Sheet1 Attachment S-3
| Pre-Proposal Information (PPI) Form | ||
| DATE OF REQUEST: 31 July 2018 | SOLICITATION NO: N00024-18-R-4407 | |
| TITLE: USS SHOUP (DDG 86) FY19 DMP | NAVSEA POC: Martha.Bello@navy.mil; kurt.boyles@navy.mil |
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
FORWARD ALL REQUESTS TO: Martha Bello, Martha.Bello@navy.mil; and Kurt Boyles, kurt.boyles@navy.mil
ITEM NO: 123-10-001 & 992-11-006 CONTRACTOR QUESTION 58:
Work Items 123-10-001 Tank and Void Open, Pump, Clean and Gas Free; accomplish & 992-11-006 Onload Fuel and Lube Oil; accomplish
Amendment 0001 provided Government responses to contractor questions. The response to questions 4 and 8 was that the work items “shall be performed as outlined in the specification by the Contractor.”
Response to question 11 states “the intent is to defuel and refuel at the Contractor's facility” and “the Government will not provide fuel and lube oil to be onloaded. The removed fuel and lube oil shall not be reused on USS Shoup.”
Neither work item identifies the quantity of fuel to be removed. Typically, vessels in the Port of San Diego arrive at contractor facility at low suction after fuel off-load at Point Loma. Any removed fuel is off-loaded at Point Loma and the contractor is not required to dispose.
Additionally, contractor cannot purchase F76/DFM as it is a controlled commodity.
Bidder's Questions:
1) Will tanks to be at low suction upon arrival at contractor facility?
2) Please provide quantities and types of fuel onboard so Contractor can fairly estimate disposition.
3) Is the method of disposition for all liquids on the ship the Contractor’s option so long as it comports with all applicable regulations?
4) If contractor is to dispose of fuel, please provide a known location for disposal.
5) Please provide specifications and known source for 630,000 gallons of F76/DFM required in PARA 3.2.1 and 3.2.3 of 992-11-006.
6) Please provide the government fuel/lube oil inspection criteria and procedures for these commodities when loading onboard.
7) Does the government intend to use DLA’s SEA Card program for refueling under existing bunker contracts? If not, why not? A contract vehicle is already established for this precise purpose: http://www.dla.mil/Energy/Offers/Products/GovernmentFuel/SEACard.aspx ?
GOVERNMENT RESPONSE:
1) No, tanks will not be at low suction upon arrival.
2) Work Item 123-10-001 has been updated via Errata 3 to clarify expected fuel amounts.
3) Yes.
4) A known location is not provide because it's at the Contractor's option.
5) This has been addressed in Errata 3. Ship's Force will provide fuel to support the two refueling evolutions.
6) See Errata #3, fuel sample criteria has been removed.
7) See answer to item 5 above.
Please contact Kurt Boyles, Kurt.Boyles@navy.mil and Martha Bello, Martha.Bello@navy.mil to request the Errata.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 123-10-001 CONTRACTOR QUESTION 59:
Paragraph 3.1.2 directs the Contractor to remove and dispose of compensating liquids.
Will the ship be defueled by the government prior to arrival at the Contractor’s facility?
If not, for estimating purposes please provide an amount of fuel to be removed and disposed vice compensating water.
Please note that there is a substantial difference in disposal costs between the two liquids.
GOVERNMENT RESPONSE:
The ship will not be defueled prior to arrival at the Contractor's facility. The work item has been updated via Errata 3 to clarify expected fuel amounts.
Please contact Kurt Boyles, Kurt.Boyles@navy.mil and Martha Bello, Martha.Bello@navy.mil to request the Errata.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 588-21-002 CONTRACTOR QUESTION 60:
Work item 588-21-002 Recovery, Assist, Securing and Traversing (RAST) Control Station Bubble Window Assembly; replace
Paragraph 3.3 states, “Remove existing, fit, and install new each part provided in 5.1 and 5.2:”
Paragraph 3.11 states, “Accomplish the requirements of 009-25 of 2.1 for a chalk test of the scuttle installed in 3.3.”
Paragraph 5.1 and 5.2 identify RAST components only. No scuttle is provided in paragraphs 5.1 or 5.2.
Bidder's Questions:
1) Is the contractor to provide and install a new scuttle?
2) Will a scuttle be provided as GFM with the contractor to install?
3) If so, please identify the scuttle required for replacement. GOVERNMENT RESPONSE:
A new scuttle comes installed in the assembly provide in para 5.1.1. Para 3.11 is required to be accomplished by the contractor after the assembly (para 5.1.1) is welded in to verify the scuttle still meets the requirements of 009-25.
| TITLE: |
| PARA. NO: 3.3, 3.11 |
| PAGE NO: |
ITEM NO: 411-90-002 CONTRACTOR QUESTION 61:
Work Item 411-90-002 Paragraph 5.3 identifies a GFM Material Kit for ship alt 89804K. That GFM material kit can be found using the 4720 in reference 2.22. The original 4720 did not define the GFM material kit for SA 89804K. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 89804 – GFM Listing”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 411-90-001 CONTRACTOR QUESTION 62:
Work Item 411-90-001 Paragraph 5.3 identifies a GFM Material Kit for ship alt 89925K. That GFM material kit can be found using the 4720 in reference 2.20. The original 4720 did not define the GFM material kit for SA 89925K. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 89925 – GFM Listing”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 167-80-001 CONTRACTOR QUESTION 63:
Work Item 167-80-001 Paragraph 5.3 identifies a GFM Material Kit for ship alt 76258K. That GFM material kit can be found using the 4720 in reference 2.5. The original 4720 did not define the GFM material kit for SA 76258K. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 76258 – GFM List as of 19 July 2018”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 512-90-003 CONTRACTOR QUESTION 64:
Work Item 512-90-003 Paragraph 5.3 identifies a GFM Material Kit for ship alt 74012K. That GFM material kit can be found using the 4720 in reference 2.17. The original 4720 did not define the GFM material kit for SA 74012K. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 74012 – GFM Listing”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 262-80-001 CONTRACTOR QUESTION 65:
Work Item 262-80-001 Paragraph 5.3 identifies a GFM Material Kit for ship alt 76501D. That GFM material kit can be found using the 4720 in reference 2.5. The original 4720 did not define the GFM material kit for SA 76501D. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 76501 – GFM Listing”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 313-80-001 CONTRACTOR QUESTION 66:
Work Item 313-80-001 Paragraph 5.3 identifies a GFM Material Kit for ship alt 86517D. That GFM material kit can be found using the 4720 in reference 2.5. The original 4720 did not define the GFM material kit for SA 86517D. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 86517 – GFM Listing”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 438-90-001 CONTRACTOR QUESTION 67:
Work Item 438-90-001 Paragraph 5.3 identifies a GFM Material Kit for ship alt 71726K. That GFM material kit can be found using the 4720 in reference 2.10. The original 4720 did not define the GFM material kit for SA 71726K. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 71726 – GFM Listing”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 438-90-002 CONTRACTOR QUESTION 68:
Work Item 438-90-002 Paragraph 5.3 identifies a GFM Material Kit for ship alt 71604K. That GFM material kit can be found using the 4720 in reference 2.19. The original 4720 did not define the GFM material kit for SA 71604K. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 71604 – GFM Listing”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 472-90-001 CONTRACTOR QUESTION 69:
Work Item 472-90-001 Paragraph 5.3 identifies a GFM Material Kit for ship alt 80156K. That GFM material kit can be found using the 4720 in reference 2.11. The original 4720 did not define the GFM material kit for SA 80156K. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 80156 – GFM List as of 18 July 2018”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 655-80-001 CONTRACTOR QUESTION 70:
Work Item 655-80-001 Paragraph 5.3 identifies a GFM Material Kit for ship alt 00429D. That GFM material kit can be found using the 4720 in reference 2.12. The original 4720 did not define the GFM material kit for SA 00429D. A new GFM list was provided by the government titled “DDG 86 – DMP6 – SA 00429 – Material Lists as of 7-19-2018”. This list is not referenced in the work item. Will the government be invoking this new GFM list on the work item? Please advise. GOVERNMENT RESPONSE:
No, the supplemental information provided is the current information available for the 4720-3 documents and lists material to be provided as part of the SHIPALT kit. Contractor's should include this information when developing their bid. The official 4720-3 document won't be updated until A-60.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 256-80-001 CONTRACTOR QUESTION 71:
Work Item 256-80-001, Drawing 7517909-B, PC# V0001 and V0002, VALVE BUTTERFLY BRZ W/GEAR OPERATOR 150 PSI 2-1/2"NPS, have been identified as LLTM. The lead time is 40 weeks and will not support the POP. Recommend material be supplied as GFM. Please advise. GOVERNMENT RESPONSE:
See Errata #2, which identified these valves will be provided as GFM.
Please contact Kurt Boyles, Kurt.Boyles@navy.mil and Martha Bello, Martha.Bello@navy.mil to request the Errata.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 123-10-001 CONTRACTOR QUESTION 72:
Paragraph 3.2 directs contractor to pump each tank containing petroleum products to low suction. Other than the compensating fuel tanks there are 22 tanks designated as fuel or oil tanks. This does not include waste oil, waste fuel or waste water tanks. These tanks can be full, at low suction or any level in between.
For estimating purposes, please provide a quantity by type to be pumped.
GOVERNMENT RESPONSE:
For bidding purposes, the Contractor should assume that all waste oil, waste fuel, and waste water tanks will be full.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 259-11-003 CONTRACTOR QUESTION 73:
Regarding WI 259-11-003 paragraph 3.4, is it the government’s intention to remove the BLISS Cap and preserve it off the vessel?
Please advise.
GOVERNMENT RESPONSE:
It is up to the contractor to determine whether the BLISS caps need to be removed or reamin in place to support the preservation requirements called out in the work item.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 643-11-001 CONTRACTOR QUESTION 74:
Regarding WI 643-11-001 paragraphs 3.11 and 3.12, is it the government’s intention to preserve the BHDS, OVHDS and decks of all the locations listed in 1.2 or only IWO repairs? Please advise. GOVERNMENT RESPONSE:
In accordance with pargraph 3.11 and 3.12, full preservation is required.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 123-10-001 CONTRACTOR QUESTION 75:
Paragraph 3.2 directs contractor to pump each tank containing petroleum products to low suction. Does this requirement also apply to the various waste tanks?
If so, for estimating purposes, please provide quantities to be pumped and disposed.
GOVERNMENT RESPONSE:
For bidding purposes, the Contractor should assume all waste tanks will be full.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 123-10-001 & 992-11-006 CONTRACTOR QUESTION 76:
Paragraph 3.10.1 directs contractor to coordinate the filling of each compensating tank with sea water upon completion of work. Is the intent to refill after tank work is complete or PCD?
992-11-006 requires Contractor to partially refill these tanks with fuel after PCD and then completely fill after LOA. Will the government provide a dewater barge and disposal of the comp water that will be displaced during refueling?
Will the government consider deleting the requirement to refill with comp water and refuel with enough fuel to support stability for Hot Plant Testing and stability for undocking? Then complete refueling once waterborne?
This prevents double handling and disposal of comp water at substantial savings to the government.
GOVERNMENT RESPONSE:
Q1: The intent is to refill tanks to support scheduled TLI testing in tanks.
Q2: See Errata #3. Contractor responsible for comp water barge and disposal of comp water
Q3: No, two separate fueling evolutions are required.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 472-90-001 CONTRACTOR QUESTION 77:
Drawing 8742083 call out for flex houses and is being sent to contractor as GFM, will the hoses comes assembled already or does it need to be assemble?
Please advise.
GOVERNMENT RESPONSE:
In accordance with Sheet 18 of drawing 8742083, it is identified that the hoses are to be fabricated from GFM parts.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 583-90-001 CONTRACTOR QUESTION 78:
Item 583-90-001, paragraph 3.1 states to “Accomplish the requirements of 009-90 of 2.1” & paragraph 3.1.1 states “Provide the services of a certified technical representative to provide on-site assistance and guidance for the inspection, repair, parts, final adjustment and testing of the equipment listed in 1.3.”
CONTRACTOR QUESTION; being APPLETON the OEM and the fact they do not provide with ON-SITE representatives, please provide with a name of a qualified alternate source to accomplish these paragraphs.
GOVERNMENT RESPONSE:
An onsite representative is available and they can be reached at (920) 738-5432 x 119.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 505-11-001 CONTRACTOR QUESTION 79:
ITEM: 505-11-001
Please supply attachment (A) stated in paragraph 3.2 for bidding purposes.
GOVERNMENT RESPONSE:
See Errata #1 for Attachment A.
Please contact Kurt Boyles, Kurt.Boyles@navy.mil and Martha Bello, Martha.Bello@navy.mil to request the Errata.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 857-11-001 and 992-11-001 CONTRACTOR QUESTION 80:
This question is a follow-up to the Government’s response to Questions 5, 12 and 29 for work items 857-11-001 and 992-11-001.
• Question 005 and 012 responses state, “Work Items 992-11-001 and 857-11-001 are applicable for all Offerors to price. Only one Work Item will be exercised under this contract pending location of the Successful Offeror’s facility.”
• Question 29 response states, “Work Item 857-11-001 is applicable for all Offerors to price.”
As the Government’s response clearly indicates that the required scope of work for these items is contingent upon the location of the Successful Offeror’s facility, bidder believes that it is improper for all offerors to price both items regardless of the location of their facility. If Offerors were to price both items regardless of location, it would result in the evaluated cost including a requirement for which there is not a bona fide need at that Offeror’s location and therefore an improper price evaluation of competing proposals. It is recommend that the solicitation be amended so that based on the Offeror’s location either CLIN 0010 work item 857-11-001 or CLIN 0013 work item 992-11-001 is to be proposed, but not both items.
Please review and reconsider the Government response to these questions.
GOVERNMENT RESPONSE:
The berthing barge availability, regardless of location, is not guaranteed, therefore it is necessary to price both work items.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: All CONTRACTOR QUESTION 81:
Contractor request a three week extension to process and incorporate changes identified in Errata 2 including all Q&A’s received with Amendment 0003. This potentially impacts all subcontractors including material, services and manhours.
Please advise as soon as possible.
Thank you
GOVERNMENT RESPONSE:
Thee Government does not intend to extend the proposal due date. No change has been made.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
ITEM NO: 980-90-027 CONTRACTOR QUESTION 82:
Item 980-90-027, Para 3.2.5 states “ Remove the following equipment from the conveyance provided by the AIT and set on the foundations on the ship, when directed by the supervisor. The equipment will be bolted and connected by the AIT. Remove existing, fit, and install new the following parts.
AS-4695/SRQ-4 Directional Antenna CW-1270/SRQ-4 Radome Platform Ku-band Test System
Will this equipment be provided by the AIT or Government or is the Contractor required to procure?
please advise
GOVERNMENT RESPONSE:
Equipment will be provided as GFM.
| TITLE: |
| PARA. NO: |
| PAGE NO: |
image1.jpg