MOC_510-1B_HVAC_Cleaning_.pdf

PDF 27 KB Posted

Attached to
RFQ 1305M223QNMAN0111 FY24 Dry Dock Repairs NOAA Ship FERDINAND HASSLER
Solicitation number
1305M223QNMAN0111
Issued by

About this file

This specification outlines requirements for cleaning HVAC systems on NOAA ships. Contractors must remove dirt, dust, lint and debris from ducts using high-vacuum trucks producing a minimum of 12,000 cubic feet per minute of reverse air flow and compressed air blasting at over 125 PSI. All fans, filters, coils and other components must be cleaned using solvents and brushes. The contractor must submit a work plan and schedule outlining access methods and times when sections of the HVAC system will be inoperable. Only one HVAC system may be inoperative at a time and all systems must be restored to full operation by the end of each work shift. The related solicitation is for dry dock repairs to NOAA Ship Ferdinand Hassler, with an anticipated award date in fiscal year 2024.

View the file

Other files

File Type Posted
Summit Appliance Use and Care Guide.pdf PDF
M286_-085_FA27_07 Outfit and Accomodation Arrangement Drawing.pdf PDF
Amendment A0004.pdf PDF
Amendment A0003.pdf PDF
Gauge Calibration List pdf.pdf PDF
Galley Frige Name Plate.jpg JPG image
Gauge Propeller Sample Report.pdf PDF
Gauge Example Report 2.pdf PDF
Galley Frige Tafco Plate.jpg JPG image
Pump Image ows process pump.jpg JPG image
Life Raft Certs.pdf PDF
Pump Image ows feed pump.jpg JPG image
Amendment A0002.pdf PDF
Attachment D7 Subcontracting Plan.doc DOC document
Attachment D1 FY24 Drydock Repairs for NOAA Ship Ferdinand Hassler Specifications Rev1.pdf PDF
RFQ 1305M223QNMAN0111 FY24 Dry Dock Repairs NOAA Ship FERDINAND HASSLER Rev1.pdf PDF
Amendment A0001 FY24 Drydock Repairs for NOAA Ship Ferdinand Hassler.pdf PDF
Manuals Part 2-20230720T161458Z-001.zip ZIP file
Craft Bearing Installation Guide.pdf PDF
Manuals Part 3-20230720T161502Z-001.zip ZIP file
Quadrans_UserManualPack_October2021.zip ZIP file
Manuals Part 5-20230720T161511Z-001.zip ZIP file
TAFCO Pre-Fabricated Walkin Cooler and Freezer Manual Rev 2-22-02.pdf PDF
Carrier Transicold Chiller.pdf PDF
Global Davit Rescue Boat Davit.pdf PDF
Vestdavit Survey Boat Davit.pdf PDF
Manuals Part 4-20230720T161506Z-001.zip ZIP file
Part 3-20230719T185946Z-001.zip ZIP file
Part 2-20230719T185938Z-001.zip ZIP file
FH Drawings for Download-20230719T205605Z-001.zip ZIP file
3.10 Genset & Switchboard Drawings-20230718T205109Z-001.zip ZIP file
Part 2-20230719T185854Z-001.zip ZIP file
Manuals for Download - working-20230719T205609Z-001.zip ZIP file
Part 1-20230719T185822Z-001.zip ZIP file
NOAA Standard Specs-20230719T013456Z-001.zip ZIP file
FA12-20230718T201723Z-001.zip ZIP file
RFQ 1305M223QNMAN0111 FY24 Dry Dock Repairs NOAA Ship FERDINAND HASSLER (1) (1).pdf PDF
Gauge Calibration.xls XLS spreadsheet
AMC_634_1A Deck Coverings.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
RO_s Installed FEB 2021-20230706T201749Z-001.zip ZIP file
Attachment D.4 US DOL POSTER.pdf PDF
AMC_505_1B _ Valve Overhaul and Test.pdf PDF
ATTACHMENT D2 Past Performance Information Form (1).docx DOCX document
Product Safety _SENR2995-04_.pdf PDF
3.17.2.6 FH Hose List.xlsx XLSX spreadsheet
AltiVAR VFD_s Ventilation-20230706T201805Z-001.zip ZIP file
3_17_2_6 FH Hose List.xlsx XLSX spreadsheet
AMC-581-1A Inspection and Preservation of Ground Tackle.pdf PDF
S2906 _ Arc Welding on Waterborne Vessels.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-510-1B

October 2000

Supercedes

AMC-510-1A

August 1995

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATIONS CENTER

STANDARD SPECIFICATION MOC-510-1B

HVAC CLEANING

1. SCOPE. This specification contains the general requirements for cleaning HVAC systems ducts, equipment and components on and for NOAA ships.

2. REFERENCES.

a. NOAA Standard Specification AMC-000-1(series), "General Requirements For Ship Repair Contract Work on NOAA Ships"

3. REQUIREMENTS.

3.1 General.

3.1.1 The Contractor shall provide all labor, material, services, tools, equipment, and supervision needed to accomplish the required work.

3.1.2 Remove all interferences necessary to complete the

required work. An interference is any structure, equipment, piping, sheathing, cable, insulation, or other part of the ship which interferes with access to the ducting or equipment being cleaned. After the work has been completed, restore the removed interference(s) to a condition equal to existing.

3.1.3 Some existing overhead panels on NOAA ships contain

asbestos. To the extent possible, the contractor should plan the work to avoid removal of asbestos-containing panels. Whenever asbestos-containing panels are removed to accomplish the required work, they shall be renewed with new non-asbestos panels of the same general appearance, rigidity and strength. Comply with section 4.11.7 of reference 2.a when removing and disposing of existing asbestos-handling panels. Contractors are encouraged to conduct a pre-bid inspection of the ship to determine how many, if any, asbestos-containing panels must be removed.

3.1.4 Prior to starting work, the contractor shall prepare and submit to the COTR or Port Engineer a work plan and schedule.

The work plan and schedule shall outline the location and methods of gaining access to ducts and components for cleaning, and the day and time specific sections of the HVAC system will be inoperable. As changes occur in the schedule, the COTR or Port Engineer shall be advised.

3.2 Ducting. The following requirements apply to cleaning of

heating, ventilation, and air-conditioning ducts.

3.2.1 Work shall be scheduled to minimize disruption of the

ships' HVAC system. On ships having more than one HVAC system, only one system shall be inoperative at a time. Restore all systems to full operation at the end of each work shift, except when work will continue immediately on another work shift.

3.2.2 The contractor shall use existing access openings in ducts to the extent practical. Where necessary, the contractor shall cut new accesses in the ducts. New access openings shall be sealed with new sheet metal covers, gaskets, and screws.

3.2.3 When cleaning ducting of systems that have hot and cold air mixing boxes and air flow control boxes, the boxes shall be opened, removed, disassembled, and otherwise protected as necessary to prevent components from being damaged by the high volume air flow required during cleaning. Steps to be taken to comply with this requirement shall be included in the work plan and schedule.

3.2.4 Ducts shall be cleaned of all dirt, dust, lint, grit, debris, and other foreign particles as follows:

a. Using a high-vacuum truck capable of pulling a minimum of 12,000 cubic feet per minute (cfm) through a 10-inch diameter duct, pull a high-volume reverse air flow through each section of ducting. While the high-volume air is being pulled through the ducting, the entire interior of the ducting shall be air blasted with a "skipper" hose delivering compressed air at a minimum of 125 psig.

b. For ducts having a cross-sectional area less than 75 square inches, the reverse air flow velocity shall not be less than 350 feet-per-second. This velocity is roughly equivalent to pulling 12,000 cfm of air through a 10-inch diameter duct.

c. For ducts having a cross-sectional area of 75 square inches and greater, the reverse air flow velocity shall not be less than that which can be created by pulling 12,000 cfm of air through the duct.

d. Take necessary precautions and steps to ensure that ducting and components are not collapsed or otherwise damaged due to the excess vacuum created when pulling the reverse air.

e. If required to obtain the required air flow in individual branch ducts, temporarily blank off the registers, terminals and other openings in other branch lines.

3.3 Clean the interior side of all fans, filters, coils, diffusers, dampers, mixing boxes, preheaters, heaters and other components in the specified HVAC system using solvents and brushes as needed to remove all dirt, dust, lint, grit, debris, and other foreign particles.

4. QUALITY ASSURANCE.

4.1 All cleaning shall be inspected and accepted by the COTR or Port Engineer prior to reinstalling access openings.

5. NOTES.

5.1 Reference 2.a may not be issued with all bid solicitations.

However, a copy of the applicable section will be provided upon request. Prospective bidders may obtain a copy by contacting the Marine Operations Center, Marine Engineering Division, 439 West York Street, Norfolk, VA, telephone (757) 441-6201.

END OF SPECIFICATION