Attachment_L-6_TMSA_-_8_Dec_2016.xlsx

XLSX spreadsheet 180 KB Posted

Attached to
Laser Eye Protection Threat Spectacles
Solicitation number
N00019-15-P1-PMA202-0006
Issued by

About this file

Attachment L-6 - TMSA

View the file

Other files

File Type Posted
Laser_Eye_Protection_-_DRAFT_SPS_Contract_A-M_FINAL_Amendment_Post_26_Sept_2017.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_6-15-17.docx DOCX document
Attachment_J-5_-_LEP_SEP_(draft_v0.97.5)_-_8_Dec_2016.pdf PDF
A004_Contractor's_Risk_Management_Plan.doc DOC document
Attachment_L-5,_Vol_4_Cost-Price_-_9_Dec_2016.xlsx XLSX spreadsheet
A015_Att_1_Encl_1_CDEX.pdf PDF
A022_FRACAS.doc DOC document
Attachment_J-3_-_Risk_Management_Plan_-_8_Dec_2016.pdf PDF
A010_Haz_Mat_Mgmt_Prog_Plan.doc DOC document
A017_-_OT-16-20001.pdf PDF
A001_Contracto_Progress_Statu.doc DOC document
A008_CM_Plan.doc DOC document
A016_-_OT-16-20052.pdf PDF
A002_Program_Management_Plan.doc DOC document
Attachment_L-1_Vol_1_ES_Tables_-_8_Dec_2016_.xlsx XLSX spreadsheet
A003_Integ_Prog_Mgmt__IMS.doc DOC document
A012_RTVM_Performance_Spec.doc DOC document
A006_Presentation.doc DOC document
Laser_Eye_Protection_-_FINAL_SPS_Sections_A_thru_M_12-13-2016.docx DOCX document
A013_Systems_Eng_Mgmt_Plan.doc DOC document
Attachment_J-1_-_LEP_SOW_-_2_Dec_2016.docx DOCX document
Attachment_L-7_Vol_2_T-1_Technical_Cross_Reference_Matrix_-_8_Dec_2016.xlsx XLSX spreadsheet
A015_Att_1_LEP_TDP_Option_Selection_Worksheet-15Nov2016.pdf PDF
Attachment_J-8_-_LEP_Cross_Ref_Matrix_-_12_Dec_2016.xlsx XLSX spreadsheet
A024_Logistics_Product_Data.doc DOC document
Attachment_J-7_-_LEP_GFP_Worksheet_-_8_Dec_2016.pdf PDF
Draft_LEP_Section_M_-_Final_Draft.docx DOCX document
Final_Draft_LEP_SOW_dated_11_August_2016.docx DOCX document
Final_Draft_LEP_SOW_dated_11_August_2016.docx DOCX document
DRAFT_A015_Test_Plan_and_Proced.doc DOC document
Attachment_8_-_Government_Furnished_Property_(GFP)_R1.docx DOCX document
DRAFT_A013_Design_Specification.doc DOC document
DRAFT_A004_Risk_Report.doc DOC document
LEP_Section_C_Cross_Ref_Matrix.xlsx XLSX spreadsheet
DRAFT_A009_Haz_Mat_Mgmt_Prog_Plan.doc DOC document
DRAFT_A006_Minute_Minutes.doc DOC document
Attachment_4_-_N00019-16-P1-PMA-202-0036_BID_DD254_signed.pdf PDF
DRAFT_A017_FEMCA.doc DOC document
DRAFT_A002_Program_Management_Plan.doc DOC document
DRAFT_A016_RTVM_Design_Spec.doc DOC document
Attachment_L-6 _TMSA_TWBS.xlsx XLSX spreadsheet
DRAFT_A008_OPSEC_Plan.doc DOC document
DRAFT_A005_Presentation.doc DOC document
DRAFT_A003_Integ_Prog_Mgmt__IMS.doc DOC document
DRAFT_A022_Data_Accession_List.doc DOC document
Laser_Eye_Protection_-_Personnel_Protective_Equipment_(PPE)_Slides_FBO Industry_Day.pdf PDF
Laser_Eye_Protection_-_DD254_Security_Classification.doc DOC document
Laser_Eye_Protection-Blank_Question_Form.xls XLS spreadsheet
Laser_Eye_Protection_-_Questions_and_Responses_FBO_Set_1.pdf PDF
Laser_Eye_Protection_-_DRAFT_LEP_SOW_19_Mar_15_(FBO).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRA TWBS

DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Information includes Proprietary Information / Critical Technology. Other requests for this document shall be referred to the Naval Air Systems Command (PMA-XXX) or the ITRO.
INSTRUCTIONS (see the TWBS Guidance & TRL Definitions tabs below for add'l guidance).

(1) Fill in the TRA Phase, program ACAT, & program name.

(2) Fill in the program background info, provide a picture of your top level system/subsystem, & provide your program level risk cube.

(3) Provide a description of what constitutes a relevant environment (lab) & operational environment (field) for your system /subsystem, a picture/chart of your overall system /subsystem architecture, & associated technology-related risk cube.

(4) Refer to the sample aircraft system decomposition, & complete the 1st 4 columns for each Technology Element (TE) of your system /subsystem based on your system /subsystem architecture.

(5) Provide a description of each TE by filling in the 5 white boxes identifying the Technology, its Function in the system /subsystem, its Location in the platform, system, or subsystem, the Requirement Reference for this TE, & if this TE can be traced to a KPP. (6) Decide, utilizing the 2 definitions provided in the TWBS Guidance tab at the bottom, if this TE is or is not a CTE. If a CTE, then complete the green section & place a "Y" in the cell for a novel, new, or new application of a technology & also the recommended to be a CTE cell. In the white box, explain why it is novel, new, or a new application. Explain if it's being repackaged such that a new relevant or operational environmental is applicable, & describe the differences between the original & new environments. If it has been modified from prior successful use, explain the extent of the mods & the technological challenges resulting from the mods. If it is expected to operate in an environment and/or achieve a performance beyond its original design intention or demo'd capability, explain & describe the new technological challenges. (7) If not a CTE, then identify if its COTS, modified COTS, repackaged technology, or an extension of, or next generation of an internal developmental effort. Under change description, provide the production part # for unmodified COTS in the pink box, or describe the extent of the mods or repackaging effort in the white box.

(8) Under the CTE/Non-CTE Justification Narrative, regardless of the category chosen for a TE, substantiate the developmental maturity of the TE by providing its heritage/pedigree, quantitative TE demonstration evidence from the prototype or end-item integrated system/subsystem testing in a low or high fidelity lab relevant environment, or simulated or real operational environment, as appropriate (include dates, quantities, lab hrs., platforms, & flight hrs.), & a concluding statement in the adjacent white boxes.

NAVAIR Technology Maturity Self-Assessment (TMSA) Technical Work Breakdown Structure (TWBS) for Laser Eye Protection
Program Background InformationThe ACAT level, the PMA, the MDA, & program master schedule including the Milestone event, items on the critical path, & current status/progress.Picture 1 - Top Level SystemProgram Level RisksPREDICTED TRLCTE DEFINITION: A technology element (TE) is “critical” if the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements,

AND

(2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.

Note to Offeror - By definition, if you assign a TRL to a Technology Element (TWBS Item) you are identifying it as a CTE, i.e. an immature technology. If a Technology Element is not a CTE, then it does not get assigned a TRL.

Relevant Environment Operational Environment Description A relevant environment is a testing environment that simulates both the most important & most stressing aspects of the operational environment. The operational environment includes all weather conditions, day & night-time operations in all USN TMS aircraft. The user must function in this environment with both LEP, Personnel Protective Equipment and helmet mounted displays and devices. Elements of a relevant environment also include the following:

. Curved surface . High humidity . High and Low temperature . Temperature shock . Salt fog environment . Solar radiation

. Laser saturationPicture 2 - Overall System / Subsystem Architecture highlighting the System / Subsystem elements that will be assessed.Associated Technology-Related Risks
INSTRUCTIONS: The following AIRCRAFT SYSTEM decomposition is just an example. Your top level (1.0) system may be a vehicle, a target, a weapon, or a piece of avionics such as a comm system or a landing system. Please populate the TWBS below in accordance with your own system decomposition.
1.0 AIRCRAFT SYSTEM1.1 Air Vehicle System

1.1.1 Fuselage

1.1.2 Wings

1.1.3 Empannage

1.1.4 Nacelle

1.1.5 Flight Controls

1.1.6 Landing Gear

1.1.7 Environmental

1.1.8 Ice Protection

1.1.9 Stores Suspension

1.1.10 Hydraulics

1.1.11 Pneumatics 1.2 Propulsion System

1.2.1 Engines

1.2.2 Monitor & Control

1.2.3 Fuel

1.2.4 Compressed Air

1.2.5 Inlet

1.2.6 Exhaust

1.2.7 Lubrication

1.2.8 Electrical Power 1.3 Crew System

1.3.1 Aircrew

1.3.2 Crew Station

1.3.3 In-flight Protection 1.4 Avionics System

1.4.1 Sensor Systems

1.4.2 Controls & Displays

1.4.3 Vehicle Management

1.4.4 Stores Management

1.4.5 Common Processing

1.4.6 Navigation Systems

1.4.7 Communication Systems

1.4.8 Antenna Systems 1.5 Stores System

1.5.1 Air-to-Air

1.5.2 Air-to-Surface

1.5.3 Expendables

1.5.4 Pods 2.0 TRAINING SYSTEM

2.1 Aircrew Training Devices

2.2 Parts Task Trainers

2.3 Embedded

2.4 Desktop Trainers

2.5 Maintenance Training Devices

2.6 Air Combat Training Systems

2.7 Targets & Scores 3.0 SUPPORT SYSTEM

3.1 Mission Planning System

3.2 Surface Control Systems

3.3 Cround Handling & Support Systems

3.4 Portable Maintenance Aids

3.5 Surface Test & Maintenance Systems

3.6 Launch & Recovery Systems

TWBS #LEVELTECHNOLOGY ELEMENT
(TE)TECHNOLOGY ELEMENT (TE) MAPPINGTECHNOLOGY ELEMENT (TE)
DESCRIPTIONENABLING TECHNOLOGY
(Note: complete this column only if a CTE has been identified for the row.)CHANGE
DESCRIPTIONTECHNOLOGY ELEMENT (TE) CTE / Non-CTE
JUSTIFICATION NARRATIVETECHNOLOGY ELEMENT (TE) TRL JUSTIFICATION
1.01LASER EYE PROTECTION (LEP)The program of record & threshold compliant design for this LASER EYE PROTECTION SYSTEM includes the Frame, Lens, Adhesives, and Other (specify) .
1.12FramesLEPTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
1.22LensLEPThe Lens includes Absorptive technology, Reflective Technology, Optical filtering, and Other (specify).PicturePicture
1.2.13Absorptive TechnologyLENSTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
1.2.23Reflective TechnologyLENSTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
1.2.33Optical FilteringLENSTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
1.2.43other (specify)LENSTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
1.32AdhesivesLEPAdhesives include…(adhesive 1 name), (adhesive 2 name).PicturePicture
1.3.13Adhesive 1 NameAdhesivesTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
1.3.23Adhesive 2 NameAdhesivesTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
1.42other (specify)LEPOther (specify) includes Hardcoatings, Sealants, etc (as appropriate)PicturePicture
1.4.13HardcoatingsOtherTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
1.4.23SealantsOtherTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
2.01SUPPORT SYSTEMDescribe any special handling, packaging,manufacturing, etc related to the concept design and include the technology required to support it.
2.12HandlingSupport systemTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
2.22PackagingSupport systemTechnology: describe the composition of this TE.NOVEL TECHNOLOGYNEW TECHNOLOGYNEW APPLICATION of TECHRECOMMENDED TO BE A CTEENABLING TECHNOLOGY
Critical TE (CTE): describe the component that may drive technology maturity. [An enabling TE is "critical" if: (1) the system being acquired depends on this TE to meet its capability development document (CDD) & capability production document(CPD) requirements, AND (2) this TE or its application is new or novel in an area that poses major technological risk during detailed design or demostration.]COTS or GOTSMODIFIED COTSREPACKAGED TECHNOLOGYCHANGE DESCRIPTION
If the answer to the "MODIFIED COTS or GOTS" or "REPACKAGED TECHNOLOGY" columns is "Yes", then provide a detailed description here of the mod incurred, and/or the new or novel environment, or of the extent of the repackaging.DEVELOPMENTAL ITEMHeritage/Pedigree: of this TE design /development approach. Is it a derivative of a previous design with minor mods, a complete redesign, or a brand new design?
Function: describe the action for which this TE is specially fitted or used in its operational environment.
PicturePlatform Location: describe where this TE resides in the host platform.NNNQuantitative Evidence: this TE has been integrated at the system/subsystem level & demo'ed in the intended relevant (lab) or operational (field) environment (include quantities, platforms, flight hrs, dates).
Requirement Ref: for this TE from CDD, specs, etc.Unmodified COTS Supplier / Production Part #: of this TE.
KPP: traced to this TE.NNNNNConclusion: This TE is not a CTE because ... OR This TE is a CTE because ...
TWBS #LEVELTECHNOLOGY
ELEMENT (TE)TECHNOLOGY

ELEMENT (TE)

MAPPING SPACE for ADDITIONAL NARRATIVE if REQUIRED

CRITICAL TECHNOLOGY ELEMENT (CTE) TECHNOLOGY MATURATION PLANS (TMPs) Once the TRA IRP has identified & scored CTEs above, an associated Technology Maturation Plan (TMP) is required here for each CTE. Update the TWBS CTE TMP whenever progress is achieved.

GUIDANCE for WRITING a TMP:

1) The chinning bar for technological maturity is for each IRP-identified CTE to achieve a TRL 6 by MS-B, a TRL 7 by MS-C, & a TRL 8 by the end of EMD.

2) The TMP should begin by listing the IRP-identified CTE & the reason(s) it was identified as a CTE.

3) Since understanding the importance of a TRL 6 is essential, the TMP should include the OSD definition of TRL 6. (See TRL Definitions tab)

4) The TMP should include subsequent definitions of all the key words identified in the TRL 6 definition.

5) The TMP should focus the rationale provided in the TMP towards addressing the finer points of the subsequent definitions.

6) The TMP should concentrate on a clear & complete definition of what constitutes a "system or subsystem" for the CTE.

7) The TMP should clearly & completely define (for a TRL 6) what constitutes a system/subsystem "relevant environment", with focus on rationale for compliance with a "high-fidelity lab environment".

8) Once these are established, the TMP should include all the steps included in the planned tests & demos with a description of what will be accomplished upon completion of each. 9) The TMP should include all tests & demos leading up to attainment of subsequent TRLs, along with anticipated time frames for each.

10) The TMP shall provide detailed insight into the objective, scope, method, & success criteria for each demonstration event, along with a definitized quantity.

11) The TMP should include "mature" fallback options in case the primary immature approach fails to mature as planned.

12) Evidence should be provided that documents why each alternative is an acceptable solution for technology maturity, performance, cost, & schedule.

13) The TMP should include a definitive time frame off-ramp for each mature fallback option to be exercised without impact to the overall program schedule.

14) The TMP should also identify any External Dependencies, i.e. dependency upon another program or investment to achieve the enabling technology maturity.

15) Once the TMP is established & underway, the CTE maturation progress should be routinely updated in the TWBS in the space provided here at the bottom as per DD Form 1423-1.

16) A CTE's TRL can only advance to the next level once the recorded progress has received concurrence from the TRA IRP.

17) If new CTEs are identified throughout the life of the program, then accordingly a TMP should be generated for each CTE.

TWBS #LEVELTECHNOLOGY
ELEMENT (TE)TECHNOLOGY

ELEMENT (TE)

MAPPINGCTE TECHNOLOGY MATURATION PLAN
Identify the CTE TWBS #TMP for CTE # 1
Identify the CTE TWBS #TMP for CTE # 2
DISTRIBUTION STATEMENT D. Distribution authorized to Department of Defense and U.S. DoD contractors only. Information includes Proprietary Information / Critical Technology. Other requests for this document shall be referred to the Naval Air Systems Command (PMA-XXX) or the ITRO.
This document is a work of the United States Government authored as part of the official duties of employee(s) of the United States Navy. No copyright is claimed in the United States under Title 17, U.S. Code. All other rights are reserved by the United States Government. Any publisher accepting this document for publication acknowledges that the United States Government retains a nonexclusive, irrevocable, worldwide license to prepare derivative works, publish or reproduce the published form of this document, or allow others to do so, for United States Government purposes. This legend must be retained on all copies of this document.

DO NOT REFORMAT &"Arial,Bold Italic"&11For Official Use Only DO NOT REFORMAT

&G NAVAIR TRA CTE TWBS V13, 1/22/2012 (Configuration controlled by the TRA Chairman - DO NOT REFORMAT)&12
&10Pg &P&12 &"Arial,Bold Italic"&11For Official Use Only&D &F

TWBS Guidance

TRA/TMA GENERAL GUIDANCE
TRA Process► PMs have found that the Technology Readiness Assessment (TRA) process is useful in managing technology maturity.
► The TRA process highlights immature technologies usually associated with enabling technologies that may contribute to Program Level Risk areas that require the PM’s attention.► The TRA not only identifies immature technologies but also requires an associated technology maturation plan (TMP) for tracking the maturity progression of those identified immature technologies.

► See NAVAIRINST 3910.1 TRA Process.

TRA

Definition & Authority ► A TRA is a formal, systematic, metrics-based process that assesses the maturity of, and the risks associated with, critical technologies (defined as Critical Technology Elements (CTEs)) to be used in Major Defense Acquisition Systems (MDAPs). CTEs can be hardware (HW) or software (SW). It is conducted for the Program Manager by the NAVAIR TRA Chairman within the NAVAIR ITRO via an Independent Review Panel (IRP) of subject matter experts (SMEs).

► TRA Authority: DoDI 5000.02 establishes a regulatory requirement for TRAs. All Department of Defense (DoD) MDAPs must prepare a TRA at Milestone B of the Defense Acquisition System. Per SECNAVINST 5000.2E, TRAs are required for MS B and MS C. A TRA is only conducted on the actual proposed threshold compliant final design(s).

► Title 10 United States Code (U.S.C.) Section 2366b requires, in part, that the Milestone Decision Authority (MDA) certify that the technology in Major Defense Acquisition Programs (MDAPs) has been demonstrated in a relevant environment (TRL 6) before Milestone B approval.

► DoDI 5000.02 requires Request for Proposal (RFP) language that prevents the award of an EMD contract if it includes technologies that have not been demonstrated to be mature. As such, a generic TRA not based on the planned technical solution is not acceptable. The TRA must be based on the technologies in the system. This means that TRAs must be performed on all the competitors’ proposals in a source selection.

CTE Definition ► CTE DEFINITION: A technology element (TE) is defined as “critical” if the system being acquired depends on that TE to meet its capability development document (CDD) & capability production document (CPD) requirements and if its application is either new or novel in an area that poses major technological risk during detailed design or demonstration.

► NOT A CTE DEFINITION: This TE is NOT “critical” because the system being acquired does depend on this TE to meet operational rqmts with acceptable development cost & schedule, & with acceptable production & operation costs BUT this TE or its application IS NOT considered either new, novel, or in an area that poses a major risk in completing technology maturation development.

► CTE lists of varying origin exist during the TRA. “Candidate” CTEs are can be self-assessed by the program manager (PM), by the Integrated Product Team (IPT), or from the pre-Materiel Solution Analysis (MSA) early evaluations of technology maturity. A final “candidate” CTE list is identified by the IRP & represents the IRP product for CNR concurrence. The term “CTE” is reserved for the final list concurred with by the Chief of Naval Research (CNR). The final list is coordinated with the Director, Research & Development (DRD).

IRP► An Independent Review Panel (IRP) of subject matter experts (SMEs) uses Technology Readiness Levels (TRLs) as the metric to assess CTE maturity.
TRLs►Technology Readiness Levels (TRLs) are not a measure of design validity. Rather, they indicate a level of maturity at the time of CTE measurement. TRLs do not indicate the difficulty in achieving the next TRL level. See TRL Definitions tab.
TMP►An associated Technology Maturation Plan (TMP) is required for each identified candidate CTE. The TMP should identify test events & demonstrations required over definitized periods of time to illustrate the progress from one TRL to the next TRL & subsequent TRLs. The rationale for each event/demonstartion should be provided along with a definitized quantity. In addition, the TMP should identify a possible mature fallback & a time frame or decision point for exercising this optional off ramp. A true TMP is more than simply listing fiscal yrs & associated TRLs.
Formal TRA► The formal TRA complements—but does not in any way preclude—the program manager’s (PM’s) responsibility to pursue all the risk reduction efforts needed to ensure that adequate technological maturity is reached before Milestone B approval is sought.

► As an activity separate from the formal TRA, an early evaluation of technology maturity conducted shortly before Milestone A should be used to support the planning of these risk reduction efforts.

► There is no such thing as an informal TRA. While many assessments of technology maturity will be conducted in the science & technology (S&T) environment & in the context of an acquisition program, the term “Technology Readiness Assessment” applies only to this regulatory requirement.

TMA► A Technology Maturity Assessment (TMA) is a systematic, metrics-based process that assesses the maturity of, & the risk associated with, critical technologies (CTEs) to be used in systems. It follows the same rigor & discipline of a TRA, but it is conducted on a non-finalized design, i.e. system concepts or concept designs during the MS A TD Phase or Pre-MS A on the results of an Analysis of Alternatives (AoA).
Key Players► The Program Manager, the Naval S&T Executive, & the Component Acquisition Executive are the principal stakeholders for the Component (Navy/NAVAIR) conducting the TRA.

► The DRD has primary responsibility for reviewing & evaluating the TRA for the Office of the Secretary of Defense (OSD) for ACAT ID & IAM programs.

► The Component S&T Executive (for Navy CNR) evaluates the TRA for ACAT ICs. The Component S&T Executive can delegate to the appropriate MDAs for ACAT II and below. ► The DRD monitors the TRA process and reports to the DDR&E.

► The IRP of SMEs is responsible for conducting the TRA itself via the NAVAIR TRA Chairman.

Basis of Technology Maturity Assessments Throughout Acquisition ► The disciplined identification of CTEs is important to a program’s success. If a CTE is overlooked & not brought to the requisite maturity level for exploitation at the start of Engineering & Manufacturing Development (EMD), the system performance, program schedule, & overall cost could be jeopardized. On the other hand, if an overly conservative approach is taken & a plethora of technologies are categorized as critical, energy & resources are likely to be diverted from the few technologies that deserve an intense maturation effort. If a disciplined process with due diligence does lead to an inordinate number of CTEs, this process should indicate that the proposed development is reaching too far for its goals.

TRA
TWBS► Two outcomes of the systems engineering approach are important to CTE identification: (1) the functional architecture, which allocates functional & technical performance requirements, & (2) the physical architecture (design), which shows the system design broken down into all its constituent elements (i.e., subsystems & components).

► The functional architecture establishes what the system accomplishes in descriptive & quantitative terms. It provides the well-defined framework around which the physical architecture is conceived & designed & the basis against which the system & its various subelements are tested.

► The physical architecture includes a representation of the SW & HW “products” necessary to realize the concept. The physical architecture forms the basis for design definition documentation (e.g., specs, baselines, the system & SW architectures, & the technical work breakdown structure (TWBS) as distinguished from a programmatic or contractual WBS)).

► The technical WBS (TWBS) has several beneficial attributes for identifying CTEs: (1) It is readily available when system-engineering practices are used, (2) It evolves with the system concept & design, (3) It is composed of all products that constitute a system &, thus, is an apt means to identify all the technologies used by a system, (4) It relates to the functional architecture &, therefore, to the environment in which the system is intended to be employed, (5) It reflects the system design/architecture & the environment & performance envelope for each product in the system, (6) It increases in specificity during development, thereby allowing old CTEs to be updated & new CTEs to be identified.

► The length of the TWBS should be as long as necessary & represent an exhaustive listing of the decomposed existing or conceptual threshold compliant baseline HW & SW design configuration elements (i.e., systems, subsystems, components & devices).

► The TWBS should decompose the design to the lowest level of indenture necessary to conclusively show that the system/subsystem is or is not a CTE by itself (as an integrated product) & that there is or is not a lower level technology component of the system/subsystem that dictates the system is a CTE .

► Do not separate the TWBS into separate HW & SW sections. Instead, embed the SW in its associated system/subsystem items.

► Include a row for anti-tamper (AT), if applicable. If it needs to be addressed in a separate forum, identify it as such. Likewise, for any other potentially classified items state that a separate forum is required.

► It is assumed that what is listed in the TWBS spreadsheet constitutes a threshold compliant design & it is part of the program of record (POR).

SPECIFIC ROW TWBS GUIDANCE
Program Background Information► The ACAT level, the MDA, & program master schedule including the Milestone event, items on the critical path, & current status/progress. Include a top level System picture or diagram. Include the Program Level Risks cube.
Relevant Environment &

Operational Environment Description ► Describe here the CONOPS & what constitutes a relevant environment for your system, & the operational environmental boundaries for your system.

► Operational performance requirements highlighting KPPs in general, & those operational requirements that will be directly influenced by the potential CTEs to be assessed.

► Generally, the requirement statement for your system will provide some description of the environment in which the system is expected/required to operate. This environment can be called the external or imposed environment. It may be natural or man-made, friendly or hostile (e.g., weather, terrain, friendly & hostile jamming, enemy fire, & so forth). Another environment — the one generally more important for identifying & evaluating CTEs — can be called the internal or realized environment. It is derived from the performance required of each design item (product, subsystem, component, TWBS element). Your design analysis should include the required or expected performance envelope & conditions for each TWBS (or system architecture & SW architecture) element.

► Overall system architecture highlighting the CTE system / subsystem elements that will be assessed.

► Include a picture of the overall System / Subsysten Architecture.

► Include a chart on the associated technology-related risks.

SPECIFIC COLUMN TWBS GUIDANCE
TWBS #To numerically separate systems, subsystems, & components of the baseline HW & SW design.
TWBS LEVELTo identify the level of decomposition attained for the item discussed.
TECHNOLOGY ELEMENT (TE)To list the systems, subsystems, & components of the baseline HW & SW design configuration elements corresponding to the TWBS level of decomposition.
TE MAPPINGTo associate each item to an applicable functional category, such as Airframe, Propulsion, Electrical, Avionics, etc.
TECHNOLOGY

ELEMENT (TE)

DESCRIPTIONTechnology: Describe the composition of this technology element.Example: The Piston Assembly (TWBS item) is a mechanical assembly, with 2 each per parent ejector unit (EU) assembly, that extend when pressure is applied, contacting the store.
Function: Describe the action for which this TE is specially fitted or used in its operational environment.Example: To counter aerodynamic forces, the piston assembly ensures that the store releases from the A/C into the free stream at the proper velocity & pitch. The piston assembly contacts the store when it is fully retracted. Upon command from the A/C, during the ejection sequence the piston extends due to rapid entry of pressure from the breech, pushing the store away from the Bomb Rack / platform.
Platform Location: Describe where this TE resides in the host platform.Example: The piston assembly is an integral part of the store ejection structure & is located on the A/C wing station pylon.
Requirement Reference: For this TE from applicable specs, ORD/CDD, & CONOPS, where applicable.
KPP: Traced to this tTE.Example: Release of threshold stores.
ENABLING TECHNOLOGY
NOVEL► A technology could be "novel" if it is unfamiliar, an original concept or approach, a nonexisting technology, or an emerging technology in early development that has never been done before, it is not in production or production representative, & it has never been operated in a relevant (lab) environment or flown in an operational (field) environment. The environment where the technology has been used must be relevant to the application of the technology in the system under consideration. For example, a radio known to work in a pristine electromagnetic environment, would be new or novel in a more challenging or complex electromagnetic environment.
NEW► A technology may be considered "new" if it has only existed for a short time, if it is other than the former or old, or if it is different from one of the same category that has existed previously. A technology may truely be "new", or it may simply be considered or labeled as "new" because it is an upgrade to, modernization of, or the next evolution of an existing technology. For example, a 20-slice toaster may be identified as "new", but it certainly is not novel, & the technology is just an extension of what is well understood. However, if the 20-slice toaster is now expected to work in an environment it was not designed for, then it may be considered new based on the intended operational environment.
► The environment in which the technology will be utilized is key to determining "new" or "novel". How you define the "relevant (lab) or operational (field) environment" is important.► Sometimes CTEs are comprised of several tightly coupled elements. Closer examination may reveal that each element is a CTE whose maturity needs to be evaluated independently. For example, a thorough analysis was conducted on a SW intensive system in order to identify CTEs. These included: .Net Framework – Microsoft programming model & integral Windows runtime component for building XLM Web services & applications consisting of the Common Language Runtime (CLR) & a unified set of class libraries; COM Callable Wrappers – A wrapper around a .NET object that is automatically generated by the .NET Framework CLR; & Runtime Callable Wrappers – A wrapper around (proxy for) a COM object that is generated automatically by the .NET Framework Common Language Runtime. The team could have integrated these 3 tightly coupled elements into a single CTE, however, since each is new or novel & critical to the functionality, it would not have been appropriate to combine the 3 elements into one CTE. Instead, they maintained desegregation.
NEW APPLICATION
of a Technology► Is this technology being applied to solve a problem or meet an operational performance threshold beyond it's original design intention or demonstrated capability? The application can be mission based or local to the design architecture.
► Is this technology going to be operating at or outside of what would be considered to be the normal performance envelope? If so, do the specs address the anticipated / predicted behavior of the technology under these conditions? Consider what is unique or different about the proposed operations environment? Is the physics understood?► The performance being demanded from the technology exceeds previous requirements.

► If more dollars, human resources, or schedule could be applied all within the Program of Record constraints to solve a technology limitation it is most likely not a CTE.

ENABLING TECHNOLOGY
Critical TE (CTE)Describe the component that may drive technology maturity.
[An enabling TE is "critical" if:(1) the system being acquired depends on that TE to meet its capability development document (CDD) & capability production document (CPD) requirements, AND

(2) this TE or its application is either new or novel in an area that poses major technological risk during detailed design or demonstration.]

Representative Questions for Identifying CTEs
Aircraft
SystemAircraft are likely to have CTEs in aerodynamic configuration & controls, airframe structure & aeroelasticity, flight control systems, & propulsion. In addition, rotary-wing A/C have CTEs in power transfer, rotor hub, & blades. CTEs could also be factors in mission equipment, secondary power, environmental control, & other systems, depending on the aircraft’s missions. A variety of methods & facilities are used to demonstrate these different technologies. For example, demonstrations such as analysis, computational fluid dynamics (CFD) investigations, wind tunnel tests, & flight tests are normally used for the aerodynamic configuration & controls. When aerodynamic configurations indicate large departures from existing A/C, free-flight models (manned or unmanned) are sometimes used. Similarly, a variety of methods & facilities are used for airframe, flight control, & other aeronautical disciplines.

Some example questions to ask when trying to identify the CTEs for aircraft development are as follows:

► Aerodynamic Configuration. Does the design incorporate a configuration that has not been used in flight? How similar is the configuration to that of A/C that are successful? Does the configuration impose limitations on control authority, stability, structural rigidity, or strength? Is stability acceptable at high angles of attack? Are stability & control acceptable during configuration changes in flight?

► Flight Performance. Is the lift-to-drag (L/D) ratio being used in range calculations consistent with that being achieved by operating aircraft? Has this L/D ratio been confirmed by wind tunnel tests corrected to full-scale, trimmed conditions? Are takeoff & landing distances based on achievable lift coefficients & installed thrust? ► Control. How is the A/C controlled & how does it interact with the operator? How much autonomy is it required to have? Can it operate without human intervention? Are there safety concerns in autonomous modes?

► Airframe Structure & Weight. Is the structural weight fraction consistent with operating A/C of the same type? Are lower fractions justified by use of more efficient materials or structural designs?