About this file

This is a specification document for a Lightning Protection System project at the Volusia County Branch Jail in Daytona Beach, Florida, issued as part of a bid set dated December 5, 2025. The project requires the installation of a complete lightning protection system on the correctional facility structure, including air terminals, conductors, grounding equipment, and bonding connections designed to protect the building against lightning damage. The system must comply with the National Fire Protection Association (NFPA) Code for Lightning Protection Systems and Underwriters' Laboratories (U.L.) standards. The contractor must be LPI (Lightning Protection Institute) certified with master and journeyman-level personnel and must obtain a U.L. Master Label for the completed system along with a witness grounding form (LPI Form 175-A). Shop drawings showing scaled layouts of cabling and air terminal points must be submitted for approval prior to work commencement, and the contractor is responsible for pulling permits and providing a complete turnkey package including all materials and components.

The specification details material requirements, including solid aluminum air terminals projecting a minimum of 12 inches above the structure, aluminum roof conductors coordinated with building flashing materials, and copper down conductors installed in concealed PVC conduit within the structure. Ground connections must include copper-weld ground rods minimum 5/8 inch by 50 feet in length, placed at least two feet from building foundations, with bonding to metallic water piping systems, building electrical grounding systems, and all metal bodies of conductance and inductance within specified distances. The contractor must provide all materials, instruments, and labor for system inspection and testing, with air terminals tested to achieve 5 ohms or less resistance to ground. Approved equipment manufacturers include Thompson Lightning Protection, Inc., Independent Protection Company, Inc., Heary Bros. Lightning Protection, or Harger (premium lines), with substitutions subject to owner approval. The contractor must provide 24-hour advance notice to the owner's authorized representative before concealing any work and must coordinate installation with all other trade contractors to avoid conflicts.

View the file

Other files

File Type Posted
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#6_Revision).pdf PDF
Exhibit_R_-_VCBJ_Existing_Drawings_(As-Builts)_1983.pdf PDF
Exhibit_Q_-_NFPA_72_Inspection_Documents.pdf PDF
Exhibit_P_-_E4.03_-_FLOOR_PLAN_C_-_SKETCH_(REPLACES_ALL_PREVIOUS_VERSIONS)_(1).pdf PDF
Exhibit_O_-_E4.01_-_FLOOR_PLAN_A_-_SKETCH_(REPLACES_ALL_PREVIOUS_VERSIONS).pdf PDF
Exhibit_N_-_238216.11_Hydronic_Air_Coils_(REPLACES_ALL_PREVIOUS_VERSIONS).pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#3_Revision).pdf PDF
Exhibit_M_-_Diagram_RTU_Curb_and_Tie_Down.pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#1_Revision).pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade.pdf PDF
Exhibit_L_-_Contractor_-_Vendor_Background_Packet_Rev_05-22-2025.pdf PDF
Exhibit_K_-_Pre-Bid_Parking_Map.pdf PDF
Exhibit_J_-_VCBJ_Bidder_Disclaimer_and_Notice_to_Bidders.pdf PDF
Exhibit_I_-_VC_Branch_Jail_AHU_Fire_Suppression_Scope.pdf PDF
Exhibit_H_-_Special_Conditions_26-B-110IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-110IF.xlsx XLSX spreadsheet
Exhibit_F_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-110IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-110IF.xlsx XLSX spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-110IF.pdf PDF
Construction_Bid_Request_Air_Handler.docx DOCX document
Pre-Bid_Meeting_Invitee_Listing_(1).docx DOCX document
283000_Digital,_Addressable_Fire_Alarm_System.pdf PDF
Table_of_Contents.pdf PDF
270500_Special_Systems.pdf PDF
264313_Surge_Protection_Devices.pdf PDF
260501_Electrical_Scope.pdf PDF
260533_Raceways_-_Metal.pdf PDF
262726_Wiring_Devices.pdf PDF
233300_Air_Duct_Accessories.pdf PDF
260534_Raceways_-_Non-metallic.pdf PDF
262813_Fuses.pdf PDF
260519_Low-Voltage_Electrical_Power_Conductors_and_Cables.pdf PDF
262816_Safety_Switches.pdf PDF
VCBJ_Bidder_Disclaimer.docx DOCX document
260535_Boxes_for_Electrical_Systems.pdf PDF
Special_Conditions.docx DOCX document
232923_Variable_Frequency_Motor_Controllers.pdf PDF
237313_Modular_Indoor_Central_Station_Air_Handler_Units.pdf PDF
237413_Packaged,_Outdoor,_Central_Station_Rooftop_Units.pdf PDF
230529_Hangers_and_Supports_for_HVAC_Piping.pdf PDF
230519_Meters_and_Gages_for_HVAC_Piping.pdf PDF
260526_Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
262416_Panelboards.pdf PDF
230548_Vibration_Controls_for_HVAC.pdf PDF
MD3.1_-_ENLARGED_MECHANICAL_ROOM_DEMO_PLAN.pdf PDF
260502_Basic_Materials_&_Methods.pdf PDF
VCDCH_Fire_Damper_100%CD_Submission_G-001_Cover_Sheet.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SET VOLUSIA COUNTY

DECEMBER 5, 2025 BRANCH JAIL

LIGHTNING PROTECTION SYSTEM 264113.00 - 1

SECTION 264113 - LIGHTNING PROTECTION

PART 1 - GENERAL

1.1 DESCRIPTION

A. Description of Systems:

1. A Lightning Protection System shall be placed on the structure by experienced installers in compliance with provisions of Code for Lightning Protection Systems as adopted by the National Fire Protection Association and Underwriters' Laboratories. Intent of the lightning protection systems shall be to protect the new building against damage by lightning. All equipment to that result shall be included whether or not specifically called for herein. Installers shall be LPI (Lightning Protection Institute) certified, master and Journeyman in accordance with LPI Standards or of equal qualifications as approved by the Owner or the Owner’s authorized representative. A U.L. Master Label for the system and a witness of grounding form, similar to that required by LPI (Form 175-A), shall be required.

2. Materials shall comply in weight, size, and composition with the requirements of

Underwriters' Laboratories and the National Fire Protection Code relating to this type of installation, and shall be U.L. Labeled.

3. Contractor shall be required to pull a permit for their work and provide a complete package of permit, drawings, specifications, and details for a complete turnkey system, including but not limited to:

a. Air terminals

b. Bonding plates

c. Conductors

d. Connectors

e. Fasteners

f. Grounding plates

g. Grounding rods

h. Rod clamps

i. Splicers

j. Fittings

k. Test wells.

1.2 SUBMITTALS

A. Shop Drawings and Product Data:

1. Shop Drawings: Shop drawings shall be submitted for approval before any work is started. Drawings shall include full “to scale” layout of cabling and air terminal points, and connections.

2. Product Data: Product Data shall be submitted on all equipment to show compliance with this section of the specifications and shall include manufacturer’s written recommendations for installation. Information shall be submitted for approval before any work is started.

LIGHTNING PROTECTION SYSTEM 264113.00 - 2

PART 2 - PRODUCTS AND INSTALLATION

2.1 AIR TERMINALS

A. Air Terminals shall be solid aluminum; to be coordinated with the building flashing materials;

and shall have proper base support for surface on which they are attached and shall be securely anchored to this surface. Terminals shall project a minimum of 12" above top of object to which attached.

2.2 CONDUCTORS

A. Roof conductors shall consist of aluminum; to be coordinated with the building flashing materials, complying with the weight and construction requirements of the Code, and shall be coursed to interconnect with air terminals, and in general, provide a two-way minimum path to ground. The angle of any turn shall not exceed 90 degrees and shall provide an approximately horizontal or downward course. Down conductors shall be copper and shall be installed in concealed PVC conduit and concealed within the structure. Approved bi-metal transitions from aluminum roof conductors to copper down conductors shall be provided where aluminum building flashing is used.

2.3 FASTENERS

A. Conductor fasteners shall be of the same material as the conductor, having ample strength to support conductor. Where fasteners are to be mounted in masonry or structural work, they shall be furnished to the Masonry or Structural Contractor so they may be installed during construction of the project.

2.4 GROUND CONNECTIONS

A. Ground connections shall be made in accordance with requirements of all applicable codes.

Ground rods shall be placed in a minimum of two (2) feet from building foundations. In addition to the above requirements additional grounds, one down conductor of each two-path system shall be connected to metallic water piping system with approved water pipe type strap connector. All ground rods shall be a minimum of 5/8" X 50'0” long (sectional) copper-weld type.

B. Provide equipment grounding and bonding connections sufficiently tight to assure permanent and effective grounds and bonds.

C. Grounded metal bodies within the bonding distance determined by the bonding distance requirements of NFPA shall be bonded to the system using bonding conductors and fittings in accordance with code requirements.

D. Underground metallic piping entering the building shall be bonded to the nearest down conductor or ground electrode.

E. Bond to metallic water service, underground metallic piping systems and the building electrical grounding electrode system as shown and as required by codes.

LIGHTNING PROTECTION SYSTEM 264113.00 - 3

F. Bond to metal bodies of conductance on roof with main size conductors as shown and as required by codes. These bonds include, but are not limited to, exhaust fans and stacks, vents, handrails, ladders, conduits, exhaust fans, HVAC / RTU units, antennas, roof mounted lighting standards, etc. or any large metal body subject to direct stroke or which exceeds the height of adjacent air terminals.

G. Bond to metal bodies of inductance located within 6’-0” of main conductor or other bonded object with approved secondary bonding conductor as shown and as required by codes. Such objects include, but are not limited to; flashing, metal coping caps, gravel guards, fascias, roof drains, downspouts, interior ducts, exhaust fans, lighting fixtures, HVAC units, boxes, conduits, boxes, machinery, or piping, etc., or in general, any isolated body at or below the roof subject to inductance and within 6’-0” of the system.

2.5 INSTALLATION

A. Installation shall be made in an inconspicuous manner with conductors coursed to conceal equipment as much as possible. Down conductors shall be concealed within the structure and shall be run in 1" PVC concealed conduit. All metallic equipment within 6 feet of any lightning conductor shall be bonded to conductor. System shall also be tied to the main service electrical grounding electrode conductor system.

2.6 EQUIPMENT

A. Equipment shall be as manufactured by Thompson Lightning Protection, Inc. as specified; or approved substitutions as manufactured by: Independent Protection Company, Inc., Heary Bros.

Lightning Protection or Harger (premium lines).

2.7 CORROSION PROTECTION

A. Use no combination of materials that may form an electrolytic couple of such nature that corrosion is accelerated in the presence of moisture unless moisture is permanently excluded from the junction of such metals. Where unusual conditions exist that would cause deterioration or corrosion of conductors, use conductors with suitable protective coatings.

2.8 FIELD QUALITY CONTROL

A Provide advance notice of at least 24 hours to the Owner’s Authorized Representative before concealing lightning protection system work.

B. Location of all devices and equipment shall be coordinated with all trade contractors and shop drawings prior to submittal of shop drawings.

C. Coordinate installation with other trades to avoid conflicts.

D. During construction, inspection and testing shall be made to assure a low resistance path throughout the system. Upon completion, the air terminals shall be tested for resistance to the grounding electrode system. Any air terminal which has more than 5 ohms resistance to ground shall be connected by additional approved means to reduce the resistance to 5 ohms or less.

LIGHTNING PROTECTION SYSTEM 264113.00 - 4

E. The Contractor shall be responsible for inspecting and testing the system and shall furnish all materials, instruments, and labor requirement to perform same. Owner’s Authorized Representative shall witness the final test.

PART 3 – EXECUTION (Not applicable)

END OF SECTION 264113