L2. Standardized Proposal Breakdown.xls

XLS spreadsheet 98 KB Posted

Attached to
IIJA FUNDED - MAF ATCT MODERNIZATION Federal contract opportunity
Solicitation number
697DCK-25-R-00211
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

The file is a Standardized Proposal Breakdown spreadsheet for an Air Traffic Control Tower (ATCT) Modernization project in Midland, Texas, funded by the Infrastructure Investment and Jobs Act (IIJA). The detailed Excel template provides a comprehensive cost breakdown structure for various modernization components, including fire alarm system replacement, electrical panel and breaker installation, HVAC unit replacements, roof replacement, lightning protection system installations, and associated labor and subcontractor costs.

The project is solicited by the Federal Aviation Administration (FAA) Southwestern Region under Solicitation Number 697DCK-25-R-00211, with critical dates including a site visit on July 15, 2025, a question submission deadline of July 22, 2025, and proposal submission deadline of August 12, 2025 at 1:00 PM EDT. Vendors must be registered in the Systems for Award Management (SAM) database and submit a detailed proposal following the specified breakdown, which includes line items for equipment, material, labor, and other costs across base and optional contract line items (CLINs).

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modernization

Standardized Proposal BreakdownDATE PREPARED: MMM DD - YYYY
PROJECT:
VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
ITEMEQUIPMENT COSTS - $MATERIAL COSTS - $LABOR COSTS - $OTHER COSTS - $TOTAL ITEM COST - $
TOTALTOTALTOTALTOTAL
PRIME
Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
Fire alarm system replacement$ - 0$ - 0$ - 0$ - 0$ - 0
Fire Stop system replacement replacement$ - 0$ - 0$ - 0$ - 0$ - 0
Fire and smoke dampers replacment$ - 0$ - 0$ - 0$ - 0$ - 0
Acoustical Ceilings replacment$ - 0$ - 0$ - 0$ - 0$ - 0
Install Electrical Panels$ - 0$ - 0$ - 0$ - 0$ - 0
Install Electrical breakers$ - 0$ - 0$ - 0$ - 0$ - 0
Install TVSS$ - 0$ - 0$ - 0$ - 0$ - 0
Lightning protection system replacement$ - 0$ - 0$ - 0$ - 0$ - 0
HVAC Units$ - 0$ - 0$ - 0$ - 0$ - 0
Replace VAV$ - 0$ - 0$ - 0$ - 0$ - 0
Replace Humidifiers$ - 0$ - 0$ - 0$ - 0$ - 0
Replace HVAC control systems$ - 0$ - 0$ - 0$ - 0$ - 0
Replace Heaters$ - 0$ - 0$ - 0$ - 0$ - 0
Replace Exhaust fans$ - 0$ - 0$ - 0$ - 0$ - 0
Replace Stair pressurization fans$ - 0$ - 0$ - 0$ - 0$ - 0
Replace Ceiling fans$ - 0$ - 0$ - 0$ - 0$ - 0
Roof replacement (Cab and base building)$ - 0$ - 0$ - 0$ - 0$ - 0
Ballasted guardrail installation$ - 0$ - 0$ - 0$ - 0$ - 0
Replace Access ramp with stair and platform$ - 0$ - 0$ - 0$ - 0$ - 0
Replace cab roof ladder and hatch$ - 0$ - 0$ - 0$ - 0$ - 0
Install Fall protection tie-off on cab roof$ - 0$ - 0$ - 0$ - 0$ - 0
Construction facilities$ - 0$ - 0$ - 0$ - 0$ - 0
Dayshift Superintendent$ - 0$ - 0$ - 0$ - 0$ - 0
Nightshift Superintendent$ - 0$ - 0$ - 0$ - 0$ - 0
Nightshift Differential$ - 0$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0
SUBCONTRACTOR
Mobilization/Demobilization$ - 0$ - 0$ - 0$ - 0$ - 0
Removal/Demolition$ - 0$ - 0$ - 0$ - 0$ - 0
Installation$ - 0$ - 0$ - 0$ - 0$ - 0
Permits$ - 0$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
OverheadRATE0%$ - 0$ - 0
ProfitRATE0%$ - 0$ - 0
BondRATE0%$ - 0$ - 0
Base CLIN Total$ - 0
Option CLIN$ - 0$ - 0$ - 0$ - 0
OheadRATE0%$ - 0$ - 0
ProfitRATE0%$ - 0$ - 0
BondRATE0%$ - 0$ - 0
Option CLIN Total$ - 0
TOTAL$ - 0
Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown.

Optional Bid Estimate

Bid Alternate Estimate
DescriptionLabor (Hours)UnitsLabor (Cost/Unit)Labor (Total Cost)Material QtyMaterial (Cost/Unit)Material (Total Cost)Equipment QtyEquipment (Cost/Unit)Equipment (Total Cost)Total
Building Lightning Protection System$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Copper down conductor on single story building$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Copper horizontal Class II lightning conductor on single story building$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Patches for the installation of horizontal Class II lightning conductor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Exothermically weld copper class II lightning conductors together (horizontal, roof top)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bond metallic object on roof to lightning protection system (copper)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bond metallic object on roof to lightning protection system (aluminum)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install #6 bonding jumper between sections of the steel structure framework$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Copper horizontal Class II lightning conductor on vertical metallic paneling$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0
Tower Lightning Protection System$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Copper down conductor (Thompson 506) on tower (40 ft)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Copper down conductor on tower (75 ft)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Copper down conductor on tower (120 ft)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Copper down conductor on tower (200 ft)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install equalization ring on tower 75 ft or below$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install equalization ring on tower 120 ft or below$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install equalization ring on a tower 200 ft.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install Copper horizontal Class II lightning conductor tower level$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Install and protect 4/0 from EES to 6' level for connection to down conductor$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Exothermically weld copper class II lightning conductors together (horizontal, roof top)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Bond metallic object on tower catwalk to lightning protection system (copper)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
OverheadRATE0%$ - 0$ - 0
ProfitRATE0%$ - 0$ - 0
BondRATE0%$ - 0$ - 0
TOTAL$ - 0

Labor Rates

PROJECT:
VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
Base CLINOption CLIN
LaborLabor
Item No.Labor Category/DescriptionUnitMeans CrewMan Hours/UnitMan HoursUnit Labor CostTotal LaborItem No.Labor Category/DescriptionUnitMeans CrewMan Hours/UnitMan HoursUnit Labor CostTotal Labor
hr1240$ - 0$ - 0hr1240$ - 0$ - 0
hr1180$ - 0$ - 0hr1180$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
120$ - 0120$ - 0
General Notes:

Subcontractor(s)

Base CLINOption CLIN
Subcontractor WorkSubcontractor Work
Item No.Labor Category/DescriptionUnitMeans CrewMan Hours/UnitMan HoursUnit Labor CostBare LaborQtyUnit Mat. CostBare Mat.QtyUnit Equip. CostBare Equip. CostTotalItem No.Labor Category/DescriptionUnitMeans CrewMan Hours/UnitMan HoursUnit Labor CostBare LaborQtyUnit Mat. CostBare Mat.QtyUnit Equip. CostBare Equip. CostTotal
hr1240$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0hr1240$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
hr1180$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0hr1180$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total120$ - 0$ - 0$ - 0$ - 0Total120$ - 0$ - 0$ - 0$ - 0
General Notes:

Materials

PROJECT:
VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
Base CLINOption CLIN
Materials - ItemizedMaterials - Itemized
Item No.Labor Category/DescriptionQtyUnit Mat. CostBare Mat.Item No.Labor Category/DescriptionQtyUnit Mat. CostBare Mat.
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Totals$ - 0Totals$ - 0
General Notes:

- Any materials provided in the Modernization tab in the lumpsum amount of $10K or more must be brokendown on this tab.