MOC-167-1 - Refurbishment of Water Tight Closures.pdf

PDF 23 KB Posted

Attached to
RFQ 1305M223QNMAN0111 FY24 Dry Dock Repairs NOAA Ship FERDINAND HASSLER
Solicitation number
1305M223QNMAN0111
Issued by

About this file

This document outlines specifications for refurbishing watertight doors, hatches, and scuttles aboard NOAA vessels. The specifications require removing all closures and transporting them to a machine shop for overhaul, including completely disassembling and cleaning components, performing welding repairs as needed, applying new preservation coatings, reassembling with new components like seals and fasteners, adjusting each closure's operation and lubricating mechanisms. Tests must be conducted including a chalk test ensuring proper contact and seal, an operational test, and a water hose test at 50 PSI for weather-tight closures to verify no leakage. Condition reports must be submitted to the Contracting Officer's Technical Representative within 24 hours of inspections or tests. The related federal contract opportunity is a request for quotation for dry dock repairs to the NOAA ship Ferdinand Hassler, issued by the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files

File Type Posted
Summit Appliance Use and Care Guide.pdf PDF
M286_-085_FA27_07 Outfit and Accomodation Arrangement Drawing.pdf PDF
Amendment A0004.pdf PDF
Amendment A0003.pdf PDF
Gauge Calibration List pdf.pdf PDF
Galley Frige Name Plate.jpg JPG image
Gauge Propeller Sample Report.pdf PDF
Gauge Example Report 2.pdf PDF
Galley Frige Tafco Plate.jpg JPG image
Pump Image ows process pump.jpg JPG image
Life Raft Certs.pdf PDF
Pump Image ows feed pump.jpg JPG image
Amendment A0002.pdf PDF
Attachment D7 Subcontracting Plan.doc DOC document
Attachment D1 FY24 Drydock Repairs for NOAA Ship Ferdinand Hassler Specifications Rev1.pdf PDF
RFQ 1305M223QNMAN0111 FY24 Dry Dock Repairs NOAA Ship FERDINAND HASSLER Rev1.pdf PDF
Amendment A0001 FY24 Drydock Repairs for NOAA Ship Ferdinand Hassler.pdf PDF
Manuals Part 2-20230720T161458Z-001.zip ZIP file
Craft Bearing Installation Guide.pdf PDF
Manuals Part 3-20230720T161502Z-001.zip ZIP file
Quadrans_UserManualPack_October2021.zip ZIP file
Manuals Part 5-20230720T161511Z-001.zip ZIP file
TAFCO Pre-Fabricated Walkin Cooler and Freezer Manual Rev 2-22-02.pdf PDF
Carrier Transicold Chiller.pdf PDF
Global Davit Rescue Boat Davit.pdf PDF
Vestdavit Survey Boat Davit.pdf PDF
Manuals Part 4-20230720T161506Z-001.zip ZIP file
Part 3-20230719T185946Z-001.zip ZIP file
Part 2-20230719T185938Z-001.zip ZIP file
FH Drawings for Download-20230719T205605Z-001.zip ZIP file
3.10 Genset & Switchboard Drawings-20230718T205109Z-001.zip ZIP file
Part 2-20230719T185854Z-001.zip ZIP file
Manuals for Download - working-20230719T205609Z-001.zip ZIP file
Part 1-20230719T185822Z-001.zip ZIP file
NOAA Standard Specs-20230719T013456Z-001.zip ZIP file
FA12-20230718T201723Z-001.zip ZIP file
RFQ 1305M223QNMAN0111 FY24 Dry Dock Repairs NOAA Ship FERDINAND HASSLER (1) (1).pdf PDF
Gauge Calibration.xls XLS spreadsheet
AMC_634_1A Deck Coverings.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
RO_s Installed FEB 2021-20230706T201749Z-001.zip ZIP file
Attachment D.4 US DOL POSTER.pdf PDF
AMC_505_1B _ Valve Overhaul and Test.pdf PDF
ATTACHMENT D2 Past Performance Information Form (1).docx DOCX document
Product Safety _SENR2995-04_.pdf PDF
MOC_510-1B_HVAC_Cleaning_.pdf PDF
3.17.2.6 FH Hose List.xlsx XLSX spreadsheet
AltiVAR VFD_s Ventilation-20230706T201805Z-001.zip ZIP file
3_17_2_6 FH Hose List.xlsx XLSX spreadsheet
AMC-581-1A Inspection and Preservation of Ground Tackle.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-167-1

September 2000

National Oceanic and Atmospheric Administration Marine Operation Center

Standard Specification MOC-167-1

REFURBISHMENT OF WATER TIGHT CLOSURES

1. SCOPE: This specification contains the general requirements and procedure used in refurbishing watertight doors, hatches and scuttles.

2. REFERENCES

None

3. REQUIREMENTS

3.1 Remove all specified closures from the ship or boat to a

suitable machine shop for overhaul and testing.

3.1.1 Work frames and coamings in place.

3.1.2 Install a temporary hinged closure of ½ inch exterior

plywood where no secondary closure exists.

3.2 The overhaul shall include the following work on each

closure to include its frame and coaming:

3.2.1 Disassembly and cleaning. Completely disassemble and

clean all parts.

a. Polish all shafts.

b. Chase all threads.

3.2.2 Repairs.

a. Grind out defects (e.g., cracks and broken welds) and weld repair.

b. Weld build up low or damaged areas on the knife edge of the coaming with filler material compatible with the base material and grind to a straight, smooth surface.

NOTE: Determination of coaming material, i.e., ferrous or CRES should be accomplished prior to welding.

c. Renew wasted steel. Use cutting and welding techniques that will minimize distortion of the surrounding steel.

d. Weld repair all hinges.

e. Install new wedges on each closure.

f. Straighten each closure, frame, and knife edge.

3.2.3 Preservation: Prepare and coat all steel painted

surfaces in accordance with the painting specification identified in the Detail Specification.

3.2.4 Reassemble the closures using new washers, shims, packing, bushings, clips and spacers for dog and latching assemblies.

3.3 Install the overhauled closure in its original location

using new:

3.3.1 Hinge pins, bushings, washers, shims, adjustment bolts, screws, cotter pins, and fasteners.

3.3.2 Rubber seals and gaskets conforming to Mil-R-900, or

equal.

3.4 Install new hasp pins, hook and rubber bumper.

3.5 Adjust each closure for fit and proper operation. Lubricate operating mechanisms with lubricant recommended by manufacturer.

4. QUALITY ASSURANCE

4.1 Prior to disassembly, inspect the system used to hold the dogs in their opened position for deterioration, damage, and excessive wear that may affect their proper operation.

4.2 After disassembly and cleaning, inspect all parts for

1deterioration, damage, and excessive wear that may affect the proper operation of the closure.

4.3 Perform a chalk test on each water tight closure. Chalk

imprint shall be centered with 100% contact.

4.4 Perform an operational test of each closure to prove correct operation.

4.5 Perform a water hose test of each weather type water tight closure in accordance with the following:

4.5.1 Use a 1-½ inch hose with a minimum nozzle diameter of ½ inch at 50 psig nozzle pressure at a maximum distance of 10 feet from the surface being tested.

4.5.2 The water stream shall be directed against the

structure in a manner most likely to disclose leakage.

4.5.3 Allowable leakage: None.

4.6 Submit Condition Reports to COTR within 24 hours of the

inspection or test.

END OF SPECIFICATION