LEP_RFP_Industry_Questions_10_January_2017.pdf

PDF 203 KB Posted

Attached to
Laser Eye Protection Threat Spectacles
Solicitation number
N00019-15-P1-PMA202-0006
Issued by

View the file

Other files

File Type Posted
Laser_Eye_Protection_-_DRAFT_SPS_Contract_A-M_FINAL_Amendment_Post_26_Sept_2017.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_6-15-17.docx DOCX document
A006_Presentation_Mod_20170605_FH.doc DOC document
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_1-12-2017.docx DOCX document
A008_CM_Plan.doc DOC document
A013_Systems_Eng_Mgmt_Plan.doc DOC document
Attachment_J-1_-_LEP_SOW_-_2_Dec_2016.docx DOCX document
A015_Prod_Drawi_Models.doc DOC document
Attachment_J-5_-_LEP_SEP_(draft_v0.97.5)_-_8_Dec_2016.pdf PDF
A004_Contractor's_Risk_Management_Plan.doc DOC document
Attachment_L-5,_Vol_4_Cost-Price_-_9_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-4_Vol_3__PP-1_PP_Con_Data_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_Haz_Mat_Mgmt_Prog_Rpt.doc DOC document
A023_Data_Accession_List.doc DOC document
A016_-_OT-16-20052.pdf PDF
A021_Manufacturing_Plan.doc DOC document
A014_Design_Specification.doc DOC document
A016_Test_Plan_and_Proced.doc DOC document
Attachment_L-1_Vol_1_ES_Tables_-_8_Dec_2016_.xlsx XLSX spreadsheet
A002_Program_Management_Plan.doc DOC document
A015_Att_1_Encl_1_CDEX.pdf PDF
A022_FRACAS.doc DOC document
A015_Att_1_Encl_2_DFISv1.0.xlsx XLSX spreadsheet
A007_Minute_Minutes.doc DOC document
A012_-_OT-16-20002.pdf PDF
A018_FEMCA.doc DOC document
Attachment_J-4_-_LEP_Program_DD254_signed_-_8_Dec_2016.pdf PDF
Attachment_J-3_-_Risk_Management_Plan_-_8_Dec_2016.pdf PDF
A003_Integ_Prog_Mgmt__IMS.doc DOC document
A012_RTVM_Performance_Spec.doc DOC document
A006_Presentation.doc DOC document
A010_Haz_Mat_Mgmt_Prog_Plan.doc DOC document
A017_-_OT-16-20001.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A_thru_M_12-13-2016.docx DOCX document
A019_Test-Inspection_Report.doc DOC document
A001_Contracto_Progress_Statu.doc DOC document
Attachment_J-6_-_SECDEF_TRA_Guidance_(Apr_2011)_-_8_Dec_2016.pdf PDF
Attachment_J-2_-_LEP_Performace_Specification_PMA202-11001_R-0.pdf PDF
A020_QA_Program_Plan.doc DOC document
A017_RTVM_Design_Spec.doc DOC document
Attachment_L-7_Vol_2_T-1_Technical_Cross_Reference_Matrix_-_8_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-2_Vol_2_T-2_SB_Goals_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_-_OT-17-20019-_Laser_Eye_Protection_(LEP)_HMMP_Report.pdf PDF
Attachment_J-8_-_LEP_Cross_Ref_Matrix_-_12_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-3_Vol_3_PPQ_-_12_Dec_2016.docx DOCX document
Attachment_J-7_-_LEP_GFP_Worksheet_-_8_Dec_2016.pdf PDF
A009_OPSEC_Plan.doc DOC document
Attachment_L-6_TMSA_-_8_Dec_2016.xlsx XLSX spreadsheet
A015_Att_1_LEP_TDP_Option_Selection_Worksheet-15Nov2016.pdf PDF
A024_Logistics_Product_Data.doc DOC document
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEP RFP Industry Questions

ID

Government Reference Document

Government Reference

Page Number

Paragraph Reference In Government

Document Question/Comment Government Response

Contract/SOW/

PSpec Various

Verification testing includes destructive tests, can the government identify the number of DT units intended for qualification testing versus the number of units to support Government ground and flight testing?

The Government cannot identify the number of Development Test (DT) units intended for qualification testing versus the number of units to support Government ground and flight testing.

2 PSpec Page 8 3.8 and 3.9

Verification testing calls for several tests in section 3.8 and 3.9 to be performed with and without Rx component. Do the quantities in CLINs 0002AB (48 units) and 0004AB (9 units) account for enough units to cover all contractor testing and subsequent Government ground and flight testing?

The Government believes that CLINs 0002AB and 0004AB quantities are sufficient to cover all contractor testing and subsequent Government ground and flight testing.

3 SOW

3.19.8 Government

Aircraft Testing. 3.19.8.1

The SOW states “The Contractor shall provide on-site technical assistance during Government Ground and Flight Testing.”

Can the Government provide more specifics (i.e. duration of on-site support) to enable contractor costing?

Duration and timing of the Government Ground and Flight Testing depends on contractor development and production schedules. No additional information is available at this time.

10 January 2017

4 Contract

Section B, Section F Section G, Section

H, Section L

Questions arose regarding the periods of performance for SLINs 000101, 000102, and 000103.

SLINs 000101, 000102, and 000103 are informational and will be used to obligate fiscal year funding for CLIN 0001 on an incremental basis. SLINs 000101, 000102, and 000103 do not have separate periods of performance. CLIN 0001 will commence upon contract award and end upon exercise of Option 0101.

5 Contract Section F

Questions arose regarding the Governments assumptions about the timing for exercise of option clins 0102, 0103, 0104, and 0105.

The Government is assuming CLINs 0102, 0103, 0104, and 0105 will be exercised in the same fiscal year. CLINs 0202 and 0203 will be exercised in the subsequent fiscal year.

6 CDRLs Various Various

Some CDRLs identify government response time to provide feedback (example 10 days in CDRL A001), however other CDRLs do not provide the government response time (example CDRL A013). For IMS planning purposes, can the government please provide durations for each of the CDRLs?

For evaluation purposes, where Government review and approval time is not specified in Block 16, the Offeror shall assume that Government review and approval will require 21 calendar days.

7 Solicitation Section L

Section L, paragraph 3.3a Relevancy (pg 33 of 58) identifies that Annex A should be provided only in electronic format and should not be provided in hard copy.

Paragraph 3.0 and Table G-2 identify that each volume, book and annex shall be submitted as one paper original and additional paper copies. Paragraph 4.1 identifies early submittal requirements for the PP-1, ES-1 and ES-2 tables as well as Annex A and asks for both hard and electronic copies. Please clarify if only electronic copies of Annex A are required, or if both hard and electronic copies are required for the early delivery of past performance information, as well as with the full proposal.

For purposes of early delivery of Past Performance information (Section 4.1), only electronic copies are needed.

For purposes of the Offeror's proposal package, one original and three copies of both paper and electronic format is required as referenced in Table G-2.

8 Contract Page 89 PP-1 Table

The PP-1 table in the Solicitation document does not completely match the table in Attachment L-4. The table does not include a field (row) to insert DUNS.

What version of the table is required for submission?

Please use Attachment L-4 as it was included. Table PP-1 is for example purposes.

9 Contract Page 8 CLIN 0103

CLIN 0103 Rx LRIP Units qty. 5 seems very low. The usual %Rx is somewhere between 10-25% of the spectacles so is the intended qty. actually 35 units. Note that CLIN 0105 and CLIN 0203 sum up to 10% of the original intended total of 3,500 LEP spectacles.

For CLIN 0103, five (5) Rx LRIP units is correct.

10 Contract Page 86 & 91

Volume 3 Past

Performance

Page 86 states "For this volume, the Offeror shall identify all contracts, or those portions of a contract, whose performance is within five years of the proposal due date...". Yet Page 91 under section defining government basis for Not Relevant (NR) sub-paragraph (2 )iv states , “ Contracts, or those portions of the contract, whose performance is older than 5 years from the RFP release date”. Which date applies, proposal due date or RFP release date? Please use RFP release date.