USS_SHOUP_FY19_DMP__BQ5.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
FY19 Depot Modernization Period (DMP) Availability For USS SHOUP (DDG 86)
Solicitation number
N00024-18-R-4407
Issued by

About this file

BQ 5

View the file

Other files

File Type Posted
N00024-18-R-4407_A0008_conformed.pdf PDF
N00024-18-R-4407_A0008.pdf PDF
N00024-18-R-4407-0007.pdf PDF
USS_SHOUP_FY19_DMP__BQ6.xlsx XLSX spreadsheet
N00024-18-R-4407-0006.pdf PDF
N00024-18-R-4407-0005.pdf PDF
N00024-18-R-4407_0004.pdf PDF
J-4_Pricing_Workbook_-_SHOUP_rev_8.xlsm XLSM spreadsheet
USS_SHOUP_FY19_DMP__BQ_4.xlsx XLSX spreadsheet
J-4_Pricing_Workbook_-_SHOUP_rev_7.xlsm XLSM spreadsheet
J-5_QASP_SHP_FY19_DMP_rev_2.docx DOCX document
USS_SHOUP_FY19_DMP__BQ_3.xlsx XLSX spreadsheet
N00024-18-R-4407_0003.pdf PDF
J-4_Pricing_Workbook_-_SHOUP_rev_6.xlsm XLSM spreadsheet
USS_SHOUP_FY19_DMP__BQ_2.xlsx XLSX spreadsheet
N00024-18-R-4407_0002.pdf PDF
N00024-18-R-4407_0001.pdf PDF
USS_SHOUP_FY19_DMP__BQ1.xlsx XLSX spreadsheet
J-4_Pricing_Workbook_-_SHOUP_rev_5.xlsm XLSM spreadsheet
J-5_QASP_SHP_FY19_DMP_rev_1.docx DOCX document
N00024-18-R-4407_USS_SHOUP.pdf PDF
S-4_PP_Reference_List_SHP.docx DOCX document
S-3_PPI_Form_SHP.docx DOCX document
J-5_QASP_SHP_FY19_DMP.docx DOCX document
S-2_Past_Performance_Questionnaire_SHP.docx DOCX document
J-7_Schedule_Model_Review.docx DOCX document
S-5_Eligibility_Criteria_Data_Sheet_SHP.docx DOCX document
J-4_Pricing_Workbook_-_SHOUP_-_12Jun18_rev4.xlsm XLSM spreadsheet
USS_SHOUP_Synopsis.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Attachment S-3

Pre-Proposal Information (PPI) Form
DATE OF REQUEST: 08 August 2018SOLICITATION NO: N00024-18-R-4407
TITLE: USS SHOUP (DDG 86) FY19 DMPNAVSEA POC: Martha.Bello@navy.mil; kurt.boyles@navy.mil

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

FORWARD ALL REQUESTS TO: Martha Bello, Martha.Bello@navy.mil; and Kurt Boyles, kurt.boyles@navy.mil

ITEM NO: CONTRACTOR QUESTION 97:

USS SHOUP (DDG-86) FY19 DMP RFP issued 6/13/2018 has a due date of 8/21/2018. This current due date only allows contractors roughly ~48 planning days to prepare/provide a robust proposal. This timeline, along with receiving late breaking Q&A/Errata/Addendum, is having a negative effect on the responsiveness of the subcontractor/material vendor community who, along with the prime contract bidders, are strained by the size of this proposal and bidding timeline.

In order to afford all contractors ample time to respond to sequential changes, prepare/submit accurate proposals, and allow adequate time for subcontractor/vendor solicitations/evaluations/selections, request that the proposal due date be extended from 21 August 2018 at 3:00 pm, local time, Washington DC. to 4 September 2018 at 3:00 pm, local time, Washington DC. A 14-day proposal due date extension.

GOVERNMENT RESPONSE:

Amendment 0005 extended the proposal due date.

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: CONTRACTOR QUESTION 98:

Contractor respectfully requests an extension to the current bid due date of 8/21/18 to 9/21/18. Contractor has only received 25% of the subcontractors and vendors solicited at this time and many are requiring additional time due to current work load and reduced resources during the summer months. This extension will be necessary for our continued participation in providing you with a proposal. GOVERNMENT RESPONSE:

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: : 150-80-001 CONTRACTOR QUESTION 98:

Item 150-80-001, Paragraph 3.1 states; “Remove existing and install new the equipment listed in 1.3.1 and 1.3.2, located in 1.2.1 and 1.2.2 in accordance with 2.2, using 2.3 through 2.11 for guidance, as designated by the SUPERVISOR.”

Location of work at 1.2.2 has an SLQ Antenna equipment mounted to a foundation that is welded to the deck that is going to be replaced, CONTRACTOR QUESTION #1; Is this equipment being removed/reinstalled by AIT?

CONTRACTOR QUESTION #2; Does the antenna foundation require critical alignment?

GOVERNMENT RESPONSE:

1: See Work item 472-90-001. The Contractor is tasked with removal/reinstallation per work item 472-90-001.

2: See Work item 472-90-001 for foundation requirements.

TITLE:
PARA. NO: 3.1&1.2.2
PAGE NO:

ITEM NO: : 721-31-001 CONTRACTOR QUESTION 99:

Item 721-31-001 (VLS) Deluge valve repair & flush

The specification requires a special test rig (kit) that is normally GFE.

Please advise if the kit will be GFE.

GOVERNMENT RESPONSE:

No, IAW Paragraph 3.1, that the 009-90 Technical Representative will provide all special tools required to accomplish the work item.

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: : 150-80-001 CONTRACTOR QUESTION 100:

Item 150-80-001, Paragraph 3.1 states; “Remove existing and install new the equipment listed in 1.3.1 and 1.3.2, located in 1.2.1 and 1.2.2 in accordance with 2.2, using 2.3 through 2.11 for guidance, as designated by the SUPERVISOR.”

Location of work at 1.2.2 has an MK 38 25 mm equipment mounted to a foundation that is welded to the deck that is going to be replaced, CONTRACTOR QUESTION; Is this equipment being removed/reinstalled by AIT?

Please advise.

GOVERNMENT RESPONSE:

Yes, the MK 38 25 mm equipment will be removed/reinstalled by an AIT

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: : 721-31-001 CONTRACTOR QUESTION 101:

Vendors have been informed KTR that the 2 each 4 inch Butterfly Valves in paragraph 1.3.5, NSN 4820-01-286-7613, have been discontinued. Non are available in the Government stock system. Recommend government provides as GFM. Please advise.

The NSN in paragraph 1.3.6 is missing a digit, making the NSN incomplete to reference the correct material. Please provide so KTR can price the correct 2 each valves. Please advise.

GOVERNMENT RESPONSE:

See Errata #5. Work Item has been updated.

Please contact Kurt Boyles, Kurt.Boyles@navy.mil and Martha Bello, Martha.Bello@navy.mil to request the Errata.

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: : CONTRACTOR QUESTION 102:

Due to the changes made on Amendment 0004, including Q&A’s, Errata 4 changes, new 4720 and references that have been provided, Contractor request a 3 week extension. This time is needed in order to allow time the contractor including all suppliers to reevaluate and assess material analysis and man-hours as they pertain to this late breaking information.

GOVERNMENT RESPONSE:

TITLE:
PARA. NO:
PAGE NO: