Attachment_4_Offeror_Participation.pptx

PPTX presentation 136 KB Posted

Attached to
Amendment 5 for MRAP Cougar Egress Upgrade
Solicitation number
M67854-13-R-5501
Issued by

About this file

Attachment 4 Offeror Participation

View the file

Other files

File Type Posted
1-14-2014_Questions_and_Answers_Amendment_5.xlsx XLSX spreadsheet
Egress_-_SF30_Solicitation_-_Amendment_5.doc DOC document
CDRL_D023_Training_Support_Document_-_Training_Test_Package.pdf PDF
Egress_-_SF30_Solicitation_-_Amendment_4.doc DOC document
CDRL_A001_Data_Management_Plan.pdf PDF
Egress_-_Amendment_0004_-_Consolidated_Questions_and_Answers.xlsx XLSX spreadsheet
M6785413R550103.doc DOC document
12-9-2013_-_questions_and_answers_egress.xlsx XLSX spreadsheet
Egress_-_SF33_Solicitation_-_Amendment_2.doc DOC document
Egress_-_SF33_Solicitation_-_Amendment_1.doc DOC document
CDRL_B017_Product_Drawings-Models_and_Associated_Lists_-_Technical_Data_Package.pdf PDF
12-3-2013_-_questions_and_answers_egress.xlsx XLSX spreadsheet
Attachment_1_-_SOW_-_13_Nov_2013.pdf PDF
Attachment_9_-_DD_Form_254_Security_Classification.pdf PDF
Attachment_10_-_DD_Form_2794_CSDR_Plan_-_13_Nov_13.xls XLS spreadsheet
Attachment_7_-_PSPEC_Exhaust.pdf PDF
Attachment_6_-_PSPEC_Rear_Door.pdf PDF
Attachment_5_-_PSPEC_Front_Door.pdf PDF
Attachment_2_-_Combined_D_CDRLs.pdf PDF
Attachment_3_-_Government_Furnished_Information_List.pdf PDF
Egress_-_SF33_Solicitation_-_22_Nov_2013.doc DOC document
Attachment_2_-_Combined_A_CDRLs.pdf PDF
ATTACHMENT_4_-_CDRL_to_CLIN_Matrix.xlsx XLSX spreadsheet
Attachment_2_-_Combined_C_CDRLs.pdf PDF
Attachment_2_-_Combined_B_CDRLs.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offeror Participation Offeror turns over test articles and all related paperwork to Contracts Representative at Bldg 3070 on ATC.

Offeror reviews material list / IBOM / Technical instructions with PM and ATC (verifies all material and paperwork are on site).

When ATC is ready for the initial functional checkout, Offeror is permitted (but not required) to observe ATC’s connection to the vehicle and functional checkout.

Offeror IS NOT permitted to handle or touch the test buck, kit, vehicles, or instrumentation during ATC’s initial functional checkout.

If any issues during installation or functional checks, the Offeror will be permitted four (4) hours of additional time to root-cause the system.

ATC will participate in the root-case and document any pertinent discussion or system fixes.

Offeror IS NOT permitted to improve design or fix manufacturing deficiencies.

ATC will retry the functional checkout following the four hour period.

If issues are not resolved after the 2nd functional checkout by ATC; the PCO will make the call to stop the test or test AS-IS.

M67854-13-R-5501 Attachment 4

Joint MRAP Vehicle Program UNCLASSIFIED For Official Use Only image1.png

File details come from the government source that posted it. Updated .