Laser Eye Protection Threat Spectacles
Solicitation number
N00019-15-P1-PMA202-0006
Issued by

About this file

One time DID for CDRL A016

View the file

Other files

File Type Posted
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_6-15-17.docx DOCX document
A006_Presentation_Mod_20170605_FH.doc DOC document
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_1-12-2017.docx DOCX document
A002_Program_Management_Plan.doc DOC document
Attachment_L-1_Vol_1_ES_Tables_-_8_Dec_2016_.xlsx XLSX spreadsheet
A003_Integ_Prog_Mgmt__IMS.doc DOC document
A012_RTVM_Performance_Spec.doc DOC document
A006_Presentation.doc DOC document
Laser_Eye_Protection_-_FINAL_SPS_Sections_A_thru_M_12-13-2016.docx DOCX document
A013_Systems_Eng_Mgmt_Plan.doc DOC document
Attachment_J-1_-_LEP_SOW_-_2_Dec_2016.docx DOCX document
A023_Data_Accession_List.doc DOC document
A011_Haz_Mat_Mgmt_Prog_Rpt.doc DOC document
A016_Test_Plan_and_Proced.doc DOC document
A014_Design_Specification.doc DOC document
A021_Manufacturing_Plan.doc DOC document
A015_Att_1_Encl_2_DFISv1.0.xlsx XLSX spreadsheet
A007_Minute_Minutes.doc DOC document
A012_-_OT-16-20002.pdf PDF
A018_FEMCA.doc DOC document
Attachment_J-4_-_LEP_Program_DD254_signed_-_8_Dec_2016.pdf PDF
A019_Test-Inspection_Report.doc DOC document
Attachment_J-6_-_SECDEF_TRA_Guidance_(Apr_2011)_-_8_Dec_2016.pdf PDF
Attachment_J-2_-_LEP_Performace_Specification_PMA202-11001_R-0.pdf PDF
Laser_Eye_Protection_-_Questions_and_Responses_FBO_RFP_7_Dec_2016.xlsx XLSX spreadsheet
Final_Draft_LEP_SOW_dated_11_August_2016.docx DOCX document
DRAFT_A009_Haz_Mat_Mgmt_Prog_Plan.doc DOC document
DRAFT_A006_Minute_Minutes.doc DOC document
Attachment_4_-_N00019-16-P1-PMA-202-0036_BID_DD254_signed.pdf PDF
DRAFT_A017_FEMCA.doc DOC document
DRAFT_A002_Program_Management_Plan.doc DOC document
DRAFT_A016_RTVM_Design_Spec.doc DOC document
Attachment_L-6 _TMSA_TWBS.xlsx XLSX spreadsheet
DRAFT_A008_OPSEC_Plan.doc DOC document
DRAFT_A005_Presentation.doc DOC document
DRAFT_A020_Manufacturing_Plan.doc DOC document
LEP_SEP_Draft_v.97_scrubbed_12_Sept.pdf PDF
DRAFT_A001_Contracto_Progress_Statu.doc DOC document
DRAFT_A021_FRACAS.doc DOC document
DRAFT_A011_RTVM_Performance_Spec.doc DOC document
DRAFT_A012_Systems_Eng_Mgmt_Plan.doc DOC document
Draft_LEP_Section_M_-_Final_Draft.docx DOCX document
Attachment_6_-_SECDEF_TRA_Guidance_Apr_2011.pdf PDF
Attachment_2_-_LEP_P-SPEC_Final.pdf PDF
Attachment_L-5 _Cost_Attachments.xlsx XLSX spreadsheet
Attachment_3_-_Risk_Management_Plan.pdf PDF
Laser_Eye_Protection_-_Questions_and_Responses_FBO_Set_3.pdf PDF
Laser_Eye_Protection_-_Questions_from_Gov't_to_Vendors_12_June_2015.pdf PDF
LEP_Industry_Day_Brief_13_May_2015_Final.pptx PPTX presentation
Laser_Eye_Protection_-_DRAFT_CLIN_Structure_19_Mar_2015_(FBO).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: TEST PLAN AND PROCEDURES Number: OT-2016-20052Dm'i- 3/ j/Y AMSC Number:

DTIC Applicable:

Preparing Activity: AS/PMA 202 Applicable Forms:

Approval Date: 20160229 Oht£. 3 /I j!.,t, Limitation: NOOO 19-16-Pl-PMA-202-0036 GIDEP Applicable:

Project Number: N/A

Use/relationship: The Test Plan outlines the plans and performance objectives at every level of testing on systems or equipment that include Prototype tests, Qualification tests, First article tests, and Lot inspection tests. The Test Plan provides the procuring activity with the test concept, objectives and requirements to be satisfied, test methods, procedures, elements, responsible activities associated with the testing, measures required and recording procedures to be used.

This Data Item Description (DID) contains the format, content, and intended use information for the data product resulting from the work task described in the contract statement of work. This DID is for one time use for solicitation N00019-16-Pl-PMA-202-0036.

Requirements:

1. Reference documents. None.

2. General. The test plan shall document in detail the contractor' s plan for conducting tests and analyzing the test results to show how the system, when fielded, will satisfy the requirements of the applicable design specification.

3. Format. The plan shall be in contractor ' s format.

4. Contents. The plan shall contain the following:

4.1. Title page. The title page shall include the following :

a. Title of the test(s) to be conducted.

b. Identification of system being tested.

c. Contractor' s name.

d. Contractor number.

e. Security classification.

f. Distribution statement.

4.2. Table of contents. The table of contents shall contain paragraph numbers, paragraph names and page numbers.

4.3. Introduction. Consists of an overview of the objectives of the test plan, including flow diagrams, milestones, personnel participation, locations, schedules, and security measures to be observed. The plan shall include the following:

4.4. Milestones. Identifies the start and expected completion dates of each test to be performed.

4.5. Participation. Identifies the government and contractor participation roles and responsibilities.

4.6. Location. Identifies the facilities where the testing will be performed.

OT-2016-20052

4. 7. Schedule. States when testing will be performed, whether testing is on schedule; if not, what procedures will be taken to meet the schedule.

4.8. Security. Identify and state briefly any security measures of guidelines to be observed.

4.9. Master test list. Lists all tests to be accomplished in the order they are to be performed, to include all tests identified in government performance specification and contractor developed tests. A separate listing for each location shall be provided. Each listing shall include the following:

4.9.1. Test description. Name and brief description of the test to be performed.

4.9.2. Applicable specification(s). The specifications shall be identified as follows:

a. Title and identification number.

b. Paragraph number associated with the tests.

c. Title of test.

4.9.3. Parameters. The number of cycles the test will be performed and selected parameters to be observed.

4.9.4. Special tests. Provides a list of special or unusual tests and examination necessary to verify satisfactory equipment performance to specifications.

4.9.5 . Test classification category. State the functional area of each test performed.

4.9.6. Test objectives. Describes the objectives of each test performed, including the criteria, baseline, duration, and number of times each test should be performed.

a. Success I failure criteria.

b. Baseline.

c. Duration.

d. Quantity of test.

e. Test Item.

4.9.7. Test equipment. List all measurement equipment to be used in the test and identify as follows:

a. Description.

b. Nomenclature.

c. Serial Number.

d. Model number.

e. Manufacturer.

f. Accuracy.

g. Range or spectrum of measurements required.

h. Calibration Requirements and Certifications.

I. Operating Instructions.

4.9.8. Support equipment. List all additional equipment that will be used to perform the tests and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

d. Model number.

e. Manufacturer.

f. Calibration constants.

g. Calibration procedures.

h. Operating instructions.

4.9.9. Special test equipment. List all special test equipment required to be designed or fabricated for use on the program as follows:

a. Description.

b. Nomenclature.

c. Data provided.

4.9.10. Approach. Describe the steps used to perform each test.

4.9.10.1. Step-by-step procedure. The following shall be included for each step of the test(s):

a. Test set-up diagrams, including test equipment connections.

b. Input and output instrumentation points.

c. Test item operating limits and test conditions to be imposed.

d. Performance parameters to be measured.

e. Step-by-step operations to obtain the required data.

f. Caution and safety warnings as appropriate.

4.9.10.2. Data sheets. Data sheets shall be included with the procedure, or be separately attached at the end of all procedures. They shall provide for:

a. Identification of item tested, including model and serial numbers.

b. Recording of test measurements

c. Identification of required or objective performance values, with Tolerances.

d. Identification of applicable procedure paragraphs.

e. Date of test.

f. Signature of technician or inspector performing the tests.

4.9.10.3. Support requirements. Any special support requirement shall be included in this section, such as:

a. Use of special facilities or test ranges.

b. Personnel requirements (numbers, types, qualifications).

c. Unusual electrical, hydraulic, pneumatic, etc., requirements

d. Support equipment requirements.

4.9.11. Instrumentation. Indicates the type and recording devices that will be used and the number and types of parameters to be recorded.

4.9.12. Data reduction and analysis. Describes data to be recorded and the data reduction and analysis techniques that will be used to interpret the data.

4.9.13. Test facilities. Identifies applicable facility and includes a reference to the appropriate facility requirements documents.

End of OT-2016-20052 °"1l- i./J /!?