N00024-19-R-4404_Q&A_1_03APR19.xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- USS MIchael Murphy DDG 112 SRA
- Solicitation number
- N00024-19-R-4404
About this file
Q&A#1.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| QUESTIONS AND ANSWERS #1 | ||
| The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation. | Wednesday, April 03, 2019 | |
| HULLS/TITLE: | DDG 112 USS MICHAEL MURPHY | |
| SOLICITATION NO: | N00024-19-R-4404 | |
| NAVSEA POCs: | Steven Galer |
Zachary Tucker NAVSEA POC E-MAIL: Steven.Galer@navy.mil Zachary.M.Tucker@navy.mil NAVSEA POC #: Steven Galer: 202-781-2040 Zachary Tucker: 202-781-4234
| QUESTION #/ DETAILS | QUESTION/ ANSWER | |||||
| # | Question Area | Para # | Date Received | Contractor Question | Government Response | |
| 1 | Place of Performance | N/A | 19-Mar-19 | What pier will USS MICHAEL MURPHY FY20 SRA be conducted at? | ||
| JBPHH has moderate to significant pier limitations that impact pier-side availabilities. Costs to mitigate risks need to be incorporated into offerors’ bids. | Offerors should propose assuming pier B15/16. There is a mobile crane limitation of 60tons. | |||||
| 2 | GFP Differential | Section L | 19-Mar-19 | GOVERNMENT FURNISHED PROPERTY DIFFERENTIAL: |
Please provide details regarding “Government Furnished Property provided under the MSMO contract”? Exactly what Government Furnished Property is being provided by the Government in support of USS MICHAEL MURPHY FY20 SRA?
Please provide cost components and values that comprise the Government Furnished Property Differential of $344,843? The Government is providing the following GFP under the MSMO contract that would be expected to be used by the MSMO contractor in execution of the USS MICHAEL MURPHY FY20 SRA:
Building 1444 Office Space Building 1444 Machine Shop Building 139 Compound Land Vision Tower 7 (VT-7) Office Space Building 394 Warehouse Space Building 388 Warehouse Space Annex C Land Bravo Pier Laydown Land DD4 Improved Space Land The MSMO contractor does not pay the Government for the use of these buildings or for the building services. Therefore, the GFP differential cost is comprised of the implied building and land rental values (based on prevailing local rates) and the implied operating costs, specifically utilities, management fees, building maintenance, real property taxes and insurance (based on prevailing local rates).
3 Section C, Statement of Work 2.2 19-Mar-19 Government defines minor delay as (8) hours or less. The subject duration can represent an entire day/shift of productive effort on the critical path.
Further, this definition of a “minor delay” incongruous with the balance of MURPHY RFP’s terms and conditions that stress schedule adherence and penalize the contractor for violations.
Recommend minor delay be defined as (2) hours or less.
| This is a standard definitition used throughout the enterprise which will remain unchanged. | ||||
| 4 | Section B | N/A | 19-Mar-19 | Level of Effort (LOE) to Completion |
What is the Government's basis for the LOE-completion growth requirement?
Please provide guidance as to the methodology Industry is to assume to develop a fully burdened labor rate for the complete execution of unknown scopes of work? Historically, work specifications containing growth reserve have provided a means to accomplish anticipated repairs which could not be clearly defined in advance of the ship’s availability due to operational restrictions or ship limiting evolutions (e.g., situations where assessments or ship checks cannot be completed or were only partially completed). Under the LOE-completion growth CLINs, anticipated growth is specifically defined and planned based upon historical growth for like or similar work specifications.
The offeror's price for LOE-completion growth CLINs shall reflect the requirements of RFP Section B, NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW WORK.
5 Small Dollar Changes Note F 19-Mar-19 NOTE F: SPECIAL AGREEMENT FOR GROWTH WITH A VALUE OF $25,000 OR LESS:
How does the Gov’t rationalize a per occurrence value of $7,894 value when $25,000 is the threshold for application? Please explain how the Government derived this $7,894 per occurrence value? Will the Government adjudicate this provision for each individual contract change valued at less than $25,000? How was the number of occurrences (72) derived?
To increase the velocity of change that occurs during ship repair and modernization availabilities, the Small Dollar Value Growth clause establishes a streamlined process to reconcile growth expected to be between $1 and $25K.
To make administration of small dollar value growth more efficient and less costly, both parties (Government and contractor) agree to pre-price increase price changes with an estimated price of $25,000 or less. The values of price and quantity were derived by reviewing and analyzing historical data for the same or similar items at Pearl Harbor, HI.
The quantity, as specified for each CLIN, will be utilized for each change valued between $1 and $25 until the quantity for that CLIN reaches zero.
6 Section C, Statement of Work 1.9.2 19-Mar-19 1.9.2 Quality Assurance Surveillance Plan (QASP)
For every incorrect / late CAR, CFR, etc., that is issued by the Gov’t, which creates contractor inefficiencies & delays, will the QASP value be deducted?
| Deducts will be based on unfavorable contractor performance as determined by the ACO. There will be monetary deducts as outlined in Enclosure (1) of the QASP. Application of any deductions in accordance with Enclosure (1) of the QASP is at the ACO’s discretion. It is not the intent to enforce deductions which are directly caused by the Government. | ||||
| 7 | Section C, Statement of Work | 4.4 | 19-Mar-19 | PAINT ABATEMENT - Abatement work will be conducted in accordance with NAVSEA Standard Item 009-32. Paint abatement will be included as part of offerors’ proposed pricing and is not subject to additional growth. |
The above requirement is impractical and unreasonable.
The Contractor has no prior knowledge of paint conditions in all affected, accessible and inaccessible areas. Recommend deletion in its entirety.
| This is an enterprise-wide definition and implimentation of the Standard Item used throughout the enterprise which will remain unchanged. | |||
| 8 | Section L | 19-Mar-19 | “52.216-1 TYPE OF CONTRACT (APR 1984) |
The Government contemplates award of a Firm Fixed Price with a performance incentive contract resulting from this solicitation.”
Please provide details of the contemplated “performance incentive” contract.
Liquidated damages and punitive QASP requirements were noted; however, performance incentives were not.
| An amendment will be used to revise to "The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.” | |||||
| 9 | 123-00-003 & 123-00-004 | N/A | 21-Mar-19 | 123-00-003 and 123-00-004 cannot both meet the 20% report requirement due to the requirement to maintain one VCHT system operational at all times. What is the government's priority among the two VCHT systems to receive 20% reports? | 3.1.4.1 will not be applicable on both specs as ship's force will be located on a barge. Spec was revised via ERRATA 1. |
| 10 | 123-00-005 | 3.8 | 21-Mar-19 | Para 3.8: Why is compensating water being mentioned in a plumbing waste work item? | 3.8 will not be applicable. Spec was revised via ERRATA 1. |
| 11 | 123-00-005 | 3.6.1 & 3.6.2 | 21-Mar-19 | Para 3.6.1 and 3.6.2 seem to cover the similar requirements except for material composition. For example, use of "brass nuts" vs. "zinc coated steel nuts". Which paragraph is desired and confirm the quantities? | 3.6.1 and sub paragraphs were deletedand accomplish 3.6.2. Spec was revised via ERRATA 1. |
| 12 | 123-00-005 & 123-00-006 | N/A | 21-Mar-19 | 123-00-005 and 123-00-006 cannot both meet the 20% report requirement due to the requirement to maintain one system operational at all times. What is the government's priority among the two VCHT systems to receive 20% reports? | FWD and AFT VCHT systems will be authorized to be brought down at same time as SF will not be located onboard. A note was added to the work items via ERRATA 1. |
| 13 | 123-12-001 & 123-12-002 | 3.5 | 21-Mar-19 | Please confirm if these mandays and material dollars cover repair work under WI 123-12-002. | This requirement of 3.5 in 123-12-001 is IN ADDITION to what is already covered under 123-12-002. |
| 14 | 123-12-002 | 3.1 | 21-Mar-19 | Standard 009-77 is a CAT II requirement. Is a PCP required to execute 009-77 in Para 3.1? | Yes, Additional step added for PCP requirements via ERRATA 1. |
| 15 | 123-12-002 | 3.3.1 | 21-Mar-19 | Para 3.3.1: Please verify that repairs are limited to no more than one linear foot per tank. | Yes, Spec was revised via ERRATA 1. |
| 16 | 123-12-002 | 3.3.3 | 21-Mar-19 | Para 3.3.3: Please verify that repairs are limited to no more than 26 square inches of base metal repair per tank. | Confirm. |
| 17 | 123-12-002 | 3.3.4 | 21-Mar-19 | Please confirm that plating included in 3.3.4 does not include shell plating. | Confirm. |
| 18 | 123-00-001; 123-00-002, 123-00-003, 123-00-004, 123-00-005, 123-00-006, & 123-00-008 | 3.4.1.1 | 21-Mar-19 | Will a chemical analysis be required from each tank and bilge listed in the work item? | KTR will be required to take the sample and turn over to the government C106 for analysis. After results of sample are known and forwarded to the KTR, then a CFR can be submitted on how to dispose of the fluids via ERRATA 1. |
| 19 | 123-00-002 | 3.2.1 & 3.4.1 | 21-Mar-19 | Para 3.2.3 and 3.4.1: Why is the contractor analyzing for petroleum products in potable water tanks? | Spec was revised to remove "petroleum products" data from work spec via ERRATA 1. |
| 20 | 123-00-003 | N/A | 21-Mar-19 | Please confirm if Ship's Force intends on relocating to a barge during this Availability? | Yes, SF will relocate to a barge. Spec was revised via ERRATA 1. |
| 21 | 123-00-003 | 3.7.1 | 21-Mar-19 | Are paragraphs 3.7.1 through 3.7.1.2 valid? Paragraph 3.7.2 seems to cover specific requirements for the VCHT tank. | Only paragraph 3.7.2 will apply as revised via ERRATA 1. |
| 22 | 123-00-003 | 3.7.2 | 21-Mar-19 | Paragraph 3.7.2: Please verify quantities. | 50 each Zinc steel nuts and 50 each CRES washers as revised via ERRATA 1. |
| 23 | 042-11-001 | 4.5 | 21-Mar-19 | If WI 042-11-001 is deemed an administrative reporting WI, then should WI’s 472-90-001 and 980-11-004 be listed in Para 4.5? | Yes, WI's 472-90-0001 and 980-11-004 was revised via ERRATA 1. |
| 24 | 077-11-001 | 3.5 | 21-Mar-19 | Paragraph 3.1 states "manage and dispose of hazardous waste”. Paragraph 3.2.1 states that Ship's Force may generate waste. Paragraph 3.5 "estimates" the hazardous waste to be produced and provides quantities and descriptions of the type of waste that may be produced by the Contractor. However, there is no estimates for "Navy" generated waste in para. 3.5. For “Navy” generated waste, please provide the types of wastes that could be generated and quantities? | The contractor will not be required to dispose of SF HAZ WASTE other than oily waste, fuel ballast, and fuel from tanks. Spec was revised via ERRATA 1. |
| 25 | 077-11-001 | 4.3 | 21-Mar-19 | Para 4.3 describes "oily waste tanks, fuel ballast tanks, fuel oil tanks" as potential types of hazardous waste that could be generated under this WI and this WI is being performed in Hawaii where such waste is deemed hazardous requiring an "estimate of the amount to be generated." Such types of hazardous wastes are not listed in para 3.5 and no estimate to be generated is provided. Please provide an updated Spec detailing the estimated volume of hazardous waste to be generated under this WI. | Currently estimating 5,000 gallons of oily waste, fuel ballast and fuel oil tanks which has been revised via ERRATA 1. |
| 26 | 167-11-001 | 3.4 | 21-Mar-19 | Paragraph 3.4 - How many BERP plates are to be fabricated? What are the dimensions of the fabricated BERP plates? | Fabricate 2 each BERP, 03-182-3 and 03-182-1 located in 1.2.1 and 1.2.2 respectively, (78 IN X 78 IN) Material PL800 .250 inch plate, ASTM A-240 GR 316L, in accordance with 2.2. |
| 27 | 167-11-001 | 3.7 | 21-Mar-19 | Paragraph 3.7 - Wrong paragraphs are referenced. Should the paragraph read, "Install each BERP…repaired in 3.3 and fabricated in 3.4..."? | Yes, should read as... repaired in 3.3 and fabricated in 3.4. as revised via ERRATA 1. |
| 28 | 167-11-001 | 5.1 | 21-Mar-19 | Paragraph 5.1 - GFM is not referenced in paragraph 3 of the work specification. Where is this material to be used? | Although not listed in the "requirements" section, as stated in the GFM section, Item #1 is for the new fasteners mentioned in paragraph 3.7. Item #2 is for the new BERP listed in 3.4. Spec was revised via ERRATA 1. |
| 29 | 251-32-001 | 3.4 | 21-Mar-19 | Paragraph 3.4 - Wrong paragraph referenced for inspection. The paragraph should read, "Accomplish the following repairs…as a result of the inspection accomplished in 3.2 and not in 3.2.1 which is for reporting purposes." | Yes, paragraph should read…as a result of inspection accomplished in 3.2 as revised via ERRATA 1. |
| 30 | 251-32-001 | 3.4 | 21-Mar-19 | Paragraph 3.4 reads to do repairs in each plenum/trunk listed in 1.3. Please provide total quantities of repairs to plenum/trunks. Please define the word "each" in this paragraph? | Each refers to each trunk listed in 1.3 as per the template directed by SURFMEP, quantities are listed in paragraph of 3.4.1, 3.4.2, 3.4.3, and 3.4.4. |
| 31 | 251-32-001 | 3.1 | 21-Mar-19 | Paragraph 3.10 - Wrong paragraph referenced. Should the paragraph read, "Accomplish 009-32…for coating removed in 3.3."? | Yes, it should reference 3.3. Spec was revised via ERRATA 1. |
| 32 | 251-32-002 | 3.4 | 21-Mar-19 | Paragraph 3.4 reads to do repairs in each plenum/trunk listed in 1.3. Please provide total quantities of repairs to plenum/trunks. Please define the word "each" in this paragraph. | Each one refers to each plenum trunk as quantified in 3.4.1, 3.4.2, 3.4.3, 3.4.4 and 3.4.5 |
| 33 | 251-32-002 | 3.1 | 21-Mar-19 | Paragraph 3.10 - Wrong paragraph referenced. Should the paragraph read, "Accomplish 009-32…for coating removed in 3.3."? | Yes, it should reference 3.3. Spec was revised via ERRATA 1. |
| 34 | 259-11-001 | 3.3.1.1 | 21-Mar-19 | Paragraph 3.3.1.1 appears to reference the wrong paragraphs. Please confirm that the paragraph should read, "Submit one legible copy…listing results of the requirements of 3.3 and 3.3.1 vs. 3.2 and 3.2.1” | Correct. Spec was revised via ERRATA 1. |
| 35 | 259-11-001 | 3.6 | 21-Mar-19 | Paragraph 3.6 appears to reference the wrong paragraphs. Please confirm that the paragraph should read, "Submit one legible copy…listing results of the requirements of 3.3.1.1.” | Should read as: “…, based on the report in 3.3.1.1 and as designated by the SUPERVISOR” as revised via ERRATA 1. |
| 36 | 259-11-001 | 3.6.2.1 | 21-Mar-19 | Paragraph 3.6.2.1 appears to reference the wrong paragraphs. Please confirm that the paragraph should read, "Submit one legible copy…listing results of the requirements of 3.6.” | Paragraph should read as: Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.6 to the SUPERVISOR as revised via ERRATA 1. |
| 37 | 262-80-001 | 3.2.2 | 21-Mar-19 | What welding and NDT requirements are to be followed for pipe hangers? | Installation of rigid hangers shall be IAW with 009-12, Table 2, Column A, Lines One through 7. |
| 38 | 262-80-001 | 3.2.2 | 21-Mar-19 | How many new hangers are required to be installed? | Please refer to note 23 of reference 2.2 (810-4714432) which delineates the requirements for pipe hangers. A specific quantity and type will not be recommended as the instruction is very clear on what is required and the latitude of what is allowed. |
| 39 | 262-80-001 | 5.3 | 21-Mar-19 | 4720 lists GFM for this ShipAlt, but the spec does not list GFM. Please provide the list of GFM that will be provided for this Work Item? | Material listed in Ship Alteration Material Summary (4720/3) for ShipAlt DDG51-76501D will be GFM |
| 40 | 451-67-001 | 1.3.1 | 21-Mar-19 | Para 1.3.1 does not specify which section on the drawing. Please specify which section this is referring to? | Section 3F2 5G of 2.2 via ERRATA 1. |
| 41 | 511-11-001 | 5.1.1 | 21-Mar-19 | The table in this paragraph refers to the word "Duck". We understand the Government meant "Duct". Recommend correction at your convenience. | Name of part should read as “Duct” via ERRATA 1. |
| 42 | 512-80-002 | 3.1.4 & 5.1 | 21-Mar-19 | Para. 3.1.4 states fabricate new assemblies; however, para. 5.1 names assemblies as GFM. Will Vent Hood Assemblies be provided pre-assembled or will the contractor receive in pieces to include loose fasteners? | Para 3.1.4 please omit; Para 5.1 Hood Assembly will be pre-assembled as revised via ERRATA 1. |
| 43 | 512-80-002 | 5.1 | 21-Mar-19 | Please provide piece numbers and NSN numbers for this GFM. | The Piece and NSN numbers can be found on Ship Alteration Material Summary 4720/3 |
| 44 | 512-80-002 | 5.1 | 21-Mar-19 | Please identify if the new Vent Hood Assemblies come prepared with all the OQE paperwork. | GFM should have OQE paperwork |
| 45 | 551-61-001 | 3.1.1 | 21-Mar-19 | Paragraph 3.1.1 states, "New materials shall conform to 2.4, including Category and Group J-9." |
1) Paragraph 3.1 states to remove and re-install equipment. It does not state to install new materials.
2) Paragraph 3.1.1 states "new material" shall conform to Category and Group J-9. Please note that Category and Group J-9 can not be found in reference 2.4.
| 3) Paragraph 3.1.3.1 states to install new gaskets conforming to Category and Group D-1 of 2.4. What "new materials" shall conform to Category and Group J-9? | 1) Paragraph 3.1: The intent of this work item is to remove existing flanged listed in 1.3. Reinstall and align the existing flanged. 2) Please omit. 3) Flange gasket shall conform to 2.4 category and group D-1. Gasket is for the 4-inch flange being realigned as revised via ERRATA 1. | |||||
| 46 | 588-21-002 | 3.7 | 21-Mar-19 | Paragraph 3.7 states to replace 5 SF of track plate foundations, 5 SF of side plate foundations and 5 SF of trough plate for a total of 10 SF. Should this read "for a total of 15 SF"? | Should read as: “… deteriorated trough plate for a total of 15 square feet” via ERRATA 1. | |
| 47 | 588-21-002 | 3.7.1.1 | 21-Mar-19 | Paragraph 3.7.1.1 states "Accomplish the requirements of 009-12…Lines One through 7 through 10." Should this read, "Lines One through 7 and 10"? | Should read as: Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, Lines One through 7 and 10 via ERRATA 1. | |
| 48 | 588-21-002 | 3.12.6.1 | 21-Mar-19 | Paragraph 3.12.6.1 states to accomplish 009-32, Table 2, Line 23. Please clarify the reference to "Table 2, Line 23." Is this for the Cap Screw Head only? | Table 2, Line 23, for cap screw head only as revised via ERRATA 1. | |
| 49 | 588-21-002 | 3.13.1 | 21-Mar-19 | Paragraph 3.13.1 references paragraph 3.14. Should this reference be 3.13? | Paragraph should read as: Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.13 to the SUPERVISOR via ERRATA 1. | |
| 50 | 588-21-002 | 3.16 | 21-Mar-19 | Paragraph 3.16 states to "Accomplish recertification of RAST track system." This is typically a Ship's Force function. Recommend deletion. | KTR should be involved in the recertification of RAST track system because KTR removed and reinstall the whole unit or system. | |
| 51 | 992-31-001 | 3.4.4 | 21-Mar-19 | How many evolutions should we install and remove pumping equipment in Para 3.4.4? | 3 EA evolutions as revised via ERRATA 1. | |
| 52 | RFP and WI123-00-004 | N/A | 21-Mar-19 | HQ C-2-0010 COMMAND INSPECTION OF BERTHING FACILITIES (NAVSEA) (OCT 1990). Pursuant to this clause and in relation to WI 123-00-004 page 1 paragraph 3.1.4.1 requires a VCHT tank be maintained for ship's force use at all the times, implies Ship's Force will remain on the ship during the period of the availability. Please confirm if Ship's Force will remain on board the ship during the availability. If Ship's Force will remain on board, then we recommend HQ C-2-0012 be deleted. If Ship's Force will not remain on board, will a berthing barge be provided by the Gov’t? | SF will not remain on the ship during the period of the availability up to HB00. Expect the SF to move onboard after HB00 is met. As stated above on question 10. Revised via ERRATA 1. | |
| 53 | RFP | 7 | 21-Mar-19 | Pursuant to HQ C-2-0018 DISPOSAL OF SCRAP (NAVSEA) (JAN 2008) and based on a value determination to be made by the Government or RMC office, will the government provide a facility to warehouse all such GFM removed from the ship pending Government determination? If yes, what square footage will be provided and the location of such a facility? | No further GFP will be provided than listed in the SOW. | |
| 54 | RFP Page 21 and Section L | 1,3,87,88 | 21-Mar-19 | Title: "Schedule of Prices / Rates" NOTE E: SCHEDULE OF PRICES / RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIERSIDE AND DRY-DOCKING (FULLY BURDENED). The title and paragraphs 1 and 3 refer to rates applying to "pierside" and "dry-docking." Additionally, use of "dry-docking rates are noted on pages 87 and 88 with respect to Attachment J-4 reference. Please confirm the intent of this Note E in relation to this solicitation will not include a "dry-docking" period. Paragraphs 1 and 3 should be revised to reflect "pierside" only. | These clauses have standard titles and structures that do not change from solicitation to solicitation. However, as the USS MICHAEL MURPHY FY20 SRA is not a dry-docking availability, these dry-docking references do not apply. | |
| 55 | RFP | N/A | 21-Mar-19 | HQ C-2-0005 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (SEP 2016). In paragraph (a), there is a set of parentheticals at the end of the last sentence. Please confirm if information is missing and if missing please provide. | Amendment 0001 has corrected this by including Series in the (). |