L2. Standardized Proposal Breakdown.xls
XLS spreadsheet 98 KB Posted
- Attached to
- IIJA FUNDED - MAF ATCT MODERNIZATION Federal contract opportunity
- Solicitation number
- 697DCK-25-R-00211
About this file
The file is a Standardized Proposal Breakdown spreadsheet for an Air Traffic Control Tower (ATCT) Modernization project in Midland, Texas, funded by the Infrastructure Investment and Jobs Act (IIJA). The detailed Excel template provides a comprehensive cost breakdown structure for various modernization components, including fire alarm system replacement, electrical panel and breaker installation, HVAC unit replacements, roof replacement, lightning protection system installations, and associated labor and subcontractor costs.
The project is solicited by the Federal Aviation Administration (FAA) Southwestern Region under Solicitation Number 697DCK-25-R-00211, with critical dates including a site visit on July 15, 2025, a question submission deadline of July 22, 2025, and proposal submission deadline of August 12, 2025 at 1:00 PM EDT. Vendors must be registered in the Systems for Award Management (SAM) database and submit a detailed proposal following the specified breakdown, which includes line items for equipment, material, labor, and other costs across base and optional contract line items (CLINs).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J5a MAF ATCT and SSC Asbestos OM Plan Aug 2024.pdf | ||
| J5c MAF ACM Removal Report 2005.pdf | ||
| 697DCK-25-R-00211 0003.pdf | ||
| J1a MAF-ATCT MODERNIZATION PROJECT SIGNED DRAWING FINAL.pdf | ||
| J5b MAF Modernization_Electrical Clarifications.pdf | ||
| J5 - MAF ATCT - RFI Set 1.pdf | ||
| 697DCK-25-R-00211 0002.pdf | ||
| 697DCK-25-R-00211 0001.pdf | ||
| J1a MAF-ATCT MODERNIZATION PROJECT SIGNED DRAWING (1).pdf | ||
| J3. RFO - MAF ATCT Modernization - FINAL.pdf | ||
| L1. Past Performance Questionnaire.pdf | ||
| J1 Specifications for MAF ATCT Modernization Project.pdf | ||
| J1c 3900-17_MAF_ATCT_MODERNIZATION_PROJECT FLS.pdf | ||
| 697DCK-25-R-00211.pdf | ||
| J1d EOSH Checklist MAF ATCT Modernization.pdf | ||
| J2 MAF ATCT_LPGBS Bid-Alternate_Updated 7.02.24 (1).pdf | ||
| J4 WD TX20250261 03.14.2025.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY | ||||
| PROJECT: | |||||
| VENDOR: | |||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||
| ITEM | EQUIPMENT COSTS - $ | MATERIAL COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | TOTAL | ||
| PRIME | |||||
| Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fire alarm system replacement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fire Stop system replacement replacement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fire and smoke dampers replacment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Acoustical Ceilings replacment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Install Electrical Panels | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Install Electrical breakers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Install TVSS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Lightning protection system replacement | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| HVAC Units | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace VAV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace Humidifiers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace HVAC control systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace Heaters | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace Exhaust fans | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace Stair pressurization fans | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace Ceiling fans | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Roof replacement (Cab and base building) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ballasted guardrail installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace Access ramp with stair and platform | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Replace cab roof ladder and hatch | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Install Fall protection tie-off on cab roof | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Construction facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Dayshift Superintendent | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Nightshift Superintendent | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Nightshift Differential | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SUBCONTRACTOR | |||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Overhead | RATE | 0% | $ - 0 | $ - 0 | |
| Profit | RATE | 0% | $ - 0 | $ - 0 | |
| Bond | RATE | 0% | $ - 0 | $ - 0 | |
| Base CLIN Total | $ - 0 | ||||
| Option CLIN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Ohead | RATE | 0% | $ - 0 | $ - 0 | |
| Profit | RATE | 0% | $ - 0 | $ - 0 | |
| Bond | RATE | 0% | $ - 0 | $ - 0 | |
| Option CLIN Total | $ - 0 | ||||
| TOTAL | $ - 0 | ||||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
Optional Bid Estimate
| Bid Alternate Estimate | |||||||||||
| Description | Labor (Hours) | Units | Labor (Cost/Unit) | Labor (Total Cost) | Material Qty | Material (Cost/Unit) | Material (Total Cost) | Equipment Qty | Equipment (Cost/Unit) | Equipment (Total Cost) | Total |
| Building Lightning Protection System | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Copper down conductor on single story building | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Copper horizontal Class II lightning conductor on single story building | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Patches for the installation of horizontal Class II lightning conductor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Exothermically weld copper class II lightning conductors together (horizontal, roof top) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Bond metallic object on roof to lightning protection system (copper) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Bond metallic object on roof to lightning protection system (aluminum) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install #6 bonding jumper between sections of the steel structure framework | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Copper horizontal Class II lightning conductor on vertical metallic paneling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | |||||||||||
| Tower Lightning Protection System | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Copper down conductor (Thompson 506) on tower (40 ft) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Copper down conductor on tower (75 ft) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Copper down conductor on tower (120 ft) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Copper down conductor on tower (200 ft) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install equalization ring on tower 75 ft or below | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install equalization ring on tower 120 ft or below | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install equalization ring on a tower 200 ft. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install Copper horizontal Class II lightning conductor tower level | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Install and protect 4/0 from EES to 6' level for connection to down conductor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Exothermically weld copper class II lightning conductors together (horizontal, roof top) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Bond metallic object on tower catwalk to lightning protection system (copper) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Overhead | RATE | 0% | $ - 0 | $ - 0 | |||||||
| Profit | RATE | 0% | $ - 0 | $ - 0 | |||||||
| Bond | RATE | 0% | $ - 0 | $ - 0 | |||||||
| TOTAL | $ - 0 |
Labor Rates
| PROJECT: | |||||||||||||||
| VENDOR: | |||||||||||||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||||||||||||
| Base CLIN | Option CLIN | ||||||||||||||
| Labor | Labor | ||||||||||||||
| Item No. | Labor Category/Description | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Labor Cost | Total Labor | Item No. | Labor Category/Description | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Labor Cost | Total Labor |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | hr | 1 | 2 | 40 | $ - 0 | $ - 0 | ||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | hr | 1 | 1 | 80 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| 120 | $ - 0 | 120 | $ - 0 | ||||||||||||
| General Notes: |
Subcontractor(s)
| Base CLIN | Option CLIN | ||||||||||||||||||||||||||||
| Subcontractor Work | Subcontractor Work | ||||||||||||||||||||||||||||
| Item No. | Labor Category/Description | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Labor Cost | Bare Labor | Qty | Unit Mat. Cost | Bare Mat. | Qty | Unit Equip. Cost | Bare Equip. Cost | Total | Item No. | Labor Category/Description | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Labor Cost | Bare Labor | Qty | Unit Mat. Cost | Bare Mat. | Qty | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| Total | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Total | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||
| General Notes: |
Materials
| PROJECT: | |||||||||
| VENDOR: | |||||||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||||||
| Base CLIN | Option CLIN | ||||||||
| Materials - Itemized | Materials - Itemized | ||||||||
| Item No. | Labor Category/Description | Qty | Unit Mat. Cost | Bare Mat. | Item No. | Labor Category/Description | Qty | Unit Mat. Cost | Bare Mat. |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Totals | $ - 0 | Totals | $ - 0 | ||||||
| General Notes: |
- Any materials provided in the Modernization tab in the lumpsum amount of $10K or more must be brokendown on this tab.