Attachment_L-2_Vol_2_T-2_SB_Goals_-_8_Dec_2016.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Laser Eye Protection Threat Spectacles
Solicitation number
N00019-15-P1-PMA202-0006
Issued by

About this file

Attachment L-2 - SB Goals

View the file

Other files

File Type Posted
Laser_Eye_Protection_-_DRAFT_SPS_Contract_A-M_FINAL_Amendment_Post_26_Sept_2017.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_6-15-17.docx DOCX document
A006_Presentation_Mod_20170605_FH.doc DOC document
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_1-12-2017.docx DOCX document
LEP_RFP_Industry_Questions_10_January_2017.pdf PDF
A008_CM_Plan.doc DOC document
A013_Systems_Eng_Mgmt_Plan.doc DOC document
Attachment_J-1_-_LEP_SOW_-_2_Dec_2016.docx DOCX document
A015_Prod_Drawi_Models.doc DOC document
Attachment_J-5_-_LEP_SEP_(draft_v0.97.5)_-_8_Dec_2016.pdf PDF
A004_Contractor's_Risk_Management_Plan.doc DOC document
Attachment_L-5,_Vol_4_Cost-Price_-_9_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-4_Vol_3__PP-1_PP_Con_Data_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_Haz_Mat_Mgmt_Prog_Rpt.doc DOC document
A023_Data_Accession_List.doc DOC document
A016_-_OT-16-20052.pdf PDF
A021_Manufacturing_Plan.doc DOC document
A014_Design_Specification.doc DOC document
A016_Test_Plan_and_Proced.doc DOC document
Attachment_L-1_Vol_1_ES_Tables_-_8_Dec_2016_.xlsx XLSX spreadsheet
A002_Program_Management_Plan.doc DOC document
A015_Att_1_Encl_1_CDEX.pdf PDF
A022_FRACAS.doc DOC document
A015_Att_1_Encl_2_DFISv1.0.xlsx XLSX spreadsheet
A007_Minute_Minutes.doc DOC document
A012_-_OT-16-20002.pdf PDF
A018_FEMCA.doc DOC document
Attachment_J-4_-_LEP_Program_DD254_signed_-_8_Dec_2016.pdf PDF
Attachment_J-3_-_Risk_Management_Plan_-_8_Dec_2016.pdf PDF
A003_Integ_Prog_Mgmt__IMS.doc DOC document
A012_RTVM_Performance_Spec.doc DOC document
A006_Presentation.doc DOC document
A010_Haz_Mat_Mgmt_Prog_Plan.doc DOC document
A017_-_OT-16-20001.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A_thru_M_12-13-2016.docx DOCX document
A019_Test-Inspection_Report.doc DOC document
A001_Contracto_Progress_Statu.doc DOC document
Attachment_J-6_-_SECDEF_TRA_Guidance_(Apr_2011)_-_8_Dec_2016.pdf PDF
Attachment_J-2_-_LEP_Performace_Specification_PMA202-11001_R-0.pdf PDF
A020_QA_Program_Plan.doc DOC document
A017_RTVM_Design_Spec.doc DOC document
Attachment_L-7_Vol_2_T-1_Technical_Cross_Reference_Matrix_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_-_OT-17-20019-_Laser_Eye_Protection_(LEP)_HMMP_Report.pdf PDF
Attachment_J-8_-_LEP_Cross_Ref_Matrix_-_12_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-3_Vol_3_PPQ_-_12_Dec_2016.docx DOCX document
Attachment_J-7_-_LEP_GFP_Worksheet_-_8_Dec_2016.pdf PDF
A009_OPSEC_Plan.doc DOC document
Attachment_L-6_TMSA_-_8_Dec_2016.xlsx XLSX spreadsheet
A015_Att_1_LEP_TDP_Option_Selection_Worksheet-15Nov2016.pdf PDF
A024_Logistics_Product_Data.doc DOC document
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions **NOTE: This tab contains instructions for completing the Small Business Goals Table**

Instructions: For the purposes of this table, the Offeror shall provide the following information for this solicitation, including all options. Use tab 1 for the prime and tab 2 etc. for each subcontractor as goals for each subcontractor must be listed separately

Row3 Fill in the Offeror's Name.

Row4 The Total Proposed Contract Value.

Row5 The Total $ amount to be Sub-Contracted to large and small businesses.

Cell B7 The Total $ amount to be Sub-Contracted to large businesses.

Cell B8 The Total $ amount to be Sub-Contracted to small businesses.

Cell B9 The Total $ amount to be subcontracted, where:

Total $ (B9) = Large $ (B7) + Small $ (B8)

Cell C7 The % of Total Contract Value for large businesses, where:

% (C7) = Large $ (B7) / Total $ (Row4)

Cell C8 The % of Total Contract Value for small businesses, where:

% (C8) = Small $ (B8) / Total $ (Row4)

Cell D7 The % of Total amount to be Sub-Contracted to large businesses, where:

% (D7) = Large $ (B7) / Total subcontract $ (Row5)

Cell D8 The % of Total amount to be Sub-Contracted to small businesses, where:

% (D8) = Small $ (B8) / Total subcontract $ (Row5)

Cell D9 The % of Total Amount to be Sub-Contracted to large plus small businesses must equal 100%.

Rows 13-17, Columns B-D For each "Small Business (SB) Concern Subcategory" in Rows 13-17, reference the instructions for Cells B8, C8, and D8, respectively, when providing the "$ to be Sub-Contracted" in Column B, "% of Total Contract Value" in Column C, and "% of Total Amount to be Sub-Contracted" in Column D.

Consider Row 13 as an example:

C13 = B13 / Row 4 and D13 = B13 / Row 5

Note: The total amount of $ to be Sub-Contracted for all small business subcategories will not necessarily equal the total amount to be Sub-Contracted to small businesses.

Small Business

Instructions

Prime SB Subcontracting Goals Table T-2 Small Business Goals

Offeror Name
Total Proposed Contract Value (including options)$
Total Amount to be Sub-Contracted$
$ to be Sub-Contracted% of Total Contract Value% of Total Amount to be Sub-Contracted
Large Business
Small Business
Total100%

Small Business (SB) Concern Subcategories (the sum of these small business subcategories will not necessarily equal the Small Business total above): $ to be Sub-Contracted % of Total Contract Value % of Total Amount to be Sub-Contracted

VOSB
SDVOSB
HUBZone
SDB
WOSB

Attachment L-2, Table T-2 Small Business Goals N00019-16-C-0017

File details come from the government source that posted it. Updated .