CDRL_B017_Product_Drawings-Models_and_Associated_Lists_-_Technical_Data_Package.pdf

PDF 105 KB Posted

Attached to
Amendment 5 for MRAP Cougar Egress Upgrade Federal contract opportunity
Solicitation number
M67854-13-R-5501
Issued by
United States Marine Corps

About this file

Updated CDRL B17

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 5 for MRAP Cougar Egress Upgrade, newest first.
File Type Posted
Egress_-_SF30_Solicitation_-_Amendment_5.doc DOC document
Attachment_4_Offeror_Participation.pptx PPTX presentation
1-14-2014_Questions_and_Answers_Amendment_5.xlsx XLSX spreadsheet
Egress_-_Amendment_0004_-_Consolidated_Questions_and_Answers.xlsx XLSX spreadsheet
CDRL_A001_Data_Management_Plan.pdf PDF
CDRL_D023_Training_Support_Document_-_Training_Test_Package.pdf PDF
Egress_-_SF30_Solicitation_-_Amendment_4.doc DOC document
M6785413R550103.doc DOC document
Egress_-_SF33_Solicitation_-_Amendment_2.doc DOC document
12-9-2013_-_questions_and_answers_egress.xlsx XLSX spreadsheet
Egress_-_SF33_Solicitation_-_Amendment_1.doc DOC document
12-3-2013_-_questions_and_answers_egress.xlsx XLSX spreadsheet
Attachment_2_-_Combined_B_CDRLs.pdf PDF
Attachment_2_-_Combined_C_CDRLs.pdf PDF
Attachment_9_-_DD_Form_254_Security_Classification.pdf PDF
Attachment_5_-_PSPEC_Front_Door.pdf PDF
Attachment_2_-_Combined_D_CDRLs.pdf PDF
Attachment_2_-_Combined_A_CDRLs.pdf PDF
Attachment_10_-_DD_Form_2794_CSDR_Plan_-_13_Nov_13.xls XLS spreadsheet
Attachment_7_-_PSPEC_Exhaust.pdf PDF
Attachment_1_-_SOW_-_13_Nov_2013.pdf PDF
Egress_-_SF33_Solicitation_-_22_Nov_2013.doc DOC document
Attachment_3_-_Government_Furnished_Information_List.pdf PDF
ATTACHMENT_4_-_CDRL_to_CLIN_Matrix.xlsx XLSX spreadsheet
Attachment_6_-_PSPEC_Rear_Door.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP _ X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

MRAP COUGAR

E. CONTRACT/PR NO.

M67854-13-R-5501

F. CONTRACTOR

1. DATA ITEM NO.

B017

2. TITLE OF DATA ITEM

PRODUCT DRAWING/MODELS AND ASSOCIATED LISTS

3. SUBTITLE

TECHNICAL DATA PACKAGE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000C

5. CONTRACT REFERENCE

SOW Paragraph(s) 6.6; 6.9

6. REQUIRING OFFICE

APM COUGAR

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION SEE BLK 16 Draft Final

Reg Repro

16. REMARKS

Product Drawings/Models and Associated Lists provide engineering data to support competitive procurement and maintenance for items interchangeable with the original items. This data represents the highest level of design disclosure.

BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, date CDRL was signed. Other U.S.

requests for this document shall be referred to Commander, MARCORSYSCOM (Attn:

MRAP), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – The Contractor shall provide the final TDP 10 calendar days after formal ECP approval in accordance with MIL-STD-31000.

BLK 13 – Subsequent submission shall be provided the final TDP to the Government 10 calendar days after formal ECP approval in accordance with MIL-STD-31000

BLK 14 – Submission shall be via electronic mail (e-mail). The submission shall be prepared and delivered in .STP, NATIVE CAD and .pdf to the E-mail address follows the addressee, below:

Commander MARCORSYSCOM (Attn: MRAP), 2200 Lester Street, Quantico, VA 22134-6050

Cougar_deliverables@usmc.mil

15. TOTAL ---------

G. PREPARED BY

Mr. Brent Ingraham

H. DATE

3 December 2013

I. APPROVED BY

Mr. Jeffery Chandler

J. DATE

3 December 2013

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _«PAGE»_ of _«PAGES»_ Pages

M67854-13-R-5501 Attachment 2B

File details come from the government source that posted it. Updated .