Laser_Eye_Protection_-_Industry_Day_Questions_13_May_2015.doc

DOC document 26 KB Posted

Attached to
Laser Eye Protection Threat Spectacles
Solicitation number
N00019-15-P1-PMA202-0006
Issued by

About this file

LEP Industry Day Questions for Industry Response

View the file

Other files

File Type Posted
Laser_Eye_Protection_-_DRAFT_SPS_Contract_A-M_FINAL_Amendment_Post_26_Sept_2017.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_6-15-17.docx DOCX document
A006_Presentation_Mod_20170605_FH.doc DOC document
Laser_Eye_Protection_-_FINAL_SPS_Sections_A-M_1-12-2017.docx DOCX document
LEP_RFP_Industry_Questions_10_January_2017.pdf PDF
A008_CM_Plan.doc DOC document
A013_Systems_Eng_Mgmt_Plan.doc DOC document
Attachment_J-1_-_LEP_SOW_-_2_Dec_2016.docx DOCX document
A015_Prod_Drawi_Models.doc DOC document
Attachment_J-5_-_LEP_SEP_(draft_v0.97.5)_-_8_Dec_2016.pdf PDF
A004_Contractor's_Risk_Management_Plan.doc DOC document
Attachment_L-5,_Vol_4_Cost-Price_-_9_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-4_Vol_3__PP-1_PP_Con_Data_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_Haz_Mat_Mgmt_Prog_Rpt.doc DOC document
A023_Data_Accession_List.doc DOC document
A016_-_OT-16-20052.pdf PDF
A021_Manufacturing_Plan.doc DOC document
A014_Design_Specification.doc DOC document
A016_Test_Plan_and_Proced.doc DOC document
Attachment_L-1_Vol_1_ES_Tables_-_8_Dec_2016_.xlsx XLSX spreadsheet
A002_Program_Management_Plan.doc DOC document
A015_Att_1_Encl_1_CDEX.pdf PDF
A022_FRACAS.doc DOC document
A015_Att_1_Encl_2_DFISv1.0.xlsx XLSX spreadsheet
A007_Minute_Minutes.doc DOC document
A012_-_OT-16-20002.pdf PDF
A018_FEMCA.doc DOC document
Attachment_J-4_-_LEP_Program_DD254_signed_-_8_Dec_2016.pdf PDF
Attachment_J-3_-_Risk_Management_Plan_-_8_Dec_2016.pdf PDF
A003_Integ_Prog_Mgmt__IMS.doc DOC document
A012_RTVM_Performance_Spec.doc DOC document
A006_Presentation.doc DOC document
A010_Haz_Mat_Mgmt_Prog_Plan.doc DOC document
A017_-_OT-16-20001.pdf PDF
Laser_Eye_Protection_-_FINAL_SPS_Sections_A_thru_M_12-13-2016.docx DOCX document
A019_Test-Inspection_Report.doc DOC document
A001_Contracto_Progress_Statu.doc DOC document
Attachment_J-6_-_SECDEF_TRA_Guidance_(Apr_2011)_-_8_Dec_2016.pdf PDF
Attachment_J-2_-_LEP_Performace_Specification_PMA202-11001_R-0.pdf PDF
A020_QA_Program_Plan.doc DOC document
A017_RTVM_Design_Spec.doc DOC document
Attachment_L-7_Vol_2_T-1_Technical_Cross_Reference_Matrix_-_8_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-2_Vol_2_T-2_SB_Goals_-_8_Dec_2016.xlsx XLSX spreadsheet
A011_-_OT-17-20019-_Laser_Eye_Protection_(LEP)_HMMP_Report.pdf PDF
Attachment_J-8_-_LEP_Cross_Ref_Matrix_-_12_Dec_2016.xlsx XLSX spreadsheet
Attachment_L-3_Vol_3_PPQ_-_12_Dec_2016.docx DOCX document
Attachment_J-7_-_LEP_GFP_Worksheet_-_8_Dec_2016.pdf PDF
A009_OPSEC_Plan.doc DOC document
Attachment_L-6_TMSA_-_8_Dec_2016.xlsx XLSX spreadsheet
A015_Att_1_LEP_TDP_Option_Selection_Worksheet-15Nov2016.pdf PDF
Show 40 more

Latest 50 of 104 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Laser Eye Protection Threat Spectacles / Questions from the Government to Industry Solicitation Number: N00019-15-P1-PMA202-0006

DISCLAIMER:

THIS IS NOT A REQUEST FOR PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS ANNOUNCEMENT IS STRICTLY VOLUNTARY.

Primary Point of Contact:

Secondary Point of Contact:

Tyesha Parker, Jamie D Billig, Contract Specialist

Procuring Contracting Officer tyesha.parker@navy.mil jamie.billig@navy.mil

1. Do you have an Rx solution? If so, can you comment on the design?

2. Do you have any products that could meet the expanded-area prism requirements without modification? Do you have any products that could meet the expanded-area prism requirements with modification? If so, how extensive would the modifications need to be?

3. Do you have, or could you develop, a product that could meet the weight requirements included in the draft Spec (25g without prescription, 40g with prescription) while still meeting the remaining requirements? If not, how close to the weight requirement do you think you could come?

File details come from the government source that posted it. Updated .