

ShipAlt LHD1-93698K, EPLRS Tri-Band Antenna , Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 93699K, Iridium Antenna, AIT

FFP

ShipAlt LHD1-93699K, Iridium Antenna, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 94058K, EMUT MUOS Replacement Antenna

FFP

ShipAlt LHD1-94058K, EMUT MUOS Replacement Antenna, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 95520K & 95532K, ECASS RF-A & RF-B

FFP

ShipAlt LHD1-95520K & LHD1-95532K, ECASS RF-A & RF-B, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 96483K, CAC2S Afloat Flight 0+, AIT

FFP

ShipAlt LHD1-96483K, CAC2S Afloat Flight 0+ , Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 78069k & TMP 93545K, AIT Spt Svc

FFP

ShipAlt LHD1-78069k and TMP 93545K, JPALS LHA/LHD Install Increment and JPALS Test System,Alteration Installation Team (AIT) Support Service; provide

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION SA 80020K, MORIAH/JPALS Connection on LC

FFP

ShipAlt LHD1-80020K, MORIAH/JPALS Connection on LC, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION SA 85294K, F-35 Automatic Logistics Info

FFP

ShipAlt LHD1-85294K, F-35 Automatic Logistics Infor JFS ALIS, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION SA 81301K, BEWT II Hardware Install AIT

FFP

ShipAlt LHD1-81301K, BEWT II Hardware Install Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION SA 86482K, TSSS NSSMS Stimulator Removal

FFP

ShipAlt LHD1-86482K, TSSS NSSMS Stimulator Removal Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 85493K, SSDS Mk 2 Upgrade to Mk 2 Mod

FFP

ShipAlt LHD1-85493K, SSDS Mk 2 Upgrade to Mk 2 Mod Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION SA 93126K, AN/USQ-T52 Training Interface

FFP

ShipAlt LHD1-93126K, AN/USQ-T52 Training Interface Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION SA 92964K, CANES HW1.2 Tech Refresh AIT

FFP

ShipAlt LHD1-92964K, CANES HW1.2 Tech Refresh Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION SA 93327K, DCGSN INC1B2 Sensor Rack AIT

FFP

ShipAlt LHD1-93327K, DCGSN INC1B2 Sensor Rack Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION SA 93584K, AIS V1 Cyber Hardening, AIT

FFP

ShipAlt LHD1-93584K, AIS V1 Cyber Hardening, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION Flight Deck, Catwalk & Platform Nonskid

FFP

Flight Deck, Catwalk and Platform Nonskid; install

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS IWO JIMA (LHD 7) DURING FY22 DSRA (Non-prorated WIs

– See attachment J-4A for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS IWO JIMA (LHD 7) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item

OPTION Growth Reservation for CLIN 0003

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0003. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0005

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0006

FFP

Growth Reservation Associated with CLIN 0006. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0006. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0006. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0006. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0007

FFP

Growth Reservation Associated with CLIN 0007. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0008

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0009

FFP

Growth Reservation Associated with CLIN 0009. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0009

FFP

Growth Reservation Associated with CLIN 0009. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0010

FFP

Growth Reservation Associated with CLIN 0010. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0011

FFP

Growth Reservation Associated with CLIN 0011. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0011. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0011. See attachment J-4A.

See Notes A, B, C, D, E and F

FFP

Growth Reservation Associated with CLIN 0011. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0012

FFP

Growth Reservation Associated with CLIN 0012. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0013

FFP

Growth Reservation Associated with CLIN 0013. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0014

FFP

Growth Reservation Associated with CLIN 0014. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0015

FFP

Growth Reservation Associated with CLIN 0015. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0016

FFP

Growth Reservation Associated with CLIN 0016. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0017

FFP

Growth Reservation Associated with CLIN 0017. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0018

FFP

Growth Reservation Associated with CLIN 0018. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0019

FFP

Growth Reservation Associated with CLIN 0019. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0020

FFP

Growth Reservation Associated with CLIN 0020. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0021

FFP

Growth Reservation Associated with CLIN 0021. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0022

FFP

Growth Reservation Associated with CLIN 0022. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0023

FFP

Growth Reservation Associated with CLIN 0023. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0024

FFP

Growth Reservation Associated with CLIN 0024. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0025

FFP

Growth Reservation Associated with CLIN 0025. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0026

FFP

Growth Reservation Associated with CLIN 0026. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0027

FFP

Growth Reservation Associated with CLIN 0027. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0028

FFP

Growth Reservation Associated with CLIN 0028. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0029

FFP

Growth Reservation Associated with CLIN 0029. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0030

FFP

Growth Reservation Associated with CLIN 0030. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0031

FFP

Growth Reservation Associated with CLIN 0031. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0032

FFP

Growth Reservation Associated with CLIN 0032. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0033

FFP

Growth Reservation Associated with CLIN 0033. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0034

FFP

Growth Reservation Associated with CLIN 0034. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0035

FFP

Growth Reservation Associated with CLIN 0035. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0036

FFP

Growth Reservation Associated with CLIN 0036. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0037

FFP

Growth Reservation Associated with CLIN 0037. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0038

FFP

Growth Reservation Associated with CLIN 0038. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0039

FFP

Growth Reservation Associated with CLIN 0039. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0040

FFP

Growth Reservation Associated with CLIN 0040. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0041

FFP

Growth Reservation Associated with CLIN 0041. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0042

FFP

Growth Reservation Associated with CLIN 0042. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0043

FFP

Growth Reservation Associated with CLIN 0043. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0044

FFP

Growth Reservation Associated with CLIN 0044. See attachment J-4A.

See Notes A, B, C, D, E and F

OPTION Growth Reservation for CLIN 0045

FFP

Growth Reservation Associated with CLIN 0045. See attachment J-4A.

See Notes A, B, C, D, E and F

AVAILABILITY PREPARATION - USS MITSCHER

FFP

The Contractor shall provide all labor, materials, facilities, supervision and equipment to meet the requirements outlined in Section C – Statement of Work, paragraph 9. All work shall be completed in accordance with all applicable local, State, Federal and Navy rules and regulations; whether they are explicitly written/referenced in this SF33 or not.

ADVANCED MATERIAL PROCUREMENT - USS MIT

FFP

The Contractor shall provide all labor, materials, facilities, supervision and equipment to meet the requirements outlined in Section C – Statement of Work, paragraph 10. All work shall be completed in accordance with all applicable local, State, Federal and Navy rules and regulations; whether they are explicitly written/referenced in this SF33 or not.

OPTION TYCOM Work Items

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 94624K, AWS/GWS/SEWIP: TI12/12R CPS

FFP

ShipAlt DDG51-94624K, AWS/GWS/SEWIP: TI12/12R Common Processing System (CPS) Conversion to T112H AN/UYQ-107B; accomplish (OPTION

ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 90495K, AWS/SEWIP: Remove NTDS to Sin

FFP

ShipAlt 90495K, AWS/SEWIP: Remove NTDS to Single Mode Fiber Converter;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

CDRL Placeholder

RESERVED

OPTION TYCOM Grp 1

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION BENL-R8256 Installation; accomplish

FFP

Crew Living Space Habitability Project (BENL-R8256) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION HENL-R8257 Installation; accomplish

FFP

Crew Sanitary Space Habitability Project (HENL-R8257) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION Steam Messing and Berthing Barge Temp

FFP

Steam Messing and Berthing Barge Temporary Service in Contractor Plant;

provide (OPTION ITEM; Naval Base Ports ONLY)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION Electric Messing and Berthing Barge Temp

FFP

Electric Messing and Berthing Barge Temporary Service in Contractor Plant;

provide (OPTION ITEM; Naval Base Ports ONLY)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION OA 81074, 81310, MK 84 Output Transforme

FFP

OrdAlt DDG51-81074, 81310, MK 84 Output Transformers, Inverter Modules and 28VDC Power Supply, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION OA 93291, Metering and Monitoring Servic

FFP

OrdAlt DDG51-93291, Metering and Monitoring Service Package (MMSP) Power Supply Upgrade, Alteration Installation Team (AIT) Support Service; provide

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION OA 94624, TI12/12R Common Processing Sys

FFP

OrdAlt DDG51-94624, TI12/12R Common Processing System (CPS), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 93687K, Liquid Conditioning Unit AIT

FFP

ShipAlt DDG51-93687K, Liquid Conditioning Unit (LCU), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 89715K, Ships Signal Exploitation Equ

FFP

ShipAlt DDG51-89715K, Ships Signal Exploitation Equipment (SSEE) Increment F System, Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MITSCHER (DDG 57) DURING FY22 DSRA (Non-prorated WIs – See attachment J-4B for list)

The Contractor shall prepare for and accomplish repair and alterations during the USS MITSCHER (DDG 57) FY22 DSRA as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract.

See Notes A, B, C, D, E and F

OPTION SA 96034K, Battle Force Tactical Network

FFP

ShipAlt DDG51-96034K, Battle Force Tactical Network (BFTN) AN/USQ- 195A(V)1HW, Alteration Installation Team (AIT) Support Service; provide

(OPTION…