J1a MAF-ATCT MODERNIZATION PROJECT SIGNED DRAWING (1).pdf
PDF 30 MB Posted
- Attached to
- IIJA FUNDED - MAF ATCT MODERNIZATION Federal contract opportunity
- Solicitation number
- 697DCK-25-R-00211
About this file
These mechanical drawings detail the HVAC system modernization for the Midland Airport Traffic Control Tower (MAF ATCT) in Midland, Texas, as part of an Infrastructure Investment and Jobs Act (IIJA) funded project. The comprehensive set of drawings includes detailed plans for replacing existing HVAC equipment with new air handling units (AHUs), condensing units, computer room air conditioning units, exhaust fans, and variable air volume (VAV) boxes across multiple building levels. The project involves a phased construction approach with temporary cooling systems to maintain critical space temperatures during equipment replacement, ensuring continuous operation of the air traffic control facility.
The mechanical system design incorporates redundant cooling for critical spaces, including the control cab and equipment rooms, with lead-standby configurations for air handling units and computer room units. Key equipment includes eight new air handling units (AHUs 1-8), two computer room air conditioning units (CRU-1 and CRU-2), multiple condensing units, and ductless split systems for temporary and backup cooling. The control system utilizes a direct digital control (DDC) system with network architecture connecting building controllers, providing comprehensive monitoring and management of temperature, humidity, and air quality across different building zones. The project emphasizes maintaining operational continuity, with detailed sequences of operation for each HVAC component and comprehensive alarm and monitoring capabilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J5a MAF ATCT and SSC Asbestos OM Plan Aug 2024.pdf | ||
| J5c MAF ACM Removal Report 2005.pdf | ||
| J5 - MAF ATCT - RFI Set 1.pdf | ||
| 697DCK-25-R-00211 0003.pdf | ||
| J1a MAF-ATCT MODERNIZATION PROJECT SIGNED DRAWING FINAL.pdf | ||
| J5b MAF Modernization_Electrical Clarifications.pdf | ||
| 697DCK-25-R-00211 0002.pdf | ||
| 697DCK-25-R-00211 0001.pdf | ||
| J3. RFO - MAF ATCT Modernization - FINAL.pdf | ||
| L1. Past Performance Questionnaire.pdf | ||
| J4 WD TX20250261 03.14.2025.pdf | ||
| 697DCK-25-R-00211.pdf | ||
| J1d EOSH Checklist MAF ATCT Modernization.pdf | ||
| J2 MAF ATCT_LPGBS Bid-Alternate_Updated 7.02.24 (1).pdf | ||
| J1 Specifications for MAF ATCT Modernization Project.pdf | ||
| J1c 3900-17_MAF_ATCT_MODERNIZATION_PROJECT FLS.pdf | ||
| L2. Standardized Proposal Breakdown.xls | XLS spreadsheet |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEVIN D MILES
Digitally signed by KEVIN D
MILES
Date: 2024.06.11 12:57:55 -05'00'
WONDWOSEN
TESFAYE ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.11 11:02:29 -05'00'
DRAFT
WONDWOSEN
TESFAYE ELLALA
Digitally signed by
WONDWOSEN TESFAYE
ELLALA
Date: 2024.06.27 07:16:21 -05'00'
KEVIN D
MILES
Digitally signed by KEVIN
D MILES
Date: 2024.07.01 07:39:39 -05'00'
MICHELLE C
SHERMAN
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 13:18:56 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 13:11:13 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:25:16 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:13:09 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:25:44 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:13:28 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:26:01 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:13:43 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:26:17 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:14:27 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:27:16 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:14:55 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:27:32 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:15:23 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:27:47 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:16:02 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:29:16 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:15:42 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:28:01 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:16:41 -05'00'
Digitally signed by MICHELLE C
SHERMAN
Date: 2024.06.06 11:28:15 -05'00'
BRADY WILLIAM
NELSON
Digitally signed by BRADY
WILLIAM NELSON
Date: 2024.06.06 10:17:10 -05'00'
SS
CG
JF
N
04/02/2024
WONDWOSEN
TESFAYE ELLALA
Digitally signed by
WONDWOSEN TESFAYE
ELLALA
Date: 2024.06.27 07:16:49 -05'00'
KEVIN D
MILES
Digitally signed by KEVIN
D MILES
Date: 2024.07.01 07:40:15 -05'00'
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:16:57 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:40:25 -05'00'
N
CG
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:17:26 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:40:34 -05'00'
JF
N
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:20:57 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES
Date: 2024.07.01 07:40:48 -05'00'
CG
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:21:20 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:40:55 -05'00'
CG
JF
04/02/2024
WONDWOSEN
TESFAYE ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:21:40 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES
Date: 2024.07.01 07:41:03 -05'00'
CG
JF
04/02/2024
WONDWOSEN
TESFAYE ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:28:06 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:41:13 -05'00'
CG
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:36:41 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:41:19 -05'00'
CG
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:36:53 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:41:26 -05'00'
CG
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:37:05 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:41:33 -05'00'
CG
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:37:15 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:41:43 -05'00'
CG
JF
04/02/2024
WONDWOSEN
TESFAYE ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:38:27 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:41:49 -05'00'
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:41:04 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:41:56 -05'00'
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:41:10 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:42:08 -05'00'
JF
04/02/2024
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:41:32 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES
Date: 2024.07.01 07:42:18 -05'00'
WONDWOSEN TESFAYE
ELLALA
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:41:56 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES
Date: 2024.07.01 07:42:25 -05'00'
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:46:09 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:42:33 -05'00'
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 07:46:42 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES
Date: 2024.07.01 07:42:41 -05'00'
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 08:00:45 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:42:50 -05'00'
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 08:01:04 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:42:58 -05'00'
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 08:08:00 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:43:03 -05'00'
Digitally signed by WONDWOSEN
TESFAYE ELLALA
Date: 2024.06.27 08:08:17 -05'00'
KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:43:09 -05'00'
M
PIPING
PIPING (CONT.) ABBREVIATIONSDOUBLE LINE DUCTWORKEQUIPMENT
GENERAL NOTES
SINGLE LINE
DUCTWORK
MISCELLANEOUS
HVAC LEGEND
FD SD
R
D
SPD
SIZE
CFM
FSD
AHU-X
U
T
F
C
C
H
C
E
PIPE TYPE AND SIZE (IN)
DOOR LOUVER
LINED DUCT
FLEXIBLE CONNECTION
FIRE DAMPER, SMOKE DAMPER
TURNING VANES
FLEXIBLE DUCT
DUCT RISE
DUCT DROP
STATIC PRESSURE DAMPER
TRANSITION-RECTANGULAR TO ROUND
COMBINATION FIRE/SMOKE DAMPER
EQUIPMENT DESIGNATION SYMBOL ABBREVIATION DESCRIPTION
HIDDEN DUCTWORK
OUTSIDE AIR INTAKE
SUPPLY DUCT PHYSICAL RISER UP
(INDICATED BY FILL)
UNDERCUT DOOR
THERMOSTAT
ROUND DUCT (DIAMETER)
RECTANGULAR DUCT ("WIDTH"X"HEIGHT")
S-X
PRG
EXHAUST GRILLE
CEILING PLENUM RETURN GRILLE, UNLESS
OTHERWISE NOTED
FILTER
LOUVER
BACKDRAFT DAMPER
HEATING COIL
MOTORIZED OPPOSED
BLADE DAMPER
ELECTRIC HEATING COIL
FIRE/SMOKE DAMPER
HUMIDIFIER
COOLING COIL
UNIT HEATER
FAN
AIR FLOW MEASURING
STATION/STATIC PRESSURE
MEASURING STATION
MOTORIZED PARALLEL
BLADE DAMPER
FAN WITH VARIABLE
FREQ. MOTOR CONTROLLER
POINT OF TERMINATION
RECTANGULAR TO ROUND
TRANSITION
SQUARE REDUCER/
INCREASER
POINT OF CONNECTION OF
NEW TO EXISTING
NEW WORK -
DARK LINE WEIGHT
EXISTING -
LIGHT LINE WEIGHT
FLUID FLOW DIRECTION
PIPE TURNING UP
PIPE TURNING DOWN
PLUGGED PIPE/OUTLET
CONCENTRIC REDUCER
ECCENTRIC REDUCER
CAPPED PIPE/OUTLET
ANGLE VALVE
GLOBE VALVE
CHECK VALVE
UNION
CP
DIRECTION OF PITCH
GC
PV
GAS COCK
PLUG VALVE
AV
GLV
CV
P/TRV
U
FLEXIBLE HOSE (FLANGED ENDS)
FLEXIBLE HOSE (SCREWED ENDS)
FLEXIBLE PIPE CONNECTOR
AIR ELIMINATOR
TEST COCK
AUTOMATIC AIR VENT
FLOW METER
STRAP-ON SENSOR
WELD CAP
SOLENOID VALVE
PRESSURE REGULATING VALVE
THERMOMETER
PUMP
BUTTERFLY VALVEBFV
PRESSURE GAUGE
TI
PI
INLINE PUMP
PRESSURE/TEMPERATURE
RELIEF/SAFETY VALVE
HOT TAP/STOPPLE FITTING
MOTOR OPERATED 2-WAY CONTROL
VALVE
MOTOR OPERATED 3-WAY CONTROL
VALVE
STRAINER WITH BLOWDOWN VALVE
PIPE HEADER WITH BLIND
FLANGE
MANUAL AIR VENTAV
AAV
BALL VALVEBV
WATER METER
FCV FLOW CONTROL VALVE
PETE'S PLUG
SHUT-OFF VALVE
TEST AND BALANCE VALVE
HEIGHT
HOSE BIBB
HEATING COIL
HEATING AND COOLING UNIT
HEAD
HORIZONTAL
HORSEPOWER, HEAT PUMP
HOUR
HAND SWITCH
HEATING
HEATER
HOT TAP/ STOPPLE FITTING
HUMIDIFIER
HOT WATER COIL
HOT WATER PUMP
HOT WATER RETURN
HOT WATER SUPPLY
HEATING AND VENTILATION
HERTZ
INTAKE LOUVER
INSULATION
INTEGRATED PART LOAD VALUE
IRON PIPE SIZE
INCH OR INCHES
INCHES WATER COLUMN
INCHES WATER GAUGE
INDUSTRIAL WATER
KILOWATT
LENGTH
LEAVING AIR TEMPERATURE
POUNDS
POUNDS PER HOUR
LEAVING DRY BULB TEMPERATURE
LINEAR FEET
LOW PRESSURE STEAM
LOW VOLTAGE
LEAVING WET BULB TEMPERATURE
LEAVING WATER TEMPERATURE
MAXIMUM
THOUSAND BTU PER HOUR
MINIMUM CURRENT AMPACITY
MECHANICAL
MAXIMUM FUSE SIZE
MANUFACTURER
MINIMUM
MINIMUM EFFICIENCY REPORTING VALUE
MAXIMUM OVERCURRENT PROTECTION
MOTOR
MOTOR STARTER
MOUNTED
NORMALLY CLOSED, NOISE CRITERIA
NATIONAL ELECTRIC CODE
NOT IN CONTRACT
NATURAL-VENTILATION LOUVER
NORMALLY OPEN, NUMBER
NOMINAL
NON-STANDARD PART LOAD VALUE
NET POSITIVE SUCTION HEAD
NOT TO SCALE
OUTSIDE AIR
OUTSIDE AIR LOUVER
OPPOSED BLADE DAMPER
ON CENTER
OUTSIDE DIAMETER, OPEN DRAIN
OPEN END DUCT
OPENING
OPPOSITE
PRESSURE DROP
PERFORATED, PERFORMANCE
PERPENDICULAR
PACKAGED FILTER, PREFILTER
PHASE
PLUMBING
PRESSURE REDUCING VALVE
PRESSURE
POUNDS PER SQUARE INCH
PSI GAUGE
PSI ABSOLUTE
PACKAGED TERMINAL AIR CONDITIONER
POLYVINYL CHLORIDE
POWER
QUALITY
QUANTITY
RISE
RETURN AIR
ROOM AIR CONDITIONER
RADIATION, RADIANT HEATER
REMOVE
REQUIRED
REQUIREMENTS
RETURN GRILLE
RELATIVE HUMIDITY
RELIEF LOUVER
REVOLUTIONS PER MINUTE
RETURN REGISTER
REMOVE EXISTING
SUPPLY AIR, SOUND ATTENUATOR
SELF-CONTAINED
AIR CONDITIONER
SEASONAL COEFFICIENT OF
PERFORMANCE
SENSIBLE
SUPPLY FAN
SUPPLY GRILLE
SMOKE DETECTOR
STATIC PRESSURE
SPECIFICATION
SUPPLY REGISTER
THROAT
TRANSFER AIR
TOTAL DYNAMIC HEAD
TEMPERATURE
TIGHT TO STRUCTURE
TOTAL STATIC PRESSURE
THERMOSTAT
TURNING VANES
TYPICAL
TOILET EXHAUST
UNIT HEATER
UNLESS OTHERWISE NOTED
VOLTS
VACUUM
VELOCITY
VARIABLE FREQUENCY DRIVE
VARIABLE SPEED DRIVE
WIDTH
WITH
WITHOUT
WET BULB
WIRE MESH SCREN
H, (H)
HB
HC
HCU
HD
HORZ
HP
HR
HS
HTG
HTR
HTP
HU
HWC
HWP
HWR
HWS
HV
HZ
IL
INS
IPLV
IPS
IN
IN WC
IN WG
IW
KW
L, (L)
LAT
LBS
LBS/HR
LDB
LIN FT, LF
LPS
LV
LWB
LWT
MAX
MBH
MCA
MECH
MFS
MFR
MIN
MERV
MOCP
MOT, MTR
MS
MTD
NC
NEC
NIC
NL
NO
NOM
NPLV
NPSH
NTS
OA
OAL
OBD
OC
OD
OED
OPNG
OPP
PD
PERF
PERP
PF
PH
PLUM
PRV
PRESS.
PSI
PSIG
PSIA
PTAC
PVC
PWR
QUAL
QTY
R
RA
RAC
RAD
REM
REQ
REQS
RG
RH
RL
RPM
RR
RX
SA
SAC
SCOP
SEN, SENS
SF
SG
SD
SP
SPEC
SR
T
TA
TDH
TEMP
TS
TSP
TSTAT
TV
TYP
TX
UH
UON
V
VAC
VEL
VFD
VSD
W, (W) W/ W/O
WB
WMS
A
ABV
AD
AFF/G
AAV
AC
ACGIH
ACT
ACM
ACU
AD
ADA
ADD
ADDL
ADH
ADJ
AF
AFF
AGG
AHU
AIA
ALT
AMB
AMP
ANCH
AP
APD
APPROX
APRVD
ARCH
AV
AVG
B
BAS
BEL
BDD
BF
BFP
BHP
BM
BOD
BOT
BT
BTU
BTUH
C
CAP
CAV
CC
CD
CFM
CFR
CLG
COND
CONN
CONT
COR
CP
CU
CV
CW
D
DAT
DB
DCW
DDCS
DE
DEG
DEGF
DEMO
DHW
DIAM, DIA
DMPR
DN
DP
DSS
DWG
E, (E)
EA
EAT
EDB
EER
EF
EFF
EH
EL
ELEC
ELEV
ENT
ER
EQUIP
ESP
ET
ETR
EWB
EWT
EX
EXH
EXP
F °F
FA
FC
FD
FF
FIN FL, FF
FL
FLA
FLEX
FLR
FPM
FPS
FRP
FSD, FD/SD
FT
FT H20
FTR
FV
G, GA
GAL
GALV'D
GEN
GPH
GPM
GR
GX
GYP
AMPERES
ABOVE
ACCESS DOOR
ABOVE FINISHED FLOOR/GRADE
AUTOMATIC AIR VENT
AIR CONDITIONING
AMERICAN CONFERENCE OF GOVERNMENTAL
INDUSTRIAL HYGIENISTS
ACCOUSTICAL TILE, ACTUAL
ASBESTOS CONTAINING MATERIAL
AIR CONDITIONING UNIT
ACCESS DOOR
AMERICANS WITH DISABILITIES
ADDENDUM, ADDITION
ADDITIONAL
ADHESIVE
ADJACENT
AIR FOIL
ABOVE FINISHED FLOOR
AGGREGATE
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
ALTERNATE, ALTITUDE
AMBIENT
AMPERE
ANCHOR
ACCESS PANEL
AIR PRESSURE DROP
APPROMIXATE, APPROXIMATELY
APPROVED
ARCHITECT
MANUAL AIR VENT
AVERAGE
BOILER
BUILDING AUTOMATION SYSTEM
BELOW
BACK DRAFT DAMPER
BLIND FLANGE
BACK FLOW PREVENTER
BRAKE HORSEPOWER
BEAM
BOTTOM OF DUCT, BASIS OF DESIGN
BOTTOM
BOTTOM THROAT, BUFFER TANK
BRITISH THERMAL UNIT
BTU PER HOUR
CONDENSER COIL
CAPACITY
CONSTANT AIR VOLUME
COOLING COIL
CEILING DIFFUSER, CONTROL DAMPER
CUBIC FEET PER MINUTE
CODE OF FEDERAL REGULATIONS
CEILING
CONDENSATE
CONNECTION
CONTINUATION
CONTRACTING OFFICER'S REPRESNTATIVE
CONTROL PANEL
CONDENSING UNIT
CONSTANT VOLUME, CONTROL VALVE
COLD WATER
DROP, DRAIN
DISCHARGE AIR TEMPERATURE
DRY BULB
DOMESTIC COLD WATER
DIRECT DIGITAL CONTROL SYSTEM
DEMOLISH EXISTING
DEGREE
DEGREES FAHREINHEIT
DEMOLITION
DOMESTIC HOT WATER
DIAMETER
DAMPER
DOWN
DIFFERENTIAL PRESSURE
DUCTLESS SPLIT SYSTEM AIR HANDLER
DRAWING
EXISTING
EXHAUST AIR
ENTERING AIR TEMPERATURE
ENTERING DRY BULB TEMPERATURE
ENERGY EFFICIENCY RATIO
EXHAUST FAN
EFFICIENCY
ELECTRIC HEATER
EXHAUST LOUVER
ELECTRIC, ELECTRICAL
ELEVATION
ENTERING
EXISTING RELOCATED, EXHAUST REGISTER
EQUIPMENT
EXTERNAL STATIC PRESSURE
EXPANSION TANK
EXISTING TO REMAIN
ENTERING WET BULB
ENTERING WATER TEMPERATURE
EXISTING
EXHAUST
EXPANSION
FILTER
DEGREES FAHREINHEIT
FREE AREA (SQ.FT)
FLEXIBLE CONNECTION
FIRE DAMPER
FINAL FILTER
FINISHED FLOOR
FLOOR
FULL LOAD AMPERES
FLEXIBLE
FLOOR
FEET PER MINUTE
FEET PER SECOND
FIBERGLASS REINFORCED PIPE
COMBINATION FIRE AND SMOKE DAMPER
FEET
FEET OF WATER
FINNED TUBE RADIATION
FACE VELOCITY
GAUGE
GALLON
GALVANIZED
GENERATOR
GALLONS PER HOUR
GALLONS PER MINUTE
GRADE
GENERAL EXHAUST
GYPSUM
AIR FLOW RATE (CFM)
DIFFUSER, GRILLE, OR REGISTER
DESIGNATION
M
M
AF
M
S
SP
M
S H
U M
ID
AXB
20"
S
M
SYMBOL
NUMBER
FD/FSD/SD HORIZONTAL DAMPER, SEE TAILS FOR TYPE
A. NOT ALL ABBREVIATIONS AND SYMBOLS SHOWN MAY BE USED ON THIS PROJECT.
B. FOR LOCATIONS AND SIZES OF WALL OPENINGS SEE ARCHITECTURAL DRAWINGS.
C. PROVIDE READY ACCESS TO VALVES, DAMPERS, COILS AIR FILTERS, AND OTHER DEVICES. INSTALL ACCESS DOORS TO
PROVIDE ADEQUATE CLEARANCES FOR DIRECT ACCESS.
D. FOR LOCATION OF CEILING DIFFUSERS AND GRILLES SEE ARCHITECTURAL REFLECTED CEILING PLANS.
E. DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING AND CUTTING OPERATIONS.
PERSON PERFORMING FIRE PROTECTION DUTIES MUST NOT BE SAME INDIVIDUAL THAT IS PERFORMING WELDING OPERATIONS. COMPLY WITH OSHA STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926. PROVIDE TEMPORARY FIRE EXTINGUISHERS DURING CONSTRUCTION. WELDING MUST BE SCHEDULED IN WRITING WITH COR AND MUST BE
PERFORMED OUTSIDE OF FACILITY OR IN SAFE LOCATION TO BE DETERMINED BY COR.
F. FOR WELDING THAT MUST BE PERFORMED INSIDE THE BUILDING, PROVIDE LOCAL MECHANICAL VENTILATION DURING WELDING DUCTED TO OUTSIDE, APPROVED BY FAA AND ACGIH. MINIMIZE WELDING WITHIN THE BUILDING WHEREVER
POSSIBLE.
G. WELDING POWERED FROM FACILITY ELECTRICAL SYSTEM IS PROHIBITED. CONNECT METAL TO BE WELDED TO A GOOD EARTH GROUND. FACILITY STRUCTURAL STEEL OR PIPING MUST NOT BE USED AS A GROUND PATH.
H. AIR FLOW QUANTITIES SHOWN ARE FLOW QUANTITIES AT SITE ELEVATION.
I. INSTALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS.
J. LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT SHOWN ARE BASED ON SPECIFIC SCHEDULED MANUFACTURERS AND MODEL NUMBERS. SUBSTITUTION OF SUCH EQUIPMENT MANUFACTURERS WILL REQUIRE THE CONTRACTORS PRIOR VERIFICATION OF CONFORMANCE PER THE REQUIREMENTS OF LOCATION, SIZE CLEARANCES AND CONFIGURATION AS COMPARED TO SPACE ALLOCATED TO HOUSE SPECIFIC EQUIPMENT. RESUBMIT PROPOSED EQUIPMENT TO CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR APPROVAL, PRIOR TO INSTALLATION.
K. CONSTRUCT, INSTALL, AND INSULATE SUPPLY AND RETURN AIR DUCTWORK AS SPECIFIED; INSPECT DUCTWORK, SUPPORTS AND INSULATION (NEW AND EXISTING) FOR DAMAGE OR FAULTY INSTALLATION. REPLACE, OR REPAIR AS REQUIRED SO THAT FINAL INSTALLATION IS ADEQUATELY SEALED FROM LEAKS, FREE OF DEFECTS, CLEANED, AND IN ACCORDANCE WITH SPECIFICATIONS. PROVIDE EXTERIOR DUCTWORK INSULATION ON ALL EXISTING DUCTWORK THAT
IS UNINSULATED.
L. PROVIDE FIRE AND FIRE/SMOKE DAMPERS IN PENETRATIONS OF FIRE RATED FLOORS, WALLS AND PARTITIONS IN
ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS.
M. LIMIT USE OF FLEXIBLE DUCTS TO AIR OUTLET CONNECTIONS. FLEXIBLE DUCT CONNECTIONS MUST NOT EXCEED 5'-0" IN LENGTH. AIR DEVICES INSTALLED IN A HARD CEILING WITHOUT ACCESS MUST BE COMPLETELY HARD-DUCTED.
EXHAUST DUCTWORK CONNECTIONS MUST BE COMPLETELY HARD-DUCTED.
N. PROVIDE WIRE MESH SCREENS FOR DUCT OPENINGS WITHOUT GRILLES.
O. FOR AREAS WITH INACCESSIBLE VOLUME DAMPERS, PROVIDE DAMPER WITH FLEXIBLE METAL CABLE OPERATORS FOR
REMOTE OPERATION OF THE DAMPER THROUGH FACE OF DIFFUSER, GRILLE OR REGISTER.
P. PROVIDE A DETAILED SCHEDULE FOR DEMOLITION OF HVAC EQUIPMENT AND INSTALLATION OF NEW HVAC SYSTEMS.
COORDINATE WITH COR PRIOR TO REMOVAL OF EQUIPMENT. WHERE INDICATED ON DRAWINGS, PROVIDE TEMPORARY COOLING SYSTEMS. SUCH SYSTEMS MUST REMAIN IN OPERATION THROUGHOUT REMOVAL AND REPLACEMENT OF
EQUIPMENT.
Q. PRIOR TO THE DEMOLITION OF ITEMS WHICH HAVE UTILITIY CONNECTIONS (WATER, ELECTRICITY, GAS ETC.) ARRANGE WITH COR TO LOCATE SHUT-OFF VALVES, PANEL BOXES AND OTHER CONTROL ELEMENTS. ONLY FAA PERSONNEL MAY
SHUT OFF, ISOLATE EQUIPMENT AND BRING EQUIPMENT BACK ONLINE.
R. REFER TO STRUCTURAL SHEET S010 AND S013 FOR APPLICABLE WIND LOAD CRITERIA.
S. PROVIDE STAINLESS STEEL FOR ALL EXTERIOR HARDWARE, INCLUDING BUT NOT LIMITED TO, BOLTS, WASHERS, CLAMPS, AND UNISTRUTS. WHERE STAINLESS STEEL IS NOT AVAILABLE, PROVIDE HARDWARE WITH ANTI-CORROSION
COATING FOR RUST PREVENTION.
T. THE REFRIGERANT CONTAINED IN SYSTEMS BEING DEMOLISHED MUST BE REMOVED PRIOR TO DEMOLITION, RECOVERED AND BROUGHT TO A EPA-CERTIFIED RECLAIMER BY AN EPA-CERTIFIED TECHNICIAN.
U. PROVIDE DUCTWORK CLEANING FOR ALL EXISTING TO REMAIN DUCTWORK IN THE AIR TRAFFIC CONTROL TOWER
(ATCT).
V. UNIT DISASSEMBLY MUST BE CONDUCTED BY A CERTIFIED TECHNICIAN.
W. REFER TO SPECIFICATIONS FOR TESTING, ADJUSTING, AND BALANCING REQUIREMENTS.
X. ALL ITEMS REMOVED FOR REUSE MUST BE INSPECTED FOR STATUS AND REPORTED TO COR. ANY DEFICIENCIES MUST
BE NOTED PRIOR TO REMOVAL.
Y. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SURVEY AND VERIFY EXISTING CONDITIONS PRIOR TO STARTING WORK. EXISTING CONDITIONS SHOWN ARE BASED ON AVAILABLE INFORMATION PROVIDED BY THE FAA. WORK MUST BE COORDINATED WITH ACTUAL EXISTING CONDITIONS.
M
FLOW CONTROL VALVEFCV
M
FLEXIBLE DUCT
(E) AHU-X
EXISTING EQUIPMENT
DESIGNATION
D
DCW
CD
RS/RL
DOMESTIC COLD WATER
CONDENSATE DRAIN
DRAIN
REFRIGERANT
DHW DOMESTIC HOT WATER
MANUAL DAMPER
MOTORIZED, AUTOMATIC, OPPOSED BLADE
DAMPER, BACKDRAFT DAMPER
M A OBD BBD
AxB SA UP OR DN
SUPPLY DUCT PHYSICAL RISER DN
(INDICATED BY DASHED LINES)
RETURN DUCT PHYSICAL RISER UP
(INDICATED BY FILL)
AxB SA UP OR DN
AxB RA UP OR DN
EXHAUST DUCT PHYSICAL RISER DN
(INDICATED BY DASHED LINES)
EXHAUST DUCT PHYSICAL RISER UP
(INDICATED BY FILL)
RETURN DUCT PHYSICAL RISER DN
(INDICATED BY DASHED LINES)
AxB EA UP OR DN
AxB EA UP OR DN
AxB RA UP OR DN
EXISTING FIRE DAMPER, SMOKE DAMPER
AP ACCESS PANEL
TS TEMPERATURE SENSOR
T/H COMBINATION TEMPERATURE AND
HUMIDITY SENSOR
TO BE DEMOLISHED
DEMO LINE - DASHED LINE
DEMOLISHED PIPING
REV. APPROVED
DATE DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PL
O
T D
AT
E/
TI
M
E:
4/
2/
0:
:4
AM
MIDLAND TXMIDLAND (MAF) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
ENGINEERING
SERVICES
TERMINAL
April 2, 2024 2200347
MAF - D - ATCT - M009
HVAC ABBREVIATIONS, SYMBOLS, AND GENERAL
NOTES
MIDLAND AIRPORT TRAFFIC CONTROL TOWER
MAF ATCT MODERNIZATION
BS
CB
JL
MIDLAND ATCT
MIDLAND,
TEXAS
4-2-24 ARTURO MEDINA Digitally signed by ARTURO MEDINA
Date: 2024.06.27 17:58:56 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.02 08:06:45 -05'00'
DO
AI
X
AO
DI
AID
MEASURED VARIABLE OR CONTROLLED DEVICE
INSTRUMENT OR DEVICE IDENTIFICATION NUMBER
EQUIPMENT INSTRUMENT OR DEVICE NOT LOCATED
IN AN ENCLOSURE
MEASURED VARIABLE OR CONTROLLED DEVICE
INSTRUMENT OR DEVICE LOCATED IN AN ENCLOSURE
DDCP DATA INPUT/OUTPUT TO
CENTRAL FEPC
ELECTRONIC INTERLOCK WIRING
DDC CONTROL SYSTEM WIRING
DIGITAL INPUT TO DDCP
DIGITAL OUTPUT FROM DDCP
ANALOG INPUT TO DDCP
ANALOG OUTPUT FROM DDCP
ADDRESSABLE INTERFACE MODULE
LS
M
N.C.
N.O.
P
PS
SL
SP
SS
SW
T
TS
TSW
WD
LEVEL SENSOR
ELECTRIC MOTOR/ACTUATOR
NORMALLY CLOSED
NORMALLY OPEN
PRESSURE SENSOR/ GAUGE
PRESSURE SWITCH
STROBE LIGHT
STATIC PRESSURE
START/STOP
SWITCH
TEMPERATURE GAUGE/THERMOSTAT
TEMPERATURE SENSOR
TEMPERATURE SWITCH
WATER DETECTOR
ACD
AFS
AM
AX
C
CD
CI
CR
DDCP
DDCS
DI
DH
DP
ECMS
ED
FACP
FCV
FM
FS
FZ
ADRESSABLE CONTROL DEVICE
AIR FLOW SWITCH
AMPERAGE
AUXILIARY CONTACT
COMMON
CONTROL DAMPER
COMMAND INPUT
CURRENT RELAY
DIRECT DIGITAL CONTROL PANEL
DIRECT DIGITAL CONTROL SYSTEM
DAMPER POSITION INDICATOR
DOOR HOLDER
DIFFERENTIAL PRESSURE
ENERGY CONTROL AND MONITORING
SYSTEM
ENABLE/DISABLE
FIRE ALARM CONTROL PANEL
FLOW CONTROL VALVE
FLOW METER (WATER)
FLOW SWITCH
FREEZESTAT
TS
SS
CONTROLS & INSTRUMENTATION
AFM AIR FLOW METER
LD LEAK DETECTOR
GD GAS DETECTOR (CO, H2)
VI VALVE POSITION INDICATOR
DPI DIFFERENTIAL PRESSURE INDICATOR
LSW LEVEL SWITCH
EOL END OF LINE RESISTOR
ES END SWITCH
RM REFRIGERANT MONITOR
OS OCCUPANCY SENSOR
POS POSITION (FEEDBACK)
SD SMOKE DETECTOR
SPS STATIC PRESSURE SWITCH
STS STATUS
JB JUNCTION BOX
H
HS
HORN
HUMIDITY SENSOR
HSW HUMIDITY SWITCH/HUMIDISTAT
COMM COMMUNICATION
DPS DIFFERENTIAL PRESSURE SWITCH
LCS LAST COMMAND STATE
FDI FIRE DAMPER POSITION INDICATOR
FVI FLOW CONTROL VALVE POSITION INDICATOR
CDI CONTROL DAMPER POSITION INDICATOR
CS CURRENT SWITCH
THE AIR TRAFFIC CONTROL TOWER (ATCT) CONTROL CAB AND BASE BUILDING CRITICAL SPACES CAN NOT TOLERATE THE LOSS OF POWER OR HVAC SYSTEM AIR CONDITIONING. A CONSTRUCTION SEQUENCE MUST BE SUBMITTED FOR APPROVAL BY THE CONTRACTOR WHICH MINIMIZES THE RISK OF FAILURE TO ANY
MECHANICAL OR ELECTRICAL SYSTEMS.
DEMOLITION
NEW WORK
PREPARATION
1. REMOVAL OF EQUIPMENT MUST INCLUDE REMOVAL OF ASSOCIATED PIPING, SUPPORT, INSULATION, MOTORS ELECTRICAL CONNECTIONS, AUTOMATIC
CONTROL WIRING AND ITS COMPONENTS UNLESS OTHERWISE NOTED (UON).
2. EXISTING DDCS OPERATOR’S WORKSTATION MUST REMAIN IN SERVICE UNTIL ALL EXISTING CONTROLLERS HAVE BEEN REMOVED. PRESERVE THE INTEGRITY OF EXISTING DDCS COMMUNICATION NETWORK THROUGHOUT PROJECT DEMOLITION WORK. EXISTING CONTROLS FOR EXISTING HVAC EQUIPMENT INCLUDING AIR HANDLING UNITS, VAV TERMINAL UNITS, COMPUTER ROOM AIR CONDITIONING UNITS, HUMIDIFIERS, EXHAUST FANS, ETC. MUST REMAIN IN SERVICE UNTIL EACH EQUIPMENT IS TAKEN OFF LINE FOR DEMOLITION. REFER TO MECHANICAL DRAWINGS FOR CONTROLS DEMOLITION.
3. DEMOLITION DRAWINGS INDICATE PIPING AND EQUIPMENT WITHIN THE WORK AREA. REMOVE AND REINSTALL (AS REQUIRED) PIPING, ELECTRICAL WIRING, CONDUITS, LIGHTNING PROTECTION, ETC. NOT INDICATED AND NOT RELATED TO THE EQUIPMENT INSTALLATION WHERE THEY INTERFERE WITH THE WORK.
OBTAIN PRIOR APPROVAL FROM COR FOR SUCH WORK. REFER TO ELECTRICAL SPECIFICATIONS FOR ELECTRICAL REQUIREMENTS.
1. PHYSICAL SIZES AND LOCATION OF EQUIPMENT AND ASSOCIATED PIPING ARE APPROXIMATE. VERIFY SIZES AND DIMENSIONS AFFECTING THE WORK.
2. DRAWINGS DO NOT SHOW ALL REQUIRED FITTINGS, ELBOWS, AND/OR OFFSETS. FINAL INSTALLATION OF ALL FITTINGS, ELBOWS, AND OFFSETS ARE THE
RESPONSIBILITY OF THE CONTRACTOR, AT NO ADDITIONAL COST TO THE FAA.
3. VERIFY AND COORDINATE DIMENSIONS, VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT PRIOR TO ORDERING AND SUBMIT THIS INFORMATION WITH SHOP DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR EQUIPMENT ORDERED WITHOUT VERIFICATION.
4. COORDINATE THE INSTALLATION OF MECHANICAL WORK WITH THE WORK OF OTHER TRADES.
5. INSTALL EQUIPMENT IN ACCORDANCE WITH APPLICABLE CODES, THE PRINTED INSTALLATION INSTRUCTIONS OF THE MANUFACTURER, THE
SPECIFICATIONS, AND APPROVED SHOP DRAWINGS.
A. VERIFY LOCATIONS AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE WORK PRIOR TO THE START OF CONSTRUCTION. BEFORE THE START OF DEMOLITION AND CONSTRUCTION. FOR MISSION-CRITICAL SPACES TEMPORARY COOLING EQUIPMENT MUST BE APPROVED, OPERATIONAL, PROVEN, AND ON SITE. APPROVED CONSTRUCTION PLANS SHOWING FABRICATED LENGTH OF PIPING AND PLACEMENT OF EQUIPMENT MUST BE COMPLETED AND APPROVED BEFORE START OF WORK. THIS MUST INCLUDE ELEVATIONS AND ANY MODIFICATION DUE TO CONFLICTS AND "AS IS" CONDITIONS.
B. EQUIPMENT INCLUDING VALVES, PIPING AND ACCESSORIES FOR THE NEXT STEP IN THE SEQUENCE MUST BE ON SITE BEFORE THAT STEP'S START OF
WORK.
C. PROTECT FLOOR DRAINS, ROOF DRAINS AND STORM DRAINS FROM DAMAGE AND DEBRIS AT ALL TIMES. DRAINS MUST NOT BE USED FOR DISPOSAL OF
CONSTRUCTION MATERIALS.
D. SHUTDOWN AND REMOVAL OF THE EQUIPMENT AND REFRIGERANT PIPING MUST BE ACCOMPLISHED BY CLOSING SHUT-OFF VALVES AND DE-ENERGIZING ELECTRICAL SUPPLY. THIS WORK MUST BE SCHEDULED AND COORDINATED WITH THE COR BEFORE START OF WORK. MECHANICAL AND ELECTRICAL SHUTDOWN FOR WORK MUST BE ACCOMPLISHED BY FAA PERSONNEL. THE REFRIGERANT CONTAINED IN SYSTEMS BEING DEMOLISHED MUST BE RECOVERED AND BROUGHT TO AN EPA-CERTIFIED RECLAIMER BY AN EPA-CERTIFIED TECHNICIAN. SEE SPECIFICATIONS FOR DOCUMENTATION
REQUIREMENTS.
E. ONE TEMPORARY UNIT MUST REMAIN IN OPERATION AT ALL TIMES, AND ONE TEMPORARY PACKAGED UNIT MUST REMAIN IN STANDBY.
F. COORDINATE ALL WORK WITH THE WORK OF OTHER TRADES. ELECTRICAL WORK MUST MATCH MECHANICAL PHASING PLAN AS REQUIRED.
G. CONSTRUCTION SEQUENCE IS PROVIDED AS AN OUTLINE OF THE SIGNIFICANT STEPS REQUIRED TO COMPLETE THE PROJECT. THE CONTRACTOR MUST SUBMIT A DETAILED CONSTRUCTION SEQUENCE WHICH ALSO PROVIDES ALL OF THE DETAILS ABSENT FROM THIS OUTLINE AS PART OF THEIR
CONSTRUCTION PHASING PLAN.
CONSTRUCTION SEQUENCE
I. NOTES AND PREPARATION
II. PRE-CONSTRUCTION
*THE PRECONSTRUCTION PHASE MUST BE COMPLETE PRIOR TO ALL DEMOLITION AND CONSTRUCTION ACTIVITES ON SITE. TO BE CONSIDERED COMPLETE, ALL WORK REQUIRING PROVING PERIODS MUST OPERATE WITHOUT INCIDENT FOR THE ENTIRE DURATION WITHOUT PAUSE.*
STEP 1 - BASE BUILDING AREA A
A. INSTALL TAHU-1, TAHU-2, TAHU-3. THIS INCLUDES PREPARING WINDOWS AND DOORWAYS FOR DUCTWORK PENETRATION. BACKUP UNITS FOR CRITICAL
SPACES TO ALSO BE PREPARED.
B. ROUTE TEMPORARY DUCTWORK, TEMPORARY AIR DEVICES, DAMPERS AND ACCESSORIES AS REQUIRED. ROUTE DUCTWORK AS NECESSARY TO ENSURE THE TEMPORARY EQUIPMENT ADEQUATELY CONDITIONS THE ADMIN SPACES WITHOUT HOT SPOTS. PROVIDE 5 SEPERATE TEMPERATURE RECORDINGS TO
ENSURE SPACE SETPOINTS ARE MET.
C. PROVDE RUN TIME OF UNITS WITH ONE DAY OF CONTINUOUS RUN TIME.
D. SPACES SERVED BY TEMPORARY UNITS ABOVE ARE NOW RUNNING ON TEMPORARY COOLING EQUIPMENT.
STEP 2 - BASE BUILDING AREA B
A. INSTALL TAHU-4 AND TAHU-5. THIS INCLUDES PREPARING WINDOWS AND DOORWAYS FOR DUCTWORK PENETRATION. BACKUP UNITS FOR CRITICAL
SPACES TO ALSO BE PREPARED.
B. ROUTE TEMPORARY DUCTWORK, TEMPORARY AIR DEVICES, DAMPERS AND ACCESSORIES AS REQUIRED. ROUTE DUCTWORK AS NECESSARY TO ENSURE THE TEMPORARY EQUIPMENT ADEQUATELY CONDITIONS THE ADMIN SPACES WITHOUT HOT SPOTS. PROVIDE 5 SEPERATE TEMPERATURE RECORDINGS TO
ENSURE SPACE SETPOINTS ARE MET.
C. PROVIDE UNITS SERVING ADMIN SPACES WITH TWO DAYS OF CONTINUOUS RUN TIME. PROVIDE UNITS SERVING CRITICAL SPACES WITH 7 DAYS OF
CONTINUOUS RUN TIME.
D. SPACES SERVED BY TEMPORARY UNITS ABOVE ARE NOW RUNNING ON TEMPORARY COOLING EQUIPMENT.
IV. AREA A CRITICAL SPACES (EQUIPMENT ROOM, TRACON)
V. AREA B ADMIN SPACES
A. INSTALL DSS-1, DSS-2 AND ASSOCIATED CONDENSING UNITS INCLUDING ALL ASSOCIATED PIPING, SUPPORTS AND APPURTENANCES.
B. PROVIDE UNITS SERVING CRITICAL SPACES WITH 7 DAYS OF CONTINUOUS RUN TIME.
C. SPACES SERVED BY TEMPORARY UNITS ABOVE ARE NOW RUNNING ON TEMPORARY COOLING EQUIPMENT.
STEP 3 - ATCT CONTROL CAB
*TEMPORARY UNITS SERVING NON CRITICAL SPACES TO BE FIRST INSTALLED AND TESTED PRIOR TO UNITS SERVING CRITICAL SPACES.
CRAC UNITS TO BE REPLACED ONE AT A TIME TO ALLOW AT LEAST ONE CRAC UNIT TO BE FUNCTIONAL.*
A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING RTU-6 & 7 AND AHU-11 & 12 MECHANICAL SYSTEMS.
B. REMOVE EXISTING DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.
C. INSTALL NEW AHU-3 & 4 AND AHU-6 & 7 AND ALL ASSOCIATED DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS. CONNECT CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON
DRAWINGS.
D. PROVE AHU-3 & 4 AND AHU-6 & 7 WITH THREE DAYS OF CONTINUOUS RUN TIME.
E. ONCE AHU-3 & 4 AND AHU-6 & 7 HAVE BEEN PROVEN, CONDITIONING OF CRITICAL SPACES ARE SUPPLIED BY AHU-3 & 4.
VI. AREA B CRITICAL SPACES (COMM EQUIPMENT ROOM)
A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING CRAC-1 & 2 MECHANICAL SYSTEM.
B. REMOVE EXISTING DUCTWORK, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.
C. CRAC UNITS ARE TO BE REMOVED ONE AT A TIME. ONCE EXISTING CRAC UNIT HAS BEEN INSTALLED AND TESTED, SECOND EXISTING CRAC UNIT CAN BE
DEMOLISHED FOR REPLACEMENT. REMOVE EXISTING CONTROLS ASSOCIATED WITH CRAC UNITS.
D. CONNECT CRAC CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.
E. INSTALL NEW CRAC-1 & 2 AND ALL ASSOCIATED DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.
CONNECT CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.
F. PROVE CRAC-1 & 2 WITH THREE DAYS OF CONTINUOUS RUN TIME.
G. ONCE CRAC-1 & 2 HAVE BEEN PROVEN, CONDITIONING OF CRITICAL SPACES ARE SUPPLIED BY CRAC-1 & 2.
H. DE-ENERGIZE TEMPORARY SYSTEM SERVING SPACES, REMOVE TEMPORARY EQUIPMENT AND ALL ASSOCIATED TEMPORARY DUCTWORK, PIPING, DIFFUSERS, REGISTERS, GRILLES, CONTROLS, SUPPORTS AND APPURTENANCES.
VII. ATCT CONTROL CAB
A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING AHU-2 & 3 MECHANICAL SYSTEM.
B. REMOVE EXISTING DUCTWORK, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.
C. INSTALL NEW AHU-1 & 2 AND ALL ASSOCIATED DUCTWORK, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.
D. PROVE AHU-1 & 2 WITH THREE DAYS OF CONTINUOUS RUN TIME.
E. ONCE AHU-1 & 2 HAVE BEEN PROVEN, CONDITIONING OF CRITICAL SPACES ARE SUPPLIED BY AHU-1 & 2 AS WELL AS DSS-1 & 2.
F. DE-ENERGIZE RTU-1 SYSTEM SERVING SPACES, REMOVE RTU-1 EQUIPMENT AND ALL ASSOCIATED TEMPORARY DUCTWORK, PIPING, DIFFUSERS, REGISTERS, GRILLES, CONTROLS, SUPPORTS AND APPURTENANCES.
G. DSS-1 & 2 SYSTEM TO REMAIN AS PART OF REDUNDANT COOLING SYSTEM. INTEGRATE THE DSS-1 & 2 SYSTEM INTO THE DDCS. CONNECT DSS-1 & 2 SYSTEM TO AHU-1 & 2 CONTROL PANELS AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.
H. DISCONNECT AND REMOVE EXISTING DDCS OPERATOR'S WORKSTATION AND ASSOCIATED DDC COMMUNICATION WIRING.
A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING AHU-10 MECHANICAL SYSTEM.
B. REMOVE EXISTING DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.
C. INSTALL NEW AHU-8 AND ALL ASSOCIATED DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS. CONNECT CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.
D. PROVE AHU-8 WITH THREE DAYS OF CONTINUOUS RUN TIME.
E. ONCE AHU-8 HAS BEEN PROVEN, CONDITIONING OF ADMIN SPACES ARE NOW SUPPLIED BY AHU-8.
F. TEMPORARY UNITS SERVING NON CRITICAL SPACES TO BE FIRST INSTALLED AND TESTED PRIOR TO UNITS SERVING CRITICAL SPACES.
G. DE-ENERGIZE TEMPORARY SYSTEM SERVING SPACES, REMOVE TEMPORARY EQUIPMENT AND ALL ASSOCIATED TEMPORARY DUCTWORK, PIPING, DIFFUSERS, REGISTERS, GRILLES, CONTROLS, SUPPORTS AND APPURTENANCES.
III. AREA A ADMIN SPACES
A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING AHU-4 MECHANICAL SYSTEM.
B. REMOVE EXISTING DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.
C. INSTALL NEW DDCS OPERATOR'S WORKSTATION LOADED WITH DDC MANUFACTURER'S FRONT-END INTERFACE SOFTWARE, NETWORK SWITCH, AND DDC
COMMUNICATION WIRING AS INDICATED BY DRAWINGS.
D. INSTALL NEW AHU-5 AND ALL ASSOCIATED DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS. CONNECT CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.
E. PROVE AHU-5 WITH THREE DAYS OF CONTINUOUS RUN TIME.
F. ONCE AHU-5 HAS BEEN PROVEN, CONDITIONING OF ADMIN SPACES ARE NOW SUPPLIED BY AHU-5.
G. TEMPORARY UNITS SERVING NON CRITICAL SPACES TO BE FIRST INSTALLED AND TESTED PRIOR TO UNITS SERVING CRITICAL SPACES.
H. DE-ENERGIZE TEMPORARY SYSTEM SERVING SPACES, REMOVE TEMPORARY EQUIPMENT AND ALL ASSOCIATED TEMPORARY DUCTWORK, PIPING, DIFFUSERS, REGISTERS, GRILLES, CONTROLS, SUPPORTS AND APPURTENANCES.
VIII. FACILITY-WIDE CONTROLS ACTIVITIES
A. TEST THE OPERATIONS OF ALL CONTROLS. DEMONSTRATE SEQUENCING CONTROL FROM OPERATOR'S WORKSTATION..
B. PROVIDE FINAL TRAINING AND INSTRUCTION OF TOTAL SYSTEM TO FAA PERSONNEL.
REV. APPROVED
DATE DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PL
O
T D
AT
E/
TI
M
E:
4/
2/
0:
:4
AM
MIDLAND TXMIDLAND (MAF) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
ENGINEERING
SERVICES
TERMINAL
April 2, 2024 2200347
MAF - D - ATCT - M010
MECHANICAL INSTRUMENTATION
MIDLAND AIRPORT TRAFFIC CONTROL TOWER
MAF ATCT MODERNIZATION
MP
AH
RJ
MIDLAND ATCT
MIDLAND,
TEXAS
4-2-24 ARTURO MEDINA Digitally signed by ARTURO MEDINA
Date: 2024.06.27 17:59:09 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:43:20 -05'00'
TSHSTS HS
T
TS
HS
TS
TS
TS HSHSTSTS HS
TSHS TS
HS
TS HS
HS
TS TS HS
TSHS HSTSTSHS
HS
TS
TSHS
HS
T
T T
T
T
2.2
2.8
3.9
G F E D C B A
20"ø SA 20"ø RA
20"ø RA 20"ø SA
20"ø SA20"ø RA
20"ø RA
20"ø SA
SD-1 1200
TYP. 2
SD-1 800 SD-1 800
TYP. 2
SD-1 500
TYP. 2
SD-1 300
SD-1 150
SD-1 150
SD-1 500
SD-1 300 SD-1 410
TYP. 2 SD-1 200 SD-1 200 SD-1 200
SD-1 150
SD-1 600
SD-1 2000
TYP. 3
TAHU-1
TAHU-5
TAHU-4 TAHU-3
TAHU-2
4 4
SD-1 750
TYP. 4
EQUIPMENT ROOM
118 MECHANICAL
EMERGENCY
GENERATOR
SSC
WOMENS
RESTROOM
MENS RESTROOM
SSC COMPUTER
AT. MANAGER
RECEPTIONIST/
SECRETARY
CORRIDOR
QATS
108 PPS OFFICE
OFFICE AREA
109CONFERENCE ROOM
SECRETARY
OFFICE
114-1
OFFICE
STORAGE ROOM
TRACON
114-A
TRACON
LOCKER ROOM
BREAKROOM
CORRIDOR
102-A
STORAGE ROOM
WOMENS
RESTROOM
MENS RESTROOM
COMM EQUIPMENT
ROOM
118-A
ETG LAB
114-B
TECHNICIANS
OFFICE
SMOKE SHELTER
S1
LINK
20"ø RA 20"ø SA
TEMPORARY EQUIPMENT REQUIREMENTS
1. RENTAL EQUIPMENT FOR TEMPORARY COOLING AND HEATING (PACKAGED AIR CONDITIONERS/HEAT
PUMPS, CONTROLS, ETC.) MUST BE PROVIDED BY THE SAME SOURCE. TEMPORARY COMPONENTS
INCLUDING BUT NOT LIMITED TO DUCTWORK, PIPING, VALVES, STAIRS/WALKWAYS/RAILINGS MUST
BE SUBMITTED FOR APPROVAL PER DIVISION 1 SPECIFICATION 01 30 00.
2. TEMPORARY UNITS SHALL BE COOLING ONLY OR HEAT PUMPS DEPENDING ON SEASON OF WORK.
3. PROVIDE MAINTENANCE AND REPAIRS OF THE TEMPORARY SYSTEM. CONTRACTOR MUST HAVE 24/7
CONTACT VIA TELEPHONE. SERVICE CALLS MUST BE RETURNED WITHIN 1-HOUR. THE CONTRACTOR MUST HAVE A QUALIFIED REPAIR TECHNICIAN ON SITE WITHIN 2 HOURS OF THE SERVICE CALL AND THE EQUIPMENT MUST BE REPAIRED OR REPLACED WITHIN 2 HOURS. FAILURE OF MORE THAN 1
UNIT WOULD BE CONSIDERED AN EMERGENCY AND ADDITIONAL RESOURCES, NAMELY ALTERNATE
REPLACEMENT RENTAL UNITS, MUST BE AVAILABLE TO RETURN THE SYSTEM TO OPERATION AS
QUICKLY AS POSSIBLE. IF ANY OF THESE CONDITIONS ARE NOT MET, THE FAA RESERVES THE RIGHT
TO PERFORM REPAIRS AS NECESSARY TO RESTORE OPERATION AND BACK CHARGE THE
CONTRACTOR FOR ANY COSTS INCURRED. A QUALIFIED TECHNICAN MUST BE ON SITE FOR A
MINIMUM OF 4 HOURS PER WEEK WHILE THE RENTAL EQUIPMENT IS IN OPERATION TO INSPECT, CLEAN, AND MAINTAIN THE EQUIPMENT.
4. TEMPORARY EQUIPMENT PROVIDER MUST HAVE AN ESTABLISHED, OPERATIONAL OFFICE LOCATED
WITHIN 1 HOUR TRAVEL TIME OF THE FAA FACILITY.
5. EQUIPMENT COMPANY MUST SUBMIT FOR APPROVAL DOCUMENTATION ATTESTING TO THE
COMPATIBILITY OF THE TEMPORARY COOLING PLAN.
6. DOCUMENTATION MUST BE SUBMITTED FOR APPROVAL DETAILING REQUIRED MAINTENANCE
REGIME AND SCHEDULE FOR THE TEMPORARY AIR CONDITIONERS FOR THE PROJECTED DURATION
OF THE INSTALLATION.
7. UNIT MUST OPERATE AT MAXIMUM OF 55 F UNIT DISCHARGE AIR TEMPERATURE. AIR CONDITIONERS
MUST BE CERTIFIED ANNUALLY OR ALTERNATIVELY FIELD ACCEPTANCE TESTED. PACKAGED
CONTROLS AND DUCTWORK CONNECTIONS ARE TO BE INCLUDED.
8. SUBMIT FOR APPROVAL DESIGN DRAWINGS SHOWING PROPOSED AIR CONDITIONERS, DUCTWORK INSTALLATION REQUIREMENTS INCLUDING FOUNDATIONS, ANCHORAGE, BRACING AND SUPPORTS, AND EQUIPMENT YARD FENCING. SUBMITTALS MUST BE SIGNED AND SEALED BY A LICENSED
PROFESSIONAL ENGINEER IN THE STATE OF TEXAS. WORK ASSOCIATED WITH THE TEMPORARY
EQUIPMENT MUST BE ACCOMPLISHED IN ACCORDANCE WITH PROJECT SPECIFICATIONS. WORK
MUST BE ACCOMPLISHED IN A PROFESSIONAL MANNER AND COMPLETED BY PERSONNEL
EXPERIENCED IN THAT PARTICULAR ASPECT OF INSTALLATION.
9. NO OTHER CONSTRUCTION RELATED ACTIVITIES, INCLUDING BUT NOT LIMITED TO MATERIAL
STORAGE, PARKING, CUTTING, OR WELDING ALLOWED WITHIN TEMPORARY EQUIPMENT AREAS.
10. TEMPORARY RENTAL EQUIPMENT MUST BE TESTED AND COMMISSIONED PRIOR TO OPERATION
WITHIN THE FACILITY. THE TEMPORARY SYSTEM MUST OPERATE CONTINUOUSLY FOR 1 DAY
WITHOUT FAILURE BEFORE DEMOLITION OF THE EXISTING SYSTEM CAN BE STARTED. THE
TEMPORARY EQUIPMENT MUST BE OPERATED CONTINUOUSLY DURING THE 1 DAY PERIOD.
11. TEMPORARY PACKAGED AIR CONDITIONERS MUST BE PROVIDED WITH CONTROLS FOR OPERATION
OF TEMPORARY EQUIPMENT. FAA SITE PERSONNEL MUST BE ABLE TO MANUALLY OPERATE EACH
AIR CONDITIONER FROM A THERMOSTAT. TEMPORARY EQUIPMENT MUST HAVE RA TEMPERATURE
SENSOR TO MONITOR SPACE TEMPERATURE. ONCE TEMPORARY UNITS ARE STARTED BY THE SITE
PERSONNEL, THERMOSTAT MUST STAGE EQUIPMENT ON AND OFF AS REQUIRED TO MAINTAIN
SPACE TEMPERATURE AT SET POINT. POWER WIRING AND CONTROL WIRING MUST BE INSTALLED IN
RGS CONDUIT. AFTER POWER INTERRUPTION, THE CONTRACTOR MUST RETURN THE SYSTEM TO
OPERATIONAL STATUS. PACKAGED AIR CONDITIONER MUST AUTOMATICALLY RECOVER FROM A
POWER INTERRUPTION.
12. PROVIDE LIGHTING IN TEMPORARY EQUIPMENT AREAS PER OSHA AND FACILITY SECURITY
REQUIREMENTS. COORDINATE LIGHTING REQUIREMENTS WITH SITE.
13. PROVIDE OPERATION AND MAINTENANCE TRAINING FOR FACILITY PERSONNEL.
14. DEMOBILIZE TEMPORARY EQUIPMENT, DUCTWORK, SUPPORTS, CONTROLS, AND WIRING AT
COMPLETION OF WORK. RETURN THE SITE TO ITS ORIGINAL CONDITION.
15. TEMPORARY AIR CONDITIONING UNITS TO KEEP ELECTRONIC SPACES CONDITIONED AT 73 DEG F DB
AND MAXIMUM 60% RH.
REV. APPROVED
DATE DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
8 0 8
Scale: 1/8 INCH = 1 FOOT
N
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PL
O
T D
AT
E/
TI
M
E:
4/
2/
0:
:4
AM
MIDLAND TXMIDLAND (MAF) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
ENGINEERING
SERVICES
TERMINAL
April 2, 2024 2200347
MAF - D - ATCT - M011
HVAC TEMPORARY WORK - BASE BUILDING -
GROUND LEVEL FLOOR PLAN
MIDLAND AIRPORT TRAFFIC CONTROL TOWER
MAF ATCT MODERNIZATION
BS
CB
JL
MIDLAND ATCT
MIDLAND,
TEXAS
1/8" = 1'-0"M011
C8 HVAC TEMPORARY - BASE BUILDING - GROUND LEVEL
1 ROUTE TEMPORARY DUCTWORK THROUGH EXTERIOR WINDOW AND SEAL WEATHERTIGHT.
2 ROUTE TEMPORARY DUCTWORK THROUGH EXTERIOR WINDOWS AND SEAL WEATHERTIGHT.
REPLACE WINDOWS UPON COMPLETION OF PROJECT.
3 LOCATE 5 TON TEMPORARY AIR HANDLING UNIT.
4 LOCATE 20 TON TEMPORARY AIR HANDLING UNIT.
5 INSTALL, TEST, AND OPERATE TEMPORARY UNIT SERVING ADMINISTRATIVE AREAS (NON-CRITICAL
SPACES) PRIOR TO INSTALLATION OF TEMPORARY UNITS SERVING CRITICAL SPACES.
6 TEMPORARY DUCTWORK TO PENETRATE THROUGH FIRE RATED WALL. PROVIDE FIRE DAMPER
FOR TEMPORARY DUCTWORK. REPAIR PENETRATION TO MEET FIRE RATING AFTER TEMPORARY
CONSTRUCTION.
7 REMOVE DOUBLE DOOR AND REPLACE WITH TEMPORARY WALL ON ONE SIDE AND 3' DOOR ON
THE OTHER. INSTALL TEMPORARY WALL TO ALLOW FOR TRANSITION OF DUCTWORK FROM ROOM
TO ROOM. PROTECT DOOR DURING CONSTRUCTION. ANY DAMAGE TO DOOR TO BE BORNE BY
THE CONTRACTOR. TEMPORARY SINGLE DOOR TO REMAIN OPERATIONAL AT ALL TIMES. AFTER
COMPLETION OF TEMPORARY PHASE, REINSTALL DOUBLE DOOR.
8 REDUNDANT TEMPORARY HVAC SYSTEM TAHU-3 AND 4 MUST BE ROUTED TO SERVE COMM
EQUIPMENT ROOM 118-A DURING THE REPLACEMENT OF CRAC-1 & 2. UPON COMPLETION OF
WORK IN THIS SPACE, DISCONNECT DIFFUSERS IN COMM EQUIPMENT ROOM 118-A FROM THE
SYSTEM AND ROUTE TEMPORARY DUCTWORK TO SERVE EQUIPMENT ROOM 118 AND TRACON
114.
9 PROVIDE TEMPORARY RA DUCTWORK WITH WIRE MESH SCREEN AT END OF RUN.
10 THERMOSTAT PROVIDED BY TEMPORARY AIR HANDLING UNIT MANUFACTURER. WHEN
TEMPORARY EQUIPMENT IS REMOVED, DEMOLISH THERMOSTAT AND ASSOCIATED WIRING AND
CONDUIT.
11 PROVIDE TEMPORARY DUCTWORK FOR TAHU-4 TO ALLOW FOR QUICK CHANGEOVER IN EVENT OF
TAHU-3 FAILURE.
12 PROVIDE TEMPORARY DUCTWORK WITH MANUAL BALANCING DAMPER TO CONTROL AIRFLOW TO
TRACON 114 DURING HVAC REPLACEMENT IN AREA A.
-SHEET NOTES
AREA B AREA A
4-2-24 ARTURO MEDINA Digitally signed by ARTURO MEDINA
Date: 2024.06.27 17:59:23 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:43:36 -05'00'
C
CU-X1
CU-X2
RS/RL
RS/RL3
(E) RTU-1
(E) CU-2
(E) CU-3
C
RS/RL
RS/RL
DSS-2DSS-1
RS/RL
UP
SECONDARY EQUIPMENT REQUIREMENTS
1. PROVIDE REDUNDANT COOLING SYSTEM FOR THE CONTROL CAB THAT WILL PROVIDE COOLING
WHILE EXSTING UNITS ARE BEING REPLACED. THIS UNIT IS TO BE INSTALLED PRIOR TO THE
REMOVAL OF THE EXISTING PACKAGED ROOF TOP UNIT. PACKAGED ROOFTOP UNIT TO NOT BE
REMOVED UNTIL AHU-1/2 HAVE BEEN REPLACED AND ARE ACTIVE. UPON COMPLETION OF PROJECT CONTROL CAB TEMPORARY COOLING EQUIPMENT MUST REMAIN IN PLACE AS THE SUPPLEMENTARY COOLING SYSTEM. THIS SYSTEM, INCLUDING ALL EQUIPMENT, DUCTWORK, REFRIGERANT PIPING, CONTROLS AND APPURTENANCES MUST BE PROVIDED BY CONTRACTOR AS PART OF THE DESIGN
PACKAGE. SEE MECHANICAL SCHEDULES AND SPECIFICATIONS FOR EQUIPMENT AND SYSTEM
INFORMATION.
2. ALL COOLING EQUIPMENT FOR SECONDARY COOLING (DUCTLESS SPLIT SYSTEM CASSETTES,
CONDENSING UNITS, CONTROLS, ETC.) MUST BE PROVIDED BY THE SAME SOURCE (TRANE,
CARRIER, DAIKIN OR APPROVED EQUAL). ALL COMPONENTS INCLUDING BUT NOT LIMITED TO
DUCTWORK, PIPING, VALVES, STAIRS/WALKWAYS/RAILINGS MUST BE SUBMITTED FOR APPROVAL
PER CONTRACT SPECIFICATIONS.
3. DURING PROJECT CONSTRUCTION, CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND
REPAIRS OF THE SECONDARY SYSTEM. CONTRACTOR MUST HAVE 24/7 CONTACT VIA TELEPHONE.
SERVICE CALLS MUST BE RETURNED WITHIN 1-HOUR. THE CONTRACTOR MUST HAVE A QUALIFIED REPAIR TECHNICIAN ON SITE WITHIN 1 HOUR OF THE SERVICE CALL AND THE EQUIPMENT MUST BE REPAIRED OR REPLACED WITHIN 1 HOUR. FAILURE OF MORE THAN 1 UNIT WOULD BE CONSIDERED AN EMERGENCY AND ADDITIONAL RESOURCES, NAMELY ALTERNATE REPLACEMENT UNITS, MUST BE AVAILABLE TO RETURN THE SYSTEM TO OPERATION AS QUICKLY AS POSSIBLE. IF ANY OF THESE CONDITIONS ARE NOT MET, THE FAA RESERVES THE RIGHT TO PERFORM REPAIRS AS NECESSARY
TO RESTORE OPERATION AND BACK CHARGE THE CONTRACTOR FOR ANY COSTS INCURRED.
4. EQUIPMENT PROVIDER MUST HAVE AN ESTABLISHED, OPERATIONAL OFFICE LOCATED WITHIN 1
HOUR TRAVEL TIME OF THE FAA FACILITY.
5. EQUIPMENT COMPANY MUST SUBMIT FOR APPROVAL DOCUMENTATION ATTESTING TO THE
COMPATIBILITY OF THE SECONDARY COOLING PLAN.
6. DOCUMENTATION MUST BE SUBMITTED FOR APPROVAL DETAILING REQUIRED MAINTENANCE
REGIME AND SCHEDULE FOR THE AIR CONDITIONERS FOR THE PROJECTED DURATION OF THE
INSTALLATION AND SUBSEQUENT CONSTRUCTION.
7. TWO (2) DIRECT EXPANSION DUCTLESS SPLIT SYSTEM CASSETTES AND TWO (2) ASSOCIATED
CONDENSING UNITS ARE REQUIRED FOR LOAD CAPACITY. SEE MECHANICAL SCHEDULES FOR
REQUIRED CAPACITIES. UNITS MUST OPERATE AT MAXIMUM OF 55 F UNIT DISCHARGE AIR
TEMPERATURE. DUCTWORK CONNECTIONS ARE TO BE INCLUDED. CONTROLS MUST BE PROVIDED.
8. PROVIDE ASSOCIATED SYSTEM POWER DISTRIBUTION AND EQUIPMENT TO TERMINATE DEDICATED
SINGLE-POINT POWER SUPPLY CONNECTION. SEE ELECTRICAL DRAWINGS FOR EQUIPMENT
ELECTRICAL CHARACTERISTICS.
9. THE DUCTLESS SPLIT SYSTEM CASSETTES AND CONDENSING UNITS MUST BE INSTALLED AS THE
SECONDARY COOLING SYSTEM. THE SECONDARY COOLING SYTEM WILL ACT AS THE TEMPORARY
COOLING SYSTEM FOR THE DURATION OF CONSTRUCTION WHILE AHU-2/3 ARE BEING REPLACED.
EXISTING PACKAGED ROOF TOP UNIT TO REMAIN IN OPERATION DURING THIS TIME. SHOULD ANY DUCTLESS SPLIT SYSTEM CASSETE OR CONDENSING UNIT FAIL DURING CONSTRUCTION, THE TWO
FUNCTIONING UNITS MUST BE UTILIZED TO PROVIDE COOLING THE SPACE UNTIL THE
MALFUNCTIONING UNIT CAN BE REPAIRED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
ENSURE THAT ADEQUATE TEMPORARY COOLING IS PROVIDED DURING CONSTRUCTION AT ALL
TIMES.
10. SUBMIT FOR APPROVAL DESIGN DRAWINGS SHOWING PROPOSED AIR CONDITIONERS AND
DUCTWORK INSTALLATION REQUIREMENTS INCLUDING FOUNDATIONS, ANCHORAGE, BRACING AND
SUPPORTS. SUBMITTALS MUST BE SIGNED AND SEALED BY A LICENSED PROFESSIONAL ENGINEER IN
THE STATE OF TEXAS. WORK ASSOCIATED WITH THE SECONDARY COOLING EQUIPMENT MUST BE
ACCOMPLISHED IN ACCORDANCE WITH PROJECT SPECIFICATIONS. WORK MUST BE ACCOMPLISHED IN A PROFESSIONAL MANNER AND COMPLETED BY PERSONNEL EXPERIENCED IN THAT PARTICULAR
ASPECT OF INSTALLATION.
11. EACH AIR CONDITIONER, FOUNDATION, ANCHORAGE AND STRUCTURAL STEEL SUPPORTS MUST BE
DESIGNED TO WITHSTAND WIND AND SEISMIC FORCES PER PROJECT SPECIFICATIONS.
12. SECONDARY EQUIPMENT AND CONTROLS MUST BE TESTED AND COMMISSIONED PRIOR TO
OPERATION WITHIN THE FACILITY. THE SECONDARY SYSTEM MUST OPERATE CONTINUOUSLY FOR 48 HOURS WITHOUT FAILURE BEFORE DEMOLITION OF THE EXISTING SYSTEM CAN BE STARTED. THE
TEMPORARY EQUIPMENT MUST BE OPERATED CONTINUOUSLY DURING THE 48 HOUR PERIOD.
13. PROVIDE OPERATION AND MAINTENANCE TRAINING FOR FACILITY PERSONNEL. PROVIDE A MINIMUM
OF 2 SESSIONS, 4 HOURS IN DURATION FOR EACH SESSION.
14. EACH AIR CONDITIONER, FOUNDATION, ANCHORAGE AND STRUCTURAL STEEL SUPPORTS MUST BE
DESIGNED TO WITHSTAND WIND AND SEISMIC FORCES PER PROJECT SPECIFICATIONS.
15. SECONDARY COOLING EQUIPMENT, REFRIGERANT, AND SUPPORTS TO REMAIN AT COMPLETION OF
WORK. SECONDARY COOLING SYSTEM TO SERVE AS SUPPLIMENTARY COOLING SYSTEM.
16. REMOVE TEMPORARY CONTROLS ASSOCIATED WITH SECONDARY COOLING SYSTEM.AIR
CONDITIONING SYSTEM. CONNECT COOLING SYSTEM AND SUPPLY FAN TO NEW DDC PANEL AND
PROVIDE PROGRAMMING AS INDICATED ON CONTROLS SHEETS.
17. PROVE SECONDARY COOLING EQUIPMENT FOR TWO (2) DAYS CONTINOUS RUNTIME
REV. APPROVED
DATE DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
4 0 4 8
Scale: 1/4 INCH = 1 FOOT
N
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PL
O
T D
AT
E/
TI
M
E:
4/
2/
0:
:5
AM
MIDLAND TXMIDLAND (MAF) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
ENGINEERING
SERVICES
TERMINAL
April 2, 2024 2200347
MAF - D - ATCT - M012
HVAC SECONDARY WORK - ATCT
MIDLAND AIRPORT TRAFFIC CONTROL TOWER
MAF ATCT MODERNIZATION
BS
CB
JL
MIDLAND ATCT
MIDLAND,
TEXAS
1/4" = 1'-0"M012
A8 HVAC SECONDARY- ATCT - CAB ROOF LEVEL
1/4" = 1'-0"M012
E8 HVAC SECONDARY - ATCT - CAB LEVEL
1 SECONDARY DUCTLESS SPLIT SYSTEM PROVIDED DURING TEMPORARY COOLING PHASE. DURING CONSTRUCTION, THE DUCTLESS SPLIT SYSTEM MUST PROVIDE TEMPORARY COOLING TO THE CAB.
UPON COMPLETION OF WORK, THE DUCTLESS SPLIT SYSTEM IS TO REMAIN AND SERVE AS REDUNDANT
COOLING SYSTEM.
2 PROVIDE INTERIOR REFRIGERANT LINES WITH INSULATED PVC SLEEVE, ONE SLEEVE PER EACH
REFRIGERANT LINE.
3 PROVIDE REFRIGERANT AND CONDUIT PIPING CURB. SEE DETAIL A8/M024.
4 PROVIDE EQUIPMENT SUPPORT RAIL. REFER TO ARCH DWGS FOR EQUIPMENT SUPPORT RAIL DETAIL.
5 PROVIDE PIPING SUPPORTS PER SMACNA. TYPICAL OF ALL EXTERIOR PIPING.
6 EXISTING THERMOSTAT ASSOCIATED WITH ROOFTOP AIR HANDLING UNIT RTU-1, THE TEMPORARY HVAC
SYSTEM SERVING THE CAB DURING CONSTRUCTION. WHEN EQUIPMENT IS REMOVED, DEMOLISH
THERMOSTAT AND ASSOCIATED WIRING AND CONDUIT.
7 THERMOSTAT PROVIDED BY EQUIPMENT MANUFACTURER. WHEN NEW AIR HANDLING UNITS AHU-1 AND AHU-2 ARE PROVEN OPERATIONAL, DEMOLISH THERMOSTAT AND ASSOCIATED WIRING AND CONDUIT.
-SHEET NOTES
4-2-24 ARTURO MEDINA Digitally signed by ARTURO MEDINA
Date: 2024.06.27 17:59:34 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:43:42 -05'00'
TSHSTSHS
TS
HS
TS
TS
TS HSHSTS
TSHS TS
HS
TS HS
HS
TS TS HS
TSHS HSTSTSHS
HS
TS
TSHS
HS
T
T T
T
T
VAV-C
VAV-A
VAV-D
VAV-B
VAV-1
VAV-3
VAV-2
VAV-5 VAV-4
EH-1
EH-2
CRU-1 CRU-2
CRU-CU-1 CRU-CU-2
VAV-6
STORAGE ROOM
TECHNICIANS
OFFICE
MENS RESTROOM
ETG LAB
114-B
COMM EQUIPMENT
ROOM
118-A
VEST
BREAKROOM
SSC SUPERVISOR
SECRETARY
CONFERENCE ROOM
112 OFFICE AREA
QATS
PPS OFFICE
CORRIDOR
TRACON
114-A
TRACON
CORRIDOR
102-A
AT. MANAGER
RECEPTIONIST/
SECRETARY
SSC COMPUTER
MENS RESTROOM
WOMENS
RESTROOM
ICSS/TELCO
VEST
SSC
CORR
EMERGENCY
GENERATOR
MECHANICAL
SOLAR CHAMBER
120-1
OFFICE
114-1
OFFICE
STORAGE ROOM
TRACON
114-A
EQUIPMENT ROOM
SMOKE SHELTER
S1
WOMENS
RESTROOM
2.2
2.8
3.9
G F E D C B A
CF-1
CF-2
CF-5
CF-4
CF-6
CF-3
CF-7CF-8CF-9
CF-10CF-12
CF-11
CF-14
CF-13
6 6
9 10
13 14
PTAC-1
HU-1
HU-2
171717
UH-5
22 23
A. REFER TO DRAWINGS M009 AND M010 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.
B. PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE WITH COR.
C. FIRE/LIFE SAFETY EQUIPMENT AND COMPONENTS ARE EXISTING AND ARE TO REMAIN UNLESS
OTHERWISE NOTED.
D. DUCTWORK DIMENSIONS SHOWN FOR REFERENCE ONLY.
E. DISCONNECT AND REMOVE CONDUIT, SUPPORTS, AND WIRING ASSOCIATED WITH CONTROLS
DESIGNATED FOR DEMOLITION. COORDINATE WORK WITH COR.
F. PRESERVE THE INTEGRITY OF EXISTING DDCS COMMUNICATION NETWORK THROUGHOUT
PROJECT DEMOLITION WORK. DO NOT DISCONNECT AND/OR REMOVE EXISTING DDCS NETWORK
WITHOUT PROPER NOTIFICATION AND/OR PRIOR WRITTEN APPROVAL BY COR.
REV. APPROVED
DATE DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
A
B
C
D
E
F
G
H
7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
8 0 8
Scale: 1/8 INCH = 1 FOOT
N
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PL
O
T D
AT
E/
TI
M
E:
4/
2/
0:
:5
AM
MIDLAND TXMIDLAND (MAF) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
ENGINEERING
SERVICES
TERMINAL
April 2, 2024 2200347
MAF - D - ATCT - M013
HVAC DEMOLITION - BASE BUILDING - GROUND
LEVEL FLOOR PLAN
MIDLAND AIRPORT TRAFFIC CONTROL TOWER
MAF ATCT MODERNIZATION
BS
CB
JL
MIDLAND ATCT
MIDLAND,
TEXAS
1/8" = 1'-0"M013
B8 HVAC DEMOLITON - BASE BUILDING - GROUND LEVEL
1 DEMOLISH FAN POWERED VAV BOXES AND ASSOCIATED FLEXIBLE DUCT CONNECTIONS. TYPICAL
FOR ALL FAN POWERED BOXES.
2 REMOVE HUMIDIFIERS IN MECHANICAL ROOM. PREPARE PIPING FOR NEW HUMIDIFIER
CONNECTIONS.
3 REMOVE COMPUTER ROOM AIR HANDLING UNITS AND COMPUTER ROOM CONDENSING UNITS
INCLUDING ALL EQUIPMENT STANDS, PIPING, VALVES, AND APPURTENANCES. REFER TO ARCH
DWGS FOR REPAIR OF EXTERIOR BUILDING.
4 DISCONNECT AND REMOVE CONTROL PANEL ONCE ASSOCIATED AIR HANDLERS AHU-4, AHU-5,
AHU-5A, AHU-6 AND AHU-7 HAVE BEEN REMOVED FROM SERVICE.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .