About this file

Attachment J-8 Facilities Maintenance Work Specification Template dtd 23 Jun 2015

View the file

Other files

File Type Posted
Conformed_Amend_0007_to_N00024-16-R-4319.docx DOCX document
Amend_0007_to_N00024-16-R-4319.pdf PDF
Amend_0006_to_N00024-16-R-4319.pdf PDF
N00024-16-R-4319_PPI_Response_48.docx DOCX document
Conformed_Amend_0006_to_N00024-16-R-4319.docx DOCX document
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_5_May_2016.xlsx XLSX spreadsheet
Amend_0005_to_N00024-16-R-4319.pdf PDF
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_2_May_2016.xlsx XLSX spreadsheet
N00024-16-R-4319-0004.pdf PDF
Conformed_N00024-16-R-4319.pdf PDF
N00024-16-R-4319_PPI_Response_46.pdf PDF
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_11_Apr_2016.xlsx XLSX spreadsheet
N00024-16-R-4319_PPI_Response_45.pdf PDF
N00024-16-R-4319-0003.pdf PDF
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_6_Apr_2016.xlsx XLSX spreadsheet
Conformed_0002_to_N00024-16-R-4319.docx DOCX document
Amend_0002_to_N00024-16-R-4319.pdf PDF
Amend_0001_to_N00024-16-R-4319.pdf PDF
Attachment_J-11_Logistics_Mgmt_Info_Wkshts_dtd_3_Mar_2016.docx DOCX document
Attachment_S-1_Request_For_Pre-Proposal_Information_Form_15_March_2016.docx DOCX document
Exhibits_A B C__SEC_East_CDRLs_dtd_3_Mar_2016.pdf PDF
Attachment_J-4_LCSRON_Compartment_Cleaning_Instruction_(COMLCSRONONEINST_4790.8)_dtd_24_Jun_2014.pdf PDF
Attachment_S-2_Technical_Capabilities_Data_Sheet_15_March_2016.docx DOCX document
Attachment_J-3_Current_Version_of_the_Naval_Sea_Logistics_Center_(NAVSEALOGCEN)_Force_Revision_(FR).docx DOCX document
Attachment_J-7_PMS_Reporting_Template_dtd_3_Mar_2016.pdf PDF
Attachment_S-3_Past_Performance_Questionnaire_15_March_2016.docx DOCX document
Attachment_J-5_TUM_Rev_7_dtd_21_Nov_2013.pdf PDF
Attachment_J-12B_LCS_1_Class_Paint_Schedule_dtd_01_Nov_2004.pdf PDF
Attachment_J-20_DD_Form_254_dtd_11_Feb_2016.pdf PDF
Attachment_J-1_Eligibility_Criteria_Data_Sheet_15_March_2016_.docx DOCX document
Attachment_J-6_Work_Authorization_Form_dtd_3_Mar_2016.pdf PDF
Attachment_J-9_PROVISIONING_REQUIREMENTS_INTRODUCTION_dtd_3_Mar_2016.docx DOCX document
Attachment_J-12A__LCS_Class_Paint_Specifications_3_Mar_2016.pdf PDF
Attachment_J-12C__LCS_1_Paint_Scheme_-_Cammo_-_Superstructure_and_Freeboard_dtd_3_Mar_2016.pdf PDF
N00024-16-R-4319_Final_Solicitation.docx DOCX document
Attachment_J-13_PMS_505_Instructions_for_Seaframe_Mission_Critical_Systems_dtd_3_Dec_2014.docx DOCX document
Attachment_J-10_PROVISIONING__STATEMENT_OF_WORK_dtd_3_Mar_2016.docx DOCX document
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_4_Mar_2016.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Facilities Maintenance Work Specification Template

Ship: LCS CLASSITEM NO.897-11-002
COAR: N/APCN: None
CWT FILE NO:CMP: N/A
REVISED: 20150623PLANNER: N/A

1. SCOPE:

1.1. Title: Littoral Combat Ship Facilities Maintenance (FM) and Corrosion Control; accomplish

1.2. Location of Work

1.2.1. Throughout the Ship

1.3. Identification

1.3.1. Not Applicable

1.4 (Security as required)

2. REFERENCES

2.1. Standard Items

2.2. NAVSEA S6480-A4-CAT-010: Authorized Chemical Cleaning Products and Dispensing Systems Catalog

2.3 COMLCSRONONEINST 4790.8 Littoral Combat Ship Compartment Cleaning Plan

3. REQUIREMENTS:

3.1. Accomplish Housekeeping and Industrial Cleaning in locations as designated by the SUPERVISOR in accordance with 2.2 and 2.3.

3.1.1. Submit one legible copy, in approved transferrable media, of an FM Surveillance Log to be used as a means of planning, tracking, and coordinating the accomplishment of contractor work no later than 7 days prior to the start of work.

3.1.2. The FM Surveillance Log shall be revised daily to include additions, deletions, modifications, progress, and completions.

3.1.2.1. Submit one legible copy, in approved transferrable media, of the revised FM Surveillance Log when requested by the SUPERVISOR.

3.1.3. Accomplish a visual inspection of each space to be cleaned for existing preservation coating, areas of corrosion or deterioration, and missing/damaged/deteriorated lagging.

3.1.3.1. Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.1.2 to the SUPERVISOR.

3.2. Accomplish the requirements of 009-32 of 2.1 (specific table) for XX square footage as designated by the SUPERVISOR.

3.3. Remove existing and install new a total of XX square feet of bulkhead plating, XX linear feet of 8 inch firemain lagging, XX linear feet of 6 inch chill water or firemain lagging, XX linear feet of 4 inch chill water or firemain lagging, and XX linear feet of one inch or 2 inch chill water or firemain lagging as designated by the SUPERVISOR

3.3.1. Accomplish the requirements of 009-11 of 2.1.

4. NOTES: None.

5. GOVERNMENT FURNISHED MATERIAL (GFM)

5.1. None.

N00024-16-R-4319 Attachment J-8 Facilities Maintenance Work Specification Template dtd 23 Jun 2015

File details come from the government source that posted it. Updated .