ATTACHMENT_4_-_CDRL_to_CLIN_Matrix.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- Amendment 5 for MRAP Cougar Egress Upgrade Federal contract opportunity
- Solicitation number
- M67854-13-R-5501
- Issued by
- United States Marine Corps
About this file
Attachment 4 CDRL Matrix
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2 (2)
| CLIN | |||
| 3.0 PROGRAM MANAGEMENT. | FINAL | 0001 Design & Development | |
| SUBCONTRACTOR MANAGEMENT. | 0003 Test and Production Readiness | ||
| CDRL A001 – DATA MANAGEMENT PLAN | 0001 Design & Development | 0005 First Article | |
| CDRL A002 – TECHNICAL REPORT STUDY/SERVICES - DATA MANAGEMENT REPORT | 0001 Design & Development | 0007 Full Rate Production | |
| CDRL A003 – RISK MANAGEMENT PLAN | 0001 Design & Development | 0010 CDSR Reporting | |
| CDRL A004 – RISK MANAGEMENT REPORT | 0001 Design & Development | ||
| CDRL A005 – INTEGRATED MASTER SCHEDULE (IMS) | 0001 Design & Development | ||
| CDRL A006 – CONFERENCE/MEETING AGENDA | ALL | ||
| CDRL A007 – CONFERENCE/MEETING MINUTES | ALL | ||
| CDRL A008 – PROGRAM MANAGEMENT PLAN | 0001 Design & Development | ||
| CDRL A009 – CONTRACTOR MONTHLY STATUS REPORT | 0001 Design & Development | ||
| CDRL A010 – TECHNCIAL PRESENTATIONS AND ENGINEERING REPORTS | 0001 Design & Development | ||
| CDRL A011 – TECHNICAL REPORT - STUDY SERVICES - CRITICAL DESIGN REVIEW (CDR) REPORT | 0001 Design & Development | ||
| CDRL A012 – TECHNICAL REPORT - STUDY SERVICES – PRODUCTION READINESS REVIEW (PRR) REPORT | 0003 Test and Production Readiness | ||
| CDRL A013 – TECHNICAL REPORT - STUDY SERVICES – MANUFACTURING PLAN | 0003 Test and Production Readiness | ||
| CDRL A014 – TECHNICAL REPORT - STUDY SERVICES – MATERIAL REVIEW BOARD (MRB) REPORT | 0005 First Article | ||
| CDRL A015 – TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM) | 0001 Design & Development | ||
| CDRL A016 - FIRST ARTICLE QUALIFICATION TEST PLAN AND PROCEDURES | 0005 First Article | ||
| CDRL A017 – FIRST ARTICLE INSPECTION REPORT | 0005 First Article | ||
| CDRL A018 – QUALITY ASSURANCE PROGRAM PLAN | 0001 Design & Development | ||
| CDRL A019 – TECHNICAL REPORT – STUDY SERVICES - FAILURE MODES, EFFECTS AND CRITICALITY ANALYSIS (FMECA) | 0003 Test and Production Readiness | ||
| CDRL A020 – RELIABILITY PREDICTION AND DOCUMENTATION OF SUPPORTING DATA - RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) | 0003 Test and Production Readiness | ||
| CDRL A021 – TECHNICAL REPORT - STUDY/SERVICES MAINTENANCE TASK LIST (MTL) | 0003 Test and Production Readiness | ||
| CDRL A022 – TECHNICAL REPORT – STUDY SERVICES – MAINTAINABILITY TASK ANALYSIS (MTA) | 0003 Test and Production Readiness | ||
| CDRL A023 – TECHNICAL REPORT-STUDY/SERVICES MAINTAINABILITY PREDICTIONS (MP) | 0003 Test and Production Readiness | ||
| CDRL A024 – RELIABILITY PREDICTION AND DOCUMENTATION OF SUPPORTING DATA - RELIABLITY CENTERED MAINTENANCE (RCM) | 0003 Test and Production Readiness | ||
| CDRL A025 – FAILURE SUMMARY AND ANALYSIS REPORT (FACAR) | 0003 Test and Production Readiness | ||
| CDRL A026– END ITEM FINAL INSPECTION RECORD (FIR) | 0005 First Article | ||
| CDRL A027 – HUMAN SYSTEMS INTEGRATION/MANPOWER AND PERSONNEL INTEGRATION (MANPRINT) | 0001 Design & Development | ||
| CDRL A028 – TECHNICAL REPORT- STUDY/SERVICE: FORCE PROTECTION AND SURVIVABILITY | 0001 Design & Development | ||
| CDRL A029 – TEST SUPPORT PLAN – PRODUCT VERIFICATION TEST | 0003 Test and Production Readiness | ||
| CDRL A030 – TEST PROCEDURES – STUDY/SERVICES REALIBILITY DEMONSTRATION TESTING (RDT) | 0003 Test and Production Readiness | ||
| CDRL A031 – TEST/INSPECTION REPORT - REALIBILITY DEMONSTRATION TESTING (RDT) | 0003 Test and Production Readiness | ||
| CDRL A032 – TEST SUPPORT PACKAGE COMPONENTS LIST | 0003 Test and Production Readiness | ||
| CDRL A033 – TEST SUPPORT SPARES PACKAGE | 0003 Test and Production Readiness | ||
| CDRL A034 – TEST PROCEDURES - ELECTROMAGNETIC INTERFERENCE TEST PROCEDURES (EMITP) | 0003 Test and Production Readiness | ||
| CDRL A035 – TEST/INSPECTION REPORT - ELECTROMAGNETIC INTERFERENCE TEST REPORT (EMITR) | 0003 Test and Production Readiness | ||
| CDRL A036 – SYSTEM SAFETY PROGRAM PLAN | 0001 Design & Development | ||
| CDRL A037 – PRELIMINARY HAZARD ANALYSIS | 0003 Test and Production Readiness | ||
| CDRL A038 – OPERATING AND SUPPORT HAZARD ANALYSIS (O&SHA) | 0001 Design & Development | ||
| CDRL A039 – SAFETY ASSESSMENT REPORT (SAR) | 0001 Design & Development | ||
| CDRL A040 – HEALTH HAZARD ASSESSMENT REPORT (HHAR) | 0001 Design & Development | ||
| CDRL A041 – HAZARDOUS MATERIALS MANAGEMENT PROGRAM PLAN (HMMPP) | 0001 Design & Development | ||
| CDRL A042 – HAZARDOUS MATERIALS MANAGEMENT PROGRAM REPORT (HMMPR) | 0001 Design & Development | ||
| CDRL A043 – TECHNICAL REPORT - STUDY SERVICES – SYSTEM VERIFICATION REVIEW (SVR) REPORT | 0003 Test and Production Readiness | ||
| CDRL A044 - CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) - CONTRACTOR COST DATA REPORTING (CCDR) | 0010 CDSR Reporting | ||
| CDRL A045 - CONTRACTOR BUSINESS DATA REPORT (DD FORM |
1921-3) - CONTRACTOR COST AND SOFTWARE DATA
| REPORTING (CSDR) | 0010 CDSR Reporting | ||
| CDRL A046 - COST DATA SUMMARY (DD FORM 1921) - CONTRACTOR COST AND SOFTWARE DATA REPORTING (CSDR) | 0010 CDSR Reporting | ||
| CDRL B001 – RECEIPT OF GOVERNMENT MATERIEL REPORT | 0001 Design & Development | ||
| CDRL B002 – GOVERNMENT FURNISHED EQUIPMENT/INFORMATION DEFICIENCY REPORTS | 0001 Design & Development | ||
| CDRL B003 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS | 0001 Design & Development | ||
| CDRL B004 – SOURCE CONTROL AND VENDOR ITEM DRAWINGS | 0001 Design & Development | ||
| CDRL B005 – CORROSION PREVENTION AND CONTROL PLAN | 0001 Design & Development | ||
| CDRL B006 – CONFIGURATION MANAGEMENT PLAN | 0001 Design & Development | ||
| CDRL B007 – ENGINEERING CHANGE PROPOSALS (ECP) | 0003 Test and Production Readiness | ||
| CDRL B008 – REQUEST FOR DEVIATION (RFD) | 0005 First Article | ||
| CDRL B009 – NOTICE OF REVISION (NOR) | 0005 First Article | ||
| CDRL B010 – CONFIGURATION CHANGE DOCUMENT | 0005 First Article | ||
| CDRL B011 – CONFIGURATION STATUS ACCOUNTING (CSA) | 0005 First Article | ||
| CDRL B012 – IUID ITEMS DATA REPORT | 0005 First Article | ||
| CDRL B013 – SOURCE DATA FOR FORECASTING DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) - INDENTURED BILLS OF MATERIALS (IBOM) | 0001 Design & Development | ||
| CDRL B014 – DATA ACCESSION LIST - CONFIGURATION DOCUMENTS | 0005 First Article | ||
| CDRL B015 – CONFIGURATION AUDIT PLAN (CAP) | 0005 First Article | ||
| CDRL B016 – PCA REPORT | 0005 First Article | ||
| CDRL B017 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS - TECHNICAL DATA PACKAGE | 0005 First Article | ||
| CDRL B018 – PARTS MANAGEMENT PLAN | 0005 First Article | ||
| CDRL C001 – PREPARATION OF DIGITAL TECHNICAL INFORMATION FOR PAGE-BASED TECHNICAL MANUALS – SOURCE DATA | 0005 First Article | ||
| CDRL C002 – PREPARATION OF DIGITAL TECHNICAL INFORMATION FOR PAGE-BASED TECHNICAL MANUALS – TECHNICAL MANUALS VALIDATION CERTIFICATION | 0005 First Article | ||
| CDRL C003 – PREPARATION OF DIGITAL TECHNICAL INFORMATION FOR PAGE-BASED TECHNICAL MANUALS - COPYRIGHT RELEASE | 0005 First Article | ||
| CDRL D001 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA PRODUCT - LONG LEAD ITEMS LIST (LLTIL) | 0003 Test and Production Readiness | ||
| CDRL D002 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA PRODUCT - TOOLS AND TEST EQUIPMENT LIST (TTEL) | 0003 Test and Production Readiness | ||
| CDRL D003 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA - PRODUCT COMMON AND BULK ITEMS LIST (CBIL) | 0003 Test and Production Readiness | ||
| CDRL D004 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA PRODUCT - PROVISIONING PARTS LIST (PPL) | 0003 Test and Production Readiness | ||
| CDRL D005 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA PRODUCT - REPAIRABLE ITEMS LIST | 0003 Test and Production Readiness | ||
| CDRL D006 – LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT - ENGINEERING DATA FOR PROVISIONING (EDFP) | 0003 Test and Production Readiness | ||
| CDRL D007 – REQUEST FOR NOMENCLATURE | 0005 First Article | ||
| CDRL D008 – LOGISTICS MANAGEMENT INFORMATION DATA PRODUCT – SPARES ACQUISITION INTEGRATED WITH PRODUCTION (SAIP) | 0003 Test and Production Readiness | ||
| CDRL D009 – LIFE CYCLE SUSTAINMENT (LCS) REPORT | 0003 Test and Production Readiness | ||
| CDRL D010 – LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT – PROVISIONING PLAN | 0003 Test and Production Readiness | ||
| CDRL D011 – LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT - PROVISIONING SCREENING DATA | 0003 Test and Production Readiness | ||
| CDRL D012 – LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT – MAINTENANCE PLAN | 0003 Test and Production Readiness | ||
| CDRL D013 – TEST/INSPECTION REPORT - LIMITED TECHNICAL INSPECTION REPORT | 0003 Test and Production Readiness | ||
| CDRL D014 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - PRESERVATION AND PACKAGING DATA | 0005 First Article | ||
| CDRL D015 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - SPECIAL PACKAGING INSTRUCTION | 0005 First Article | ||
| CDRL D016 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - SPECIAL PACKAGING INSTRUCTION - VALIDATION REPORT | 0005 First Article | ||
| CDRL D017 –TRAINING DATA PRODUCTS – TRAINING COURSE CURRICULUM MATERIAL | 0003 Test and Production Readiness | ||
| CDRL D018 – INSTRUCTIONAL PERFORMANCE REQUIREMENTS DOCUMENT – CRITICAL OR TRAINING TASK LIST | 0003 Test and Production Readiness | ||
| CDRL D019 – COURSE INFORMATION PACKAGE – NEW EQUIPMENT TRAINING (NET) | 0003 Test and Production Readiness | ||
| CDRL D020 – TRAINING SUPPORT DOCUMENT – TRAINING PROGRAM STRUCTURE DOCUMENTATION (CURRICULUM OUTLINE OF INSTRUCTION) DEVELOPMENT | 0003 Test and Production Readiness | ||
| CDRL D021 – TRAINING SUPPORT DOCUMENT –INSTRUCTOR AND STUDENT GUIDE | 0003 Test and Production Readiness | ||
| CDRL D022 – TRAINING INFORMATION PACKAGE – INSTRUCTIONAL MEDIA PACKAGE (COURSEWARE DATA FILES) DEVELOPMENT | 0003 Test and Production Readiness | ||
| CDRL D023 – TEST PACKAGE – TRAINING TEST PACKAGE DEVELOPMENT | 0003 Test and Production Readiness | ||
| CDRL D024 – COURSE INFORMATION PACKAGE - TRAINING AIDS, DEVICES, SIMULATORS, AND SIMULATIONS (TADSS) DATA | 0003 Test and Production Readiness | ||
| DATA MANAGEMENT. | |||
| 3.3 SECURITY REQUIREMENTS. | |||
| 3.3.1 SECURITY REQUIREMENTS | |||
| INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR), SAFETY, AND ENVIRONMENTAL (ITAR). | |||
| GOVERNMENT FURNISHED EQUIPMENT (GFE) AND GOVERNMENT FURNISHED INFORMATION (GFI). | |||
| CONTRACTOR RECORDS. | |||
| RISK MANAGEMENT. | |||
| SCHEDULE PLANNING. | |||
| MEETINGS/CONFERENCES/REVIEWS. | |||
| POSTAWARD CONFERENCE (FAR 42.503). | |||
| PUBLICATION START OF WORK MEETING | |||
| 3.7.1.2 ENGINEERING START OF WORK MEETING. | |||
| 3.7.1.3 CONFIGURATION MANAGEMENT (CM) START OF WORK MEETING. | |||
| PROGRAM MANAGEMENT REVIEWS (PMR)/PROGRAM STATUS REVIEWS (PSR). | |||
| 3.7.2.1 QUALITY ASSURANCE MANAGEMENT MEETINGS (QAMMS). | |||
| PROVISIONING CONFERENCE. | |||
| TEST READINESS REVIEWS. | |||
| TECHNICAL REVIEWS. | |||
| PRELIMINARY DESIGN REVIEW (PDR). | |||
| 3.7.5.2 CRITICAL DESIGN REVIEW (CDR). | |||
| 3.7.5.3 PRODUCTION READINESS AND SYSTEM VERIFICATION REVIEW. | |||
| 3.7.5.4 MATERIAL REVIEW BOARD (MRB). | |||
| 3.7.5.5 SYSTEM SAFETY WORKING GROUP (SSWG) | |||
| 4.0 ENGINEERING. | |||
| 4.1 DESIGN AND ENGINEERING. | |||
| VEHICLE INTEGRATION. | |||
| REQUIREMENTS TRACEABILITY MATRIX (RTM). | |||
| SOURCE CONTROL AND VENDOR ITEM DRAWINGS. | |||
| REQUIREMENTS FOR SOURCE CONTROL DRAWINGS (SCDS). | |||
| FIRST ARTICLE TEST (FAT). | |||
| FIRST ARTICLE INSPECTION PLAN. | |||
| FAI REPORT. | |||
| 4.6.2.1 DISAPPROVAL. | |||
| 4.6.2.2 CHANGES. | |||
| 4.6.2.3 MANUFACTURE. | |||
| 4.6.2.4 FIRST ARTICLE CONDITIONS. | |||
| QUALITY ASSURANCE PLAN (QAP). | |||
| CORROSION PREVENTION AND CONTROL (CPAC) PLAN. | |||
| RELIABILITY PROGRAM. | |||
| FAILURE MODES, EFFECTS AND CRITICALITY ANALYSIS (FMECA). | |||
| RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) PROGRAM. | |||
| 4.9.2.1 MAINTAINABILITY TASK LIST (MTL). | |||
| 4.9.2.2 MAINTAINABILITY TASK ANALYSIS (MTA). | |||
| 4.9.2.3 MAINTAINABILITY PREDICTIONS. | |||
| RELIABLITY CENTERED MAINTENANCE (RCM). | |||
| FAILURE ANALYSIS AND CORRECTIVE ACTION REPORTS (FACAR). | |||
| FINAL INSPECTION RECORD (FIR). | |||
| 4.10 WELDING PROCEDURES. | |||
| 4.11 WELDER AND WELDING OPERATOR CERTIFICATION. | |||
| 4.12 HUMAN FACTORS ENGINEERING (HFE)/ HUMAN SYSTEMS INTEGRATION (HSI). | |||
| 4.13 FORCE PROTECTION AND SURVIVABILITY. | |||
| 5.0 TEST. | |||
| TEST SUPPORT PLAN. | |||
| RELIABILITY DEMONSTRATION TESTING. | |||
| TEST SUPPORT SPARES. | |||
| ENVIRONMENTAL TEST SERIES. | |||
| ELECTROMAGNETIC ENVIRONMENTAL EFFECTS (E3). | |||
| ELECTROMAGNETIC INTERFERENCE (EMI) TEST PROCEDURE. | |||
| ELECTROMAGNETIC INTERFERENCE TEST REPORT. | |||
| GROUNDING, BONDING AND SHIELDING. | |||
| 6.0 CONFIGURATION MANAGEMENT (CM). | |||
| CONFIGURATION MANAGEMENT PROCESS. | |||
| ENGINEERING CHANGE PROPOSAL (ECP)/REQUEST FOR DEVIATION (RFD) CLASSIFICATION. | |||
| CONFIGURATION CHANGE DOCUMENT (CCD). | |||
| ENGINEERING CHANGE PROPOSAL (ECP) CLASSIFICATION. | |||
| REQUEST FOR DEVIATION (RFD). | |||
| CONFIGURATION STATUS ACCOUNTING (CSA). | |||
| ITEM UNIQUE IDENTIFICATION (IUID). | |||
| ITEM UNIQUE IDENTIFICATION DATA PLATE. | |||
| SUBASSEMBLY DATA PLATES. | |||
| INDENTURED BILL OF MATERIALS (IBOM), DRAWINGS, DATA ATTRIBUTES. | |||
| DRAWING NUMBER ASSIGNMENT. | |||
| GOVERNMENT PHYSICAL CONFIGURATION AUDIT (PCA). | |||
| TECHNICAL DATA PACKAGE(S) (TDP). | |||
| CONFIGURATION IDENTIFICATION. | |||
| PARTS MANAGEMENT PLAN. | |||
| ENGINEERING DESIGN SUPPORT. | |||
| 6.10 MASTER SOURCE DATA REPORT ON THE MASTER DATA SET. | |||
| 7.0 SAFETY. | |||
| ENVIRONMENT, SAFETY & OCCUPATIONAL HEALTH (ESOH). | |||
| SYSTEM SAFETY PROGRAM PLAN (SSPP). | |||
| PRELIMINARY HAZARD ANALYSIS (PHA). | |||
| OPERATING AND SUPPORT HAZARD ANALYSIS (O&SHA). | |||
| SAFETY ASSESSMENT REPORT (SAR). | |||
| HEALTH HAZARD ASSESSMENT (HHA). | |||
| HAZARDOUS MATERIALS MANAGEMENT PROGRAM PLAN (HMMPP). | |||
| HAZARDOUS MATERIALS MANAGEMENT PROGRAM REPORT (HMMPR). | |||
| DISPOSITION AND CLOSEOUT. | |||
| SAFETY REVIEW SUPPORT. | |||
| 8.0 LOGISTICS. | |||
| SUPPLY SUPPORT. | |||
| LONG LEAD TIME ITEMS LIST (LLTIL). | |||
| TOOLS AND TEST EQUIPMENT LIST (TTEL). | |||
| COMMON AND BULK ITEMS LIST (CBIL). | |||
| PROVISIONING PARTS LIST (PPL). | |||
| REPAIRABLE ITEMS LIST (RIL). | |||
| ENGINEERING DATA FOR PROVISIONING (EDFP). | |||
| REQUEST FOR NOMENCLATURE. | |||
| SPARES ACQUISITION INTEGRATED WITH PRODUCTION (SAIP). | |||
| 8.1.9 LIFE CYCLE SUSTAINMENT (LCS). | |||
| 8.1.10 PROVISIONING PLAN. | |||
| PROVISIONING AND OTHER PRE-PROCUREMENT SCREENING DATA. | |||
| RELIABILITY ENGINEERING, MAINTAINABILITY ENGINEERING AND MAINTENANCE (PREVENTIVE, PREDICTIVE AND CORRECTIVE) PLANNING. | |||
| MAINTENANCE PLANNING AND EXECUTION. | |||
| TECHNICAL DATA / PUBLICATIONS. | |||
| LIMITED TECHNICAL INSPECTION (LTI). | |||
| TECHNICAL MANUALS (TM). | |||
| MANUAL DEVELOPMENT. | |||
| MANUAL VALIDATION | |||
| 8.3.3.2 MANUAL VERIFICATION. | |||
| COPYRIGHTS | |||
| PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T). | |||
| PACKAGING, SHIPMENT AND DATA STORAGE. | |||
| PRESERVATION AND PACKAGING. | |||
| CLASSIFICATION AND DATA DEVELOPMENTFOR SPECIAL PACKAGING. | |||
| PHS&T VALIDATION. | |||
| DEVELOPMENT OF MARKING REQUIREMENTS. | |||
| ENGINEERING CHANGES. | |||
| TRACKING. | |||
| TRAINING DEVELOPMENT. | |||
| CRITICAL OR TRAINING TASK LIST. | |||
| NEW EQUIPMENT TRAINING (NET) DEVELOPMENT MATERIALS MODIFICATIONS AND UPDATES. | |||
| TRAINING PROGRAM STRUCTURE DOCUMENTATION (CURRICULUM OUTLINE OF INSTRUCTION) DEVELOPMENT. | |||
| INSTRUCTOR GUIDE. | |||
| STUDENT GUIDE. | |||
| INSTRUCTIONAL MEDIA PACKAGE (COURSEWARE DATA FILES) DEVELOPMENT. | |||
| TRAINING TEST PACKAGE DEVELOPMENT. | |||
| TRAINING AIDS, DEVICES, SIMULATORS, AND SIMULATIONS (TADSS). | |||
| 8.5.8.1 COUGAR VEHICLE TADSS INPUT. |
M67854-12-R-5501 Attachment 4
Sheet2
| CLIN | CLIN | CLIN | CLIN | ||||
| 3.0 PROGRAM MANAGEMENT. | Dodge and Shrout | Richard | Ingraham | FINAL | 0001 Design | ||
| SUBCONTRACTOR MANAGEMENT. | 0003 Test and Production Readiness | ||||||
| nic | CDRL A001 – DATA MANAGEMENT PLAN | 0001 Design | 0001 Design | 0001 Design | All | 0001 Design | 0005 First Article Production |
| CDRL A001 – DATA MANAGEMENT PLAN | 0001 Design | 0001 Design | 0005 First Article Production | All | 0001 Design | 0007 Full Rate Production | |
| CDRL A002 – TECHNICAL REPORT STUDY/SERVICES - DATA MANAGEMENT REPORT | 0001 Design | 0001 Design | 0001 Design | All | 0001 Design | ||
| CDRL A002 – TECHNICAL REPORT STUDY/SERVICES - DATA MANAGEMENT REPORT | 0001 Design | 0001 Design | 0005 First Article Production | All | 0001 Design | ||
| CDRL A003 – RISK MANAGEMENT PLAN | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A004 – RISK MANAGEMENT REPORT | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A005 – INTEGRATED MASTER SCHEDULE (IMS) | 0001 Design | 0001 Design | 0001 Design | All | 0001 Design | ||
| CDRL A005 – INTEGRATED MASTER SCHEDULE (IMS) | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A005 – INTEGRATED MASTER SCHEDULE (IMS) | 0001 Design | 0001 Design | 0003 Test and Production Readiness | All | 0001 Design | ||
| CDRL A005 – INTEGRATED MASTER SCHEDULE (IMS) | 0001 Design | 0001 Design | 0003 Test and Production Readiness | 3,5 | 0001 Design | ||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0003 Test and Production Readiness | 0001 Design | ALL | ||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | ALL | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0003 Test and Production Readiness | 0001 Design | 0005 First Article Production | 5,7 | ALL | ||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0003 Test and Production Readiness | All | ALL | ||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0003 Test and Production Readiness | 0001 Design | ALL | ||||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | ALL | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0003 Test and Production Readiness | 0001 Design | 0005 First Article Production | 5,7 | ALL | ||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0003 Test and Production Readiness | All | ALL | ||
| CDRL A008 – PROGRAM MANAGEMENT PLAN | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A009 – CONTRACTOR MONTHLY STATUS REPORT | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A010 – TECHNCIAL PRESENTATIONS AND ENGINEERING REPORTS | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A011 – TECHNICAL REPORT - STUDY SERVICES - PRELIMINARY DESIGN REVIEW (PDR) REPORT | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A012 – TECHNICAL REPORT - STUDY SERVICES - CRITICAL DESIGN REVIEW (CDR) REPORT | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A013 – TECHNICAL REPORT - STUDY SERVICES – PRODUCTION READINESS REVIEW (PRR) REPORT | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | 0003 Test and Production Readiness | |||
| CDRL A014 – TECHNICAL REPORT - STUDY SERVICES – MANUFACTURING PLAN | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | 0003 Test and Production Readiness | |||
| CDRL A015 – TECHNICAL REPORT - STUDY SERVICES – MATERIAL REVIEW BOARD (MRB) REPORT | 0003 Test and Production Readiness | 0001 Design | 0005 First Article Production | 5,7 | 0005 First Article Production | ||
| CDRL A016 – FIRST ARTICLE QUALIFICATION TEST PLAN AND PROCEDURES | 0003 Test and Production Readiness | 0005 First Article Production | 0005 First Article Production | 3,5 | 0005 First Article Production | ||
| CDRL A017 – TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM) | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A017 – TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 5,7 | 0001 Design | ||
| CDRL A018 – FIRST ARTICLE INSPECTION REPORT | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 3,5 | 0005 First Article Production | ||
| CDRL A018 – FIRST ARTICLE INSPECTION REPORT | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 3,5 | 0005 First Article Production | ||
| CDRL A019 – QUALITY ASSURANCE PROGRAM PLAN | 0001 Design | 0001 Design | 0007 Full Rate Production | 5,7 | 0001 Design | ||
| CDRL A020 – TECHNICAL REPORT – STUDY SERVICES - FAILURE MODES, EFFECTS AND CRITICALITY ANALYSIS (FMECA) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | 1,3 | 0003 Test and Production Readiness | ||
| CDRL A021 – RELIABILITY PREDICTION AND DOCUMENTATION OF SUPPORTING DATA - RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 1,3,5 | 0003 Test and Production Readiness | ||
| CDRL A021 – RELIABILITY PREDICTION AND DOCUMENTATION OF SUPPORTING DATA - RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5 | 0003 Test and Production Readiness | ||
| CDRL A022 – TECHNICAL REPORT – STUDY SERVICES - MAINTAINABILITY TASK LIST (MTL) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5,7 | 0003 Test and Production Readiness | ||
| CDRL A022 – TECHNICAL REPORT - STUDY/SERVICES MAINTENANCE TASK LIST (MTL) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL A023 – TECHNICAL REPORT – STUDY SERVICES – MAINTAINABILITY TASK ANALYSIS (MTA) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5,7 | 0003 Test and Production Readiness | ||
| CDRL A024 – TECHNICAL REPORT-STUDY/SERVICES MAINTAINABILITY PREDICTIONS (MP) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5,7 | 0003 Test and Production Readiness | ||
| CDRL A025 – RELIABILITY PREDICTION AND DOCUMENTATION OF SUPPORTING DATA - RELIABLITY CENTERED MAINTENANCE (RCM) | 0005 First Article Production | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5,7 | 0003 Test and Production Readiness | ||
| CDRL A026 – FAILURE SUMMARY AND ANALYSIS REPORT (FACAR) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0007 Full Rate Production | 5,7 | 0003 Test and Production Readiness | ||
| CDRL A027– END ITEM FINAL INSPECTION RECORD (FIR) | 0005 First Article Production | 0005 First Article Production | 0007 Full Rate Production | 5,7 | 0005 First Article Production | ||
| CDRL A028 – HUMAN SYSTEMS INTEGRATION/MANPOWER AND PERSONNEL INTEGRATION (MANPRINT) | 0003 Test and Production Readiness | 0001 Design | 0001 Design | 1,3 | 0001 Design | ||
| CDRL A029 – TECHNICAL REPORT- STUDY/SERVICE: FORCE PROTECTION AND SURVIVABILITY | 0001 Design | 0001 Design | 0001 Design | 1,3,5 | 0001 Design | ||
| CDRL A030 – TEST SUPPORT PLAN – PRODUCT VERIFICATION TEST | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | |||
| CDRL A030 – TEST SUPPORT PLAN – PRODUCT VERIFICATION TEST | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5 | 0003 Test and Production Readiness | ||
| CDRL A030 – TEST SUPPORT PLAN – PRODUCT VERIFICATION TEST | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5 | 0003 Test and Production Readiness | ||
| CDRL A031 – TEST PROCEDURES – STUDY/SERVICES REALIBILITY DEMONSTRATION TESTING (RDT) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5 | 0003 Test and Production Readiness | ||
| CDRL A032 – TEST/INSPECTION REPORT - REALIBILITY DEMONSTRATION TESTING (RDT) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5 | 0003 Test and Production Readiness | ||
| CDRL A033 – TEST SUPPORT PACKAGE COMPONENTS LIST | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5 | 0003 Test and Production Readiness | ||
| CDRL A034 – TEST PROCEDURE - RELIABILITY GROWTH TESTING (RGT) PLAN | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3,5 | 0003 Test and Production Readiness | ||
| A035 | |||||||
| CDRL A036 – TEST PROCEDURES - ELECTROMAGNETIC INTERFERENCE TEST PROCEDURES (EMITP) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3 | 0003 Test and Production Readiness | ||
| CDRL A036 – TEST PROCEDURES - ELECTROMAGNETIC INTERFERENCE TEST PROCEDURES (EMITP) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3 | 0003 Test and Production Readiness | ||
| CDRL A037 – TEST/INSPECTION REPORT - ELECTROMAGNETIC INTERFERENCE TEST REPORT (EMITR) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3 | 0003 Test and Production Readiness | ||
| CDRL A037 – TEST/INSPECTION REPORT - ELECTROMAGNETIC INTERFERENCE TEST REPORT (EMITR) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 3 | 0003 Test and Production Readiness | ||
| CDRL A038 – SYSTEM SAFETY PROGRAM PLAN | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | All | 0001 Design | ||
| CDRL A039 – PRELIMINARY HAZARD ANALYSIS | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | All | 0003 Test and Production Readiness | ||
| CDRL A039 – PRELIMINARY HAZARD ANALYSIS | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | All | 0003 Test and Production Readiness | ||
| CDRL A040 – OPERATING AND SUPPORT HAZARD ANALYSIS (O&SHA) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | All | 0001 Design | ||
| CDRL A041 – SAFETY ASSESSMENT REPORT (SAR) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | All | 0001 Design | ||
| CDRL A042 – HEALTH HAZARD ASSESSMENT REPORT (HHAR) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | All | 0001 Design | ||
| CDRL A043 – HAZARDOUS MATERIALS MANAGEMENT PROGRAM PLAN (HMMPP) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | All | 0001 Design | ||
| CDRL A044 – HAZARDOUS MATERIALS MANAGEMENT PROGRAM REPORT (HMMPR) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | All | 0001 Design | ||
| CDRL A045 – TECHNICAL REPORT - STUDY SERVICES – SYSTEM VERIFICATION REVIEW (SVR) REPORT | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | 0003 Test and Production Readiness | |||
| CDRL B001 – RECEIPT OF GOVERNMENT MATERIEL REPORT | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL B002 – GOVERNMENT FURNISHED EQUIPMENT/INFORMATION DEFICIENCY REPORTS | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL B003 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS | 0001 Design | 0001 Design | 0001 Design | 5,7 | 0001 Design | ||
| CDRL B003 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS | 0001 Design | 0001 Design | 0007 Full Rate Production | 5,7 | 0001 Design | ||
| CDRL B004 – SOURCE CONTROL AND VENDOR ITEM DRAWINGS | 0001 Design | 0001 Design | 0001 Design | 5,7 | 0001 Design | ||
| CDRL B004 – SOURCE CONTROL AND VENDOR ITEM DRAWINGS | 0001 Design | 0001 Design | 0007 Full Rate Production | 5,7 | 0001 Design | ||
| CDRL B005 – CORROSION PREVENTION AND CONTROL PLAN | 0001 Design | 0001 Design | 0001 Design | All | 0001 Design | ||
| CDRL B006 – CONFIGURATION MANAGEMENT PLAN | 0001 Design | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL B006 – CONFIGURATION MANAGEMENT PLAN | 0001 Design | 0001 Design | 0005 First Article Production | 3,5,7 | 0001 Design | ||
| CDRL B007 – ENGINEERING CHANGE PROPOSAL (ECP) | 0001 Design | 0001 Design | 0003 Test and Production Readiness | ||||
| CDRL B007 – ENGINEERING CHANGE PROPOSALS (ECP) | 0001 Design | 0001 Design | 0001 Design | All | 0003 Test and Production Readiness | ||
| CDRL B007 – ENGINEERING CHANGE PROPOSALS (ECP) | 0001 Design | 0001 Design | 0005 First Article Production | 3,5,7 | 0003 Test and Production Readiness | ||
| CDRL B007 – ENGINEERING CHANGE PROPOSALS (ECP) | 0001 Design | 0001 Design | 0005 First Article Production | 3,5,7 | 0003 Test and Production Readiness | ||
| CDRL B007 – ENGINEERING CHANGE PROPOSALS (ECP) | 0001 Design | 0001 Design | 0003 Test and Production Readiness | ||||
| CDRL B008 – REQUEST FOR DEVIATION (RFD) | 0001 Design | 0001 Design | 0005 First Article Production | 3,5,7 | 0005 First Article Production | ||
| CDRL B008 – REQUEST FOR DEVIATION (RFD) | 0001 Design | 0001 Design | 0005 First Article Production | 3,5,7 | 0005 First Article Production | ||
| CDRL B008 – REQUEST FOR DEVIATION (RFD) | 0001 Design | 0001 Design | 0005 First Article Production | 3,5,7 | 0005 First Article Production | ||
| CDRL B009 – NOTICE OF REVISION (NOR) | 0001 Design | 0001 Design | 0005 First Article Production | 3,5,7 | 0005 First Article Production | ||
| CDRL B009 – NOTICE OF REVISION (NOR) | 0001 Design | 0001 Design | 0005 First Article Production | 3,5,7 | 0005 First Article Production | ||
| CDRL B009 – NOTICE OF REVISION (NOR) | 0001 Design | 0001 Design | 0005 First Article Production | ||||
| CDRL B010 – CONFIGURATION CHANGE DOCUMENT | 0001 Design | 0001 Design | 3,5,7 | 0005 First Article Production | |||
| CDRL B011 – CONFIGURATION STATUS ACCOUNTING (CSA) | 0001 Design | 0001 Design | 0005 First Article Production | 5,7 | 0005 First Article Production | ||
| CDRL B012 – IUID ITEMS DATA REPORT | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 5,7 | 0005 First Article Production | ||
| CDRL B013 – SOURCE DATA FOR FORECASTING DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) - INDENTURED BILLS OF MATERIALS (IBOM) | 0007 Full Rate Production | 0001 Design | 0005 First Article Production | 5,7 | 0001 Design | ||
| CDRL B013 – SOURCE DATA FOR FORECASTING DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) - INDENTURED BILLS OF MATERIALS (IBOM) | 0005 First Article Production | 0001 Design | 0005 First Article Production | 5,7 | 0001 Design | ||
| CDRL B014 – DATA ACCESSION LIST - CONFIGURATION DOCUMENTS | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 5,7 | 0005 First Article Production | ||
| CDRL B014 – DATA ACCESSION LIST - CONFIGURATION DOCUMENTS | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 3,5,7 | 0005 First Article Production | ||
| CDRL B015 – CONFIGURATION AUDIT PLAN (CAP) | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 5,7 | 0005 First Article Production | ||
| CDRL B016 – PCA REPORT | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 5,7 | 0005 First Article Production | ||
| CDRL B017 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS - TECHNICAL DATA PACKAGE | 0005 First Article Production | 0001 Design | 0005 First Article Production | All | 0005 First Article Production | ||
| CDRL B017 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS - TECHNICAL DATA PACKAGE | 0005 First Article Production | 0003 Test and Production Readiness | 0001 Design | All | 0005 First Article Production | ||
| CDRL B018 – PARTS MANAGEMENT PLAN | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | 3,5,7 | 0005 First Article Production | ||
| CDRL C001 – PREPARATION OF DIGITAL TECHNICAL INFORMATION FOR PAGE-BASED TECHNICAL MANUALS – SOURCE DATA | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL C002 – PREPARATION OF DIGITAL TECHNICAL INFORMATION FOR PAGE-BASED TECHNICAL MANUALS – TECHNICAL MANUALS VALIDATION CERTIFICATION | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL C003 – PREPARATION OF DIGITAL TECHNICAL INFORMATION FOR PAGE-BASED TECHNICAL MANUALS - COPYRIGHT RELEASE | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL D001 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA PRODUCT - LONG LEAD ITEMS LIST (LLTIL) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D002 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA PRODUCT - TOOLS AND TEST EQUIPMENT LIST (TTEL) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D003 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA - PRODUCT COMMON AND BULK ITEMS LIST (CBIL) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D004 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA PRODUCT - PROVISIONING PARTS LIST (PPL) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D005 – LOGISTICS MANAGEMENT INFORMATION (LMI)-DATA PRODUCT - REPAIRABLE ITEMS LIST | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D006 – LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT - ENGINEERING DATA FOR PROVISIONING (EDFP) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D007 – REQUEST FOR NOMENCLATURE | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | ||||
| CDRL D008 – LOGISTICS MANAGEMENT INFORMATION DATA PRODUCT – SPARES ACQUISITION INTEGRATED WITH PRODUCTION (SAIP) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D009 – LIFE CYCLE SUSTAINMENT (LCS) REPORT | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D010 – LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT – PROVISIONING PLAN | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D011 – LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT - PROVISIONING SCREENING DATA | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D012 – LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT – MAINTENANCE PLAN | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D013 – TEST/INSPECTION REPORT - LIMITED TECHNICAL INSPECTION REPORT | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D014 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - PRESERVATION AND PACKAGING DATA | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL D014 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - PRESERVATION AND PACKAGING DATA | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL D015 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - SPECIAL PACKAGING INSTRUCTION | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL D015 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - SPECIAL PACKAGING INSTRUCTION | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL D015 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - SPECIAL PACKAGING INSTRUCTION | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL D016 – PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T) - SPECIAL PACKAGING INSTRUCTION - VALIDATION REPORT | 0005 First Article Production | 0003 Test and Production Readiness | 0005 First Article Production | ||||
| CDRL D017 –TRAINING DATA PRODUCTS – TRAINING COURSE CURRICULUM MATERIAL | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D018 – INSTRUCTIONAL PERFORMANCE REQUIREMENTS DOCUMENT – CRITICAL OR TRAINING TASK LIST | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D019 – COURSE INFORMATION PACKAGE – NEW EQUIPMENT TRAINING (NET) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D020 – TRAINING SUPPORT DOCUMENT – TRAINING PROGRAM STRUCTURE DOCUMENTATION (CURRICULUM OUTLINE OF INSTRUCTION) DEVELOPMENT | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D021 – TRAINING SUPPORT DOCUMENT –INSTRUCTOR AND STUDENT GUIDE | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D021 – TRAINING SUPPORT DOCUMENT –INSTRUCTOR AND STUDENT GUIDE | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D022 – TRAINING INFORMATION PACKAGE – INSTRUCTIONAL MEDIA PACKAGE (COURSEWARE DATA FILES) DEVELOPMENT | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D023 – TEST PACKAGE – TRAINING TEST PACKAGE DEVELOPMENT | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| CDRL D024 – COURSE INFORMATION PACKAGE - TRAINING AIDS, DEVICES, SIMULATORS, AND SIMULATIONS (TADSS) DATA | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | ||||
| DATA MANAGEMENT. | |||||||
| 3.3 SECURITY REQUIREMENTS. | |||||||
| 3.3.1 SECURITY REQUIREMENTS | |||||||
| INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR), SAFETY, AND ENVIRONMENTAL (ITAR). | |||||||
| GOVERNMENT FURNISHED EQUIPMENT (GFE) AND GOVERNMENT FURNISHED INFORMATION (GFI). | |||||||
| CONTRACTOR RECORDS. | |||||||
| RISK MANAGEMENT. | |||||||
| SCHEDULE PLANNING. | |||||||
| MEETINGS/CONFERENCES/REVIEWS. | |||||||
| POSTAWARD CONFERENCE (FAR 42.503). | |||||||
| PUBLICATION START OF WORK MEETING | |||||||
| 3.7.1.2 ENGINEERING START OF WORK MEETING. | |||||||
| 3.7.1.3 CONFIGURATION MANAGEMENT (CM) START OF WORK MEETING. | |||||||
| PROGRAM MANAGEMENT REVIEWS (PMR)/PROGRAM STATUS REVIEWS (PSR). | |||||||
| 3.7.2.1 QUALITY ASSURANCE MANAGEMENT MEETINGS (QAMMS). | |||||||
| PROVISIONING CONFERENCE. | |||||||
| TEST READINESS REVIEWS. | |||||||
| TECHNICAL REVIEWS. | |||||||
| PRELIMINARY DESIGN REVIEW (PDR). | |||||||
| 3.7.5.2 CRITICAL DESIGN REVIEW (CDR). | |||||||
| 3.7.5.3 PRODUCTION READINESS AND SYSTEM VERIFICATION REVIEW. | |||||||
| 3.7.5.4 MATERIAL REVIEW BOARD (MRB). | |||||||
| 3.7.5.5 SYSTEM SAFETY WORKING GROUP (SSWG) | |||||||
| 4.0 ENGINEERING. | |||||||
| 4.1 DESIGN AND ENGINEERING. | |||||||
| VEHICLE INTEGRATION. | |||||||
| REQUIREMENTS TRACEABILITY MATRIX (RTM). | |||||||
| SOURCE CONTROL AND VENDOR ITEM DRAWINGS. | |||||||
| REQUIREMENTS FOR SOURCE CONTROL DRAWINGS (SCDS). | |||||||
| FIRST ARTICLE TEST (FAT). | |||||||
| FIRST ARTICLE INSPECTION PLAN. | |||||||
| FAI REPORT. | |||||||
| 4.6.2.1 DISAPPROVAL. | |||||||
| 4.6.2.2 CHANGES. | |||||||
| 4.6.2.3 MANUFACTURE. | |||||||
| 4.6.2.4 FIRST ARTICLE CONDITIONS. | |||||||
| QUALITY ASSURANCE PLAN (QAP). | |||||||
| CORROSION PREVENTION AND CONTROL (CPAC) PLAN. | |||||||
| RELIABILITY PROGRAM. | |||||||
| FAILURE MODES, EFFECTS AND CRITICALITY ANALYSIS (FMECA). | |||||||
| RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) PROGRAM. | |||||||
| 4.9.2.1 MAINTAINABILITY TASK LIST (MTL). | |||||||
| 4.9.2.2 MAINTAINABILITY TASK ANALYSIS (MTA). | |||||||
| 4.9.2.3 MAINTAINABILITY PREDICTIONS. | |||||||
| RELIABLITY CENTERED MAINTENANCE (RCM). | |||||||
| FAILURE ANALYSIS AND CORRECTIVE ACTION REPORTS (FACAR). | |||||||
| FINAL INSPECTION RECORD (FIR). | |||||||
| 4.10 WELDING PROCEDURES. | |||||||
| 4.11 WELDER AND WELDING OPERATOR CERTIFICATION. | |||||||
| 4.12 HUMAN FACTORS ENGINEERING (HFE)/ HUMAN SYSTEMS INTEGRATION (HSI). | |||||||
| 4.13 FORCE PROTECTION AND SURVIVABILITY. | |||||||
| 5.0 TEST. | |||||||
| TEST SUPPORT PLAN. | |||||||
| RELIABILITY DEMONSTRATION TESTING. | |||||||
| TEST SUPPORT SPARES. | |||||||
| ENVIRONMENTAL TEST SERIES. | |||||||
| ELECTROMAGNETIC ENVIRONMENTAL EFFECTS (E3). | |||||||
| ELECTROMAGNETIC INTERFERENCE (EMI) TEST PROCEDURE. | |||||||
| ELECTROMAGNETIC INTERFERENCE TEST REPORT. | |||||||
| GROUNDING, BONDING AND SHIELDING. | |||||||
| 6.0 CONFIGURATION MANAGEMENT (CM). | |||||||
| CONFIGURATION MANAGEMENT PROCESS. | |||||||
| ENGINEERING CHANGE PROPOSAL (ECP)/REQUEST FOR DEVIATION (RFD) CLASSIFICATION. | |||||||
| CONFIGURATION CHANGE DOCUMENT (CCD). | |||||||
| ENGINEERING CHANGE PROPOSAL (ECP) CLASSIFICATION. | |||||||
| REQUEST FOR DEVIATION (RFD). | |||||||
| CONFIGURATION STATUS ACCOUNTING (CSA). | |||||||
| ITEM UNIQUE IDENTIFICATION (IUID). | |||||||
| ITEM UNIQUE IDENTIFICATION DATA PLATE. | |||||||
| SUBASSEMBLY DATA PLATES. | |||||||
| INDENTURED BILL OF MATERIALS (IBOM), DRAWINGS, DATA ATTRIBUTES. | |||||||
| DRAWING NUMBER ASSIGNMENT. | |||||||
| GOVERNMENT PHYSICAL CONFIGURATION AUDIT (PCA). | |||||||
| TECHNICAL DATA PACKAGE(S) (TDP). | |||||||
| CONFIGURATION IDENTIFICATION. | |||||||
| PARTS MANAGEMENT PLAN. | |||||||
| ENGINEERING DESIGN SUPPORT. | |||||||
| 6.10 MASTER SOURCE DATA REPORT ON THE MASTER DATA SET. | |||||||
| 7.0 SAFETY. | |||||||
| ENVIRONMENT, SAFETY & OCCUPATIONAL HEALTH (ESOH). | |||||||
| SYSTEM SAFETY PROGRAM PLAN (SSPP). | |||||||
| PRELIMINARY HAZARD ANALYSIS (PHA). | |||||||
| OPERATING AND SUPPORT HAZARD ANALYSIS (O&SHA). | |||||||
| SAFETY ASSESSMENT REPORT (SAR). | |||||||
| HEALTH HAZARD ASSESSMENT (HHA). | |||||||
| HAZARDOUS MATERIALS MANAGEMENT PROGRAM PLAN (HMMPP). | |||||||
| HAZARDOUS MATERIALS MANAGEMENT PROGRAM REPORT (HMMPR). | |||||||
| DISPOSITION AND CLOSEOUT. | |||||||
| SAFETY REVIEW SUPPORT. | |||||||
| 8.0 LOGISTICS. | |||||||
| SUPPLY SUPPORT. | |||||||
| LONG LEAD TIME ITEMS LIST (LLTIL). | |||||||
| TOOLS AND TEST EQUIPMENT LIST (TTEL). | |||||||
| COMMON AND BULK ITEMS LIST (CBIL). | |||||||
| PROVISIONING PARTS LIST (PPL). | |||||||
| REPAIRABLE ITEMS LIST (RIL). | |||||||
| ENGINEERING DATA FOR PROVISIONING (EDFP). | |||||||
| REQUEST FOR NOMENCLATURE. | |||||||
| SPARES ACQUISITION INTEGRATED WITH PRODUCTION (SAIP). | |||||||
| 8.1.9 LIFE CYCLE SUSTAINMENT (LCS). | |||||||
| 8.1.10 PROVISIONING PLAN. | |||||||
| PROVISIONING AND OTHER PRE-PROCUREMENT SCREENING DATA. | |||||||
| RELIABILITY ENGINEERING, MAINTAINABILITY ENGINEERING AND MAINTENANCE (PREVENTIVE, PREDICTIVE AND CORRECTIVE) PLANNING. | |||||||
| MAINTENANCE PLANNING AND EXECUTION. | |||||||
| TECHNICAL DATA / PUBLICATIONS. | |||||||
| LIMITED TECHNICAL INSPECTION (LTI). | |||||||
| TECHNICAL MANUALS (TM). | |||||||
| MANUAL DEVELOPMENT. | |||||||
| MANUAL VALIDATION | |||||||
| 8.3.3.2 MANUAL VERIFICATION. | |||||||
| COPYRIGHTS | |||||||
| PACKAGING, HANDLING, STORAGE & TRANSPORTATION (PHS&T). | |||||||
| PACKAGING, SHIPMENT AND DATA STORAGE. | |||||||
| PRESERVATION AND PACKAGING. | |||||||
| CLASSIFICATION AND DATA DEVELOPMENTFOR SPECIAL PACKAGING. | |||||||
| PHS&T VALIDATION. | |||||||
| DEVELOPMENT OF MARKING REQUIREMENTS. | |||||||
| ENGINEERING CHANGES. | |||||||
| TRACKING. | |||||||
| TRAINING DEVELOPMENT. | |||||||
| CRITICAL OR TRAINING TASK LIST. | |||||||
| NEW EQUIPMENT TRAINING (NET) DEVELOPMENT MATERIALS MODIFICATIONS AND UPDATES. | |||||||
| TRAINING PROGRAM STRUCTURE DOCUMENTATION (CURRICULUM OUTLINE OF INSTRUCTION) DEVELOPMENT. | |||||||
| INSTRUCTOR GUIDE. | |||||||
| STUDENT GUIDE. | |||||||
| INSTRUCTIONAL MEDIA PACKAGE (COURSEWARE DATA FILES) DEVELOPMENT. | |||||||
| TRAINING TEST PACKAGE DEVELOPMENT. | |||||||
| TRAINING AIDS, DEVICES, SIMULATORS, AND SIMULATIONS (TADSS). | |||||||
| 8.5.8.1 COUGAR VEHICLE TADSS INPUT. |
Sheet3
| CLIN | CLIN | CLIN | ||||
| 3.0 PROGRAM MANAGEMENT. | Dodge and Shrout | Richard | Ingraham | 0001 Design | ||
| SUBCONTRACTOR MANAGEMENT. | 0003 Test and Production Readiness | |||||
| DATA MANAGEMENT. | 0005 First Article Production | |||||
| CDRL A001 – DATA MANAGEMENT PLAN | 0001 Design | 0001 Design | 0001 Design | All | 0007 Full Rate Production | |
| CDRL A002 – TECHNICAL REPORT STUDY/SERVICES - DATA MANAGEMENT REPORT | 0001 Design | 0001 Design | 0001 Design | All | ||
| 3.3 SECURITY REQUIREMENTS. | ||||||
| 3.3.1 SECURITY REQUIREMENTS | ||||||
| INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR), SAFETY, AND ENVIRONMENTAL (ITAR). | ||||||
| GOVERNMENT FURNISHED EQUIPMENT (GFE) AND GOVERNMENT FURNISHED INFORMATION (GFI). | ||||||
| CONTRACTOR RECORDS. | ||||||
| CDRL B001 – RECEIPT OF GOVERNMENT MATERIEL REPORT | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL B002 – GOVERNMENT FURNISHED EQUIPMENT/INFORMATION DEFICIENCY REPORTS | 0001 Design | 0001 Design | 0001 Design | |||
| RISK MANAGEMENT. | ||||||
| CDRL A003 – RISK MANAGEMENT PLAN | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A004 – RISK MANAGEMENT REPORT | 0001 Design | 0001 Design | 0001 Design | |||
| SCHEDULE PLANNING. | ||||||
| CDRL A005 – INTEGRATED MASTER SCHEDULE (IMS) | 0001 Design | 0001 Design | 0001 Design | All | ||
| MEETINGS/CONFERENCES/REVIEWS. | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | |||
| POSTAWARD CONFERENCE (FAR 42.503). | ||||||
| PUBLICATION START OF WORK MEETING | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A008 – PROGRAM MANAGEMENT PLAN | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A009 – CONTRACTOR MONTHLY STATUS REPORT | 0001 Design | 0001 Design | 0001 Design | |||
| 3.7.1.2 ENGINEERING START OF WORK MEETING. | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A010 – TECHNCIAL PRESENTATIONS AND ENGINEERING REPORTS | 0001 Design | 0001 Design | 0001 Design | |||
| 3.7.1.3 CONFIGURATION MANAGEMENT (CM) START OF WORK MEETING. | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL B006 – CONFIGURATION MANAGEMENT PLAN | 0001 Design | 0001 Design | 0001 Design | |||
| PROGRAM MANAGEMENT REVIEWS (PMR)/PROGRAM STATUS REVIEWS (PSR). | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | |||
| 3.7.2.1 QUALITY ASSURANCE MANAGEMENT MEETINGS (QAMMS). | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | |||
| PROVISIONING CONFERENCE. | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0003 Test and Production Readiness | 0001 Design | ||||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0003 Test and Production Readiness | 0001 Design | ||||
| TEST READINESS REVIEWS. | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | |||
| CDRL A030 – TEST SUPPORT PLAN – PRODUCT VERIFICATION TEST | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0001 Design | |||
| TECHNICAL REVIEWS. | ||||||
| PRELIMINARY DESIGN REVIEW (PDR). | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A011 – TECHNICAL REPORT - STUDY SERVICES - PRELIMINARY DESIGN REVIEW (PDR) REPORT | 0001 Design | 0001 Design | 0001 Design | |||
| 3.7.5.2 CRITICAL DESIGN REVIEW (CDR). | ||||||
| CDRL A005 – INTEGRATED MASTER SCHEDULE (IMS) | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A012 – TECHNICAL REPORT - STUDY SERVICES - CRITICAL DESIGN REVIEW (CDR) REPORT | 0001 Design | 0001 Design | 0001 Design | |||
| CDRL A017 – TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM) | 0001 Design | 0001 Design | 0001 Design | |||
| 3.7.5.3 PRODUCTION READINESS AND SYSTEM VERIFICATION REVIEW. | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | |||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | |||
| CDRL A013 – TECHNICAL REPORT - STUDY SERVICES – PRODUCTION READINESS REVIEW (PRR) REPORT | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | |||
| CDRL A014 – TECHNICAL REPORT - STUDY SERVICES – MANUFACTURING PLAN | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | |||
| CDRL A045 – TECHNICAL REPORT - STUDY SERVICES – SYSTEM VERIFICATION REVIEW (SVR) REPORT | 0003 Test and Production Readiness | 0001 Design | 0003 Test and Production Readiness | |||
| 3.7.5.4 MATERIAL REVIEW BOARD (MRB). | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0003 Test and Production Readiness | 0001 Design | 0005 First Article Production | 5,7 | ||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0003 Test and Production Readiness | 0001 Design | 0005 First Article Production | 5,7 | ||
| CDRL A015 – TECHNICAL REPORT - STUDY SERVICES – MATERIAL REVIEW BOARD (MRB) REPORT | 0003 Test and Production Readiness | 0001 Design | 0005 First Article Production | 5,7 | ||
| 3.7.5.5 SYSTEM SAFETY WORKING GROUP (SSWG) | ||||||
| CDRL A006 – CONFERENCE/MEETING AGENDA | 0001 Design | 0001 Design | 0003 Test and Production Readiness | All | ||
| CDRL A007 – CONFERENCE/MEETING MINUTES | 0001 Design | 0001 Design | 0003 Test and Production Readiness | All | ||
| 4.0 ENGINEERING. | ||||||
| 4.1 DESIGN AND ENGINEERING. | ||||||
| VEHICLE INTEGRATION. | ||||||
| REQUIREMENTS TRACEABILITY MATRIX (RTM). | ||||||
| CDRL A017 – TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM) | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 0003 Test and Production Readiness | 5,7 | ||
| SOURCE CONTROL AND VENDOR ITEM DRAWINGS. | ||||||
| CDRL B003 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS | 0001 Design | 0001 Design | 0001 Design | 5,7 | ||
| CDRL B004 – SOURCE CONTROL AND VENDOR ITEM DRAWINGS | 0001 Design | 0001 Design | 0001 Design | 5,7 | ||
| REQUIREMENTS FOR SOURCE CONTROL DRAWINGS (SCDS). | ||||||
| CDRL B003 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS | 0001 Design | 0001 Design | 0007 Full Rate Production | 5,7 | ||
| CDRL B004 – SOURCE CONTROL AND VENDOR ITEM DRAWINGS | 0001 Design | 0001 Design | 0007 Full Rate Production | 5,7 | ||
| FIRST ARTICLE TEST (FAT). | ||||||
| FIRST ARTICLE INSPECTION PLAN. | ||||||
| CDRL A016 – FIRST ARTICLE QUALIFICATION TEST PLAN AND PROCEDURES | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 3,5 | ||
| FAI REPORT. | ||||||
| CDRL A018 – FIRST ARTICLE INSPECTION REPORT | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 3,5 | ||
| 4.6.2.1 DISAPPROVAL. | ||||||
| CDRL A018 – FIRST ARTICLE INSPECTION REPORT | 0005 First Article Production | 0005 First Article Production | 0005 First Article Production | 3,5 | ||
| 4.6.2.2 CHANGES. | ||||||
| 4.6.2.3 MANUFACTURE. | ||||||
| 4.6.2.4 FIRST ARTICLE CONDITIONS. | ||||||
| QUALITY ASSURANCE PLAN (QAP). |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .