Exhibit_B.pdf

PDF 519 KB Posted

Attached to
MK48 Heavyweight Torpedo (HWT) Afterbody/Tailcone Notice of Proposed Contract Action
Solicitation number
N00024-15-R-6401
Issued by

About this file

Exhibit B

View the file

Other files

File Type Posted
Q A_Posted_8_Sep_2015.pdf PDF
Q A_Posted_3_Sep_2015.pdf PDF
Attachment_2_via_Amendment_0002_dtd_13_Aug_2015.pdf PDF
N00024-15-R-6401_Conformed_Through_Amendment_0002.pdf PDF
Exhibit_D_via_Amendment_0002_dtd_13_Aug_2015.xlsx XLSX spreadsheet
Q A_via_Amendment_0002_dtd_13_Aug_2015_-_Final.pdf PDF
N00024-15-R-6401_Amendment_0002.pdf PDF
Exhibit_C_via_Amendment_0002_dtd_13_Aug_2015.xlsx XLSX spreadsheet
Exhibit_A_via_Amendment_0002_dtd_13_Aug_2015.pdf PDF
Exhibit_B_via_Amendment_0002_dtd_13_Aug_2015.pdf PDF
Q A_23_July_2015.pdf PDF
N00024-15-R-6401_Conformed_Through_Amendment_0001.pdf PDF
N00024-15-R-6401_-_Amendment_0001.pdf PDF
Attachment_3-_AEPS_Test_Requirements.pdf PDF
Attachment_11_-_Questions_and_Comments_Form.docx DOCX document
Attachment_1_to_Exhibits_A_and_B_-_CDRL_Glossary.pdf PDF
Attachment_20_-_7028_List.pdf PDF
Attachment_10_-_FIT_Process.pdf PDF
Attachment_17-_BIIL_List_Placeholder.pdf PDF
Attachment_19_-_7017_List.pdf PDF
Attachment_13-_Description_of_GFF-GFE_Test_Capabilities.pdf PDF
Responses_to_Industry_DRAFT_RFP_Questions_-_17_July_2015.pdf PDF
Attachment_7_-_GFE.pdf PDF
Attachment_8_-_GFI.pdf PDF
Exhibit_D.xlsx XLSX spreadsheet
Attachment_4_-_AEPS_SRD.pdf PDF
Attachment_16_-_RESERVED.pdf PDF
Attachment_12_-_QASP.pdf PDF
Attachment_5_-_GFF.pdf PDF
Exhibit_C.xlsx XLSX spreadsheet
Attachment_6_-_FOSS-CCS.xlsx XLSX spreadsheet
Exhibit_A.pdf PDF
Attachment_2_-_FA-FAT_Testing_Requirements.pdf PDF
Attachment_14_-_Shipping_Instruction_Data.pdf PDF
Attachment_15-_Terms_of_Use_and_Non-Disclosure_Agreement.pdf PDF
Attachment_1-_Build_to_Print_Technical_Data_Package.pdf PDF
N00024-15-R-6401.pdf PDF
Attachment_9_-_DD254.pdf PDF
Attachment_18_-_Competition_Library_Request_Form.docx DOCX document
DRAFT_N00024-15-R-6401.pdf PDF
Attachment_15_-_Terms_of_Use_and_Non-Disclosure_Agreement.pdf PDF
Attachment_6_-_FOSS-CCS.xlsx XLSX spreadsheet
Attachment_14_-_Shipping_Instruction_Data.pdf PDF
Attachment_4_-_AEPS_SRD.pdf PDF
Attachment_12_-_QASP.pdf PDF
Attachment_8_-_GFI.pdf PDF
Attachment_13-_Description_of_GFF-GFE_Test_Capabilities.pdf PDF
Exhibit_D.xlsx XLSX spreadsheet
Attachment_20_-_7028_List.pdf PDF
Attachment_19_-_7017_List.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit B CDRLs B001 Product Drawings/Models and Associated Lists – Auto Electrical Power Source (AEPS) Test Equipment

B002 Special Inspection Equipment Descriptive Documentation – Auto Electrical Power Source (AEPS) Test

Equipment

B003 Special Inspection Equipment Calibration Procedures – Auto Electrical Power Source (AEPS) Test

Equipment

B004 Test Requirements Document (TRD) – Auto Electrical Power Source (AEPS) Test Equipment

B005 Computer Software Product – Auto Electrical Power Source (AEPS) Test Equipment

B006 Software Documentation – Auto Electrical Power Source (AEPS) Test Equipment

Page 1 of 8 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0005 B TDP _X___ TM _____ OTHER ________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK 48 MOD 7 AB/TC SECTIONS N00024-15-R-6401 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

17. PRICE GROUP

B001 PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS AUTO ELECTRICAL POWER SOURCE (AEPS) TEST EQUIPMENT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-81000E* SOW 3.3.3.3.1, 3.3.3.4.1, 3.3.4.2 PMS404

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED SEE BLOCK 16 SEE BLOCK 16 b. COPIES

8. APP CODE

SEE BLOCK 16

11. AS OF DATE 13. DATE IF SUBSEQUENT

SUBMISSION a. ADDRESSEE Draft

Final

A* SEE BLOCK 16 SEE BLOCK 16 Reg Repo

16. REMARKS PMS404 1 1 0

BLOCK 4: Attached TDP Option Selection Worksheet provides specific requirements.

BLOCK 8: PMS404 is the approving activity and approval will be for format and content only. Allow 60 days for Government review and approval/disapproval. If disapproved, the Contractor shall resubmit within 15 days of receipt of Government comments, addressing/incorporating Government comments. Allow 30 days for Government review and approval/disapproval upon resubmission by the Contractor.

BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other request for this document shall be referred to PEO

SUB (PMS404).

For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 10: Data resubmittal shall occur on base year, and each exercised option years of Contract Line Item Numbers (CLINs) 0005, 0105, 0205, 0305 and 0405.

BLOCK 11: Subsequent draft data submittals shall occur 60 days prior and final submittals shall occur at the time of the first production delivery of the base year of Contract Line Item Number (CLIN) 0003, and each exercised option years of CLINs 0103, 0203, 0303 and 0403. Revisions shall be as required to accommodate changes to the Test Equipment. All data submissions shall have all Change Notices (CNs) and approved Engineering Change Proposals (ECPs) and Notice of Revisions (NORs) incorporated.

BLOCK 12: First delivery is required 30 day prior to hardware Critical Design Review (CDR).

BLOCKS 10,13 & 14b: Second draft data submission will be required 30 days prior to delivery and final data submission will be required at the time of delivery of the first test equipment units (CLIN 0003) and for each exercised option years of CLINs 0103, 0203, 0303 and 0403. All data submissions shall have all CNs and approved ECPs and NORs incorporated.

BLOCK 14: Media Requirements: Distribution and submittal shall be made electronically in the formats specified by the TDP Option Selection Worksheets. Drawings and associated lists shall be provided to NUWCDIVNPT and NUWCDIVKPT. Other addressees shall receive only a notification of delivery.

Distribution Addresses are specified in the CDRL Glossary (Attachment 1 to Exhibit A).

NUWCDIVNPT 1 1 0

NUWCDIVKPT 1 1 0

DCMA 1 1 0

PCO (LTR Only) 1 1 0

15. TOTAL -----------> 5 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

MARK KINNEY PATRICIA KIRKHAM

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 8 Pages

TDP OPTION SELECTION WORKSHEET

SYSTEM: MK 48 MOD 7 HWT AB/TC SECTION DATE PREPARED:

A. CONTRACT NO.

N00024-15-R-6401

B. EXHIBIT/ATTACHMENT NO.

B

C. CLIN

D. CDRL DATA ITEM NO.

B001

1. TDP Level (X and complete as applicable.)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODEL ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) _______ _______________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)

ISO32000 PORTABLE DOCUMENT FORMAT: _______________________

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

HARDCOPY: __________________________________________________

REMARKS: _________________________________________________________

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS:

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: _________________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply)

ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR-OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LIST

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LIST

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LIST

6. ASSOCIATED LISTS (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

D. WIRINGLIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

E. INDENTURE DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100 ENGINEERING

DRAWING PRACTICES WITH

APPENDICES

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF ENGINEERING

DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35 REVISION OF ENGINEERING DRAWINGS AND

ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DATA PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCES

OTHER STANDARDS APPLY AS

DESCRIBED:

COMPANY STANDARDS PERMITTED:

YES NO

8. OTHER TAILORING

Page 3 of 8 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

0005 B TDP _____ TM _____ OTHER _QCIC ___

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK 48 MOD 7 AB/TC SECTIONS N00024-15-R-6401 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

17. PRICE GROUP

B002

SPECIAL INSPECTION EQUIPMENT DESCRIPTIVE

DOCUMENTATION

AUTO ELECTRICAL POWER SOURCE (AEPS) TEST EQUIPMENT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-81006 SOW 3.3.3.3.1, 3.3.3.4.1, 3.3.4.2 PMS404

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED SEE BLOCK 16 SEE BLOCK 16 b. COPIES

A* N/A SEE BLOCK 16 Reg Repo

BLOCK 8: PMS404 is the approving activity and approval will be for format and content only. Allow 60 days for Government review and approval/disapproval. If disapproved, the Contractor shall resubmit within 15 days of receipt of Government comments, addressing/incorporating Government comments. Allow 30 days for Government review and approval/disapproval upon resubmission by the Contractor.

BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other request for this document shall be referred to PEO

SUB (PMS404).

For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 12: The first submission shall be submitted 90 days prior to Production Readiness Review (PRR).

BLOCKS 10 & 13: Subsequent data submittals shall occur 60 days prior to the first production delivery of the base year of Contract Line Item Number (CLIN) 0003, and each exercised option years of CLINs 0103, 0203, 0303 and 0403. Revisions shall be as required to accommodate changes to the Test Equipment SW.

BLOCK 14: Distribution and submittal shall be by electronic media whenever possible. Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.

Text Document: Adobe PDF (.pdf, searchable) or Microsoft Word (.doc) Presentation: Adobe PDF (.pdf, searchable) or Microsoft PowerPoint (.ppt) Spreadsheet: Microsoft Excel (.xls)

The deliverables shall be in accordance with the latest Federal Government Microsoft Office approved version.

Distribution Addresses are specified in the CDRL Glossary (Attachment 1 to Exhibit A).

BLOCK 14b: Draft deliverables are due 30 days prior to final submital for all required submittals.

NUWCDIVNPT 1 1 0

NUWCDIVKPT 1 1 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 8 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

0005 B TDP _____ TM _____ OTHER _QCIC ___

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK 48 MOD 7 AB/TC SECTIONS N00024-15-R-6401 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

B003 SPECIAL INSPECTION EQUIPMENT CALIBRATION PROCEDURES AUTO ELECTRICAL POWER SOURCE (AEPS) TEST EQUIPMENT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-81007 SOW 3.3.3.3.1, 3.3.3.4.1, 3.3.4.2, 3.3.11.2.3.2 PMS404

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED SEE BLOCK 16 SEE BLOCK 16 b. COPIES

BLOCK 8: PMS404 is the approving activity and approval will be for format and content only. Allow 60 days for Government review and approval/disapproval. If disapproved, the Contractor shall resubmit within 15 days of receipt of Government comments, addressing/incorporating Government comments. Allow 30 days for Government review and approval/disapproval upon resubmission by the Contractor.

BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other request for this document shall be referred to PEO

SUB (PMS404).

For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 12: The first submission shall be submitted 90 days prior to Production Readiness Review (PRR).

BLOCKS 10 & 13: Subsequent data submittals shall occur 60 days prior to the first production delivery of the base year of Contract Line Item Number (CLIN) 0003, and each exercised option years of CLINs 0103, 0203, 0303 and 0403. Revisions shall be as required to accommodate changes to the Test Equipment SW.

BLOCK 14: Distribution and submittal shall be by electronic media whenever possible. Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.

Text Document: Adobe PDF (.pdf, searchable) or Microsoft Word (.doc) Presentation: Adobe PDF (.pdf, searchable) or Microsoft PowerPoint (.ppt) Spreadsheet: Microsoft Excel (.xls)

The deliverables shall be in accordance with the latest Federal Government Microsoft Office approved version.

Distribution Addresses are specified in the CDRL Glossary (Attachment 1 to Exhibit A).

BLOCK 14b: Draft deliverables are due 30 days prior to final submital for all required submittals.

NUWCDIVNPT 1 1 0

NUWCDIVKPT 1 1 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 8 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

0005 B TDP _____ TM _____ OTHER _ATTS ___

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK 48 MOD 7 AB/TC SECTIONS N00024-15-R-6401 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

B004 TEST REQUIREMENTS DOCUMENT (TRD) AUTO ELECTRICAL POWER SOURCE (AEPS) TEST EQUIPMENT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ATTS-80041A* SOW 3.3.3.3.1, 3.3.3.4.1, 3.3.4.2, 3.3.11.2.3.3 PMS404

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED SEE BLOCK 16 SEE BLOCK 16 b. COPIES

BLOCK 4: Tailoring

- Section 3.1:

o Delete: “(e.g., tapes, tape manuals, and interface items, etc.)”

- Section 10.2.4:

o Delete: “Abbreviated Test Language for All Systems (ATLAS)” o Replace with: “Software Source Code”

BLOCK 8: PMS404 is the approving activity and approval will be for format and content only. Allow 60 days for Government review and approval/disapproval. If disapproved, the Contractor shall resubmit within 15 days of receipt of Government comments, addressing/incorporating Government comments. Allow 30 days for Government review and approval/disapproval upon resubmission by the Contractor.

BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other request for this document shall be referred to PEO

SUB (PMS404).

For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 12: The first submission shall be submitted 90 days prior to PRR.

BLOCKS 10, 13 & 14b: Subsequent draft data submittals shall occur 60 days prior and final submittals shall occur at the time of the first production delivery of the base year of Contract Line Item Number (CLIN) 0003, and each exercised option years of CLINs 0103, 0203, 0303 and 0403. Revisions shall be as required to accommodate changes to the Test Equipment. All data submissions shall have all Change Notices (CNs) and approved Engineering Change Proposals (ECPs) and Notice of Revisions (NORs) incorporated.

BLOCK 14: Distribution and submittal shall be by electronic media whenever possible. Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.

Text Document: Adobe PDF (.pdf, searchable) or Microsoft Word (.doc) Presentation: Adobe PDF (.pdf, searchable) or Microsoft PowerPoint (.ppt) Spreadsheet: Microsoft Excel (.xls)

The deliverables shall be in accordance with the latest Federal Government Microsoft Office approved version.

Distribution Addresses are specified in the CDRL Glossary (Attachment 1 to Exhibit A).

NUWCDIVNPT 1 1 0

NUWCDIVKPT 1 1 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 6 of 8 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

0005 B TDP _____ TM _____ OTHER _IPSC ___

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK 48 MOD 7 AB/TC SECTIONS N00024-15-R-6401 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

B005 COMPUTER SOFTWARE PRODUCT AUTO ELECTRICAL POWER SOURCE (AEPS) TEST EQUIPMENT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81488 SOW 3.3.3.3.1, 3.3.3.4.1, 3.3.4.2, 3.3.7.3 PMS404

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED SEE BLOCK 16 SEE BLOCK 16 b. COPIES

BLOCK 8: PMS404 is the approving activity and approval will be for format and content only. Allow 60 days for Government review and approval/disapproval. If disapproved, the Contractor shall resubmit within 15 days of receipt of Government comments, addressing/incorporating Government comments. Allow 30 days for Government review and approval/disapproval upon resubmission by the Contractor.

BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other request for this document shall be referred to PEO

SUB (PMS404).

For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 12: The first submission shall be submitted 90 days prior to Production Readiness Review (PRR).

BLOCKS 10 & 13: Subsequent data submittals shall occur 30 days prior to the first production delivery of the base year of Contract Line Item Number (CLIN) 0003, and each exercised option years of CLINs 0103, 0203, 0303 and 0403. Revisions shall be as required to accommodate changes to the Test Equipment SW and to incorporate Government comments and lessons learned from Proof of Manufacture (POM) testing. All data submissions shall have all Change Notices (CNs) and approved Engineering Change Proposals (ECPs) and Notice of Revisions (NORs) incorporated.

BLOCK 14: Distribution and submittal shall be by electronic media whenever possible. Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.

Text Document: Adobe PDF (.pdf, searchable) or Microsoft Word (.doc) Presentation: Adobe PDF (.pdf, searchable) or Microsoft PowerPoint (.ppt) Spreadsheet: Microsoft Excel (.xls)

The deliverables shall be in accordance with the latest Federal Government Microsoft Office approved version.

Distribution Addresses are specified in the CDRL Glossary (Attachment 1 to Exhibit A).

BLOCK 14b: Draft deliverables are due 30 days prior to final submital for all required submittals.

NUWCDIVNPT 1 1 0

NUWCDIVKPT 1 1 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 7 of 8 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

0005 B TDP _____ TM _____ OTHER _IPSC ___

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK 48 MOD 7 AB/TC SECTIONS N00024-15-R-6401 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

B006 SOFTWARE DOCUMENTATION AUTO ELECTRICAL POWER SOURCE (AEPS) TEST EQUIPMENT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81756 SOW 3.3.3.3.1, 3.3.3.4.1, 3.3.4.2, 3.3.5.3, 3.3.7.3 PMS404

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED SEE BLOCK 16 SEE BLOCK 16 b. COPIES

BLOCK 8: PMS404 is the approving activity and approval will be for format and content only. Allow 60 days for Government review and approval/disapproval. If disapproved, the Contractor shall resubmit within 15 days of receipt of Government comments, addressing/incorporating Government comments. Allow 30 days for Government review and approval/disapproval upon resubmission by the Contractor.

BLOCK 9: DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other request for this document shall be referred to PEO

SUB (PMS404).

For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

BLOCK 12: The first submission shall be submitted 90 days prior to Production Readiness Review (PRR).

BLOCKS 10 & 13: Subsequent data submittals shall occur 30 days prior to the first production delivery of the base year of Contract Line Item Number (CLIN) 0003, and each exercised option years of CLINs 0103, 0203, 0303 and 0403. Revisions shall be as required to accommodate changes to the Test Equipment SW and to incorporate Government comments and lessons learned from Proof of Manufacture (POM) testing. All data submissions shall have all Change Notices (CNs) and approved Engineering Change Proposals (ECPs) and Notice of Revisions (NORs) incorporated.

BLOCK 14: Distribution and submittal shall be by electronic media whenever possible. Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government.

Text Document: Adobe PDF (.pdf, searchable) or Microsoft Word (.doc) Presentation: Adobe PDF (.pdf, searchable) or Microsoft PowerPoint (.ppt) Spreadsheet: Microsoft Excel (.xls)

The deliverables shall be in accordance with the latest Federal Government Microsoft Office approved version.

Distribution Addresses are specified in the CDRL Glossary (Attachment 1 to Exhibit A).

BLOCK 14b: Draft deliverables are due 30 days prior to final submital for all required submittals.

NUWCDIVNPT 1 1 0

NUWCDIVKPT 1 1 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 8 of 8 Pages