MD3.1_-_ENLARGED_MECHANICAL_ROOM_DEMO_PLAN.pdf

PDF 318 KB Posted

Attached to
Volusia County Branch Jail Air Handler-Fire Suppression System Removal, Replacement and Upgrade
Solicitation number
26-B-110IF
Issued by
Volusia County, Florida

About this file

This is an Enlarged Mechanical Room Demolition Plan prepared for the Volusia County Department of Corrections' Air Handler and Fire Suppression System Replacement project located at the Volusia County Branch Jail, 1300 Red John Drive, Daytona Beach, Florida. The plan, dated December 5, 2025, details the removal and replacement scope of work for multiple mechanical rooms within the facility. The project encompasses the demolition of existing Air Handling Units (AHUs) numbered 5, 8, 9, 11, and 12, along with associated ductwork, manual and motorized dampers, hot water coils, chilled water supply and return lines, and hot water supply and return lines. The contractor is responsible for disconnecting all HVAC piping at the riser points and preparing connections for new equipment installation. Additionally, the existing purge and exhaust fan systems are to be replaced in kind. The plan indicates that all manual and motorized dampers throughout the mechanical rooms require replacement as part of the new work scope.

The demolition plan establishes that the contractor bears full responsibility for verifying actual field conditions and making all necessary modifications to accommodate the removal and replacement work. The plan notes that existing equipment and ductwork dimensions are approximate and derived from a cursory field engineer visit and historical construction documents, requiring the contractor to determine exact locations and conditions before commencing work. Where existing ductwork and control wiring are of specified type, meet new work requirements, and remain in good condition, these components may be reused. The project's fire suppression system integration and building automation system upgrades are addressed through coordinated replacement across mechanical, controls, and fire/life safety systems to enable pod isolation capabilities during smoke or contamination events.

View the file

Other files

File Type Posted
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#6_Revision).pdf PDF
Exhibit_R_-_VCBJ_Existing_Drawings_(As-Builts)_1983.pdf PDF
Exhibit_Q_-_NFPA_72_Inspection_Documents.pdf PDF
Exhibit_P_-_E4.03_-_FLOOR_PLAN_C_-_SKETCH_(REPLACES_ALL_PREVIOUS_VERSIONS)_(1).pdf PDF
Exhibit_O_-_E4.01_-_FLOOR_PLAN_A_-_SKETCH_(REPLACES_ALL_PREVIOUS_VERSIONS).pdf PDF
Exhibit_N_-_238216.11_Hydronic_Air_Coils_(REPLACES_ALL_PREVIOUS_VERSIONS).pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#3_Revision).pdf PDF
Exhibit_M_-_Diagram_RTU_Curb_and_Tie_Down.pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#1_Revision).pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade.pdf PDF
Exhibit_L_-_Contractor_-_Vendor_Background_Packet_Rev_05-22-2025.pdf PDF
Exhibit_K_-_Pre-Bid_Parking_Map.pdf PDF
Exhibit_J_-_VCBJ_Bidder_Disclaimer_and_Notice_to_Bidders.pdf PDF
Exhibit_I_-_VC_Branch_Jail_AHU_Fire_Suppression_Scope.pdf PDF
Exhibit_H_-_Special_Conditions_26-B-110IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-110IF.xlsx XLSX spreadsheet
Exhibit_F_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-110IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-110IF.xlsx XLSX spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-110IF.pdf PDF
Construction_Bid_Request_Air_Handler.docx DOCX document
Pre-Bid_Meeting_Invitee_Listing_(1).docx DOCX document
283000_Digital,_Addressable_Fire_Alarm_System.pdf PDF
Table_of_Contents.pdf PDF
270500_Special_Systems.pdf PDF
264313_Surge_Protection_Devices.pdf PDF
260501_Electrical_Scope.pdf PDF
260533_Raceways_-_Metal.pdf PDF
262726_Wiring_Devices.pdf PDF
233300_Air_Duct_Accessories.pdf PDF
260534_Raceways_-_Non-metallic.pdf PDF
262813_Fuses.pdf PDF
260519_Low-Voltage_Electrical_Power_Conductors_and_Cables.pdf PDF
262816_Safety_Switches.pdf PDF
VCBJ_Bidder_Disclaimer.docx DOCX document
264113_Lightning_Protection_System.pdf PDF
260535_Boxes_for_Electrical_Systems.pdf PDF
Special_Conditions.docx DOCX document
232923_Variable_Frequency_Motor_Controllers.pdf PDF
237313_Modular_Indoor_Central_Station_Air_Handler_Units.pdf PDF
237413_Packaged,_Outdoor,_Central_Station_Rooftop_Units.pdf PDF
230529_Hangers_and_Supports_for_HVAC_Piping.pdf PDF
230519_Meters_and_Gages_for_HVAC_Piping.pdf PDF
260526_Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
262416_Panelboards.pdf PDF
230548_Vibration_Controls_for_HVAC.pdf PDF
260502_Basic_Materials_&_Methods.pdf PDF
VCDCH_Fire_Damper_100%CD_Submission_G-001_Cover_Sheet.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUAL

DAMPER

30"/30"

32"/28"

M

M

SD

22"/16"

18"/12"

AHU

9 2

HWC

X.4

HWC

X.2

HWC

X.1

HWC

X.3

HWC

X.5

SD

HWS/R

CHWS/R

MANUAL

DAMPER

30"/30"

DUCT TO SPACE

32"/28"

M

M

SD

32"/28"

AHU

5 2

SD

HWC

XA.3

HWC

XA.1

HWC

X.2

HWC

X.3

HWC

XA.2

HWC

X.1

REFERENCE NOTES

ALL MANUAL AND MOTORIZED DAMPERS TO BE

REPLACED. SEE NEW WORK PLANS.

REMOVE EXISTING AHU AND ASSOCIATED DUCT WORK IN

THE MECHANICAL ROOM UP TO POINTS OF DISCONNECT.

DISCONNECT ALL CHWS+R AND HWS+R RUNNING TO THE

AHU AND ASSOCIATED HEATING COILS.

X IN TAG REPRESENTS AHU NUMBER WHICH

CORRESPONDS WITH COIL TAG.

EXISTING PURGE/EXHAUST FAN TO BE REPLACED LIKE

FOR LIKE.

REMOVE EXISTING CHW AND HW PIPING BACK TO RISER

AND PREPARE FOR NEW CONNECTION.

GENERAL NOTES

ALL INFORMATION AND WORK SHOWN AS EXISTING WAS TAKEN FROM

NOTES FROM A CURSORY FIELD VISIT BY THE ENGINEER AND FROM PAST

CONSTRUCTION DOCUMENTS. EQUIPMENT AND DUCTWORK HAS BEEN

SHOWN IN AN APPROXIMATE WAY. CONSEQUENTLY, THE CONTRACTOR

SHALL BE RESPONSIBLE FOR DETERMINING ALL WORK NECESSARY TO

RENOVATE, ALTER, CHANGE, AND REPAIR EXISTING SYSTEMS BASED ON

THE ACTUAL FIELD CONDITIONS.

DETERMINE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DEVICES

AND WIRING BEFORE COMMENCING WORK.

LOCATE AND PRESERVE ALL PORTIONS OF THE EXISTING HVAC SYSTEMS

WHICH SHALL REMAIN.

EXISTING DUCTWORK AND CONTROLS WIRING MAY BE REUSED WHERE

THEY ARE OF THE TYPE SPECIFIED, MEET THE REQUIREMENTS OF THE

NEW WORK AS DEFINED BY THE CONTRACT DOCUMENTS, AND REMAIN IN

GOOD CONDITION.

EXISTING DUCT SIZES PER AS-BUILT DRAWINGS. CONTRACTOR TO FIELD

VERIFY EXISTING CONDITIONS AND MAKE MODIFICATIONS AS NEEDED.

1.

2.

3.

4.

5.

A

54321

B

C

D

E

F

SCALE

APPROVED BY

CHECKED BY

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

REVISIONS

KEY PLAN

CA# 26308 I22569.00

SEAL

/3

/2

:0

:5

P M

ENLARGED

MECHANICAL

ROOM DEMO

PLAN

FDS

ESC

12/05/2025

50166610

V C

B J A

IR

H

A N

D L

E R

F

IR

E S

U P

P R

E S

S

IO

N S

Y S

T E

M R

E P

L A

C E

M E

N T

V o lu s ia

C o u n ty

D e p a rt m e n t o f

C o rr e c ti o n s

B

ID

S E

T

R e d J o h n D ri v e D a y to n a B e a c h

F L

800 N. Magnolia Ave Suite 1000 Orlando, FL 32803 407.843.5120

MD3.1

Eric Cepull PE 64750

0' 16' 32'8'

Scale: 3/16" = 1'-0"

MECHANICAL ROOM #9, #11, & #12 DEMO

Scale: 3/16" = 1'-0"

MECHANICAL ROOM #5, #8 DEMO

NO. DESCRIPTION DATE

BID SET 12/05/2025

50166610 - VCBJ Air Handler Fire Suppression_MECH_v22
MD3.1 - ENLARGED MECHANICAL ROOM DEMO PLAN

File details come from the government source that posted it. Updated .