- A Request For Proposal (RFP), under full and open competition, to provide mission module hardware and performance-based engineering labor. Federal contract opportunity
- Solicitation number
- N00024-16-R-6300
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Respond to bidder questions and update the solicitation accordingly. The proposal deadline is hereby extended to 05 January 2017 at
02:00PM.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 41
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Oct-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-16-R-6300
X 9B. DATED (SEE ITEM 11)
09-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Oct-2016
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2060
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-16-R-6300
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
Q&A
Number Page #
Section /
Paragraph Question and Answer
Q40 232 1.2
Pursuant to solicitation, N00024-16-R-6300, “Instructions, Conditions and Notices to
Bidders” paragraph 1.2, we respectfully request copies of the drawings identified on the attached listing. These drawings are called out in the DEP&S Technical Data Package (TDP) but are missing from the TDP provided.
A40 Additional GFI drawings have been added to the TDP.
Q41 88 C
The following drawing trees include part numbers that are full-up support containers in addition to the subassemblies that make up respective containers:
- CLIN X004, Dwg Tree 8224094 (ALMDS/AMNS Support Container)
- CLIN X006, Dwg Tree 8224091 (Q-20 Support Container)
- CLIN X010, Dwg Tree 8470538, (Common Support Container)
Should respective full-up containers, including BOAs, be included in the Kit as well as the subassemblies?
Recommend striking the top level container drawing from the kit to clarify this issue.
A41 The BOA assembly (Drawing 8224325) is not included in the any of the kits. The kits do not include the BOA. The full drawing tree is provided for overall details of the BOA and kits.
Q42 88 C
Section B CLINs 1001, 2001, 3001, 4001, and 5001 require the production and delivery of
RO/RO Storage Cabinets. On page 88 of Section C, the definition of CLINs 1001, 2001, 3001, 4001, and 5001 cites master drawing number 20110701; the drawing is for the
Common Transport Container (CTC). Does the USN intend to buy RO/RO cabinets, if so, what is the quantity mix per the TDP spec provided? Also, does the Navy intend to procure
CTCs under this contract, and if so, in what quantity?
Please clarify Section B vs. Section C discrepancy.
If the Navy intends to procure CTCs, recommend a separate CLIN be established to specify quantities and price of CTCs.
A42 Please see Amendment 0004. Section B, Section C, and associated drawings have been updated to clarify the desired end items.
Q43 89 C
It appears that "Find Numbers (FNs)" were inadvertently used in the spares table instead of actual part dash numbers in the following cases:
-19 does not exist on drawing 8224640, Find Number (FN)19 is the correct callout for the
ECU Set
-146 does not exist on drawing 8224750, FN 146 is the callout for the Tow Boom Assembly which is defined on drawing 8224766-3 not 8224750
-44 does not exist on drawing 8350954, Find Number (FN) 44 is the correct callout for the motor
-25 does not exist on drawing 8351047, Find Number (FN) 25 is the correct callout for the
Manual Wrench
-2 does not exist on drawing 8197631, Find Number (FN) 2 is the correct callout for the
Exhaust Tubes
-7 does not exist on drawing 8224420, Find Number (FN) 7 is the correct callout for the
28VDC exterior connector
-23 does not exist on drawing 8224420, Find Number (FN) 23 is the correct callout for the
440VAC 60 Hz exterior connector
-24 does not exist on drawing 8224420, Find Number (FN) 24 is the correct callout for the
115VAC 400 Hz exterior connector
-26 does not exist on drawing 8224420, Find Number (FN) 26 is the correct callout for the
115VAC 60 Hz exterior connector
-2 does not exist on drawing 8351164, there is a Find Number (FN)2 which is a -3 assembly
-23 does not exist on drawing 8224582, FN 23 is the original callout for the motor but is now obsolete; FN58 is the current motor call out and is retrofitable
Recommend update the part numbers by removing dash numbers, properly referring to the FN and referencing the appropriate information as shown in the question.
A43
See amendment 0004. The Table for ITEMS 1011, 2011, 3011, 4011, AND 5011: MINE
COUNTERMEASURES (MCM) MISSION MODULES SPARES for updated part numbers for spares list.
Q44 89 C
8224582 is not a "Trolly Gear Box;" it is the "Motor Plate Assembly" which includes all the sprockets, spindles, bearings, chain drives and electric motor mounted on a plate. There is no separate gear box for the OAMCM container.
Recommend update the description to "Motor Plate Assembly" and callout the 8224582-14 part number. If individual parts are required for spares, recommend they be called out and identified by their individual Find Numbers (FN).
A44 Please see A43.
Q45 89 C
The 8351006 is not a "Drawer Gearbox"; it is a "Middle Base Rack with Gearing Assembly".
-31 does not exist on drawing 8351006, there is a Find Number (FN) 31 which is a -2
Assembly, which yields the middle drawer rack and all the individual components to build the gearing assembly. There is no separate gear box on the ALMDS/AMNS outfitted container;
it is built out of individual components and sub-assemblies on the 8351006.
If gearing components are required for spares, recommend the 8351006 be broken down into the individual Find Numbers that make up the gearing assembly.
A45 Please see A52.
Q46 120 C.6
Since environmental testing only covers testing, test reports, and procedures, can the
Contractor assume the test articles are being provided as GFP, after the contractor delivers the article under a separate CLIN?
Recommend the Gov't consider providing two (2) test articles as GFP, taking into account destructive testing.
A46 Test articles will be provided as GFP after the Contractor delivers the article under a separate
CLIN.
Q47 178 H
Clause 5252.245-9105 Lists: MPSF, San Diego, Mayport, Singapore, Japan
Page 178 does not list Bahrain. Section 7.4 does list Bahrain. Is Bahrain a Gov't furnished site? Please clarify.
A47 Please see Amendment 0004 for update to clause 5252.245-9105.
Q48 238 L.3.1.1.6
CLIN 1005 (Q20) delivery period is 3 months shorter than the similar CLIN 1003 (ALMDS) container.
Recommend making this delivery period 24 months.
A48 Please see Amendment 0004 for update to Section L.3.1.1.6.
Q49 11, 25, 37, 49, 61, 90 B & C
For the X013 CLIN series in Section B, 4 containers are listed: ALMDS, AMNS, Q20, and
CSC. However, there is no individual "AMNS" container in existence; it appears that an
OAMCM container should be identified here. Page 90 only lists 3 containers in the X013
CLIN series (no OAMCM), but calls out the 8224500-3 which is the OAMCM full-up container. The RFP also calls out an OAMCM Kit.
Please clarify.
A49 Please see Amendment 0002, A21.
Q50 90, 157 C & E
For CLIN 1014 "Reduced Weight BOA TDP", Section E requires –" Production acceptance testing shall be conducted using the Contractor-developed/Government approved Production
Acceptance Test Procedures submitted in accordance with the Statement of Work to ensure that all requirements of the approved baseline drawing package are met". This seems to be in conflict with the page 90 CLIN description of item 1014 which only requires delivery of a
TDP, with no mention of an article being fabricated. Is the Government looking for the
Contractor to fabricate a unit under CLIN 1014 as well as develop a TDP?
A50 CLIN 1014 is for the TDP. Please see Amendment 0004 for updates to inspection and acceptance terms for CLIN 1014 in Section E.
Q51 108 C.4.1.5.2
Is the intent to only run an FCA if design changes have been made, since some of the production items will be build-to-print? Should this be a First Article Inspection for the build to print items?
A51 Please see Amendment 0004 for clarifications of functional configuration audit Section
C.4.1.5.2. .
Q52 N/A TDP
In the Knifefish TDP folder “Knifefish SC CIPFSs” there is a routing & signoff sheet provided for a (CIPFS) SMCM UUV/Knifefish – Support Container Hardware Configuration
Item Specification – SMCM-KFCIPFSHCI-1.0.0.0 but no actual document is provided.
Please provide date when the SMCM-KFCIPFSHCI-1.0.0.0 specification will be provided.
A52 The TDP has been updated to provide SMCM-KFCIPFSHCI-1.0.0.0.
Q53 91 C
The components listed for CLIN 1021 (non-recurring ASW engineering) and the components listed for CLINs X024 (ASW production) do not match. Neither of those CLIN listings match the TDP parts list in the document titled “ASW Mission Components Production.”
Several ASW MM drawings called out in the drawing tree (e.g., EDMASW -0002-0001, EDMASW -0004-0001, EDMASW -0004-0009, etc.) are not found. Also, the ASW TDP is unclear on whether full assemblies are required in addition to components, and what quantities of each component/assembly are to be provided.
Please clarify which ASW components are required, and if you are ordering the full assembly plus components that go into the full assembly separately, and provide a date when missing drawings identified in the drawing tree will be provided.
A53 Please see Amendment 0004 for revisions to the ASW drawings listed in Section C item description.
Q54 Various
C (CDRL
Tables) and
Exhibits A, B, C, & E
The following anomalies exist between the SOW and CDRL Exhibits and within CDRL
Exhibits:
'- CDRL E041 Scientific & Technical Report is listed in Exhibit A
'- CDRL A007 OPSEC Plan sited in SOW but there is no 1423-1 in Exhibit A
'- CDRL B047 Integrated Program Management Report cited in SOW but there is no 1423-1 in Exhibit B
'- Exhibit C - CDRL C003 Scientific and Technical Report isn't sited in the SOW but has a
1423-1
'- Exhibit C - CDRL C007 Scientific and Technical Report / Design Engineering Services isn't sited in SOW but has a 1423-1
'- Exhibit C - CDRL C008 Scientific and Technical Report / Trip Report isn't sited in SOW but has a 1423-1
'- Exhibit C - CDRL C012 Test/Inspection Report / FAT isn't sited in SOW but has a 1423-1
'- Exhibit C - CDRL C021 Special Tooling Drawings/Models and Associated Lists sited in
SOW but no 1423-1
'- Exhibit C - CDRL C022 Duplicate 1423-1
'- Exhibit C - CDRL C026 Duplicate 1423-1
'- Exhibit C - CDRL C036 sited in SOW but no 1423-1
'- Exhibit C - CDRL C043 Integrated Program Management Report cited in SOW but no
1423-1 in
'- Exhibit E - CDRL C043 Integrated Program Management Report listed on 1423-1 but not in
SOW
'- Exhibit E - CDRL E041 Scientific and Technical Reports, Design Engineering Services sited in SOW but no 1423-1
A54 Please see Amendment 0004 for updates to Exhibits A, B, C and E and Section C.3.5.8.
Q55 1 Attachment 4
– GFI
Could a list of the TDP items to be provided for the contract be provided in the RFP to supplement item 1?
Recommend a summary of the technical data package be provided.
A55 The Government will not provide an additional drawing summary. Please refer to the DEPS
CLIN DWG Reference in the MISC file folder of the TDP.
Q56 88 Section C, ITEMS x001
The title of CLINs x001 references the Roll-on Roll-off (RO/RO) Storage Cabinet Sets where the description in Section C references the Common Transport Container (CTC), drawing
20110701. Does the government want just the RO/RO cabinets within the drawing set or the entire CTC assembly?
A56 Please see A42.
Q57 TDP TDP
Could the government provide the existing deviations and waivers for the items currently in production?
Please add waivers and deviations in attachment 4 GFI.
A57 Previous Deviatons and Waivers applied only to previous units. Offerors shall refer to the current drawings for current product requirements.
Q58 TDP TDP
Are there available test procedures for the environmental test CLINs? Please provide.
Please add environmental test procedures in attachment 4 GFI.
A58 Offerors should refer to table 6.1 and Amendment 0004 which updates Section C 6.0 for test procedure generation.
Q59 TDP TDP
Should the environmental test CLINS be updated to CPFF from FFP? If no are there available test procedures?
If test procedures need to be development than recommend updating CLINS to CPFF.
A59 Environmental testing CLINS are correct as FFP. Please see A58 regarding testing procedures.
Q60
11-13, 26 –
26, 37 – 39, 49 – 50, 61
– 62
B and C
There is a Reduced Weight 10’ BOA CLIN (X016) but no Steel 10’ BOA CLIN. Should there be a Steel 10’ BOA CLIN for the existing design similar to the Steel 20’ BOA CLIN (X013)?
Please clarify and/or update the RFP as necessary.
A60 No 10’ steel BOA is required. The Government does not intend to update the RFP.
Q61
TDP
8470212
TDP Drawing
8470212, Could LCSMPI-SCD-001 be made available for the RFP which is referenced in drawing
8470212 (GMM Containers)?
page 1 Note 3
Please provide LCSMPI-SCD-001.
A61 LCSMPI-SCD-001 has been added to the TDP.
Q62 91 Section C, paragraph 1
A number of drawings included in ASW production CLINs x024 are missing in the description of CLIN x021, the Design Transition Services for the Reduced Weight ASW MM
(ex. MASS Outfitting and the A-Frame). Is it the intent of the government that these should not be considered for reduced weight and are build-to-print only?
Please identify the Government’s intent.
A62 Please see A53.
Q63 91 Section C, ITEMS x024
The ASW MM TDP is currently missing some of the drawings referenced in Section C. Can the missing drawings be provided for the RFP?
Please provide the missing drawings.
A63 The missing drawings have been added to the TDP.
Q64 TDP TDP
Can the government provide LCSMPI-SCD-001?
Q64 Please see A61.
Q65 1 Attachment 4
Can you provide an itemized list of the TDP (Attachment 4 item 1)?
Please provide TDP drawing list.
A65 Please see A55.
Q66 1 Attachment 4
Can the government provide LCSMPI-SCD-001?
A66 Please see A61.
Q67 91 ITEM 1021
The following drawings referenced in ITEM 1021 and X024 appear to be missing from the
ASW TDP:
- Cofferdam:LCSMPI-DWG-0043,44,45; EDMASW-0116
- MFTA SUPPT ASSEMBLY: LCSMPI-DWG-0033,35
- TRS-1 ISS:EDMASW-0089
- DOLLY ASSEMBLY:EDMASW-0098,99,100,103
Will these drawings be provided?
Please provide LCSMPI-DWG-0043,0044,0045, 0033,0035 ; EDMASW-
0089,0098,0100,0103.
A67 The missing drawings have been added to the TDP.
Q68 91 ITEM 1021
The MASS drawing(s) is not included in list of ASW Mission components referenced in
CLIN 1021. Should the MASS drawing(s) be included in that list?
Please add MASS to CLIN 1021 description.
A68 Please see A53
Q69 88 ITEM x001
The RORO TDP contains a spec for common transport container; does the government intend for the CTC to be procured along with the RORO?
Please clarify that CTC is included in RORO Item x001.
A69 Please see A42.
Q70 91 ITEM X024
Is the MASS transported in a shipping container or CTC? If it is shipped in a CTC, should a
CTC be included in the ASW Components CLIN x024?
Please clarify that Item x024 includes a CTC.
A70 Please see Amendment 0004 for TDP updates for CLIN X024.
Q71
Should the MASS components called out in CLIN X024 be included in CLIN 1021 and 1023?
Please add MASS components to Items 1021 and 1023.
A71 Please see A53 for CLIN 1021. CLIN 1023 is for environmental testing and does not require updates.
Q72
Will an option to deliver a Steel 10 ft. BOA be needed for any other mission package other than MCM?
Please clarify other uses of Steel 10 ft BOA.
A72 No, a steel 10ft BOA is not needed for other mission packages.
Q73 11, 90, 117–
118, 238
B - CLIN
1014;
C - Item
1014; SOW
5.5;
L-3.1.1.6
Per Sections B and C, the sole deliverable for CLIN 1014 is “a production-ready Technical
Data Package (TDP) in accordance with the Statement of Work” for the Reduced Weight
BOA.
However, in addition to the TDP, the SOW section for this CLIN (5.0) also includes development of end-user Logistics Products (SOW 5.5; CDRLs C028-C040). This creates two issues:
1. Development of the TDP is a predecessor task for creating most of these Logistics
Products. Per Section L, the TDP is a deliverable 9 months after option exercise, which then requires Government Approval after the 9 months PoP is closed before Logistic products would typically be developed. This leaves insufficient time under the CLIN period of performance to also develop successor products from a not-yet-approved TDP.
2. Because all of these Logistics Products (e.g., Technical Manuals) are intended for use subsequent to BOA delivery, these products will not be of use to the Government until/unless an Option CLIN for Reduced Weight BOA Production is exercised.
Please modify the RFP to address these issues per one of the following methods:
1. Specify that the Logistics Products for the Reduced Weight BOA, currently defined in
SOW 5.5 and CDRLs C028-C040, will be instead be procured as Sustainment and Support
Services, in accordance with the corresponding requirements in :
a. CLINs 1700, 2700, 3700, 4700, and 5700;
b. SOW section 7.6.2; and
c. CDRLs E094-E106.
2. Create a separate Option CLIN for Reduced Weight BOA Logistics Products.
A73 Please see Amendment 0004 for updates to Section L.3.1.1.6. CDRL Exhibit C items C028-
C042 due dates have been adjusted accordingly.
Q74 112, 117 C-4.1.10, C-
5.4.5
Manufacturing work instructions are requested both in the production and RW BOA TDP development SOWs.
Development of the TDP is a predecessor task for creating usable work instructions. Per
Section L, the TDP is a deliverable 9 months after option exercise, which then requires
Government Approval after the 9 months PoP is closed before work instruction products would typically be developed. This leaves insufficient time under the CLIN period of performance to also develop successor products from an approved TDP.
Because work instructions are intended for use during RW BOA fabrication, these products will not be of use to the Government until/unless an Option CLIN for Reduced Weight BOA
Production is exercised.
Recommend work instruction delivery tasking be performed under production, since the effort is dependent on successful TDP generation under SOW Section 5.
A74 Please see Amendment 0004 for updates to SOW 5.4.5 and SOW 7.2.1.5.
Q75 113 C.4.1.13
This paragraph states that "The Contractor shall provide all calibration and test data required for the Mission Package Detachment sailors to pass their qualification/certification to use production end items." Is GFI available that defines the qualification and certification requirements?
Please provide GFI that identifies what the qualification/certification requirements are.
A75 Please see Amendment 0004 for updates to Section C.4.1.13.
Q76 238 L.3.1.1.6
Does the 9-month delivery period allowed for TDP development under CLIN 1014 include the time required for Gov't approval of the documentation?
Recommend adding notation that Gov't approval time is outside the 9-month window.
A76 Yes, the 9-month TDP delivery period includes the time required for Government approval of the documentation.
Q77 120 C.6
This section requires that the contractor repair and refurbish the EQT test article in order to allow it to successfully pass the production acceptance testing. Given that the specified environmental testing may prove destructive, a definition of “Beyond Economical Repair” as it may potentially apply to repair and refurbishment process is needed.
Please define.
A77 The requirements of C 6.0 as modified by Amendment 0005 describe the Government requirement. No definition of beyond economical repair is needed.
Q78 91
ITEM 1021,
X024
Will the x024 ASW Components include the Reduced weight BOA (for ASW TAS-2)?
Please clarify that Item 1021, x024 includes a Reduced Weight BOA.
A78
The Governments expects the Reduced Weight ASW Mission Modules will include the
Reduced Weight BOA design as a basis for the design effort under CLIN 1021. CLIN 1024 will be production based on the design efforts under CLIN 1021 using the weight reduction specifications provided in the TDP.
Q79 N/A TDP
Is a 10' RWBOA spec available to inform CLIN 1014 tasking? If not, how does the Gov't intend to evaluate the contractor's technical offering?
A79
The Governement does not have a specification for the 10' RWBOA. The Government expects the weight reduction under the 10' RWBOA TDP CLIN 1014 to be proportionally scaled from the 20' RWBOA TDP produced under the same CLIN. For example, if an offeror proposes a weight reduction of X% on the 20' RWBOA, the Government would expect a substantially similar, or greater, reduction of X% on the 10' RWBOA.
Q80 91 ITEM X024
What is the quantity of twist locks, as defined in EDMASW-0085, for each MM component that is fastened to the LCS deck?
Please provide quantity of EDMASW-0085 twistlock.
A80 Please see Amendment 0004 for update to Item X024 description in Section C.
Q81 TDP TDP
The Reduced Weight SSMM specification was not included in the Final RFP TDP. Can the government provide the specifications for the Reduced Weight SSMM?
Please add Reduced Weight SSMM specification to TDP.
A81 MMCD-1009 REV B Change 3 10.04.16 has been added to the TDP.
Q82 91
ITEM
1023,X024
Does a Product Performance Specification exits for the Reduced Weight ASW Mission
Modules?
Please provide a Product Performance Specification for the Reduced Weight ASW Mission
Modules.
A82 See amendment 0004 for EMM_SSS Level 4 2015_10_9 which provides the ASW specification.
SECTION B - SUPPLIES OR SERVICES AND PRICES
The CLIN description for CLINs 1001, 2001, 3001, 4001, and 5001 has changed from Roll-On/Roll-Off (RO/RO)
Storage Cabinet to CTC Set with RO/RO Storage Cabinet.
The CLIN extended description for CLINs 1001, 2001, 3001, 4001, and 5001 has changed from Up to 8 eaNote B, E, & F to Common Transport Container (CTC) Set with (RO/RO) Storage CabinetUp to 8 eaNote B, E, & F.
The CLIN extended description for CLINs 1013, 2013, 3013, 4013, and 5013 has changed from 1 ALMDS/AMNS, 1 AQS20, 1 Common Support ContainerUp to 20 eaNote B, E, & F to 1 ALMDS/AMNS, 1 AQS20, 1 OAMCM, 1
Common Support ContainerUp to 20 eaNote B, E, & F.
CLIN 1007 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Each
OPTION Reduced Weight OAMCM Set
FPI
Up to 6 ea
Note B, E, & F
FOB: Destination
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
CLIN 1008 is added as follows:
OAMCM Module Kit
FFP
OPTION Up to 6 ea
Note B & E
NET AMT
CLIN 2007 is added as follows:
FPI
Up to 6 ea
TOTAL TARGET PRICE
CEILING PRICE
CLIN 2008 is added as follows:
CLIN 3007 is added as follows:
FPI
Up to 6 ea
TOTAL TARGET PRICE
CEILING PRICE
CLIN 3008 is added as follows:
CLIN 4007 is added as follows:
FPI
Up to 6 ea
TOTAL TARGET PRICE
CEILING PRICE
CLIN 4008 is added as follows:
CLIN 5007 is added as follows:
FPI
Up to 6 ea
TOTAL TARGET PRICE
CEILING PRICE
CLIN 5008 is added as follows:
Stepladder pricing tables have been added for CLINs X007 and X008 as follows:
STEPLADDER PRICING TABLES
STEPLADDER PRICING FOR FIRM-FIXED-PRICE ITEMS
UNIT PRICE FOR ITEMS X008
QTY 1008 2008 3008 4008 5008
1 $ $ $ $ $
2 $ $ $ $ $
3 $ $ $ $ $
4 $ $ $ $ $
5 $ $ $ $ $
6 $ $ $ $ $
STEPLADDER PRICING FOR FIXED-PRICE INCENTIVE ITEMS
FPI ITEM
1007 TARGET COST
TARGET
PROFIT TARGET PRICE
CEILING PRICE
(120% OF
TARGET COST)
OVER TARGET
SHARE RATIO
UNDER
TARGET SHARE
RATIO
Qty = 1 $ $ $ $ 50/50 50/50
Qty = 2 $ $ $ $ 50/50 50/50
Qty = 3 $ $ $ $ 50/50 50/50
Qty = 4 $ $ $ $ 50/50 50/50
Qty = 5 $ $ $ $ 50/50 50/50
Qty = 6 $ $ $ $ 50/50 50/50
2007 TARGET COST
TARGET
PROFIT TARGET PRICE
CEILING PRICE
(120% OF
TARGET COST)
OVER TARGET
SHARE RATIO
UNDER
TARGET SHARE
RATIO
Qty = 1 $ $ $ $ 50/50 50/50
Qty = 2 $ $ $ $ 50/50 50/50
Qty = 3 $ $ $ $ 50/50 50/50
Qty = 4 $ $ $ $ 50/50 50/50
3007 TARGET COST
TARGET
PROFIT TARGET PRICE
CEILING PRICE
(120% OF
TARGET COST)
OVER TARGET
SHARE RATIO
UNDER
TARGET SHARE
RATIO
Qty = 1 $ $ $ $ 50/50 50/50
Qty = 2 $ $ $ $ 50/50 50/50
Qty = 3 $ $ $ $ 50/50 50/50
Qty = 4 $ $ $ $ 50/50 50/50
4007 TARGET COST
TARGET
PROFIT TARGET PRICE
CEILING PRICE
(120% OF
TARGET COST)
OVER TARGET
SHARE RATIO
UNDER
TARGET SHARE
RATIO
Qty = 1 $ $ $ $ 50/50 50/50
Qty = 2 $ $ $ $ 50/50 50/50
Qty = 3 $ $ $ $ 50/50 50/50
Qty = 4 $ $ $ $ 50/50 50/50
5007 TARGET COST
TARGET
PROFIT TARGET PRICE
CEILING PRICE
(120% OF
TARGET COST)
OVER TARGET
SHARE RATIO
UNDER
TARGET SHARE
RATIO
Qty = 1 $ $ $ $ 50/50 50/50
Qty = 2 $ $ $ $ 50/50 50/50
Qty = 3 $ $ $ $ 50/50 50/50
Qty = 4 $ $ $ $ 50/50 50/50
The following have been modified to include CLINs X007 and X008:
NON-RECURRING COSTS
NON-RECURRING COSTS FOR FIRM-FIXED-PRICE ITEMS
CLIN SERIES TOTAL NON-RECURRING COSTS
X000 $
X001 $
X002 $
X004 $
X006 $
X008 $
X010 $
X011 $
X012 $
X013 $
X020 $
X024 $
NON-RECURRING COSTS FOR FIXED-PRICE-INCENTIVE ITEMS
FPI ITEM TARGET COST
TARGET
PROFIT
TARGET PRICE
CEILING PRICE
(120% OF
TARGET COST)
OVER TARGET
SHARE RATIO
UNDER
TARGET SHARE
RATIO
X003 $ $ $ $ 50/50 50/50
X005 $ $ $ $ 50/50 50/50
X007 $ $ $ $ 50/50 50/50
X009 $ $ $ $ 50/50 50/50
X016 $ $ $ $ 50/50 50/50
X017 $ $ $ $ 50/50 50/50
X027 $ $ $ $ 50/50 50/50
HQ B-2-0023 has changed from:
HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST/FIXED PRICE) (FEB 1997)
This contract includes the following mixture of cost reimbursement and fixed price line items:
Items Type
0900, 0901, 0902, 0903, 0904 Not Separately Priced (NSP)
0906, 0907, 1000, 2000, 3000, 4000, 5000, 1001, 2001, 3001, 4001, 5001, 1002, 2002, 3002, 4002, 5002
1004, 2004, 3004, 4004, 5004, 1006, 2006, 3006, 4006, 5006, 1010, 2010, 3010, 4010, 5010, 1011, 2011, 3011, 4011, 5011, 1012, 2012, 3012, 4012, 5012, 1013, 2013, 3013, 4013, 5013, 1015, 1019, 1020, 2020, 3020, 4020, 1023, 2024, 3024, 4024, 5024
Firm Fixed Price (FFP)
1003, 2003, 3003, 4003, 5003, 1005, 2005, 3005, 4005, 5005, 1009, 2009, 3009, 4009, 5009, 1014, 1016, 2016, 3016, 4016, 5016, 1017, 2017, 3017, 4017, 5017, 2026, 3026, 4026, 5026
Fixed-Price-Incentive (FPI)
0905, 1018, 1021, 1025, 1100, 2100, 3100, 4100, 5100, 1300, 2300, 3300, 4300, 5300, 1500, 2500, 3500, 4500, 5500, 1700, 2700, 3700, 4700, 5700
Cost Plus Fixed Fee
(CPFF)
1200, 2200, 3200, 4200, 5200, Cost Reimbursement
(CR) (no fee)
1400, 2400, 3400, 4400, 5400, 1600, 2600, 3600, 4600, 5600, 1800, 2800, 3800, 4800, 5800
To:
HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST/FIXED PRICE) (FEB 1997)
This contract includes the following mixture of cost reimbursement and fixed price line items:
Items Type
0900, 0901, 0902, 0903, 0904 Not Separately Priced (NSP)
0906, 0907, 1000, 2000, 3000, 4000, 5000, 1001, 2001, 3001, 4001, 5001, 1002, 2002, 3002, 4002, 5002
1004, 2004, 3004, 4004, 5004, 1006, 2006, 3006, 4006, 5006, 1008, 2008, 3008, 4008, 5008, 1010, 2010, 3010, 4010, 5010, 1011, 2011, 3011, 4011, 5011, 1012, 2012, 3012, 4012, 5012, 1013, 2013, 3013, 4013, 5013, 1015, 1019, 1020, 2020, 3020, 4020, 1023, 2024, 3024, 4024, 5024
Firm Fixed Price (FFP)
1003, 2003, 3003, 4003, 5003, 1005, 2005, 3005, 4005, 5005, 1007, 2007, 3007, 4007, 5007, 1009, 2009, 3009, 4009, 5009, 1014, 1016, 2016, 3016, 4016, 5016, 1017, 2017, 3017, 4017, 5017, 2026, 3026, 4026, 5026
Fixed-Price-Incentive (FPI)
0905, 1018, 1021, 1025, 1100, 2100, 3100, 4100, 5100, 1300, 2300, 3300, 4300, 5300, 1500, 2500, 3500, 4500, 5500, 1700, 2700, 3700, 4700, 5700
Cost Plus Fixed Fee
(CPFF)
1200, 2200, 3200, 4200, 5200, 1400, 2400, 3400, 4400, 5400, 1600, 2600, 3600, 4600, 5600, 1800, 2800, 3800, 4800, 5800
Cost Reimbursement
(CR) (no fee)
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The description for Items 1001, 2001, 3001, 4001, and 5001 has changed from:
ITEMS 1001, 2001, 3001, 4001, AND 5001: ROLL-ON ROLL-OFF STORAGE CABINET SETS
The Contractor shall fabricate, assemble, integrate, test, inspect, package and deliver Roll-On Roll-Off Storage
Cabinet Sets in accordance with master drawing 20110701 and the Statement of Work.
ITEMS 1001, 2001, 3001, 4001, AND 5001: COMMON TRANSPORT CONTAINER (CTC) SETS WITH
ROLL-ON ROLL-OFF STORAGE CABINETS
The Contractor shall fabricate, assemble, integrate, test, inspect, package and deliver one Common Transport
Container in accordance with drawing 8470212_B and the Statement of Work with following cabinets installed:
One (1) Configuration D Cabinet number: 8480077 manufactured by Turnbull LLC or equivalent
Three (3) Configuration H Cabinet number: 8480228 manufactured by Turnbull LLC or equivalent, deliver one Common Transport Container in accordance with drawing 8470212_B with following cabinets installed
Five (5) Configuration H Cabinet number: 8480228 manufactured by Turnbull LLC or equivalent
Each cabinet will have a set of the following clips:
Cabinet side mounting hardware
(2) 8480168 (left cabinet clip)
(2) 8480156 (center cabinet clip)
(1) 8480221 (right top cabinet clip)
(1) 8480221 (right bottom cabinet clip; different than clip above)
Flexible Infrastructure (FI) side (on ship) mounting hardware (including total 4 pins and 4 lanyards)
(2) 8480135 (left FI clip)
(2) 8480163 (center FI clip)
(1) 8480233 (right top FI clip)
(1) 8480234 (right bottom FI clip)
Note, drawing 8470212_B is a GMM Container that is being re-purposed/re-used as the Common Transport
Container.
The description for Items 1007, 2007, 3007, 4007, and 5007 has been added as follows:
ITEMS 1007, 2007, 3007, 4007, AND 5007: REDUCED WEIGHT OAMCM SETS
The Contractor shall fabricate, assemble, integrate, test, inspect, package and deliver Reduced Weight OAMCM sets in accordance with the Reduced Weight BOA TDP delivered under item 1014, master drawing 8224500, and the
Statement of Work. Testing shall be performed using Mass Model Test Sets provided as Government Furnished
Property (see Attachment J-2).
The description for Items 1008, 2008, 3008, 4008, and 5008 has been added as follows:
ITEMS 1008, 2008, 3008, 4008, AND 5008: OAMCM MODULE KITS
The Contractor shall fabricate, assemble, integrate, test, inspect, package and deliver OAMCM Module Kits in accordance with master drawing 8224500 and the Statement of Work.
The list of spares under Items 1011, 2011, 3011, 4011, and 5011 is hereby restated in its entirety as follows:
PART
NUMBER
Cage Code DESCRIPTION QTY
AC280-12 54080 ECU - Q-20 1
8224175-4 53711 Strongback for Q-20s (Q-20 SC) 2
8224639-1 53711 Ladder -(Q-20 SC) 1
S4 3E423 Speedwrench - (Q-20 SC) 1
8224136-2 53711 Motor Assembly (Q-20 SC drawer) 1
8224459-1 53711 Maintenance Cradle Assembly (Q-20 SC) 1
8224458-1 53711 Upper Cradle Assembly (Q-20 SC) 1
8224444-1 53711 Lower Cradle Assembly (Q-20 SC) 1
8351247-3 53711 Sensor Crane Sub-Assembly (Q-20SC) 1
8224158-2 53711 Gearbox Sub-Assembly, Right (Q-20 SC rack) 1
8224158-1 53711 Gearbox Sub-Assembly, Left (Q-20 SC rack) 1
8351007-1 53711 19H Pulley Sub-Assembly 1
8351465-1 53711 Pully, 20 Tooth 1
8351469-1 53711 Flanged Pulley, 40 Tooth Sub-Assembly 1
8350955-2 53711 10th Idler Pulley 1
8224766-3 53711 Tow Boom Plate Assembly - (OAMCM SC) 1
VEL11304 05472 Trolley Motor (OAMCM SC) 1
DK004AR5FN 1FAK9 Trolley Gearbox (OAMCM SC) 1
8224586-9 53711 Trolley Bridge feet (OAMCM SC) 2
8351458-2 53711 Speedwrench - (OAMCM SC) 1
8224765-2 53711 Strong Back Sub-Assembly, (OAMCM SC) 1
8224197-2 53711 Handgrip Controller Sub-Assembly 3
8197093-1 53711 Support Slave Handle Sub-Assembly (MHU-191 adapter) 1
8197093-1 53711 Tow Body Support Sub-Assembly (MHU-191 adapter) 1
8224201-2 53711 Maintenance Stand Sub-Assembly (Q-20 SC) 1
8197335-1 53711 Maintenance Platform Cup Sub-Assembly 1
8197178-1 53711 Stanchion Pad ASM, Short 1
8197178-2 53711 Stanchion Pad ASM, Long 1
102663 56065 Drawer Motor (ALMDS/AMNS SC) 1
8351006-31 53711 Drawer Gearbox (ALMDS/AMNS SC) 1
6393K16 2V507 Manual Wrench for the RMS extending wall (RMS SC) 1
8351099-1 53711 VIDMAR Door stoppers - (RMS SC) 2
8197631-2 53711 Exhaust Hose Tubes - (RMS SC) 1
8351164-2 53711 PEEP Box Cradle - (RMS SC) 1
8224415-1 53711 Damage Control Signal Cable Assembly 1
8224436-2 53711 Actuator Controller Box (Q-20 SC, ALMDS/AMNS SC, OAMCM SC) 1
8351297-38 53711 Cargo Door Bumpers 10
8224365-2 53711 Communications box 5
8224420-7 53711 28 VDC Exterior Connector 1
8224420-23 53711 440VAC, 60 Hz Exterior Connector 1
8224420-24 53711 115 VAC, 400 Hz Exterior Connector 1
8224420-26 53711 115 VAC, 60 Hz Exterior Connector 1
8224434-3 53711 115 VAC 60 Hz Cable 1
8224433-1 53711 28 VDC Cable 1
8224431-1 53711 115 VAC 400 Hz Cable 1
8224432-1 53711 440 VAC 60 Hz Cable 1
The description for Items 1013, 2013, 3013, 4013, and 5013 has changed from:
ITEMS 1013, 2013, 3013, 4013, AND 5013: STEEL MCM MISSION MODULE SETS
The Contractor shall fabricate, assemble, integrate, test, inspect, package and deliver Steel MCM Mission Module
Sets in accordance with drawing 8224325 and 8224500-3, and the Statement of Work. Each set shall include one
ALMDS/AMNS Support Container (P/N: 8224600-2) one AN/AQS-20A Support Container (P/N: 8224100-2), and one CSC (P/N: 8470515-3). Testing shall be performed using Mass Model Test Sets provided as Government
Furnished Property (see Attachment J-2).
ITEMS 1013, 2013, 3013, 4013, AND 5013: STEEL MCM MISSION MODULE SETS
The Contractor shall fabricate, assemble, integrate, test, inspect, package and deliver Steel MCM Mission Module
Sets in accordance with drawing 8224325 and 8224500-3, and the Statement of Work. Each set shall include one
ALMDS/AMNS Support Container (P/N: 8224600-2) one AN/AQS-20A Support Container (P/N: 8224100-2), one
OAMCM, and one CSC (P/N: 8470515-3). Testing shall be performed using Mass Model Test Sets provided as
Government Furnished Property (see Attachment J-2).
The description for Item 1021 has changed from:
ITEM 1021: DESIGN TRANSITION SERVICES FOR THE REDUCED WEIGHT ANTI-SUBMARINE
WARFARE (ASW) MISSION MODULE
The Contractor shall perform non-recurring engineering services on a level-of-effort basis in accordance with the
Statement of Work with a goal of producing a production-ready Reduced Weight Anti-Submarine Warfare (ASW)
Mission Module TDP. The TDP shall incorporate drawings COFFERDAM:LCSMPI-DWG-0043,44,45, EDMASW-0116, MFTA SUPPT ASSEMBLY: LCSMPI-DWG-0033,34,35, TRS-1 ISS: EDMASW-0090,89,85, DOLLY ASSEMBLY: EDMASW-0096,98,99,100,103.
ITEM 1021: DESIGN TRANSITION SERVICES FOR THE REDUCED WEIGHT ANTI-SUBMARINE
WARFARE (ASW) MISSION MODULE
The Contractor shall perform non-recurring engineering services on a level-of-effort basis in accordance with the
Statement of Work with a goal of producing a production-ready Reduced Weight Anti-Submarine Warfare (ASW)
Mission Module TDP. The TDP shall incorporate drawings EDM MASS OUTFITTING: EDMASW-0080, A-
FRAME: EDMASW-0001, SONOBUOY CABINETS: EDMASW-0120, OUTFITTING ITEMS: EDMASW-
0039,46,56,57,58,59,63,68,70, COFFERDAM: LCSMPI-DWG-0043,44,45,EDMASW-0116, MFTA SUPPT
ASSEMBLY: LCSMPI-DWG-0033,34,35, TRS-1 ISS: EDMASW-0090,89,85, DOLLY ASSEMBLY:
EDMASW-0096,98,99,100,103.
The description for Items 2024, 3024, 4024, and 5024 has changed from:
ITEMS 2024, 3024, 4024, AND 5024: ASW MISSION MODULES
The Contractor shall fabricate, assemble, integrate, test, inspect, package and deliver ASW Mission Modules in accordance with drawings EDM MASS OUTFITTING: EDMASW-0080, A-FRAME: EDMASW-0001, SONOBUOY CABINETS: EDMASW-0120, OUTFITTING ITEMS: EDMASW-0039,46,56,57,58,59,63,68,70, COFFERDAM:LCSMPI-DWG-0043,44,45,EDMASW-0116, MFTA SUPPT ASSEMBLY: LCSMPI-DWG-
0033,34,35, TRS-1 ISS: EDMASW-0090,89,85, DOLLY ASSEMBLY: EDMASW-0096,98,99,100,103, and the
Statement of Work.
ITEMS 2024, 3024, 4024, AND 5024: ASW MISSION MODULES
The Contractor shall fabricate, assemble, integrate, test, inspect, package and deliver ASW Mission Modules in accordance with drawings EDM MASS OUTFITTING: EDMASW-0080, A-FRAME: EDMASW-0001, SONOBUOY CABINETS: EDMASW-0120, OUTFITTING ITEMS: EDMASW-0039,46,56,57,58,59,63,68,70, COFFERDAM:LCSMPI-DWG-0043,44,45,EDMASW-0116, MFTA SUPPT ASSEMBLY: LCSMPI-DWG-
0033,34,35, TRS-1 ISS: EDMASW-0090,89,85, DOLLY ASSEMBLY: EDMASW-0096,98,99,100,103, and the
Statement of Work. Each MM component that is fastened to the LCS deck shall include 50 each EDMASW-0085 twistlocks.
Section 1.5 of the Statement of Work has changed from:
1.5 Technical Data Package
The current configuration of the LCS MMs has been integrated and tested and deployed in at-sea environments. The technology maturation process has resulted in a mature product baseline including detailed design documentation, requirements updates, and study results. A technical data package providing relevant drawings, specifications, integration requirements, and applicable government studies performed to date is provided as Government
Furnished Information (GFI) in Contract Attachment J-4.
1.5 Technical Data Package
The current configuration of the LCS MMs has been integrated and tested and deployed in at-sea environments. The technology maturation process has resulted in a mature product baseline for some components that includes detailed design documentation, requirements updates, and study results. A technical data package providing relevant drawings, specifications, integration requirements, and applicable government studies performed to date is provided as Government Furnished Information (GFI) in Contract Attachment J-4. Engineering changes, modifications, and new components are needed for other MM components, as described in this SOW and attached specifications.
Section 3.5.8 Operational Security (OPSEC) Plan of the Statement of Work has been removed in its entirety.
Section 4.1.5.2 of the Statement of Work has changed from:
4.1.5.2 Functional Configuration Audit (FCA)
The Contractor shall provide technical documentation, equipment, facilities and technical services in support of the
Government-run FCA conducted on the first pre-production unit systems (hardware or software) submitted for delivery. Specifically, the Contractor shall respond to audit findings, recommend corrective actions, resolve all deficiencies identified during these audits within 30 calendar days of the FCA, and document the FCA process and results (CDRL B015). The Contractor shall define the as-built design of the pre-production unit. The FCA shall verify and certify that the new product or system functions in accordance with the system performance specifications. The Government representative(s) will conduct the FCA at the Contractor’s facility.
CDRL Data Items:
B015 “Configuration Audit Summary Report, Functional Configuration Audit”
4.1.5.2 Functional Configuration Audit (FCA)
For major changes, such as a significant design change or new supplier, the Contractor shall provide technical documentation, equipment, facilities and technical services in support of the Government-run FCA conducted on the first pre-production unit systems (hardware or software) submitted for delivery. Specifically, the Contractor shall respond to audit findings, recommend corrective actions, resolve all deficiencies identified during these audits within 30 calendar days of the FCA, and document the FCA process and results (CDRL B015). The Contractor shall define the as-built design of the pre-production unit. The FCA shall verify and certify that the new product or system functions in accordance with the system performance specifications. The Government representative(s) will conduct the FCA at the Contractor’s facility.
Section 4.1.13 of the Statement of Work has changed from:
4.1.13 Calibration Objective Quality Evidence (OQE)
The Contractor shall provide all calibration and test data required for the Mission Package Detachment sailors to pass their qualification/certification to use production end items (CDRL Item B046).
CDRL Data Item:
B046 “Technical Report-Study/Services, Consolidated Calibration/Safety Objective Quality
Evidence (OBE)
4.1.13 Calibration Objective Quality Evidence (OQE)
The Contractor shall provide all calibration and test data required for the Mission Package to pass qualification/certification to use production end items (CDRL Item B046).
CDRL Data Item:
B046 “Technical Report-Study/Services, Consolidated Calibration/Safety Objective Quality
Evidence (OBE)
Section 5.4.5 of the Statement of Work has changed from:
5.4.5 Technical Data Package (TDP)
The Contractor shall update and maintain a Product Drawing package for the equipment procured under this contract line. The TDP (CDRLs C013 to C027) shall contain all data sufficient to provide life-cycle support down to the
Lowest Replaceable Unit (LRU) level, at a quality that allows successful Government re-procurement of the end item and components via multiple sources. The Contractor shall include all products in the TDP. The TDP shall contain, as a minimum, the following data as currently defined by the product baseline TDP:
a. All engineering and manufacturing Product Drawings and Associated Lists;
b. Listings of all Contractor Engineering Change Orders (ECOs) or drawing change authorizing documents categorized by ECP;
c. Outstanding SCNs/ECP along with their implementation, or cut-in date;
d. Listings of all TDP documentation and ECOs or authorizing drawing changes documents that describe in detail changes incorporated into engineering drawings;
e. Updates to any of the drawings or specifications delivered in the GFI TDP, with all redline and hanging-paper changes incorporated.
Format shall conform to DoN Policy on Digital Product/Technical Data, dated October 23, 2004.
The Contractor shall update and deliver Work Instructions (WI) based on their internal fabrication processes. The
WIs shall contain all data and information sufficient to manufacture the product (product, system, or equipment) configurations as identified and required under this contract line. The WI shall be identified (CDRL Item C026) and shall include digital photographic images of assembly procedures and any cable dressing techniques. The actual
Work Instruction drawings shall be delivered as a part of the related TDP drawings. The Contractor shall use
Integrated Product Teams to resolve ambiguities and deficiencies found in the TDPs. The Contractor shall identify and implement training of their employees for any critical manufacturing processes as necessary to manufacture successfully the deliverable end items.
C013 “Baseline Description Document
C014 “Program Unique Specification Documents”
C015 “Product Drawings/Models and Associated Lists, Product Drawings”
C016 “Commercial Drawings/Models and Associated Lists”
C017 “Schematic Block Diagrams, Electrical Drawing and Associated List”
C018 “Drawing Number Assignment Report”
C019 “Proposed Critical Manufacturing Process Description (PCMPD)”
C020 “Special Inspection Equipment (SIE) Drawings/Models and Associated Lists”
C021 “Special Tooling (ST) Drawings/Models and Associated Lists”
C022 “Source Control Drawing Approval Request”
C023 “Product Drawings/Models and Associated Lists, Revisions to Existing Drawings”
C024 “Installation Control Drawings”
C025 “Program Unique Specification Documents, Product Specifications”
C026 “Proposed Critical Manufacturing Process Description (PCMPD), Work Instructions”
C027 “Supplemental Provisioning Technical Data (SPTD)”
5.4.5 Technical Data Package (TDP)
The Contractor shall update and maintain a Product Drawing package for the equipment procured under this contract line. The TDP (CDRLs C013 to C027) shall contain all data sufficient to provide life-cycle support down to the
Lowest Replaceable Unit (LRU) level, at a quality that allows successful Government re-procurement of the end item and components via multiple sources. The Contractor shall include all products in the TDP. The TDP shall contain, as a minimum, the following data as currently defined by the product baseline TDP:
a. All engineering and manufacturing Product Drawings and Associated Lists;
b. Listings of all Contractor Engineering Change Orders (ECOs) or drawing change authorizing documents categorized by ECP;
c. Outstanding SCNs/ECP along with their implementation, or cut-in date;
d. Listings of all TDP documentation and ECOs or authorizing drawing changes documents that describe in detail changes incorporated into engineering drawings;
e. Updates to any of the drawings or specifications delivered in the GFI TDP, with all redline and hanging-
C013 “Baseline Description Document
C014 “Program Unique Specification Documents”
C015 “Product Drawings/Models and Associated Lists, Product Drawings”
C016 “Commercial Drawings/Models and Associated Lists”
C017 “Schematic Block Diagrams, Electrical Drawing and Associated List”
C018 “Drawing Number Assignment Report”
C019 “Proposed Critical Manufacturing Process Description (PCMPD)”
C020 “Special Inspection Equipment (SIE) Drawings/Models and Associated Lists”
C021 “Special Tooling (ST) Drawings/Models and Associated Lists”
C022 “Source Control Drawing Approval Request”
C023 “Product Drawings/Models and Associated Lists, Revisions to Existing Drawings”
C024 “Installation Control Drawings”
C025 “Program Unique Specification Documents, Product Specifications”
C027 “Supplemental Provisioning Technical Data (SPTD)”
Section 6.0 of the Statement of Work has changed from:
6.0 Environmental Testing
(Applicable to CLINs 1015, 1019, 1023, 1026)
In addition to the general requirements described in Section 3.0, unique requirements for Environmental Testing are described below.
The Contractor shall execute a test program for the applicable hardware associated with CLINs 1016, 1017, 1020, 2024, and 2027, when each option is exercised, and complete the testing identified in Table 6-1, below, as modified by any individual requirements in the individual Product Performance Specifications. The Contractor shall develop and deliver a test plan (including a test program schedule), test procedures (CDRL D001), and a test report (CDRL
D002) identifying the results of the testing. The Contractor shall repair and refurbish the test article as necessary in order to conduct each successive test, and then repair and refurbish the test article in order to allow it to successfully pass the production acceptance testing. This effort and scope does not include any redesign engineering effort necessary to revise the product design if the test results are not successful, but does include the requirement to provide recommendations on future engineering work that may be useful in improving the product performance, which would be separately funded, if desired.
Table 6-1 Environmental Testing
Test Name Standard
Vibration MIL-STD-167-A
EMC MIL-STD-461F
Shock MIL-STD-901D
Environmental, including:
Sea Packaging, Handling, Storage and Transportation
(PHS&T)
Air PHS&T
Road PHS&T
Rail PHS&T
Common Environment Requirements Document (CERD) /
Common Logistics Requirement Document (CLRD)
Salt/Fog
Humidity
Extreme Temperature
Settling Dust
Blowing Sand
MIL-STD-810G
Watertight Best Commercial Practice
Structural and Accuracy Performance Best Commercial Practice
Rivet Analysis Best Commercial Practice
D001 “Test Plans, Test Procedures, Environmental Testing”
D002 “Test/Inspection Report, Environmental Testing”
6.0 Environmental Testing
(Applicable to CLINs 1015, 1019, 1023, 1026)
In addition to the general requirements described in Section 3.0, unique requirements for Environmental Testing are described below.
The Contractor shall execute a test program for the applicable hardware associated with CLINs 1016, 1017, 1020, 2024, and 2027, when each option is exercised, and complete the testing identified in Table 6-1, below, as modified by any individual requirements in the individual Product Performance Specifications. The Contractor shall develop and deliver a test plan (including a test program schedule), test procedures (CDRL D001), and a test report (CDRL
D002) identifying the results of the testing. The contractor shall conduct vibration and shock at the end of the test program. The contractor shall conduct functional testing prior to the completion of each step in the test program.
After completion of test sequence, the contractor shall contactor shall run the production acceptance testing to determine condition of the test article.