This document is an amendment to a solicitation for dry dock repairs of the NOAA Ship Ferdinand Hassler. The amendment provides responses to contractor questions to clarify requirements and specifications. Key details include dry dock repairs of various ship systems and components, such as gauges, life rafts, auto pilot, crane, refrigeration units, pumps, propeller inspection, generators, lighting, and machinery space painting. The National Oceanic and Atmospheric Administration is the contracting agency, with responses due by the date and time specified in the original solicitation. The amendment aims to ensure accurate contractor understanding of repair needs to inform their proposals.

View the file

Other files

File Type Posted
Summit Appliance Use and Care Guide.pdf PDF
M286_-085_FA27_07 Outfit and Accomodation Arrangement Drawing.pdf PDF
Amendment A0004.pdf PDF
Amendment A0003.pdf PDF
Gauge Calibration List pdf.pdf PDF
Galley Frige Name Plate.jpg JPG image
Gauge Propeller Sample Report.pdf PDF
Gauge Example Report 2.pdf PDF
Galley Frige Tafco Plate.jpg JPG image
Pump Image ows process pump.jpg JPG image
Life Raft Certs.pdf PDF
Pump Image ows feed pump.jpg JPG image
Attachment D7 Subcontracting Plan.doc DOC document
Attachment D1 FY24 Drydock Repairs for NOAA Ship Ferdinand Hassler Specifications Rev1.pdf PDF
RFQ 1305M223QNMAN0111 FY24 Dry Dock Repairs NOAA Ship FERDINAND HASSLER Rev1.pdf PDF
Amendment A0001 FY24 Drydock Repairs for NOAA Ship Ferdinand Hassler.pdf PDF
Manuals Part 2-20230720T161458Z-001.zip ZIP file
Craft Bearing Installation Guide.pdf PDF
Manuals Part 3-20230720T161502Z-001.zip ZIP file
Quadrans_UserManualPack_October2021.zip ZIP file
Manuals Part 5-20230720T161511Z-001.zip ZIP file
TAFCO Pre-Fabricated Walkin Cooler and Freezer Manual Rev 2-22-02.pdf PDF
Carrier Transicold Chiller.pdf PDF
Global Davit Rescue Boat Davit.pdf PDF
Vestdavit Survey Boat Davit.pdf PDF
Manuals Part 4-20230720T161506Z-001.zip ZIP file
Part 3-20230719T185946Z-001.zip ZIP file
Part 2-20230719T185938Z-001.zip ZIP file
FH Drawings for Download-20230719T205605Z-001.zip ZIP file
3.10 Genset & Switchboard Drawings-20230718T205109Z-001.zip ZIP file
Part 2-20230719T185854Z-001.zip ZIP file
Manuals for Download - working-20230719T205609Z-001.zip ZIP file
Part 1-20230719T185822Z-001.zip ZIP file
NOAA Standard Specs-20230719T013456Z-001.zip ZIP file
FA12-20230718T201723Z-001.zip ZIP file
RFQ 1305M223QNMAN0111 FY24 Dry Dock Repairs NOAA Ship FERDINAND HASSLER (1) (1).pdf PDF
Gauge Calibration.xls XLS spreadsheet
AMC_634_1A Deck Coverings.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
RO_s Installed FEB 2021-20230706T201749Z-001.zip ZIP file
Attachment D.4 US DOL POSTER.pdf PDF
AMC_505_1B _ Valve Overhaul and Test.pdf PDF
ATTACHMENT D2 Past Performance Information Form (1).docx DOCX document
Product Safety _SENR2995-04_.pdf PDF
MOC_510-1B_HVAC_Cleaning_.pdf PDF
3.17.2.6 FH Hose List.xlsx XLSX spreadsheet
AltiVAR VFD_s Ventilation-20230706T201805Z-001.zip ZIP file
3_17_2_6 FH Hose List.xlsx XLSX spreadsheet
AMC-581-1A Inspection and Preservation of Ground Tackle.pdf PDF
S2906 _ Arc Welding on Waterborne Vessels.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Continuation Page – Amendment

FERDINAND HASSLER FY24 DRYDOCK

RFQ# 1305M223QNMAN01111

The purpose of this Amendment is as follows:

Answer questions submitted by interested contractors.

Q1. Gauge List – The provided gauge lists “Gauge Calibration List.xls” and “Gauge Calibration.xls” do not provide enough valve information. They do not provide size/descriptions of the gauges. Can this please be provided?

A1. Rated gauge pressure and manufacturer is provided. Is most cases the system fluid can be gleaned from the gauge nomenclature. Posted on SAM.gov see file name Gauge Calibration List.

Q2. Item 3.13 – Will NOAA please provide the latest inspection certificates for the Life rafts?

A2. Posted on Sam.gov See file name Life raft Certification and Sample Reports

Q3. WI 5.2.5 Auto Pilot- Furuno has requested the following information in order to quote the correct configuration of the FAP3000 system. Please provide below information in order to quote the correct system configuration.

A3. Contractor is responsible to verify via drawings, ship-checks, etc...

The current AP is a Sperry Marine Navipilot 4000

Note that the gyros, ECDIS and radars are all planned for upgrades within this package. As such, the contractor is advised to review the technical specifications for the new equipment and how it will interface with the FAP3000 system, as necessary.

System Configuration information requested as follows:

1. Normal Cruising Speed (max speed.

12.0/12.5 knots

2. Number of AEU?

3. Number of MIP?

4. Number of Rudders?

5. Number of Isolation amplifiers in AEU? (0-4)?

Undetermined

6. Rudder Order scale-factor (V/Deg)?

0.3-3 (“rudder gain”, per Sperry)

7. Number of Gyro Inputs to AEU611 (see Notes sheet)

Posted on Sam.gov named “Supporting Documents.”

8. Primary heading source Format? HDT or THS or HDG?

Currently HDT

9. Primary Speed source Format? Pulse or VBW or VTG or WHW or PESSD?

10. Secondary speed source Format? Pulse or WBW or VTG or WHW or PESSD?

11. Course mode reference? (VTG) Y/N

Y

12. Is a Feedback unit attached? Y/N

13. If a Feedback unit is attached is rudder super vision needed? Y/N

Q4. WI 5.6 – Please provide reference 5.6.2.3 Ferdinand Hassler Crane Replacement?

A4. Specifications Revision 1 removes this reference and address it in the notes section. The reference is a work in progress (WIP).

Q5. WI 3.20 - Para 3.20.4.1.1.3 replenish refrigerant levels to OEM RECOMMENDATIONS. What type of refrigerant does the system have?

A5. R22

Q6. WI 3.20 - Para 3.20.4.3.1 Replace galley chiller and freezer roof top condensing units and evaporators. Could you provide the model and Serial # for both condensing units along with both evaporators?

A6. Pictures condenser nameplates provided in specifications. Poste on SAM.gov file “Galley

Chiller and Freezer Plate Image”.

Q7. WI 3.19 – Can NOAA provide an image of the pump face plate (not the unit face plate) on the

Alfa Laval FO purifier?

A7. Posted on Sam.gov in file named “Pump Image”.

Q8. WI 3.7- Paragraph 3.7.6.3.2 states “Gauge propellers using dial indicators.” Can this requirement be clarified? This does not appear to be a standard request.

A8. Posted on Sam.gov in file named “Gauge Propeller Sample Reports.”

Q9. Is there an electrical bill of materials for the cabling required for the installation of the SSDGs?

I am going through the drawings, and it only seems to show the components and not the cabling required.

A9. No

Q10. WI 3.1.4.5: Is there an estimated volume of sewage and turbid water for disposal per day that the contractor should estimate for?

A10. It is anticipated that the sewage system will be offline for a large portion of dry docking, until ship’s power distribution network is restored from WI 3.10. Otherwise, assume industry standard for 12 people per day on the ship while inhabitable.

Q11. WI 3.10: Will NOAA be providing the caterpillar representative for installation?

A11. NOAA will provide a Caterpillar representative for start-up and commissioning.

Contractor is responsible for any further CAT assistance.

Q12. WI 3.10: Do the foundations / skids on the GFM generators already have resilient mounts attached installed on them?

A12. The generators come with resilient mounts from the factor see diagram below.

Q13. Appleton has stated that the GFM crane that NOAA is to provide is not going to be available for installation until after the period of performance. Does NOAA intend for the contractor to continue as if this item will still be completed during the scheduled period of performance?

A13. The crane is listed as an option item and will be awarded at the Government’s discretion.

The contractor should bid the item as normal.

Q14. 3.17.4.2.6 - The 12 batteries requested for the Galaxy 3500 Mission UPS - This unit uses Battery Units each of which has 8 batteries, and the voltage of the unit requires at least 4 of these battery units. The individual batteries are 12V 7.5Ah Batteries. Does NOAA want 12 each Battery Units with 8 batteries each for each UPS for a total of 24 battery units, totaling 192 individual 12V batteries, or do they just want 12 each 12V batteries?

A14. The intent is to provide all new batteries for UPS’, no spares. The intent is to replace 3 battery units, each battery unit containing 4 batteries (12 total batteries).

Q15. 3.17.4.2.5 - Requirement for MER lighting is 4 ea 4 foot and 1 ea 2 foot light. That would only cover the lower level of the engine room by the main propulsion engines. Is that all that NOAA requires?

A15. The intent is to only do the lower, main engine, level. However, the requirement stated within the question is incorrect. Please see 3.17.4.2.5.2.1 and 3.17.4.2.5.2.2

Q16. Galley lighting does not identify a quantity. The galley has 8 lights and the mess deck has 3 light each 4'. Does NOAA want the galley only or mess deck too?

A16. Replace each overhead lighting fixture in the galley. Mess deck is not included.

Q17. The other missing information there is Lumen Values for the lights. Is there a minimum Lumen value for the lights? 1 row of LEDs vs 2 rows of LEDs?

A17. Per 3.17.4.2.5.1 new LED lighting shall be comparable to existing. Reference 3.17.2.3 on the existing lights.

For example: A light fixture with 2ea 24W T5 bulbs can be expected to produce ≥4000 lumens. The new, LED fixture should also provide at least that lumen value.

Per 3.17.4.2.5.5 the contractor will submit to their recommended lights and Government will review and approve or deny use of said lights.

Q18. 3.17.4.2.7 - Will all new cameras be mounted on the exterior of the ship in the open deck areas or will some be mounted below decks? This will impact cable lengths and, and routing through MCTs, and stuffing tubes

A18. The new cameras are external in the elements type per specifications 3.17.4.2.7.3.

External in the elements.

Q19. 5.5.4.10 Machinery Space Preservation. The last time we did this item it was specked 1 ea. 10 mil coat and then 2 ea. 20 mil coats of the Mascoat material. Do you want us to put that material on the bare steel or a primer under it? Spec has no info. Is the intent to SP-11 the entire space?

A19. The spec says to apply the new paint system IAW the paint manufacturer’s instructions.

Blasting will not be accepted in engineering spaces.

End of Amendment A0002

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: A0002
Code[0]: AJ930073
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]:

NOAA SHIP FERDINAND HASSLER FY 24 DRYDOCK REPAIRS

Please see continuation page for details pertaining to this amendment.

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NOAA/ERAD

200 GRANBYSTREET

NORFOLK, VA 23510

Susan Kenney-Lambert, susan.kenney-lambert@noaa.gov 757-364-6910

NameandAddress[0]:
AdministeredBy[0]: See Block 6
ContractIDCode[0]:
ReqNumber[0]: NM-AN2120-23-01111
AmendmentNo[1]: 1305M223QNMAN01111
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 6
EffectiveDate[0]: 08/01/2023
Dated9B[0]: 07/10/2023
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]:
CopiesReturned[0]: 1

File details come from the government source that posted it. Updated .