Laser_Eye_Protection_-_Questions_and_Responses_FBO_Set_2.pdf

PDF 16 KB Posted

Attached to
Laser Eye Protection Threat Spectacles
Solicitation number
N00019-15-P1-PMA202-0006
Issued by

View the file

Other files

File Type Posted
Laser_Eye_Protection_-_DRAFT_SPS_Contract_A-M_FINAL_Amendment_Post_26_Sept_2017.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_6-15-17.docx DOCX document
A006_Presentation_Mod_20170605_FH.doc DOC document
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_1-12-2017.docx DOCX document
LEP_RFP_Industry_Questions_10_January_2017.pdf PDF
A008_CM_Plan.doc DOC document
A013_Systems_Eng_Mgmt_Plan.doc DOC document
Attachment_J-1_-_LEP_SOW_-_2_Dec_2016.docx DOCX document
A015_Prod_Drawi_Models.doc DOC document
Attachment_J-5_-_LEP_SEP_(draft_v0.97.5)_-_8_Dec_2016.pdf PDF
A004_Contractor's_Risk_Management_Plan.doc DOC document
Attachment_L-5,_Vol_4_Cost-Price_-_9_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-4_Vol_3__PP-1_PP_Con_Data_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_Haz_Mat_Mgmt_Prog_Rpt.doc DOC document
A023_Data_Accession_List.doc DOC document
A016_-_OT-16-20052.pdf PDF
A021_Manufacturing_Plan.doc DOC document
A014_Design_Specification.doc DOC document
A016_Test_Plan_and_Proced.doc DOC document
Attachment_L-1_Vol_1_ES_Tables_-_8_Dec_2016_.xlsx XLSX spreadsheet
A002_Program_Management_Plan.doc DOC document
A015_Att_1_Encl_1_CDEX.pdf PDF
A022_FRACAS.doc DOC document
A015_Att_1_Encl_2_DFISv1.0.xlsx XLSX spreadsheet
A007_Minute_Minutes.doc DOC document
A012_-_OT-16-20002.pdf PDF
A018_FEMCA.doc DOC document
Attachment_J-4_-_LEP_Program_DD254_signed_-_8_Dec_2016.pdf PDF
Attachment_J-3_-_Risk_Management_Plan_-_8_Dec_2016.pdf PDF
A003_Integ_Prog_Mgmt__IMS.doc DOC document
A012_RTVM_Performance_Spec.doc DOC document
A006_Presentation.doc DOC document
A010_Haz_Mat_Mgmt_Prog_Plan.doc DOC document
A017_-_OT-16-20001.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A_thru_M_12-13-2016.docx DOCX document
A019_Test-Inspection_Report.doc DOC document
A001_Contracto_Progress_Statu.doc DOC document
Attachment_J-6_-_SECDEF_TRA_Guidance_(Apr_2011)_-_8_Dec_2016.pdf PDF
Attachment_J-2_-_LEP_Performace_Specification_PMA202-11001_R-0.pdf PDF
A020_QA_Program_Plan.doc DOC document
A017_RTVM_Design_Spec.doc DOC document
Attachment_L-7_Vol_2_T-1_Technical_Cross_Reference_Matrix_-_8_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-2_Vol_2_T-2_SB_Goals_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_-_OT-17-20019-_Laser_Eye_Protection_(LEP)_HMMP_Report.pdf PDF
Attachment_J-8_-_LEP_Cross_Ref_Matrix_-_12_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-3_Vol_3_PPQ_-_12_Dec_2016.docx DOCX document
Attachment_J-7_-_LEP_GFP_Worksheet_-_8_Dec_2016.pdf PDF
A009_OPSEC_Plan.doc DOC document
Attachment_L-6_TMSA_-_8_Dec_2016.xlsx XLSX spreadsheet
A015_Att_1_LEP_TDP_Option_Selection_Worksheet-15Nov2016.pdf PDF
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Received Response/Comments /Question to Government Response from Government

1 13-Apr-2015 We suggest the Government consider an LRIP phase after passing the

SVR. The goal of this phase would be to establish yields, understand drivers, improve yields, and validate the manufacturing processes. This would also allow the Government to field test a statistically significant number of spectacles before production. An LRIP quantity of ~400 units is suggested.

The Government will consider your suggestion.

2 13-Apr-2015 Can the Government clarify anticipated production ramp up quantities and time frames? The current SOW indicates production jumping from 80 prototypes used for testing and evaluation to upwards of 1,495 units.

The RFP will clarify anticipated production quantities and time frames.

3 13-Apr-2015 Can the Government clarify what the ISIL is and work is expected of the contractor under section 3.5.10 regarding the NSN and ISIL? Can the

Government also clarify what is meant by the IOC and MSD milestones and how these milestones tie into a timeline for the overall project with respect to other project milestones?

The contractor shall provide an Interim Support Items List (ISIL). The ISIL shall contain the recommended items and quantities determined to be required for removal and replacement between the Initial Operational Capability (IOC) date and Material Support Date (MSD).The information contained in the ISIL will be used to establish NSN's to new items, in addition to

NSN's the ISIL will be used to assist in establishing Maintenance Planning for all assigned new items as per reference MIL-PRF-49506 Appendix B. Initial Operating Capability (IOC) is defined as when the first units will be delivered for use by the Fleet. Material Support Data is defined as when the required parts/items are available to support the end item by the Navy

Supply System.

4 15-Apr-2015 Will the Program Management Team and Technical Team be willing to meet with industry to meet and discuss technology / capability / requirements prior to the RFP release?

The LEP Threat Spectacles Industry Day Announcement posted to FedBizOpps on 24 April

2015 included provisions for one-on-one sessions with the Government LEP Team.

5 15-Apr-2015 Has funding for this procurement been approved? If so, what fiscal year

(FY16?)

Funding for the LEP Threat Spectacle effort has been approved, the estimated timeframe is pending.

6 13-May-2015 Does this procurement include laser eye protection for both pilots and ground crew?

This procurement is for pilot laser eye protection only.

7 13-May-2015 Is a visor part of this procurement? No. This is a spectacles procurement only.

8 13-May-2015 Does contract award occur after Milestone B? Yes.

9 Fi How do you envision the process for fitting spectacles properly to those who will wear them?

The Government envisions minimal fitting time. The Government will use the fit process that the vendor provides with its LEP spectacles. Fitting requirements will be clarified in the

Specification.

10 27-May-2015 What is the meaning of "initial fit time" in the case of a pooled asset? Defined in Section 3.5 of the Specification. Initial fitting requirements will be clarified in the

Specification.

11 27-May-2015 Comment: We believe as a pooled asset the spectacles will not be fitted correctly by everyone and subject those wearing them to potential hazards. We strongly suggest making them assigned to each individual.

Thank you for your recommendation, however, individual assets are not within the scope of this program.

12 27-May-2015 May we please get a list of all PPE for each platforms? Appendix B to the LEP Specification has been updated to include all PPE. Appendix B will be provided with the Draft RFP.

13 27-May-2015 May we please get copies of the charts containing details of the PPE that the staff had during the PPE measurement and examination timeslot during industry day

Yes, this information can be made available.

14 27-May-2015 How is the optimized TopOwl helmet adjusted to accommodate prescription compared to the helmet that was on display for industry day

There is a small amount of adjustment available to accommodate Rx spectacles.

15 2-Jun-2015 Are visors worn with NVGs? What combinations of equipment are used? No visors will be used with LEP spectacle and NVG combinations. Spectacles will be worn with the NVGs.

16 2-Jun-2015 Is this procurement for spectacles only, or are visors also being considered?

This is a spectacles procurement only; a visor capability will be considered at another time.

17 2-Jun-2015 What wavelengths are symbology projected at? P-43 Spectrum is currently included in the LEP Specification.

18 2-Jun-2015 Is there interest in nuclear flash protection or other active protection? No.

File details come from the government source that posted it. Updated .