Exhibit_E_-_Technical_Specifications.pdf

PDF 3 MB Posted

Attached to
Volusia County Branch Jail Air Handler-Fire Suppression System Removal, Replacement and Upgrade
Solicitation number
26-B-110IF
Issued by
Volusia County, Florida

About this file

This is a Technical Specifications document (Exhibit E) for the Volusia County Branch Jail's mechanical, plumbing, electrical, and fire protection system replacement project located at 1300 Red John Drive, Daytona Beach, Florida. The document establishes comprehensive technical and contractual requirements for the removal, replacement, and upgrade of the facility's air handling unit infrastructure, fire/smoke damper systems, building automation controls, and related fire suppression systems. The specifications cover work under Divisions 23 (Mechanical and Plumbing), 26 (Electrical), and 27 (Communications), with the bid set dated December 5, 2025. The project is phased, requiring temporary valving and capping of mechanical, electrical, plumbing, and fire protection utilities throughout construction. Key deliverables include shop drawings, coordination drawings showing HVAC, electrical, plumbing, and fire protection systems superimposed to identify conflicts, record documents with photographs of concealed work, and comprehensive operation and maintenance manuals. Contractors must submit submittals within 30 days of Notice to Proceed, with submittal review periods of five working days or more depending on volume. The contractor is responsible for site visits before bidding, coordination with all trades, compliance with all applicable codes and standards, and 24-hour service beginning at substantial completion through the one-year guarantee period.

The specifications establish stringent performance and compliance requirements with no exceptions to substitution of specified manufacturers and products unless specifically listed as acceptable alternates. Contractors must furnish all labor, materials, and equipment necessary for complete installation, including temporary services, core drilling, testing and balancing, system flushing and cleaning, and start-up procedures. Equipment must be certified to meet seismic, wind, and hurricane impact requirements per Florida Building Code, including large and small missile impact tests for equipment located in hurricane zones. The contractor bears all costs associated with permits, utility company fees, inspections, temporary services, equipment damage due to improper handling or storage, and any re-flushing or re-piping required due to air-bound systems. Record drawings must be submitted in electronic format prior to final payment request, and the contractor is solely responsible for accuracy of as-built documentation. Contractors must provide three copies of operation and maintenance manuals at least 30 days before substantial completion, including approved submittals, manufacturer data, startup procedures, flow diagrams, test records, and wiring diagrams organized by specification section.

View the file

Other files

File Type Posted
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#6_Revision).pdf PDF
Exhibit_R_-_VCBJ_Existing_Drawings_(As-Builts)_1983.pdf PDF
Exhibit_Q_-_NFPA_72_Inspection_Documents.pdf PDF
Exhibit_P_-_E4.03_-_FLOOR_PLAN_C_-_SKETCH_(REPLACES_ALL_PREVIOUS_VERSIONS)_(1).pdf PDF
Exhibit_O_-_E4.01_-_FLOOR_PLAN_A_-_SKETCH_(REPLACES_ALL_PREVIOUS_VERSIONS).pdf PDF
Exhibit_N_-_238216.11_Hydronic_Air_Coils_(REPLACES_ALL_PREVIOUS_VERSIONS).pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#3_Revision).pdf PDF
Exhibit_M_-_Diagram_RTU_Curb_and_Tie_Down.pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade_(Addendum_#1_Revision).pdf PDF
Volusia_County_Branch_Jail_Air_Handler-Fire_Suppression_System_Removal,_Replacement_and_Upgrade.pdf PDF
Exhibit_L_-_Contractor_-_Vendor_Background_Packet_Rev_05-22-2025.pdf PDF
Exhibit_K_-_Pre-Bid_Parking_Map.pdf PDF
Exhibit_J_-_VCBJ_Bidder_Disclaimer_and_Notice_to_Bidders.pdf PDF
Exhibit_I_-_VC_Branch_Jail_AHU_Fire_Suppression_Scope.pdf PDF
Exhibit_H_-_Special_Conditions_26-B-110IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-110IF.xlsx XLSX spreadsheet
Exhibit_F_-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-110IF.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-110IF.xlsx XLSX spreadsheet
Exhibit_A_-_Insurance_Requirements_26-B-110IF.pdf PDF
Construction_Bid_Request_Air_Handler.docx DOCX document
Pre-Bid_Meeting_Invitee_Listing_(1).docx DOCX document
283000_Digital,_Addressable_Fire_Alarm_System.pdf PDF
Table_of_Contents.pdf PDF
270500_Special_Systems.pdf PDF
264313_Surge_Protection_Devices.pdf PDF
260501_Electrical_Scope.pdf PDF
260533_Raceways_-_Metal.pdf PDF
262726_Wiring_Devices.pdf PDF
233300_Air_Duct_Accessories.pdf PDF
260534_Raceways_-_Non-metallic.pdf PDF
262813_Fuses.pdf PDF
260519_Low-Voltage_Electrical_Power_Conductors_and_Cables.pdf PDF
262816_Safety_Switches.pdf PDF
VCBJ_Bidder_Disclaimer.docx DOCX document
264113_Lightning_Protection_System.pdf PDF
260535_Boxes_for_Electrical_Systems.pdf PDF
Special_Conditions.docx DOCX document
232923_Variable_Frequency_Motor_Controllers.pdf PDF
237313_Modular_Indoor_Central_Station_Air_Handler_Units.pdf PDF
237413_Packaged,_Outdoor,_Central_Station_Rooftop_Units.pdf PDF
230529_Hangers_and_Supports_for_HVAC_Piping.pdf PDF
230519_Meters_and_Gages_for_HVAC_Piping.pdf PDF
260526_Grounding_and_Bonding_for_Electrical_Systems.pdf PDF
262416_Panelboards.pdf PDF
230548_Vibration_Controls_for_HVAC.pdf PDF
MD3.1_-_ENLARGED_MECHANICAL_ROOM_DEMO_PLAN.pdf PDF
260502_Basic_Materials_&_Methods.pdf PDF
VCDCH_Fire_Damper_100%CD_Submission_G-001_Cover_Sheet.pdf PDF
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SET

DECEMBER 5, 2025

Division 23

230000 230500 230513 230519 230523 230529 230548 230553 230593 230593.01 230700 230800 230900 230940 232113 232923 233113 233300 237313 237413

Division 26

260500 260501 260502 260519 260526 260533 260534 260535 262416 262726 262813 262816 264113 264313

Division 27

270500

Division 28

TOC

Table of Contents

Mechanical and Plumbing Supplemental Requirements Basic Mechanical Materials and Methods Common Motor Requirements for HY AC Equipment Meters and Gages for HY AC Piping General-Duty Valves for HVAC Piping Hangers and Supports for HVAC Piping Vibration Controls for HY AC Identification for HY AC Piping and Equipment Testing, Adjusting and Balancing for HVAC T &B for Smoke Control Systems HY AC Insulation Commissioning of HY AC Instrumentation and Control for HYAC Sequence of Operations Hydronic Piping Variable Frequency Motor Controllers Metal Ducts Air Duct Accessories Modular Indoor Central-Station Air-Handling Units Packaged, Outdoor, Central Station Rooftop Units

General Provisions Electrical Scope Basic Materials & Methods Low-Voltage Electrical Power Conductors and Cables Grounding and Bonding for Electrical Systems Raceways - Metal Raceways - Non-metallic Boxes for Electrical Systems Panel boards Wiring Devices Fuses Safety Switches Lightning Protection System TV Suppression for L V Electrical Power

Special Systems

VOLUSIA COUNTY

BRANCH JAIL

12/05/2025

Digitally sig,ed by Eric S Cepull Location: Orlando, Florida Reason: I am approving this document Contact Info:

ecepull@ingenLityci.com Date: 2025.12.05

11·49·30-05'00'

Table of Contents - I

283000 Digital, Addressable Fire Alarm System

BID SET VOLUSIA COUNTY

DECEMBER 5, 2025 BRANCH JAIL

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 1

SECTION 230000 - MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS

PART 1 -GENERAL

1.1 REFERENCES

A. This entire section forms an integral part of each HVAC, Electrical, Plumbing, Fire Protection, Controls and all other related Mechanical and Electrical sections included in the 230000 and 260000 series of the specifications.

B. Conditions of the Contract and Division 1, General Requirements, apply to work of this Section. Where Paragraphs of this Section conflict with similar paragraphs of Division 1, requirements of this Section shall prevail.

C. Examine Drawings and other Sections of Specifications for requirements that affect work of this Section.

D. Attention is directed to the following specialized requirements of this Part I:

1. Article 1.7 REQUEST FOR INFORMATION (RFI) PROCEDURE. This Article describes the requirements of the Contractor when submitting RFIs.

2. Article 1.13 GUARANTEE AND 24 HOUR SERVICE. The requirement to provide a 24 hour phone number for service during the guarantee period is incorporated; also, an extended warranty to cover the full one year contractor's guarantee period starting on the date of substantial completion, even if equipment has been previously used for temporary heat or other purpose.

3. Article 1.14 RECORD DOCUMENTS. A requirement to incorporate photographs, taken during construction, of buried and concealed components is incorporated.

4. Article 1.18 SUBMITTALS. A special cover sheet for each submittal, to be filled out by the contractor, is required. A description of "Acceptable Manufacturers" is included. No other manufacturers will be considered for this project. The turn-around time required to process submittals is defined.

1.2 DEFINITIONS

A. As used in these Sections, "provide,” means "furnish and install." "Furnish" means "to purchase and deliver to the project site complete with every necessary appurtenance and support," and "Install" means "to unload at the delivery point at the site and perform every operation necessary to establish secure mounting and correct operation at the proper location in the project. "Architect" means the "Prime Design Consultant," and if Ingenuity, Inc. is not the prime design consultant, the Architect may authorize Ingenuity, Inc. to act on the Architect's behalf in matters concerning the 210000, 220000, 230000, 260000, and 270000 series of specifications. "RFI" means Contractor's “Request for Information."

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 2

1.3 SCOPE

A. Perform work and provide material and equipment as shown on Drawings and/or as specified and/or indicated in this Section of the Specifications. Completely coordinate work of Sections (Divisions 21, 22, 23, 26, and 27) with work of other trades and provide a complete and fully functional installation.

B. Drawings and Specifications form complementary requirements; provide work specified and not shown, and work shown and not specified as though explicitly required by both.

Although work is not specifically shown or specified, provide supplementary or miscellaneous items, appurtenances, devices and materials obviously necessary for a sound, secure and complete installation.

C. It is the intent that these Specifications and Drawings are to establish minimum requirements for methods, products and equipment and to provide electrical service, distribution and systems finished, tested and ready for operation. Incidental detail not usually shown or specified, but necessary for proper installation and operation shall be included in the work and this Contractor's estimate, the same as if specified. Locations of all equipment and material shall be adjusted at no extra cost to the Owner, to accommodate the work interferences anticipated and/or encountered. Prior to installation, determine the exact route and location of each raceway and piece of equipment to minimize conflicts with other trades.

D. Give notices, file plans, obtain permits and licenses, pay fees and backcharges, and obtain necessary approvals from authorities that have jurisdiction as required to perform work in accordance with all legal requirements and with Specifications, Drawings, Addenda and Change Orders, all of which are part of Contract Documents.

E. This project will be phased, as defined by the Owner. This will necessitate the provision of temporary valving and capping of Mechanical, Electrical, Plumbing and Fire Protection utilities. All associated appurtenances with the utilities shall be provided as part of this project.

F. The scope of electrical work shall include all labor, materials, tools, equipment and services necessary for, or incidental to proper installation and completion of the work indicated on the Drawings and stated within these Specifications.

1. Unless otherwise noted, provide labor and materials to install electrical disconnects, pushbutton stations, controllers and motor starters supplied by other trades.

2. Unless otherwise noted, provide labor and materials to make final electrical connections to motors, controllers and starters and electrical interconnections between equipment supplied by other trades.

3. Division 23 Contractor shall furnish all motor starters and disconnect switches as required by NEC for HVAC motors, unless specifically noted otherwise in the specifications or on the drawings. Motor starters and disconnect switches shall be in accordance with Division 26 Specifications.

G. These documents describe the systems required and approximately where the larger equipment is to be located. This contractor shall include allowances in his estimates to

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 3

fully complete the system including all interconnecting and coordination and installation details and components and extending the system into and throughout all spaces. He shall also include allowances for startup and for making the systems fully operational, and for scope and design contingencies. Future changes in price above the GMP or selected Bid, for items not shown on these drawings will not be allowed if the system itself is shown or described in these documents. The only future changes in price that will be allowed are if new systems are added.

H. If a Guaranteed Maximum Price (GMP) has been prepared using documents prior to the issuance of the 100% Bid Documents, the Contractor shall identify any and all changes to the documents (both drawings and specifications) that are affecting the GMP, either increasing or decreasing the GMP amount. All changes shall be numbered and circled, in both drawings and specifications. The Contractor shall also provide detailed cost back-up for all items noted above.

1.4 CONTRACT DOCUMENTS

A. Listing of Drawings does not limit responsibility of determining full extent of work required by these Contract Documents. Refer to Architectural, HVAC, Plumbing, Fire Protection, Electrical, Structural, Site Utility and all other Drawings and other Sections that indicate types of construction in which work shall be installed and work of other trades with which work of Sections (Divisions 21, 22, 23, 26, and 27) must be coordinated.

B. Except where modified by a specific notation to the contrary, it shall be understood that the indication and/or description of any item, in the drawings or specifications or both, carries with it the instruction to furnish and install the item, regardless of whether or not this instruction is explicitly stated as part of the indication or description.

C. Items referred to in singular number in Contract Documents shall be provided in quantities necessary to complete work.

D. Drawings are diagrammatic. They are not intended to be absolutely precise; they are not intended to specify or to show every offset, fitting, and component. The purpose of the drawings is to indicate a systems concept, the main components of the systems, and the approximate geometrical relationships. Based on the systems concept, the main components, and the approximate geometrical relationships, the contractor shall provide all other components and materials necessary to make the systems fully complete and operational.

E. Information and components shown on riser diagrams but not shown on plans, and vice versa, shall apply or be provided as if expressly required on both.

F. Data that may be furnished electronically by the Architect (on computer tape, diskette, or otherwise) is diagrammatic. Such electronically furnished information is subject to the same limitation of precision as heretofore described. If furnished, such data is for convenience and generalized reference, and shall not substitute for Architect's sealed or stamped construction documents.

1.5 DISCREPANCIES IN DOCUMENTS

A. Where Drawings or Specifications conflict or are ambiguous, advise Architect in writing before Award of Contract. Otherwise, Architect's interpretation of Contract Documents

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 4

shall be final, and no additional compensation shall be permitted due to discrepancies or ambiguities thus resolved.

B. Where Drawings or Specifications do not coincide with manufacturers' recommendations, or with applicable codes and standards, alert Architect in writing before installation. Otherwise, make changes in installed work as Architect requires within Contract Price.

C. If the required material, installation, or work can be interpreted differently from drawing to drawing, or between drawings and specifications, this contractor shall provide that material, installation, or work which is of the higher, more stringent standard.

D. It is the requirement of the Contract Documents to have the contractor provide systems and components that are fully complete, operational and suitable for the intended use.

There may be situations in the documents where insufficient information exists to precisely describe a certain component or subsystem, or the routing of a component or its coordination with other building elements. In cases such as this, where the Contractor has failed to notify the Architect of the situation in accordance with Paragraph (A) above, the Contractor shall provide the specific component or subsystem with all parts necessary for the intended use, fully complete and operational, and installed in workmanlike manner either concealed or exposed per the design intent.

E. In cases covered by Paragraph (D) above, where the Contractor believes he needs engineering guidance, he shall submit a sketch identifying his proposed solution and the Architect shall review and advise of disposition (refer to Article 1.7).

1.6 MODIFICATIONS IN LAYOUT

A. HVAC, Plumbing, Fire Protection, and Electrical Drawings are diagrammatic. They indicate general arrangements of mechanical and electrical systems and other work.

They do not show all offsets required for coordination nor do they show the exact routings and locations needed to coordinate with structure and other trades and to meet Architectural requirements.

B. In order to obtain the Architect's desired aesthetics in spaces used by building occupants, in all such spaces, prior to installation of visible material and equipment (including access panels) review Architectural Drawings for desired locations and where not definitely indicated, request information from Architect.

C. Check Contract Documents, as well as, Submittals and Shop Drawings of all subcontractors to verify and coordinate spaces in which work of Divisions 21, 22, 23, 26, and 27 will be installed.

D. Maintain maximum headroom at all locations. All piping, duct, conduit and associated components to be as tight to underside of structure as possible.

E. Make reasonable modifications in layout and components needed to prevent conflict with work of other trades and to coordinate according to Paragraphs A, B, C and D above.

Systems shall be run in a rectilinear fashion.

F. Where conflicts or potential conflicts exist and engineering guidance is desired, submit sketch of proposed resolution to Architect for review and approval (refer to Article 1.7).

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 5

1.7 REQUESTS FOR INFORMATION (RFI’S)

A. If the RFI is a request to resolve a conflict or an ambiguity, or a request for additional detail, Contractor's RFI shall include a sketch or equivalent description of Contractor's proposed solution, in accordance with paragraphs 1.5 (E) and 1.6 (F) above.

B. To expedite the flow of RFI's, for all RFI's under Divisions 23 and 26, Contractor shall submit the attached form, or similar form including the same information, to the Architect, with copy to Engineer. Contractor shall include proposed solution in the indicated space on the form.

1.8 COORDINATION DRAWINGS

A. When included as part of the Contract Documents, there shall be full cooperation and coordination of all specialty trades.

B. The Division 21, 22, 23, 26, and 27 Contractors shall both comply fully with the requirements set forth in the “Coordination Drawings” specification section. At a minimum, this shall include the following trades:

1. Mechanical Ductwork

2. Mechanical Piping

3. Plumbing

4. Electrical

5. Fire Protection (sprinkler system)

6. Controls

7. Special Building Systems

C. Refer to the Coordination Drawings specification section for specific requirements.

D. The following work is required by, but not specified in, Division 23 and 26 and shall be performed in compliance with the appropriate Sections.

1. Excavation and backfill.

2. Concrete work, including concrete housekeeping pads and other pads and blocks for vibrating and rotating equipment, ductbank envelopes and cast-in-place manholes and handholes.

3. Cutting and patching of masonry, concrete, tile and other parts of structure, with the exception of drilling for hangers and providing holes and openings in metal decks.

4. Flashing of wall and roof penetrations.

5. Installation of access panels in floors, walls, and furred spaces or above ceilings.

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 6

6. Painting, except as specified herein.

7. Structural supports necessary to distribute loading from equipment to roof or floor, except as specified herein.

8. Temporary light, power, water, heat, gas and sanitary facilities for use during construction and testing.

9. Outdoor air intake and exhaust louvers.

1.9 SITE VISIT

A. Before submitting bid, visit and carefully examine site to identify existing conditions and difficulties that will affect work of Divisions 21, 22, 23, 26, and 27. No extra payment will be allowed for additional work caused by unfamiliarity with site conditions that are visible or readily construed by an experienced observer.

1.10 EXISTING CONDITIONS AND PREPARATORY WORK

A. Before starting work in a particular area of the project, visit site and examine conditions under which work must be performed including preparatory work done under other Sections or other Contracts or by the Owner. Report conditions that might affect work adversely, in writing, through Contractor to Architect via RFI. Do not proceed with work until defects have been corrected and conditions are satisfactory. Commencement of work shall be construed as complete acceptance of existing conditions and preparatory work.

1.11 CODES, STANDARDS, AUTHORITIES AND PERMITS

A. Perform work strictly as required by rules, regulations, standards, codes, ordinances, and laws of local, state, and Federal governments, and other authorities that have legal jurisdiction over the site.

B. Prior to commencement of work, notify State and applicable authorities as required and submit all of the applicable notifications for construction, operation and/or demolition.

C. Materials and equipment shall be manufactured, installed and tested as specified in latest editions of applicable publications, standards, rulings and determinations of:

1. Local and state building, plumbing, mechanical, electrical, fire and health department codes.

2. Air Movement and Controls Association, Inc. (AMCA)

3. American Gas Association (AGA).

4. American Society of Plumbing Engineers (ASPE).

5. Cast Iron Soil Pipe Institute (CISPI).

6. Factory Mutual Association (FM).

7. Mechanical Contractors Association (MCA).

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 7

8. Manufacturers Standardization Society (MSS).

9. National Bureau of Standards (NBS).

10. National Electrical Code (NEC).

11. National Fire Protection Association (NFPA).

12. National Sanitation Foundation (NSF).

13. Plumbing and Drainage Institute (PDI).

14. American Insurance Association (A.I.A.) (formerly National Board of Fire Underwriters).

15. Occupational Safety and Health Act (OSHA).

16. Underwriters Laboratories (UL)

17. Water Conditioning Foundation (WCF).

18. Owner’s Insurance Underwriter.

D. Material and equipment shall be listed by Underwriters' Laboratories (UL), and approved by ASME, ANSI, ASTM, and AGA for intended service.

E. Fire protection equipment shall be listed by Underwriters’ Laboratories (UL) and/or Factory Mutual (FM) approved for fire service.

F. When requirements cited in this Specification conflict with each other or with Contract Documents, the most stringent shall govern work. Architect may relax this requirement when such relaxation does not violate ruling of authorities that have jurisdiction.

Approval for such relaxation shall be obtained in writing.

G. Most recent editions of applicable specifications and publications of the following organizations form part of these Contract Documents.

1. American Gas Association (AGA).

2. Air Movement and Control Association (AMCA).

3. American National Standards Institute (ANSI).

4. Air-Conditioning and Refrigeration Institute (ARI).

5. American Society of Heating Refrigeration and Air-Conditioning Engineers

(ASHRAE).

6. American Society of Mechanical Engineers (ASME).

7. American Society of Plumbing Engineers (ASPE).

8. American Society of Sanitary Engineering (ASSE).

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 8

9. American Society for Testing and Materials (ASTM).

10. American Water Works Association (AWWA).

11. Cast Iron Soil Pipe Institute (CISPI).

12. Certified Ballast Manufacturers (CMB).

13. Factory Mutual Engineering (FM).

14. Manufacturer's Standardization Society of the Valve & Fittings Industry (HSS)

15. Insulated Cable Engineers Association (ICEA).

16. Institute of Electrical and Electronics Engineers (IEEE).

17. Illuminating Engineering Society (IES).

18. Mechanical Contractors Association (MCA).

19. National Bureau of Standards (NBS).

20. National Electrical Code (NEC).

21. National Electric Manufacturers Association (NEMA).

22. National Fire Protection Association (NFPA).

23. National Sanitation Foundation (NSF).

24. Plumbing and Drainage Institute (PDI).

25. Sheet Metal and Air Conditioning Contractors National Association (SMACNA).

26. Thermal Insulation Manufacturers Association (TIMA).

27. Underwriters Laboratories (UL).

28. Water Conditioning Foundation (WCF).

H. The complete installation shall comply with the following codes:

0B1. 1BNFPA 1 2B2021 3BUniform Fire Code

4B2. 5BNFPA 13 6B2019 7BStandard for the Installation of Sprinkler Systems

8B3. 9BNFPA 13R 10B2019 11BStandard for the Installation of Sprinkler Systems in Residential Occupancies up to and Including Four Stories in Height

12B4. 13BNFPA 24 14B2019 15BStandard for the Installation of Private Fire

Service Mains and Their Appurtenances

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 9

16B5. 17BNFPA 25 18B2019 19BStandard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems

20B6. 21BNFPA 51B 22B2021 23BStandard for Fire Protection During Welding, Cutting and Other Hot Work

24B7. 25BNFPA 70 26B2020 27BNational Electrical Code

28B8. 29BNFPA 72 30B2019 31BNational Fire Alarm Code

32B9. 33BNFPA 75 34B2021 35BStandard for the Protection of Information

Technology Equipment

36B10. 37BNFPA 90A 38B2019 39BStandard for the Installation of Air Conditioning and Ventilating Systems

40B11. 41BNFPA 92A 42B2018 43BStandard for Smoke – Control Systems Utilizing

Barriers and Pressure Differences

44B12. 45BNFPA 96 46B2021 47BStandard for Ventilation Control and Fire

Prevention of Commercial Cooking Operations

48B13. 49BNFPA 99 50B2021 51BStandard for Health Care Facilities

52B14. 53BNFPA 101 54B2021 55BLife Safety Code

56B15. 57BNFPA 110 58B2019 59BStandard for Emergency and Standby Power

Systems

60B16. 61BNFPA 780 62B2017 63BInstallation of Lightning Protection Systems

64B17. 65BASME A17.1 66B2019 67BElevator Code

68B18. 69B2010 ADA Standards for Accessible Design

70B19. 71BANSI A117-1 72B2017 73BAccessibility Code

74B20. 75BAMCA 210 (latest edition) 76BLaboratory Methods of Testing Fans for Rating Purposes

77B21. 78BAMCA 310 (latest

79BReverberant Room Method for Sound Testing of Fans

80B22. 81BAMCA 500 (latest

82BTest Method for Louvers, Dampers, and Shutters

83B23. 84BARI 410 (latest

85BForced-Circulation Air-Cooling and Air Heating Coils

86B24. 87BSMACNA (latest 88BFire, Smoke and Radiation Damper Installation Guide for

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 10

edition) HVAC Systems, Sheet Metal and Air Conditioning Contractors National Association, Inc.

89B25. 90BFlorida Building Code, Accessibility, Eighth Edition – 2023

91B26. 92BFlorida Building Code, Building, Eighth Edition – 2023

93B27. 94BFlorida Building Code, Mechanical, Eighth Edition – 2023

95B28. 96BFlorida Building Code, Plumbing, Eighth Edition – 2023

97B29. 98BFlorida Building Code, Fuel Gas, Eighth Edition – 2023

99B30. 100BFlorida Building Code, Test Protocols for High Velocity Hurricane Zones, Eighth

Edition – 2023

101B31. 102BFlorida Building Code, Energy Conservation, Eighth Edition – 2023

I. Secure and pay for all permits and inspections required by any of the Authorities Having Jurisdiction (AHJ).

1.12 GUARANTEE AND 24 HOUR SERVICE

A. Guarantee the Work of this Section in writing for one year following the date of Substantial Completion. If the equipment is used for ventilation, temporary heat, etc.

prior to initial beneficial occupancy by the Owner, the bid price shall include an extended period of warranty covering the one-year of occupancy, starting from the initial date of beneficial occupancy by the Owner. The guarantee shall repair or replace defective materials, equipment, workmanship and installation that develop within this period, promptly and to Architect's satisfaction and correct damage caused in making necessary repairs and replacements under guarantee within Contract Price.

B. In addition to guarantee requirements of Division 1 and of Paragraph A above, obtain written equipment and material warranties offered in manufacturer's published data without exclusion or limitation, in Owner's name.

C. Replace material and equipment that require excessive service during guarantee period as defined and as directed by Architect.

D. Provide 24-hour service beginning on the date of Substantial Completion and lasting until the termination of the guarantee period. Service shall be at no cost to the Owner. This contractor or a separate service organization can provide Service. Choice of service organization shall be subject to Architect and Owner approval. Submit name and a phone number that will be answered on a 24-hour basis each day of the week, for the duration of the service.

E. Submit copies of equipment and material warranties to Architect as part of the close-out documents before final payment.

F. At end of guarantee period, transfer manufacturers' equipment and material warranties still in force to Owner.

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 11

G. This Article shall not be interpreted to limit Owner's rights under applicable codes and laws and under this Contract.

H. Specific Paragraphs of the Specification sections may specify warranty requirements that exceed those of this Article.

I. Use of systems provided under Divisions 21, 22, 23, 26, and 27 for temporary services and facilities shall not constitute Final Acceptance of work nor beneficial use by Owner, and shall not institute guarantee period.

J. Provide manufacturer's engineering and technical staff at site to analyze and rectify problems that develop during guarantee period immediately. If problems cannot be rectified immediately to Owner's satisfaction, advise Architect in writing, describe efforts to rectify situation, and provide analysis of cause of problem. Architect will suggest course of action.

1.13 RECORD DOCUMENTS

A. As work progresses and for duration of Contract, maintain a complete and dedicated set of Contract Documents (including drawings and specifications) at the job site at all times, to become the Record Documents. Record work completed and all changes from original Contract Documents clearly and accurately, including work installed as a modification or addition to the original design. This shall be updated, at a minimum weekly, and will be reviewed prior to each Pay Application approval.

B. Take photographs of all concealed equipment in gypsum board ceilings, shafts, underground (buried) piping routes and supports and other concealed, inaccessible work.

At completion of work, make copies of photographs with written explanation for each photo. These shall become part of Record Documents.

C. Underground and utility work shall be located by distances to landmarks, such as building foundations. Give actual dimensions of everything installed including elevations and elevations at each change in direction.

D. Drawings shall also show record condition of details, sections, riser diagrams, control changes and corrections to schedules. Schedules shall incorporate actual manufacturer and make and model numbers of final equipment installation.

E. THE ENGINEER/ARCHITECT WILL NOT CERTIFY THE ACCURACY OF THE

RECORD DRAWINGS - THIS IS THE SOLE RESPONSIBILITY OF THE

CONTRACTOR.

F. When required by the jurisdiction, each trade shall submit the record set for approval by the building department in a form acceptable to the department. Any document format size changes, and supplemental information required for the submittal are the responsibility of the contractor.

G. The Record Documents shall include at a minimum:

1. Actual location of existing utilities.

2. Field changes to installation that differ from original design documents.

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 12

3. Document revisions associated with RFI responses, Supplemental Instructions, Proposal Requests, and Change Orders, etc.

4. Show routing of electrical feeder conduits.

5. Show power and lighting circuiting indicating actual panel and circuit number.

H. Quality of Record Documents shall equal or exceed that of original Contract Documents.

I. The record documents shall be submitted in electronic media format to the Architect/Engineer for review and approval, prior to Application for Final Payment.

J. Obtain at time of purchase of equipment, three copies of operation, lubrication and maintenance manuals for all items. Assemble literature in coordinated manuals with additional information describing combined operation of field assembled units, including as-built wiring diagrams. Manual shall contain names and addresses of manufacturers and local representatives who stock or furnish repair parts for items or equipment.

Divide manuals into three sections or books as follows:

1. Directions for and sequence of operation of each item of the Mechanical and Electrical systems, e.g., air handling units, boilers, domestic water pump, generator, etc. Sequence shall list valves, switches and other devices used to start, stop and control system. Detail procedure to be followed in case of malfunctions. Include detailed approved flow diagrams of temperature control, heating, condensate, chilled water, condenser water, etc., as appropriate for systems provided. Include approved valve directory showing each valve number, location of each valve, and equipment or fixture controlled by valve.

2. Detailed maintenance and troubleshooting manuals containing data furnished by manufacturer for complete maintenance. Include copy of Engineer-approved balancing report.

3. Lubrication instructions detailing type of lubricant, amount, and intervals recommended by manufacturer for each item of equipment. Include additional instructions necessary for implementation of first class lubrication program.

Include approved summary of lubrication instructions in chart form, where appropriate.

K. The manuals shall include the following and shall have an index of contents and tabs for each Specification Section and each piece of equipment specified in that Section and be provided in the order listed below, per Specification Section.

1. Copies of all approved submittals/shop drawings.

2. Manufacturer's operating and maintenance instructions and parts lists of all items or equipment. Where manufacturer's data includes several types or models, the applicable type or model shall be clearly designated.

3. Startup and shutdown procedures.

4. Flow diagrams.

5. Test records.

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 13

6. Wiring diagrams.

7. Composite electrical diagrams.

8. Owner's written acknowledgement of satisfactory completion of instruction period.

L. The operation manuals and instructions to the Owner are of prime importance and shall be provided prior to request for final payment.

M. Furnish three copies of manuals to Architect for approval and distribution to Owner.

Deliver manuals no less than 30 days prior to acceptance of equipment to permit Owner's personnel to become familiar with equipment and operation prior to acceptance.

N. Provide framed and glazed charts as follows (mount as directed by Owner or Architect):

1. Flow diagrams from first part of manual as described above.

2. Valve directory.

3. Lubrication chart from third part of manual.

O. Operating instructions: Upon completion of installation or when Owner accepts portions of building and equipment for operational use, instruct Owner's operating personnel in any or all parts of all systems. Factory-trained personnel shall perform instructions.

Owner shall determine which systems require additional instructions. Duration of instructions shall take equipment through complete cycle of operation (at least five working days). Make adjustments under operating conditions.

1.14 PROTECTION OF WORK

A. Each contractor shall be responsible for his work and equipment until finally inspected, tested, and accepted. Carefully store materials and equipment, which are not immediately installed after delivery to site. Close open ends of work with temporary covers or plug during construction to prevent entry of obstructing material.

B. Each separate contractor shall protect the work and material of other trades that might be damaged by his work or workmen and make good all damage thus caused.

1.15 SUBMITTALS

A. This Article supplements Division 1.

B. Definitions:

1. Shop Drawings are information prepared by the Contractor to illustrate portions of the work, such as ductwork layout arrangements, in more detail than shown in the Contract Documents.

2. Coordination Drawings are detailed, large-scale layout Shop Drawings showing HVAC, Electrical, Plumbing and Fire Protection work superimposed in order to identify conflicts and ensure inter-coordination of Mechanical, Electrical, Architectural, Structural and other work.

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 14

3. Submittals are a compilation of product data cutsheets fully describing performance, size, connections, color selection, etc., as provided by the manufacturer.

C. Submittal Cover Sheet

1. Submittal data for each product shall include a copy of the following cover sheet completely filled out. Incomplete or incorrect cover sheet submittal shall constitute reason for rejection.

2. Shop drawings/submittals shall be submitted according to applicable specification section’s requirements with a separate cover sheet completed for each product, rather than one cover sheet for multiple products, whether or not supplied by one manufacturer or vendor.

3. Review submittal packages for compliance with Contract Documents and then submit to Architect for review. Submit reproducible drawing and two blue- or black-line reproductions of each Shop Drawing larger than 8-1/2 x 11. Submit four sets of each smaller shop drawing. After review, reproducible original of each large Shop Drawing and three sets of each small shop drawing will be returned with reviewer's marks.

4. Submittals and shop drawings shall be submitted COMPLETE, by trade, in heavy-duty three-ring binders. Each binder shall include a Table of Contents identifying each section. Each section shall be arranged in order of specification section and tabbed accordingly. Each item submitted shall reference the article and paragraph of its specification section. Each item specified shall be addressed. If specified item will not be used, state so in submittal with brief explanation. (Example: Globe Valves - N/A, use ball and butterfly valves.) In the instance when a resubmission is necessary, resubmit only the items required;

a complete resubmittal containing previously approved data is not required.

5. Submittals and/or shop drawings associated with long lead items required on this project, shall be submitted within 30 days after Notice to Proceed has been issued.

6. Provide additional copies of approved submittals/shop drawings as required for full distribution.

7. Shop Drawings showing layouts of systems shall contain sufficient plans, elevations, sections, details and schematics to describe work clearly. They shall be 1/4 inches = 1 foot 0 inch scale unless specified otherwise. Sheet Metal Shop Drawings shall be 3/8 inch = 1 foot 0 inch and shall indicate work of other Sections where physical clearances are critical and where interferences are possible. Provide larger scale details as necessary. Sheet Metal Drawings shall show elements of Architect's reflected ceiling plan, exposed ductwork, walls, partitions, diffusers, registers, grilles, fire dampers, sleeves and other aspects of construction as necessary for coordination. Submit one reproducible plus two prints of each shop drawing.

8. ALL FIREWALLS AND SMOKE PARTITIONS MUST BE HIGHLIGHTED

ON THE SHEETMETAL DRAWINGS FOR APPROPRIATE

COORDINATION.

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 15

9. Shop drawings and submittals showing manufacturer's product data shall contain detailed dimensional drawings, accurate and complete description of materials of construction, manufacturer's published performance characteristics and capacity ratings (performance data, alone, is not acceptable), electrical requirements and wiring diagrams. Drawings shall clearly indicate location (terminal block or wire number), voltage and function for all field terminations, and other information necessary to demonstrate compliance with all requirements of Contract Documents.

10. Provide shop drawing submittals showing details of piping connections to ALL equipment. If connection details are not submitted and connections are found to be installed incorrectly in the field, this contractor shall reinstall them within the original contract price.

D. Acceptable Manufacturers

1. The Engineer’s mechanical/electrical design for each product is based on the manufacturer listed in the schedule or shown on the drawings. In Part 2 of the specifications certain Alternate Manufacturers are listed as being acceptable.

The listing of a manufacturer as acceptable does not imply automatic approval. It is the sole responsibility of the Contractor to ensure that any submittals made are for products that meet or exceed the specifications included herein. These are acceptable only if, as a minimum, they:

a. Meet all performance criteria listed in the schedules and outlined in the specification. For example, to be acceptable, an air-handling unit must deliver equal CFM against equal external static pressure using equal or fewer horsepower as the air handler listed in the schedules.

b. Have identical operating characteristics to those called for in the specification. For example, a two-stroke diesel generator will not be acceptable if a four-stroke model is specified.

c. Fit within the available space it was designed for, including space for maintenance and component removal, with no modification to either the space or the product. Clearances to walls, ceilings and other equipment will be at least equal to those shown on the design drawings. The fact that a manufacturer’s name appears as acceptable shall not be taken to mean that the Engineer has determined that the manufacturer’s products will fit within the available space - this determination is solely the responsibility of the contractor.

d. For rooftop mounted equipment and for equipment mounted in areas where structural matters are a consideration, the products must have a weight no greater than the product listed in the schedules or specifications.

e. Products must adhere to all architectural considerations including but not limited to: being of the same color as the product scheduled or specified, fitting within architectural enclosures and details, and for diffusers, lighting and plumbing fixtures - being the same size and of the same physical appearance as scheduled or specified products.

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 16

f. All equipment shall be labeled or listed by the National Board of Underwriters Laboratories (U.L.) where such labeling or listing exists for such material.

g.

E. Required Use of Acceptable Manufacturers on this Project:

1. Substitution of products other than those of the Acceptable Manufacturers specified herein shall not be made. Only the specified items or the comparable product by one of the specified Alternate Manufacturers shall be submitted.

Products by other manufacturers shall not be used on this project.

2. Listing of a manufacturer's name for a particular material or piece of equipment does not imply acceptance of all of that manufacturer's products. Use of more than one manufacturer to supply any specific material or equipment shall have prior approval of the Architect/Engineer.

F. Deviations

1. Concerning deviations other than substitutions, proposed deviations from Contract Documents should be requested individually in writing whether deviations result from field conditions, standard shop practice, or other cause.

Submit letter with transmittal of submittals/shop drawings which flags the deviation to the attention of the Architect.

2. Without letters flagging the deviation to the Architect, it is possible that the Architect may not notice such deviation or may not realize its ramifications.

Therefore, if such letters are not submitted to the Architect, the contractor shall hold the Architect and his consultants harmless for any and all adverse consequences resulting from the deviations being implemented. This shall apply regardless of whether the Architect has reviewed or approved submittals/shop drawings containing the deviation, and will be strictly enforced.

3. Approval of proposed deviations, if any, will be made at the discretion of the Architect.

4. Where equipment or methods different than those specified are submitted by this Contractor and approved for use by the Engineer and Owner, the installation shall be in full conformance with the intent of these Contract Documents. All costs related to the use of the different method and/or equipment shall be paid by this Contractor.

G. Submittal Dispositions: Submittals will be returned from the Engineer marked as illustrated below:

103BNO EXCEPTIONS

TAKEN -

104BSubmitted data is in compliance with Contract Document requirements; contractor is still required to coordinate and field verify products and installation.

105BMAKE CORRECTIONS

NOTED -

106BSubmitted data is generally in compliance with Contract Document requirements with minor notations; no resubmission required. Item is approved for release if

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 17

engineers’ notations are addressed.

107BREVISE AND

RESUBMIT -

108BSubmitted data contains deviations, is incomplete, or requires further clarification any of which require resubmission for confirmation; item is not approved for release.

109BREVIEWED FOR

GENERAL

CONFORMANCE WITH

OUR DISCIPLINES

ONLY -

110BSubmitted data and products reviewed for compatibility with the Engineering systems. Specific product performance must be reviewed and approved by the Engineer/Architect that designed the system.

H. Responsibility

1. Intent of Submittal review is to check for capacity, rating, and certain construction features. Contractor shall ensure that work meets requirements of Contract Documents regarding information that pertains to fabrication processes or means, methods, techniques, sequences and procedures of construction; and for coordination of work of this and other Sections. Work shall comply with submittal notations to extent that they agree with Contract Documents. Submittal review shall not diminish responsibility under this Contract for dimensional coordination, quantities, installation, wiring, supports and access for service, nor shop drawing errors or deviations from requirements of Contract Documents.

The Architect's/Engineer’s noting of some errors while overlooking others will not excuse the Contractor from proceeding in error. Contract Documents requirements are not limited, waived nor superseded in any way by review.

2. INFORM SUBCONTRACTORS, MANUFACTURERS, SUPPLIERS, ETC.,

OF SCOPE AND LIMITED NATURE OF REVIEW PROCESS AND

ENFORCE COMPLIANCE WITH CONTRACT DOCUMENTS.

a. The Engineer’s obligations to review shop drawings and other submittals and to return them in a timely manner are conditioned upon the prior review and approval of the shop drawings or submittals by the Contractor as required in the construction contract and the Contractor’s submittal of the shop drawings and other submittals in accordance with a written schedule distributed in advance to the Engineer identifying the dates for the submittal of the various shop drawings and submittals.

I. Schedule: Incorporate submittal review period into construction schedule so that Work is not delayed. Contractor shall assume full responsibility for delays caused by not incorporating the following submittal review time requirements into his project schedule.

Working days listed reference the time in the Engineer's office. It does not include transmittal or review time of Contractor or Architect. If more than five submittals/shop drawings of a single trade are received in one week, allow at least five (5) additional working days, exclusive of transmittal time, for review, each time a submittal/shop drawing is submitted or resubmitted.

J. Multiple Re-submittals: The Engineer will review the first submittal from the contractor and respond with comments, and will review one re-submittal for the same item(s) from the contractor and respond with comments. If the contractor is required to make subsequent submittals for the same item(s) the Engineer shall be compensated by the

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 18

contractor for the time to review each subsequent re-submittal. The contractor shall agree to compensate the Engineer a minimum of $500 per each re-submittal item.

1.16 UTILITY COSTS

A. The Contractor shall include all costs from the electrical, water, sewer, gas, etc., utility companies that are assessed the Owner for installation of these services. It is the responsibility of the Contractor to obtain these costs from the utility companies and include them in his Bid.

1.17 TEMPORARY/CONTINUITY OF UTILITY SERVICES

A. Refer to Division 1 - General Requirements, regarding specific requirements.

B. Provide temporary services where project construction schedule requires extended shut downs of existing equipment and/or systems. Temporary services include the necessary equipment and/or systems to maintain continuity of services. Extended shut downs are interruptions of existing services for a period of time longer than that acceptable to the Owner.

C. Coordinate work under Divisions 21, 22, 23, 26, and 27 with progress of construction so that permanent-heating/cooling system will be ready to provide temporary heating/cooling if permitted by Architect as soon as building is closed in.

D. Provide and direct labor required for attendance, operation and final restoration of permanent heating/cooling system if used for temporary heating/cooling purposes.

Owner shall provide continuous direct attendance whenever permanent system is in operation prior to acceptance of permanent heating/cooling system.

E. Heating, air conditioning, humidity control and any other environmental factors shall be the responsibility of the Contractor throughout the construction period.

F. Do not interrupt existing utility services without written Owner's approval.

G. Schedule interruptions in advance, according to Owner's instructions. Submit, in writing, with request for interruption, methods proposed to minimize length of interruption.

H. Interruptions shall be scheduled at such times of day and work so that they have minimal impact on Owner's operations.

I. Contractor shall coordinate any shutdowns of existing systems as follows:

1. Give proper notice to Owner when making shutdowns; a minimum of fourteen full days is required.

2. Minimize timeline of shutdowns of any system.

3. Provide temporary services where required and perform shutdowns and tie in’s at a time convenient to Owner.

4. Contractor shall be responsible for completing and filing the Owner's shutdown notice questionnaire.

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 19

5. Perform required survey and inspection work required by the notice for shutdown.

6. All life safety systems, including but not limited to automatic sprinklers, shall be returned to service at the end of each work day, when work is being performed on the systems. It is the responsibility of the Contractor to provide all associated appurtenances necessary to ensure that the systems are in proper working condition at all times.

J. Provide all necessary material, tools, and labor as required for the provisions of temporary services.

K. Include premium time work associated with interruptions of services and/or shutdowns as necessary to avoid disruption to Owner's operations.

L. For electrical work associated with Primary power, coordinate with the Electrical Power Utility Company.

M. Complete the following form, indicating what is being included as part of this bid, and this project.

N. For work involving an independent utility company (i.e., non-owner provided utility), Contractor shall coordinate directly with the utility provider all aspects of related work, including shutdowns, tie-ins, capacity impacts, etc.

PART 2 -PRODUCTS

2.1 GENERAL

A. Refer to each specific Mechanical and Electrical section for specific details.

PART 3 -EXECUTION

3.1 SPECIAL RESPONSIBILITIES

A. Cooperate and coordinate with work of other Sections in executing work of Divisions 23 and 26.

1. Perform work such that progress of entire project including work of other Sections shall not be interfered with or delayed.

2. Provide information as requested on items furnished under Divisions 23 and 26 which shall be installed under other Sections.

3. Obtain detailed installation information from manufacturers of equipment provided under Divisions 23 and 26.

4. Obtain final rough-in dimensions or other information as needed for complete installation of items furnished under Divisions 23 and 26 or by Owner.

5. Keep fully informed as to shape, size and position of openings required for material or equipment to be provided under Divisions 23 and 26 and their

MECHANICAL & PLUMBING SUPPLEMENTAL REQUIREMENTS 230000.00 - 20

Sections. Give full information so that openings required by work of Divisions 23 and 26 may be coordinated with other work and other openings and may be provided for in advance. In case of failure to provide sufficient information in proper time, provide cutting and patching or have same done, at own expense and to full satisfaction of Architect.

6. Provide information as requested as to sizes, number and locations of concrete housekeeping pads necessary for floor-mounted vibrating and rotating equipment provided under Divisions 23 and 26.

7.…