Attachment_L-3_Vol_3_PPQ_-_12_Dec_2016.docx

DOCX document 26 KB Posted

Attached to
Laser Eye Protection Threat Spectacles
Solicitation number
N00019-15-P1-PMA202-0006
Issued by

About this file

Attachment L-3 - Past Performance Questionnaire

View the file

Other files

File Type Posted
Laser_Eye_Protection_-_DRAFT_SPS_Contract_A-M_FINAL_Amendment_Post_26_Sept_2017.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_6-15-17.docx DOCX document
A006_Presentation_Mod_20170605_FH.doc DOC document
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_1-12-2017.docx DOCX document
LEP_RFP_Industry_Questions_10_January_2017.pdf PDF
A008_CM_Plan.doc DOC document
A013_Systems_Eng_Mgmt_Plan.doc DOC document
Attachment_J-1_-_LEP_SOW_-_2_Dec_2016.docx DOCX document
A015_Prod_Drawi_Models.doc DOC document
Attachment_J-5_-_LEP_SEP_(draft_v0.97.5)_-_8_Dec_2016.pdf PDF
A004_Contractor's_Risk_Management_Plan.doc DOC document
Attachment_L-5,_Vol_4_Cost-Price_-_9_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-4_Vol_3__PP-1_PP_Con_Data_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_Haz_Mat_Mgmt_Prog_Rpt.doc DOC document
A023_Data_Accession_List.doc DOC document
A016_-_OT-16-20052.pdf PDF
A021_Manufacturing_Plan.doc DOC document
A014_Design_Specification.doc DOC document
A016_Test_Plan_and_Proced.doc DOC document
Attachment_L-1_Vol_1_ES_Tables_-_8_Dec_2016_.xlsx XLSX spreadsheet
A002_Program_Management_Plan.doc DOC document
A015_Att_1_Encl_1_CDEX.pdf PDF
A022_FRACAS.doc DOC document
A015_Att_1_Encl_2_DFISv1.0.xlsx XLSX spreadsheet
A007_Minute_Minutes.doc DOC document
A012_-_OT-16-20002.pdf PDF
A018_FEMCA.doc DOC document
Attachment_J-4_-_LEP_Program_DD254_signed_-_8_Dec_2016.pdf PDF
Attachment_J-3_-_Risk_Management_Plan_-_8_Dec_2016.pdf PDF
A003_Integ_Prog_Mgmt__IMS.doc DOC document
A012_RTVM_Performance_Spec.doc DOC document
A006_Presentation.doc DOC document
A010_Haz_Mat_Mgmt_Prog_Plan.doc DOC document
A017_-_OT-16-20001.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A_thru_M_12-13-2016.docx DOCX document
A019_Test-Inspection_Report.doc DOC document
A001_Contracto_Progress_Statu.doc DOC document
Attachment_J-6_-_SECDEF_TRA_Guidance_(Apr_2011)_-_8_Dec_2016.pdf PDF
Attachment_J-2_-_LEP_Performace_Specification_PMA202-11001_R-0.pdf PDF
A020_QA_Program_Plan.doc DOC document
A017_RTVM_Design_Spec.doc DOC document
Attachment_L-7_Vol_2_T-1_Technical_Cross_Reference_Matrix_-_8_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-2_Vol_2_T-2_SB_Goals_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_-_OT-17-20019-_Laser_Eye_Protection_(LEP)_HMMP_Report.pdf PDF
Attachment_J-8_-_LEP_Cross_Ref_Matrix_-_12_Dec_2016.xlsx XLSX spreadsheet
Attachment_J-7_-_LEP_GFP_Worksheet_-_8_Dec_2016.pdf PDF
A009_OPSEC_Plan.doc DOC document
Attachment_L-6_TMSA_-_8_Dec_2016.xlsx XLSX spreadsheet
A015_Att_1_LEP_TDP_Option_Selection_Worksheet-15Nov2016.pdf PDF
A024_Logistics_Product_Data.doc DOC document
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION L – VOLUME 3

PAST PERFORMANCE QUESTIONNAIRE (PPQ)

Within 2 weeks from receipt of this questionnaire return this form to Jamie Billig (PCO), at Email -jamie.billig@navy.mil.

1. CONTRACTOR IDENTIFICATION

a. Contractor: _______________________

b. Program Title: _____________________

c. Contract Number: __________________

d. Type of Contract: ____________Percent Complete: ____________
e. Award Fee (if applicable): _________Percent of Award Fee Received: _________

Note: Whether identified or not, if you have any knowledge of other contracts for the identified contractor, you are requested to complete a questionnaire for each contract or subcontract similar to this acquisition.

2. RESPONDENT IDENTIFICATION

a. Name: ________________________________________________

b. Agency: _______________________________________________

c. Position: _______________________________________________

d. Relation to Program: _____________________________________

e. Phone/Fax Number/Email Address: _________________________

f. Date Questionnaire Completed: ____________________________

3. PROGRAM CHARACTERISTICS

3a. Please provide a short description of the subject contract.

3b. Please check those activities, which are applicable to your program:

LIST A EXAMPLE

a. Laser Eye Protection (LEP) detailed design, integration, testing ____

b. Spectacle frame design, development, testing, and manufacturing___

c. LEP fabrication, assembly ____

d. LEP durability integration____

e. LEP ground testing___

f. LEP flight testing___

g. LEP Maintenance support development___

h. LEP Logistics support development____

i. LEP Training support development____

j. Security program implementation____

k. LEP production____

4. PERFORMANCE LEVELS

4.1 PERFORMANCE GRADES (Use these grades to provide the overall rating where requested below).

Exceptional - Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory - Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal - Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory - Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

4.2 QUESTIONS

4.2.1. TECHNICAL AND QUALITY PERFORMANCE

a. What kind of technical performance problems or strengths were experienced by the contractor?

b. What was the cause of these technical problems or strengths?

c. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.

d. Overall, the contractor's technical performance is rated ________________________.

|_|Exceptional |_|Very Good |_|Satisfactory |_|Marginal |_|Unsatisfactory

4.2.2: SCHEDULE PERFORMANCE

a. What kinds of delivery/schedule problems or strengths were experienced by the contractor?

b. What was the cause of these delivery/schedule problems or strengths?

c. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.

d. Overall, the contractor's delivery/schedule performance is rated _________________.

4.2.3. COST PERFORMANCE

a. What kinds of Cost problems or strengths were experienced by the contractor?

b. If the contractor experienced an overrun please provide the percentage. _________

c. What was the cause of these Cost problems or strengths?

d. If available, provide earned value cost performance measures including indices for cost efficiency (CPI) and schedule efficiency (SPI). Based on this information, please provide a narrative assessment of their performance.

e. To what extent have corrective actions been taken to correct problem(s) identified above and to what extent have the corrective actions been effective? Describe the progress made to date. Also explain to what extent the corrective actions addressed the root cause of the problem(s) and led to systemic improvement such that similar problems would not reoccur.

f. Overall, the contractor's Cost performance is rated ________________________.

4.2.4 MANAGEMENT

4.2.4.1 MANAGEMENT RESPONSIVENSS

What was the contractor’s record of timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, engineering change proposals, or other undefinitized contract actions), the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction?

4.2.4.2 SUBCONTRACT MANAGEMENT

What was the contractor’s success with timely award and management of subcontracts, including whether the contractor met or exceeded small business, small disadvantaged business, small business HUBZone, veteran-owned small business, service disabled veteran owned small business, women-owned small business participation and subcontracting goals?

4.2.4.3 PROGRAM MANAGEMENT AND OTHER MANAGEMENT

a. To what extent does the contractor discharge their responsibility for integration and coordination of all activity needed to execute the contract; identify and apply resources required to meet schedule requirements; assign responsibilities for tasks/actions required by contract; and communicate appropriate information to affected program elements in a timely manner?

b. What were the contractor’s risk management practices, especially the ability to identify risks and formulate and implement risk mitigation plans?

c. If applicable, identify and provide information on any other areas that are unique to the contract, or that cannot be captured elsewhere under the Management Assessment.

4.2.4.4 Small Business Utilization

If this contract contains a small business subcontracting goal, assess compliance with all terms and conditions in the contract relating to Small Business participation (including FAR 52.219-8, Utilization of Small Businesses and FAR 52.219-9, Small Business Subcontracting Plan (when required). Assess any small business participation goals which are stated separately in the contract Assess achievement on each individual goal stated within the contract or subcontracting plan including good faith effort if the goal was not achieved. Check one of the boxes below, noting however when applying the rating definitions for this assessment equate “small business goals” to requirements.

4.2.4.5 Overall Management Assessment

Overall, the contractor's management performance is rated____________________.

4.2.5. OTHER. Is there any other information regarding this acquisition that you think would be helpful to our evaluation? If so please explain. Examples of additional information that could be helpful to our evaluation include information on (1) problems or strengths with regard to key personnel and (2) the kind of business relationship problems or strengths with regard to management of subcontracts, cooperation with business partners/customers, customer satisfaction, etc.

4.3 SUMMARY: If you had the option, knowing what you know today, would you (pick one), 1) definitely would not, 2) probably would not, 3) might, 4) might not, 5) probably would, 6) definitely would award this contract to this contractor, given the choice? Please explain.

Signature _____________________________________________ Date _____________ Please note that electronic signatures are acceptable. An e-mail from the originator of this document will suffice. Signatures (electronic or hand written) verify that the signator completed this form and agrees with the information contained within it.

File details come from the government source that posted it. Updated .