260502_Basic_Materials_&_Methods.pdf

PDF 106 KB Posted

Attached to
Volusia County Branch Jail Air Handler-Fire Suppression System Removal, Replacement and Upgrade
Solicitation number
26-B-110IF
Issued by
Volusia County, Florida

About this file

This is a Basic Materials and Methods specification document for Volusia County's Branch Jail electrical construction project, scheduled for bid set on December 5, 2025. The document establishes the foundational requirements and standards for all electrical materials, equipment, and installation methods under Division 26 of the project specifications. The scope requires that all materials be furnished in strict accordance with the drawings and specifications, with shop drawings submitted as required by the Electrical Scope section. All electrical equipment must include factory identification marking indicating suitability for use and installation in compliance with Article 110 of the 2020 National Electrical Code, with identifying information either marked on equipment, attached via permanent label, or included in Operation and Maintenance Manuals.

Material requirements mandate that all equipment be new, of the best quality and design, free from defects, and bearing manufacturer identification and nameplates establishing quality, size, and capacity. All materials of the same type must be from the same manufacturer, with the Architect/Engineer retaining final approval authority over all materials. The document explicitly prohibits substitutions other than those from manufacturers specifically listed for the project. Execution requirements emphasize strict compliance with OSHA codes and regulations, safe installation techniques, and quality practices. The contractor must implement comprehensive protection measures during all phases of work, including handling, installation, connection, and transportation, to prevent dust, debris, and moisture from entering work spaces or spreading to finished areas, with cutting, patching, and finishing operations separated from finished spaces by temporary dustproof partitions sealed on all sides.

View the file

Other files

File Type Posted
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#6_Revision).pdf PDF
Exhibit_R_-_VCBJ_Existing_Drawings_(As-Builts)_1983.pdf PDF
Exhibit_Q_-_NFPA_72_Inspection_Documents.pdf PDF
Exhibit_P_-_E4.03_-_FLOOR_PLAN_C_-_SKETCH_(REPLACES_ALL_PREVIOUS_VERSIONS)_(1).pdf PDF
Exhibit_O_-_E4.01_-_FLOOR_PLAN_A_-_SKETCH_(REPLACES_ALL_PREVIOUS_VERSIONS).pdf PDF
Exhibit_N_-_238216.11_Hydronic_Air_Coils_(REPLACES_ALL_PREVIOUS_VERSIONS).pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#3_Revision).pdf PDF
Exhibit_M_-_Diagram_RTU_Curb_and_Tie_Down.pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#1_Revision).pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade.pdf PDF
Exhibit_L_-_Contractor_-_Vendor_Background_Packet_Rev_05-22-2025.pdf PDF
Exhibit_K_-_Pre-Bid_Parking_Map.pdf PDF
Exhibit_J_-_VCBJ_Bidder_Disclaimer_and_Notice_to_Bidders.pdf PDF
Exhibit_I_-_VC_Branch_Jail_AHU_Fire_Suppression_Scope.pdf PDF
Exhibit_H_-_Special_Conditions_26-B-110IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-110IF.xlsx XLSX spreadsheet
Exhibit_F_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-110IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-110IF.xlsx XLSX spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-110IF.pdf PDF
Construction_Bid_Request_Air_Handler.docx DOCX document
Pre-Bid_Meeting_Invitee_Listing_(1).docx DOCX document
283000_Digital,_Addressable_Fire_Alarm_System.pdf PDF
Table_of_Contents.pdf PDF
270500_Special_Systems.pdf PDF
264313_Surge_Protection_Devices.pdf PDF
260501_Electrical_Scope.pdf PDF
260533_Raceways_-_Metal.pdf PDF
262726_Wiring_Devices.pdf PDF
233300_Air_Duct_Accessories.pdf PDF
260534_Raceways_-_Non-metallic.pdf PDF
262813_Fuses.pdf PDF
260519_Low-Voltage_Electrical_Power_Conductors_and_Cables.pdf PDF
262816_Safety_Switches.pdf PDF
VCBJ_Bidder_Disclaimer.docx DOCX document
264113_Lightning_Protection_System.pdf PDF
260535_Boxes_for_Electrical_Systems.pdf PDF
Special_Conditions.docx DOCX document
232923_Variable_Frequency_Motor_Controllers.pdf PDF
237313_Modular_Indoor_Central_Station_Air_Handler_Units.pdf PDF
237413_Packaged,_Outdoor,_Central_Station_Rooftop_Units.pdf PDF
230529_Hangers_and_Supports_for_HVAC_Piping.pdf PDF
230519_Meters_and_Gages_for_HVAC_Piping.pdf PDF
260526_Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
262416_Panelboards.pdf PDF
230548_Vibration_Controls_for_HVAC.pdf PDF
MD3.1_-_ENLARGED_MECHANICAL_ROOM_DEMO_PLAN.pdf PDF
VCDCH_Fire_Damper_100%CD_Submission_G-001_Cover_Sheet.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SET VOLUSIA COUNTY

DECEMBER 5, 2025 BRANCH JAIL

BASIC MATERIALS AND METHODS 260502.00 - 1

SECTION 260502 - BASIC MATERIALS AND METHODS

PART 1 - GENERAL

1.1 SCOPE:

A. This section outlines the intent of the plans and specifications of DIVISION 26 with regard to Basic Materials and Methods.

PART 2 - PRODUCTS

2.1 MATERIAL FURNISHED AS SPECIFIED:

A. Material proposed to be furnished as specified shall be in strict accordance with the drawings and specifications of DIVISION 26 and of the requirements of WCI. Shop drawings shall be furnished as required by SECTION 26 05 01 - ELECTRICAL SCOPE. All material furnished is subject to the approval of the Architect/Engineer and his authority for approval is final.

B. All electrical equipment shall be furnished with factory identification for the suitability of use and installation, either by a description marked on the equipment, permanently attached label, or printed description packed with the equipment, in accordance with Article 110 of the 2020 National Electrical Code (NEC). If a printed description is packaged with the equipment, this shall be bound in the Operation and Maintenance Manuals.

C. All material and equipment shall be new; shall be of the best quality and design; shall be free from defects and imperfections and shall have markings, or a nameplate identifying the manufacturer and providing sufficient reference to establish quality, size, and capacity. All material and equipment of the same type shall be of the same manufacturer. Equipment shall function and perform efficiently and quietly at the required capacity without producing objectionable noise within the occupied areas of the building; if not, the Contractor shall remedy the condition or replace the equipment at no additional cost to the Owner.

2.2 MATERIAL SUBSTITUTIONS:

A. No substitutions other than manufactures listed will be considered for this project.

PART 3 - EXECUTION

3.1 SAFETY:

A. Maximum consideration shall be given to job safety and only such methods as will reasonably insure the safety of all persons shall be employed. The codes and regulations of OSHA shall be given strict compliance as well as such other codes, laws, and regulations as may be applicable.

3.2 TECHNIQUE:

A. It is the intent of these plans and specifications to direct attention to the absolute necessity to use safe techniques and ones that provide quality installations in compliance with good practice and the plans and specifications of DIVISION 26.

BID SET VOLUSIA COUNTY

DECEMBER 5, 2025 BRANCH JAIL

BASIC MATERIALS AND METHODS 260502.00 - 2

3.3 PROTECTION:

A. Every precaution shall be taken during handling, installation, connection, transporting, erection, and performing any work to prevent and eliminate dust, debris, and moisture from entering or being carried into spaces outside the work area and onto or into the finished spaces.

Cutting, patching, finishing, painting, or any other construction work which will cause dirt or dust to be created shall be separated from finished spaces by temporary dustproof partitions or curtains sealed at top, bottom, and all around.

END OF SECTION 260502

1.
1.1 SCOPE:
2.
2.1 MATERIAL FURNISHED AS SPECIFIED:
2.2 MATERIAL SUBSTITUTIONS:
3.
3.1 SAFETY:
3.2 TECHNIQUE:
3.3 PROTECTION:
A. Every precaution shall be taken during handling, installation, connection, transporting, erection, and performing any work to prevent and eliminate dust, debris, and moisture from entering or being carried into spaces outside the work area and onto...
Cutting, patching, finishing, painting, or any other construction work which will cause dirt or dust to be created shall be separated from finished spaces by temporary dustproof partitions or curtains sealed at top, bottom, and all around.

File details come from the government source that posted it. Updated .