About this file

Attachment J-1 Eligibility Criteria Data Data Sheet dtd 15 Mar 2016

View the file

Other files

File Type Posted
Conformed_Amend_0007_to_N00024-16-R-4319.docx DOCX document
Amend_0007_to_N00024-16-R-4319.pdf PDF
Amend_0006_to_N00024-16-R-4319.pdf PDF
N00024-16-R-4319_PPI_Response_48.docx DOCX document
Conformed_Amend_0006_to_N00024-16-R-4319.docx DOCX document
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_5_May_2016.xlsx XLSX spreadsheet
Amend_0005_to_N00024-16-R-4319.pdf PDF
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_2_May_2016.xlsx XLSX spreadsheet
N00024-16-R-4319-0004.pdf PDF
Conformed_N00024-16-R-4319.pdf PDF
N00024-16-R-4319_PPI_Response_46.pdf PDF
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_11_Apr_2016.xlsx XLSX spreadsheet
N00024-16-R-4319_PPI_Response_45.pdf PDF
N00024-16-R-4319-0003.pdf PDF
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_6_Apr_2016.xlsx XLSX spreadsheet
Conformed_0002_to_N00024-16-R-4319.docx DOCX document
Amend_0002_to_N00024-16-R-4319.pdf PDF
Amend_0001_to_N00024-16-R-4319.pdf PDF
Attachment_J-11_Logistics_Mgmt_Info_Wkshts_dtd_3_Mar_2016.docx DOCX document
Attachment_J-8_Facilities_Maintenance_Work_Specification_Template_dtd_23_Jun_2015.docx DOCX document
Attachment_S-1_Request_For_Pre-Proposal_Information_Form_15_March_2016.docx DOCX document
Exhibits_A B C__SEC_East_CDRLs_dtd_3_Mar_2016.pdf PDF
Attachment_J-4_LCSRON_Compartment_Cleaning_Instruction_(COMLCSRONONEINST_4790.8)_dtd_24_Jun_2014.pdf PDF
Attachment_S-2_Technical_Capabilities_Data_Sheet_15_March_2016.docx DOCX document
Attachment_J-3_Current_Version_of_the_Naval_Sea_Logistics_Center_(NAVSEALOGCEN)_Force_Revision_(FR).docx DOCX document
Attachment_J-7_PMS_Reporting_Template_dtd_3_Mar_2016.pdf PDF
Attachment_S-3_Past_Performance_Questionnaire_15_March_2016.docx DOCX document
Attachment_J-5_TUM_Rev_7_dtd_21_Nov_2013.pdf PDF
Attachment_J-12B_LCS_1_Class_Paint_Schedule_dtd_01_Nov_2004.pdf PDF
Attachment_J-20_DD_Form_254_dtd_11_Feb_2016.pdf PDF
Attachment_J-6_Work_Authorization_Form_dtd_3_Mar_2016.pdf PDF
Attachment_J-9_PROVISIONING_REQUIREMENTS_INTRODUCTION_dtd_3_Mar_2016.docx DOCX document
Attachment_J-12A__LCS_Class_Paint_Specifications_3_Mar_2016.pdf PDF
Attachment_J-12C__LCS_1_Paint_Scheme_-_Cammo_-_Superstructure_and_Freeboard_dtd_3_Mar_2016.pdf PDF
N00024-16-R-4319_Final_Solicitation.docx DOCX document
Attachment_J-13_PMS_505_Instructions_for_Seaframe_Mission_Critical_Systems_dtd_3_Dec_2014.docx DOCX document
Attachment_J-10_PROVISIONING__STATEMENT_OF_WORK_dtd_3_Mar_2016.docx DOCX document
Attachment_J-2_Labor_and_Material_Price_Sheet_dtd_4_Mar_2016.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELIGIBILITY CRITERIA DATA SHEET

MASTER SHIP REPAIR AGREEMENT (MSRA)

MSRA Number:

DRYDOCK

Drydock Name/Identification: Drydock Owner:

Drydock POC:

POC Phone Number:POC Email Address:
Teaming or Resource Sharing Agreement: YESNO

If not the owner of drydock, and have marked YES to Sharing Agreement, please provide copy.

The proposed drydock is capable of berthing a LCS 1 variant ship and has, at minimum, the following characteristics: YES NO

Drydock Facilities
LCS

Min Water depth (MLW) 35 Feet depends on the type of dock (graving vs floating) and blocks used but LCS 1 variant has a mean draft of 4.34 meters at full load

Electric Power
440 volt/60 amp step down transformer to provide 220 volts and 115 volts 4 lines at 400 amps each with total of 1600Amps
Saltwater
1,000 GPM
Potable Water
4500 GPD @50-55 PSIG
Shore Steam
N/A
Compressed Air
125 PSIG at a minimum of 1600 CFM flow rate
Telephone
15 direct trunk lines connected to municipal telephone system
Waste Water
Ability to accommodate and dispose of 5,000 GPD of effluent,5,000 GPD of

waste water and 500 GPD oily water waste

T-1
4 T-1/ISDN lines capable of delivering Non-secure Internet Protocol Router Network

(NIPRNET) and Secure Internet Protocol Router Network (SIPRNET) service

Has the dry dock has to be certified IAW MIL-STD-1625, Titled “Safety Certification Program for Drydocking Facilities and Shipbuilding Ways for US Navy Ships”? YES NO

FOR GOVERNMENT USE ONLY:

MSRA MEETS ELIGIBILITY REQUIREMENT:

YES

NO

DOCUMENTATION MEETS ELIGIBILITY REQUIREMENT:

YES

NO

N00024-16-R-4319 Attachment J-1 Eligibility Criteria Data Sheet 15 March 2016

File details come from the government source that posted it. Updated .