J1a MAF-ATCT MODERNIZATION PROJECT SIGNED DRAWING FINAL.pdf

PDF 41 MB Posted

Attached to
IIJA FUNDED - MAF ATCT MODERNIZATION Federal contract opportunity
Solicitation number
697DCK-25-R-00211
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document is a comprehensive set of HVAC (Heating, Ventilation, and Air Conditioning) mechanical drawings and control system specifications for the Midland Airport Traffic Control Tower (ATCT) Modernization project. The drawings detail a complete HVAC system replacement involving multiple air handling units (AHUs), condensing units, exhaust fans, variable air volume (VAV) boxes, and control systems across different building levels, including the base building, subjunction level, junction level, and control cab.

The project involves installing eight new air handling units (AHU-1 through AHU-8), two computer room air conditioning units (CRU-1 and CRU-2), multiple condensing units, and a sophisticated direct digital control (DDC) system with network architecture. The mechanical design includes detailed sequences of operation for each unit, specifying temperature and humidity control, damper operations, fan controls, and integration with fire alarm systems. The project emphasizes redundancy, with lead/standby unit arrangements, and includes provisions for temporary cooling during construction to ensure continuous operation of critical spaces like the TRACON and control cab areas.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEVIN D MILES

Digitally signed by KEVIN D

MILES

Date: 2024.06.11 12:57:55 -05'00'

WONDWOSEN

TESFAYE ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.11 11:02:29 -05'00'

WONDWOSEN

TESFAYE ELLALA

Digitally signed by

WONDWOSEN TESFAYE

ELLALA

Date: 2024.06.27 07:16:21 -05'00'

KEVIN D

MILES

Digitally signed by KEVIN

D MILES

Date: 2024.07.01 07:39:39 -05'00'

MICHELLE C

SHERMAN

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 13:18:56 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

WILLIAM NELSON

Date: 2024.06.06 13:11:13 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:25:16 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:13:09 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:25:44 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:13:28 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:26:01 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:13:43 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:26:17 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:14:27 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:27:16 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:14:55 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:27:32 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:15:23 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:27:47 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:16:02 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:29:16 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:15:42 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:28:01 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:16:41 -05'00'

Digitally signed by MICHELLE C

SHERMAN

Date: 2024.06.06 11:28:15 -05'00'

BRADY WILLIAM

NELSON

Digitally signed by BRADY

Date: 2024.06.06 10:17:10 -05'00'

SS

CG

JF

N

04/02/2024

WONDWOSEN

TESFAYE ELLALA

Digitally signed by

WONDWOSEN TESFAYE

ELLALA

Date: 2024.06.27 07:16:49 -05'00'

KEVIN D

MILES

Digitally signed by KEVIN

D MILES

Date: 2024.07.01 07:40:15 -05'00'

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:16:57 -05'00'

KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:40:25 -05'00'

N

CG

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:17:26 -05'00'

Date: 2024.07.01 07:40:34 -05'00'

JF

N

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:20:57 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES

Date: 2024.07.01 07:40:48 -05'00'

CG

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:21:20 -05'00'

Date: 2024.07.01 07:40:55 -05'00'

CG

JF

04/02/2024

WONDWOSEN

TESFAYE ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:21:40 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES

Date: 2024.07.01 07:41:03 -05'00'

CG

JF

04/02/2024

WONDWOSEN

TESFAYE ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:28:06 -05'00'

Date: 2024.07.01 07:41:13 -05'00'

CG

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:36:41 -05'00'

Date: 2024.07.01 07:41:19 -05'00'

CG

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:36:53 -05'00'

Date: 2024.07.01 07:41:26 -05'00'

CG

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:37:05 -05'00'

Date: 2024.07.01 07:41:33 -05'00'

CG

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:37:15 -05'00'

Date: 2024.07.01 07:41:43 -05'00'

CG

JF

04/02/2024

WONDWOSEN

TESFAYE ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:38:27 -05'00'

Date: 2024.07.01 07:41:49 -05'00'

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:41:04 -05'00'

Date: 2024.07.01 07:41:56 -05'00'

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:41:10 -05'00'

Date: 2024.07.01 07:42:08 -05'00'

JF

04/02/2024

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:41:32 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES

Date: 2024.07.01 07:42:18 -05'00'

WONDWOSEN TESFAYE

ELLALA

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:41:56 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES

Date: 2024.07.01 07:42:25 -05'00'

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:46:09 -05'00'

Date: 2024.07.01 07:42:33 -05'00'

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 07:46:42 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES

Date: 2024.07.01 07:42:41 -05'00'

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 08:00:45 -05'00'

Date: 2024.07.01 07:42:50 -05'00'

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 08:01:04 -05'00'

Date: 2024.07.01 07:42:58 -05'00'

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 08:08:00 -05'00'

Date: 2024.07.01 07:43:03 -05'00'

Digitally signed by WONDWOSEN

TESFAYE ELLALA

Date: 2024.06.27 08:08:17 -05'00'

Date: 2024.07.01 07:43:09 -05'00'

M

PIPING

PIPING (CONT.) ABBREVIATIONSDOUBLE LINE DUCTWORKEQUIPMENT

GENERAL NOTES

SINGLE LINE

DUCTWORK

MISCELLANEOUS

HVAC LEGEND

FD SD

R

D

SPD

SIZE

CFM

FSD

AHU-X

U

T

F

C

C

H

C

E

PIPE TYPE AND SIZE (IN)

DOOR LOUVER

LINED DUCT

FLEXIBLE CONNECTION

FIRE DAMPER, SMOKE DAMPER

TURNING VANES

FLEXIBLE DUCT

DUCT RISE

DUCT DROP

STATIC PRESSURE DAMPER

TRANSITION-RECTANGULAR TO ROUND

COMBINATION FIRE/SMOKE DAMPER

EQUIPMENT DESIGNATION SYMBOL ABBREVIATION DESCRIPTION

HIDDEN DUCTWORK

OUTSIDE AIR INTAKE

SUPPLY DUCT PHYSICAL RISER UP

(INDICATED BY FILL)

UNDERCUT DOOR

THERMOSTAT

ROUND DUCT (DIAMETER)

RECTANGULAR DUCT ("WIDTH"X"HEIGHT")

S-X

PRG

EXHAUST GRILLE

CEILING PLENUM RETURN GRILLE, UNLESS

OTHERWISE NOTED

FILTER

LOUVER

BACKDRAFT DAMPER

HEATING COIL

MOTORIZED OPPOSED

BLADE DAMPER

ELECTRIC HEATING COIL

FIRE/SMOKE DAMPER

HUMIDIFIER

COOLING COIL

UNIT HEATER

FAN

AIR FLOW MEASURING

STATION/STATIC PRESSURE

MEASURING STATION

MOTORIZED PARALLEL

BLADE DAMPER

FAN WITH VARIABLE

FREQ. MOTOR CONTROLLER

POINT OF TERMINATION

RECTANGULAR TO ROUND

TRANSITION

SQUARE REDUCER/

INCREASER

POINT OF CONNECTION OF

NEW TO EXISTING

NEW WORK -

DARK LINE WEIGHT

EXISTING -

LIGHT LINE WEIGHT

FLUID FLOW DIRECTION

PIPE TURNING UP

PIPE TURNING DOWN

PLUGGED PIPE/OUTLET

CONCENTRIC REDUCER

ECCENTRIC REDUCER

CAPPED PIPE/OUTLET

ANGLE VALVE

GLOBE VALVE

CHECK VALVE

UNION

CP

DIRECTION OF PITCH

GC

PV

GAS COCK

PLUG VALVE

AV

GLV

CV

P/TRV

U

FLEXIBLE HOSE (FLANGED ENDS)

FLEXIBLE HOSE (SCREWED ENDS)

FLEXIBLE PIPE CONNECTOR

AIR ELIMINATOR

TEST COCK

AUTOMATIC AIR VENT

FLOW METER

STRAP-ON SENSOR

WELD CAP

SOLENOID VALVE

PRESSURE REGULATING VALVE

THERMOMETER

PUMP

BUTTERFLY VALVEBFV

PRESSURE GAUGE

TI

PI

INLINE PUMP

PRESSURE/TEMPERATURE

RELIEF/SAFETY VALVE

HOT TAP/STOPPLE FITTING

MOTOR OPERATED 2-WAY CONTROL

VALVE

MOTOR OPERATED 3-WAY CONTROL

VALVE

STRAINER WITH BLOWDOWN VALVE

PIPE HEADER WITH BLIND

FLANGE

MANUAL AIR VENTAV

AAV

BALL VALVEBV

WATER METER

FCV FLOW CONTROL VALVE

PETE'S PLUG

SHUT-OFF VALVE

TEST AND BALANCE VALVE

HEIGHT

HOSE BIBB

HEATING COIL

HEATING AND COOLING UNIT

HEAD

HORIZONTAL

HORSEPOWER, HEAT PUMP

HOUR

HAND SWITCH

HEATING

HEATER

HOT TAP/ STOPPLE FITTING

HUMIDIFIER

HOT WATER COIL

HOT WATER PUMP

HOT WATER RETURN

HOT WATER SUPPLY

HEATING AND VENTILATION

HERTZ

INTAKE LOUVER

INSULATION

INTEGRATED PART LOAD VALUE

IRON PIPE SIZE

INCH OR INCHES

INCHES WATER COLUMN

INCHES WATER GAUGE

INDUSTRIAL WATER

KILOWATT

LENGTH

LEAVING AIR TEMPERATURE

POUNDS

POUNDS PER HOUR

LEAVING DRY BULB TEMPERATURE

LINEAR FEET

LOW PRESSURE STEAM

LOW VOLTAGE

LEAVING WET BULB TEMPERATURE

LEAVING WATER TEMPERATURE

MAXIMUM

THOUSAND BTU PER HOUR

MINIMUM CURRENT AMPACITY

MECHANICAL

MAXIMUM FUSE SIZE

MANUFACTURER

MINIMUM

MINIMUM EFFICIENCY REPORTING VALUE

MAXIMUM OVERCURRENT PROTECTION

MOTOR

MOTOR STARTER

MOUNTED

NORMALLY CLOSED, NOISE CRITERIA

NATIONAL ELECTRIC CODE

NOT IN CONTRACT

NATURAL-VENTILATION LOUVER

NORMALLY OPEN, NUMBER

NOMINAL

NON-STANDARD PART LOAD VALUE

NET POSITIVE SUCTION HEAD

NOT TO SCALE

OUTSIDE AIR

OUTSIDE AIR LOUVER

OPPOSED BLADE DAMPER

ON CENTER

OUTSIDE DIAMETER, OPEN DRAIN

OPEN END DUCT

OPENING

OPPOSITE

PRESSURE DROP

PERFORATED, PERFORMANCE

PERPENDICULAR

PACKAGED FILTER, PREFILTER

PHASE

PLUMBING

PRESSURE REDUCING VALVE

PRESSURE

POUNDS PER SQUARE INCH

PSI GAUGE

PSI ABSOLUTE

PACKAGED TERMINAL AIR CONDITIONER

POLYVINYL CHLORIDE

POWER

QUALITY

QUANTITY

RISE

RETURN AIR

ROOM AIR CONDITIONER

RADIATION, RADIANT HEATER

REMOVE

REQUIRED

REQUIREMENTS

RETURN GRILLE

RELATIVE HUMIDITY

RELIEF LOUVER

REVOLUTIONS PER MINUTE

RETURN REGISTER

REMOVE EXISTING

SUPPLY AIR, SOUND ATTENUATOR

SELF-CONTAINED

AIR CONDITIONER

SEASONAL COEFFICIENT OF

PERFORMANCE

SENSIBLE

SUPPLY FAN

SUPPLY GRILLE

SMOKE DETECTOR

STATIC PRESSURE

SPECIFICATION

SUPPLY REGISTER

THROAT

TRANSFER AIR

TOTAL DYNAMIC HEAD

TEMPERATURE

TIGHT TO STRUCTURE

TOTAL STATIC PRESSURE

THERMOSTAT

TURNING VANES

TYPICAL

TOILET EXHAUST

UNIT HEATER

UNLESS OTHERWISE NOTED

VOLTS

VACUUM

VELOCITY

VARIABLE FREQUENCY DRIVE

VARIABLE SPEED DRIVE

WIDTH

WITH

WITHOUT

WET BULB

WIRE MESH SCREN

H, (H)

HB

HC

HCU

HD

HORZ

HP

HR

HS

HTG

HTR

HTP

HU

HWC

HWP

HWR

HWS

HV

HZ

IL

INS

IPLV

IPS

IN

IN WC

IN WG

IW

KW

L, (L)

LAT

LBS

LBS/HR

LDB

LIN FT, LF

LPS

LV

LWB

LWT

MAX

MBH

MCA

MECH

MFS

MFR

MIN

MERV

MOCP

MOT, MTR

MS

MTD

NC

NEC

NIC

NL

NO

NOM

NPLV

NPSH

NTS

OA

OAL

OBD

OC

OD

OED

OPNG

OPP

PD

PERF

PERP

PF

PH

PLUM

PRV

PRESS.

PSI

PSIG

PSIA

PTAC

PVC

PWR

QUAL

QTY

R

RA

RAC

RAD

REM

REQ

REQS

RG

RH

RL

RPM

RR

RX

SA

SAC

SCOP

SEN, SENS

SF

SG

SD

SP

SPEC

SR

T

TA

TDH

TEMP

TS

TSP

TSTAT

TV

TYP

TX

UH

UON

V

VAC

VEL

VFD

VSD

W, (W) W/ W/O

WB

WMS

A

ABV

AD

AFF/G

AAV

AC

ACGIH

ACT

ACM

ACU

AD

ADA

ADD

ADDL

ADH

ADJ

AF

AFF

AGG

AHU

AIA

ALT

AMB

AMP

ANCH

AP

APD

APPROX

APRVD

ARCH

AV

AVG

B

BAS

BEL

BDD

BF

BFP

BHP

BM

BOD

BOT

BT

BTU

BTUH

C

CAP

CAV

CC

CD

CFM

CFR

CLG

COND

CONN

CONT

COR

CP

CU

CV

CW

D

DAT

DB

DCW

DDCS

DE

DEG

DEGF

DEMO

DHW

DIAM, DIA

DMPR

DN

DP

DSS

DWG

E, (E)

EA

EAT

EDB

EER

EF

EFF

EH

EL

ELEC

ELEV

ENT

ER

EQUIP

ESP

ET

ETR

EWB

EWT

EX

EXH

EXP

F °F

FA

FC

FD

FF

FIN FL, FF

FL

FLA

FLEX

FLR

FPM

FPS

FRP

FSD, FD/SD

FT

FT H20

FTR

FV

G, GA

GAL

GALV'D

GEN

GPH

GPM

GR

GX

GYP

AMPERES

ABOVE

ACCESS DOOR

ABOVE FINISHED FLOOR/GRADE

AUTOMATIC AIR VENT

AIR CONDITIONING

AMERICAN CONFERENCE OF GOVERNMENTAL

INDUSTRIAL HYGIENISTS

ACCOUSTICAL TILE, ACTUAL

ASBESTOS CONTAINING MATERIAL

AIR CONDITIONING UNIT

ACCESS DOOR

AMERICANS WITH DISABILITIES

ADDENDUM, ADDITION

ADDITIONAL

ADHESIVE

ADJACENT

AIR FOIL

ABOVE FINISHED FLOOR

AGGREGATE

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

ALTERNATE, ALTITUDE

AMBIENT

AMPERE

ANCHOR

ACCESS PANEL

AIR PRESSURE DROP

APPROMIXATE, APPROXIMATELY

APPROVED

ARCHITECT

MANUAL AIR VENT

AVERAGE

BOILER

BUILDING AUTOMATION SYSTEM

BELOW

BACK DRAFT DAMPER

BLIND FLANGE

BACK FLOW PREVENTER

BRAKE HORSEPOWER

BEAM

BOTTOM OF DUCT, BASIS OF DESIGN

BOTTOM

BOTTOM THROAT, BUFFER TANK

BRITISH THERMAL UNIT

BTU PER HOUR

CONDENSER COIL

CAPACITY

CONSTANT AIR VOLUME

COOLING COIL

CEILING DIFFUSER, CONTROL DAMPER

CUBIC FEET PER MINUTE

CODE OF FEDERAL REGULATIONS

CEILING

CONDENSATE

CONNECTION

CONTINUATION

CONTRACTING OFFICER'S REPRESNTATIVE

CONTROL PANEL

CONDENSING UNIT

CONSTANT VOLUME, CONTROL VALVE

COLD WATER

DROP, DRAIN

DISCHARGE AIR TEMPERATURE

DRY BULB

DOMESTIC COLD WATER

DIRECT DIGITAL CONTROL SYSTEM

DEMOLISH EXISTING

DEGREE

DEGREES FAHREINHEIT

DEMOLITION

DOMESTIC HOT WATER

DIAMETER

DAMPER

DOWN

DIFFERENTIAL PRESSURE

DUCTLESS SPLIT SYSTEM AIR HANDLER

DRAWING

EXISTING

EXHAUST AIR

ENTERING AIR TEMPERATURE

ENTERING DRY BULB TEMPERATURE

ENERGY EFFICIENCY RATIO

EXHAUST FAN

EFFICIENCY

ELECTRIC HEATER

EXHAUST LOUVER

ELECTRIC, ELECTRICAL

ELEVATION

ENTERING

EXISTING RELOCATED, EXHAUST REGISTER

EQUIPMENT

EXTERNAL STATIC PRESSURE

EXPANSION TANK

EXISTING TO REMAIN

ENTERING WET BULB

ENTERING WATER TEMPERATURE

EXISTING

EXHAUST

EXPANSION

FILTER

DEGREES FAHREINHEIT

FREE AREA (SQ.FT)

FLEXIBLE CONNECTION

FIRE DAMPER

FINAL FILTER

FINISHED FLOOR

FLOOR

FULL LOAD AMPERES

FLEXIBLE

FLOOR

FEET PER MINUTE

FEET PER SECOND

FIBERGLASS REINFORCED PIPE

COMBINATION FIRE AND SMOKE DAMPER

FEET

FEET OF WATER

FINNED TUBE RADIATION

FACE VELOCITY

GAUGE

GALLON

GALVANIZED

GENERATOR

GALLONS PER HOUR

GALLONS PER MINUTE

GRADE

GENERAL EXHAUST

GYPSUM

AIR FLOW RATE (CFM)

DIFFUSER, GRILLE, OR REGISTER

DESIGNATION

M

M

AF

M

S

SP

M

S H

U M

ID

AXB

20"

S

M

SYMBOL

NUMBER

FD/FSD/SD HORIZONTAL DAMPER, SEE TAILS FOR TYPE

A. NOT ALL ABBREVIATIONS AND SYMBOLS SHOWN MAY BE USED ON THIS PROJECT.

B. FOR LOCATIONS AND SIZES OF WALL OPENINGS SEE ARCHITECTURAL DRAWINGS.

C. PROVIDE READY ACCESS TO VALVES, DAMPERS, COILS AIR FILTERS, AND OTHER DEVICES. INSTALL ACCESS DOORS TO

PROVIDE ADEQUATE CLEARANCES FOR DIRECT ACCESS.

D. FOR LOCATION OF CEILING DIFFUSERS AND GRILLES SEE ARCHITECTURAL REFLECTED CEILING PLANS.

E. DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING AND CUTTING OPERATIONS.

PERSON PERFORMING FIRE PROTECTION DUTIES MUST NOT BE SAME INDIVIDUAL THAT IS PERFORMING WELDING OPERATIONS. COMPLY WITH OSHA STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926. PROVIDE TEMPORARY FIRE EXTINGUISHERS DURING CONSTRUCTION. WELDING MUST BE SCHEDULED IN WRITING WITH COR AND MUST BE

PERFORMED OUTSIDE OF FACILITY OR IN SAFE LOCATION TO BE DETERMINED BY COR.

F. FOR WELDING THAT MUST BE PERFORMED INSIDE THE BUILDING, PROVIDE LOCAL MECHANICAL VENTILATION DURING WELDING DUCTED TO OUTSIDE, APPROVED BY FAA AND ACGIH. MINIMIZE WELDING WITHIN THE BUILDING WHEREVER

POSSIBLE.

G. WELDING POWERED FROM FACILITY ELECTRICAL SYSTEM IS PROHIBITED. CONNECT METAL TO BE WELDED TO A GOOD EARTH GROUND. FACILITY STRUCTURAL STEEL OR PIPING MUST NOT BE USED AS A GROUND PATH.

H. AIR FLOW QUANTITIES SHOWN ARE FLOW QUANTITIES AT SITE ELEVATION.

I. INSTALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS.

J. LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT SHOWN ARE BASED ON SPECIFIC SCHEDULED MANUFACTURERS AND MODEL NUMBERS. SUBSTITUTION OF SUCH EQUIPMENT MANUFACTURERS WILL REQUIRE THE CONTRACTORS PRIOR VERIFICATION OF CONFORMANCE PER THE REQUIREMENTS OF LOCATION, SIZE CLEARANCES AND CONFIGURATION AS COMPARED TO SPACE ALLOCATED TO HOUSE SPECIFIC EQUIPMENT. RESUBMIT PROPOSED EQUIPMENT TO CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR APPROVAL, PRIOR TO INSTALLATION.

K. CONSTRUCT, INSTALL, AND INSULATE SUPPLY AND RETURN AIR DUCTWORK AS SPECIFIED; INSPECT DUCTWORK, SUPPORTS AND INSULATION (NEW AND EXISTING) FOR DAMAGE OR FAULTY INSTALLATION. REPLACE, OR REPAIR AS REQUIRED SO THAT FINAL INSTALLATION IS ADEQUATELY SEALED FROM LEAKS, FREE OF DEFECTS, CLEANED, AND IN ACCORDANCE WITH SPECIFICATIONS. PROVIDE EXTERIOR DUCTWORK INSULATION ON ALL EXISTING DUCTWORK THAT

IS UNINSULATED.

L. PROVIDE FIRE AND FIRE/SMOKE DAMPERS IN PENETRATIONS OF FIRE RATED FLOORS, WALLS AND PARTITIONS IN

ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS.

M. LIMIT USE OF FLEXIBLE DUCTS TO AIR OUTLET CONNECTIONS. FLEXIBLE DUCT CONNECTIONS MUST NOT EXCEED 5'-0" IN LENGTH. AIR DEVICES INSTALLED IN A HARD CEILING WITHOUT ACCESS MUST BE COMPLETELY HARD-DUCTED.

EXHAUST DUCTWORK CONNECTIONS MUST BE COMPLETELY HARD-DUCTED.

N. PROVIDE WIRE MESH SCREENS FOR DUCT OPENINGS WITHOUT GRILLES.

O. FOR AREAS WITH INACCESSIBLE VOLUME DAMPERS, PROVIDE DAMPER WITH FLEXIBLE METAL CABLE OPERATORS FOR

REMOTE OPERATION OF THE DAMPER THROUGH FACE OF DIFFUSER, GRILLE OR REGISTER.

P. PROVIDE A DETAILED SCHEDULE FOR DEMOLITION OF HVAC EQUIPMENT AND INSTALLATION OF NEW HVAC SYSTEMS.

COORDINATE WITH COR PRIOR TO REMOVAL OF EQUIPMENT. WHERE INDICATED ON DRAWINGS, PROVIDE TEMPORARY COOLING SYSTEMS. SUCH SYSTEMS MUST REMAIN IN OPERATION THROUGHOUT REMOVAL AND REPLACEMENT OF

EQUIPMENT.

Q. PRIOR TO THE DEMOLITION OF ITEMS WHICH HAVE UTILITIY CONNECTIONS (WATER, ELECTRICITY, GAS ETC.) ARRANGE WITH COR TO LOCATE SHUT-OFF VALVES, PANEL BOXES AND OTHER CONTROL ELEMENTS. ONLY FAA PERSONNEL MAY

SHUT OFF, ISOLATE EQUIPMENT AND BRING EQUIPMENT BACK ONLINE.

R. REFER TO STRUCTURAL SHEET S010 AND S013 FOR APPLICABLE WIND LOAD CRITERIA.

S. PROVIDE STAINLESS STEEL FOR ALL EXTERIOR HARDWARE, INCLUDING BUT NOT LIMITED TO, BOLTS, WASHERS, CLAMPS, AND UNISTRUTS. WHERE STAINLESS STEEL IS NOT AVAILABLE, PROVIDE HARDWARE WITH ANTI-CORROSION

COATING FOR RUST PREVENTION.

T. THE REFRIGERANT CONTAINED IN SYSTEMS BEING DEMOLISHED MUST BE REMOVED PRIOR TO DEMOLITION, RECOVERED AND BROUGHT TO A EPA-CERTIFIED RECLAIMER BY AN EPA-CERTIFIED TECHNICIAN.

U. PROVIDE DUCTWORK CLEANING FOR ALL EXISTING TO REMAIN DUCTWORK IN THE AIR TRAFFIC CONTROL TOWER

(ATCT).

V. UNIT DISASSEMBLY MUST BE CONDUCTED BY A CERTIFIED TECHNICIAN.

W. REFER TO SPECIFICATIONS FOR TESTING, ADJUSTING, AND BALANCING REQUIREMENTS.

X. ALL ITEMS REMOVED FOR REUSE MUST BE INSPECTED FOR STATUS AND REPORTED TO COR. ANY DEFICIENCIES MUST

BE NOTED PRIOR TO REMOVAL.

Y. DRAWINGS ARE DIAGRAMMATIC IN NATURE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SURVEY AND VERIFY EXISTING CONDITIONS PRIOR TO STARTING WORK. EXISTING CONDITIONS SHOWN ARE BASED ON AVAILABLE INFORMATION PROVIDED BY THE FAA. WORK MUST BE COORDINATED WITH ACTUAL EXISTING CONDITIONS.

M

FLOW CONTROL VALVEFCV

M

FLEXIBLE DUCT

(E) AHU-X

EXISTING EQUIPMENT

DESIGNATION

D

DCW

CD

RS/RL

DOMESTIC COLD WATER

CONDENSATE DRAIN

DRAIN

REFRIGERANT

DHW DOMESTIC HOT WATER

MANUAL DAMPER

MOTORIZED, AUTOMATIC, OPPOSED BLADE

DAMPER, BACKDRAFT DAMPER

M A OBD BBD

AxB SA UP OR DN

SUPPLY DUCT PHYSICAL RISER DN

(INDICATED BY DASHED LINES)

RETURN DUCT PHYSICAL RISER UP

(INDICATED BY FILL)

AxB SA UP OR DN

AxB RA UP OR DN

EXHAUST DUCT PHYSICAL RISER DN

(INDICATED BY DASHED LINES)

EXHAUST DUCT PHYSICAL RISER UP

(INDICATED BY FILL)

RETURN DUCT PHYSICAL RISER DN

(INDICATED BY DASHED LINES)

AxB EA UP OR DN

AxB EA UP OR DN

AxB RA UP OR DN

EXISTING FIRE DAMPER, SMOKE DAMPER

AP ACCESS PANEL

TS TEMPERATURE SENSOR

T/H COMBINATION TEMPERATURE AND

HUMIDITY SENSOR

TO BE DEMOLISHED

DEMO LINE - DASHED LINE

DEMOLISHED PIPING

REV. APPROVED

DATE DESCRIPTION JCN REDLINE

DATE APVD

REVIEWED BY SUBMITTED BY APPROVED BY

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

A

B

C

D

E

F

G

H

7 6 5 4 3 2 1

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

PL

O

T D

AT

E/

TI

M

E:

4/

2/

0:

:4

AM

MIDLAND TXMIDLAND (MAF) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

ENGINEERING

SERVICES

TERMINAL

April 2, 2024 2200347

MAF - D - ATCT - M009

HVAC ABBREVIATIONS, SYMBOLS, AND GENERAL

NOTES

MIDLAND AIRPORT TRAFFIC CONTROL TOWER

MAF ATCT MODERNIZATION

BS

CB

JL

MIDLAND ATCT

MIDLAND,

TEXAS

4-2-24 ARTURO MEDINA Digitally signed by ARTURO MEDINA

Date: 2024.06.27 17:58:56 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.02 08:06:45 -05'00'

DO

AI

X

AO

DI

AID

MEASURED VARIABLE OR CONTROLLED DEVICE

INSTRUMENT OR DEVICE IDENTIFICATION NUMBER

EQUIPMENT INSTRUMENT OR DEVICE NOT LOCATED

IN AN ENCLOSURE

MEASURED VARIABLE OR CONTROLLED DEVICE

INSTRUMENT OR DEVICE LOCATED IN AN ENCLOSURE

DDCP DATA INPUT/OUTPUT TO

CENTRAL FEPC

ELECTRONIC INTERLOCK WIRING

DDC CONTROL SYSTEM WIRING

DIGITAL INPUT TO DDCP

DIGITAL OUTPUT FROM DDCP

ANALOG INPUT TO DDCP

ANALOG OUTPUT FROM DDCP

ADDRESSABLE INTERFACE MODULE

LS

M

N.C.

N.O.

P

PS

SL

SP

SS

SW

T

TS

TSW

WD

LEVEL SENSOR

ELECTRIC MOTOR/ACTUATOR

NORMALLY CLOSED

NORMALLY OPEN

PRESSURE SENSOR/ GAUGE

PRESSURE SWITCH

STROBE LIGHT

STATIC PRESSURE

START/STOP

SWITCH

TEMPERATURE GAUGE/THERMOSTAT

TEMPERATURE SENSOR

TEMPERATURE SWITCH

WATER DETECTOR

ACD

AFS

AM

AX

C

CD

CI

CR

DDCP

DDCS

DI

DH

DP

ECMS

ED

FACP

FCV

FM

FS

FZ

ADRESSABLE CONTROL DEVICE

AIR FLOW SWITCH

AMPERAGE

AUXILIARY CONTACT

COMMON

CONTROL DAMPER

COMMAND INPUT

CURRENT RELAY

DIRECT DIGITAL CONTROL PANEL

DIRECT DIGITAL CONTROL SYSTEM

DAMPER POSITION INDICATOR

DOOR HOLDER

DIFFERENTIAL PRESSURE

ENERGY CONTROL AND MONITORING

SYSTEM

ENABLE/DISABLE

FIRE ALARM CONTROL PANEL

FLOW CONTROL VALVE

FLOW METER (WATER)

FLOW SWITCH

FREEZESTAT

TS

SS

CONTROLS & INSTRUMENTATION

AFM AIR FLOW METER

LD LEAK DETECTOR

GD GAS DETECTOR (CO, H2)

VI VALVE POSITION INDICATOR

DPI DIFFERENTIAL PRESSURE INDICATOR

LSW LEVEL SWITCH

EOL END OF LINE RESISTOR

ES END SWITCH

RM REFRIGERANT MONITOR

OS OCCUPANCY SENSOR

POS POSITION (FEEDBACK)

SD SMOKE DETECTOR

SPS STATIC PRESSURE SWITCH

STS STATUS

JB JUNCTION BOX

H

HS

HORN

HUMIDITY SENSOR

HSW HUMIDITY SWITCH/HUMIDISTAT

COMM COMMUNICATION

DPS DIFFERENTIAL PRESSURE SWITCH

LCS LAST COMMAND STATE

FDI FIRE DAMPER POSITION INDICATOR

FVI FLOW CONTROL VALVE POSITION INDICATOR

CDI CONTROL DAMPER POSITION INDICATOR

CS CURRENT SWITCH

THE AIR TRAFFIC CONTROL TOWER (ATCT) CONTROL CAB AND BASE BUILDING CRITICAL SPACES CAN NOT TOLERATE THE LOSS OF POWER OR HVAC SYSTEM AIR CONDITIONING. A CONSTRUCTION SEQUENCE MUST BE SUBMITTED FOR APPROVAL BY THE CONTRACTOR WHICH MINIMIZES THE RISK OF FAILURE TO ANY

MECHANICAL OR ELECTRICAL SYSTEMS.

DEMOLITION

NEW WORK

PREPARATION

1. REMOVAL OF EQUIPMENT MUST INCLUDE REMOVAL OF ASSOCIATED PIPING, SUPPORT, INSULATION, MOTORS ELECTRICAL CONNECTIONS, AUTOMATIC

CONTROL WIRING AND ITS COMPONENTS UNLESS OTHERWISE NOTED (UON).

2. EXISTING DDCS OPERATOR’S WORKSTATION MUST REMAIN IN SERVICE UNTIL ALL EXISTING CONTROLLERS HAVE BEEN REMOVED. PRESERVE THE INTEGRITY OF EXISTING DDCS COMMUNICATION NETWORK THROUGHOUT PROJECT DEMOLITION WORK. EXISTING CONTROLS FOR EXISTING HVAC EQUIPMENT INCLUDING AIR HANDLING UNITS, VAV TERMINAL UNITS, COMPUTER ROOM AIR CONDITIONING UNITS, HUMIDIFIERS, EXHAUST FANS, ETC. MUST REMAIN IN SERVICE UNTIL EACH EQUIPMENT IS TAKEN OFF LINE FOR DEMOLITION. REFER TO MECHANICAL DRAWINGS FOR CONTROLS DEMOLITION.

3. DEMOLITION DRAWINGS INDICATE PIPING AND EQUIPMENT WITHIN THE WORK AREA. REMOVE AND REINSTALL (AS REQUIRED) PIPING, ELECTRICAL WIRING, CONDUITS, LIGHTNING PROTECTION, ETC. NOT INDICATED AND NOT RELATED TO THE EQUIPMENT INSTALLATION WHERE THEY INTERFERE WITH THE WORK.

OBTAIN PRIOR APPROVAL FROM COR FOR SUCH WORK. REFER TO ELECTRICAL SPECIFICATIONS FOR ELECTRICAL REQUIREMENTS.

1. PHYSICAL SIZES AND LOCATION OF EQUIPMENT AND ASSOCIATED PIPING ARE APPROXIMATE. VERIFY SIZES AND DIMENSIONS AFFECTING THE WORK.

2. DRAWINGS DO NOT SHOW ALL REQUIRED FITTINGS, ELBOWS, AND/OR OFFSETS. FINAL INSTALLATION OF ALL FITTINGS, ELBOWS, AND OFFSETS ARE THE

RESPONSIBILITY OF THE CONTRACTOR, AT NO ADDITIONAL COST TO THE FAA.

3. VERIFY AND COORDINATE DIMENSIONS, VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT PRIOR TO ORDERING AND SUBMIT THIS INFORMATION WITH SHOP DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR EQUIPMENT ORDERED WITHOUT VERIFICATION.

4. COORDINATE THE INSTALLATION OF MECHANICAL WORK WITH THE WORK OF OTHER TRADES.

5. INSTALL EQUIPMENT IN ACCORDANCE WITH APPLICABLE CODES, THE PRINTED INSTALLATION INSTRUCTIONS OF THE MANUFACTURER, THE

SPECIFICATIONS, AND APPROVED SHOP DRAWINGS.

A. VERIFY LOCATIONS AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE WORK PRIOR TO THE START OF CONSTRUCTION. BEFORE THE START OF DEMOLITION AND CONSTRUCTION. FOR MISSION-CRITICAL SPACES TEMPORARY COOLING EQUIPMENT MUST BE APPROVED, OPERATIONAL, PROVEN, AND ON SITE. APPROVED CONSTRUCTION PLANS SHOWING FABRICATED LENGTH OF PIPING AND PLACEMENT OF EQUIPMENT MUST BE COMPLETED AND APPROVED BEFORE START OF WORK. THIS MUST INCLUDE ELEVATIONS AND ANY MODIFICATION DUE TO CONFLICTS AND "AS IS" CONDITIONS.

B. EQUIPMENT INCLUDING VALVES, PIPING AND ACCESSORIES FOR THE NEXT STEP IN THE SEQUENCE MUST BE ON SITE BEFORE THAT STEP'S START OF

WORK.

C. PROTECT FLOOR DRAINS, ROOF DRAINS AND STORM DRAINS FROM DAMAGE AND DEBRIS AT ALL TIMES. DRAINS MUST NOT BE USED FOR DISPOSAL OF

CONSTRUCTION MATERIALS.

D. SHUTDOWN AND REMOVAL OF THE EQUIPMENT AND REFRIGERANT PIPING MUST BE ACCOMPLISHED BY CLOSING SHUT-OFF VALVES AND DE-ENERGIZING ELECTRICAL SUPPLY. THIS WORK MUST BE SCHEDULED AND COORDINATED WITH THE COR BEFORE START OF WORK. MECHANICAL AND ELECTRICAL SHUTDOWN FOR WORK MUST BE ACCOMPLISHED BY FAA PERSONNEL. THE REFRIGERANT CONTAINED IN SYSTEMS BEING DEMOLISHED MUST BE RECOVERED AND BROUGHT TO AN EPA-CERTIFIED RECLAIMER BY AN EPA-CERTIFIED TECHNICIAN. SEE SPECIFICATIONS FOR DOCUMENTATION

REQUIREMENTS.

E. ONE TEMPORARY UNIT MUST REMAIN IN OPERATION AT ALL TIMES, AND ONE TEMPORARY PACKAGED UNIT MUST REMAIN IN STANDBY.

F. COORDINATE ALL WORK WITH THE WORK OF OTHER TRADES. ELECTRICAL WORK MUST MATCH MECHANICAL PHASING PLAN AS REQUIRED.

G. CONSTRUCTION SEQUENCE IS PROVIDED AS AN OUTLINE OF THE SIGNIFICANT STEPS REQUIRED TO COMPLETE THE PROJECT. THE CONTRACTOR MUST SUBMIT A DETAILED CONSTRUCTION SEQUENCE WHICH ALSO PROVIDES ALL OF THE DETAILS ABSENT FROM THIS OUTLINE AS PART OF THEIR

CONSTRUCTION PHASING PLAN.

CONSTRUCTION SEQUENCE

I. NOTES AND PREPARATION

II. PRE-CONSTRUCTION

*THE PRECONSTRUCTION PHASE MUST BE COMPLETE PRIOR TO ALL DEMOLITION AND CONSTRUCTION ACTIVITES ON SITE. TO BE CONSIDERED COMPLETE, ALL WORK REQUIRING PROVING PERIODS MUST OPERATE WITHOUT INCIDENT FOR THE ENTIRE DURATION WITHOUT PAUSE.*

STEP 1 - BASE BUILDING AREA A

A. INSTALL TAHU-1, TAHU-2, TAHU-3. THIS INCLUDES PREPARING WINDOWS AND DOORWAYS FOR DUCTWORK PENETRATION. BACKUP UNITS FOR CRITICAL

SPACES TO ALSO BE PREPARED.

B. ROUTE TEMPORARY DUCTWORK, TEMPORARY AIR DEVICES, DAMPERS AND ACCESSORIES AS REQUIRED. ROUTE DUCTWORK AS NECESSARY TO ENSURE THE TEMPORARY EQUIPMENT ADEQUATELY CONDITIONS THE ADMIN SPACES WITHOUT HOT SPOTS. PROVIDE 5 SEPERATE TEMPERATURE RECORDINGS TO

ENSURE SPACE SETPOINTS ARE MET.

C. PROVDE RUN TIME OF UNITS WITH ONE DAY OF CONTINUOUS RUN TIME.

D. SPACES SERVED BY TEMPORARY UNITS ABOVE ARE NOW RUNNING ON TEMPORARY COOLING EQUIPMENT.

STEP 2 - BASE BUILDING AREA B

A. INSTALL TAHU-4 AND TAHU-5. THIS INCLUDES PREPARING WINDOWS AND DOORWAYS FOR DUCTWORK PENETRATION. BACKUP UNITS FOR CRITICAL

SPACES TO ALSO BE PREPARED.

B. ROUTE TEMPORARY DUCTWORK, TEMPORARY AIR DEVICES, DAMPERS AND ACCESSORIES AS REQUIRED. ROUTE DUCTWORK AS NECESSARY TO ENSURE THE TEMPORARY EQUIPMENT ADEQUATELY CONDITIONS THE ADMIN SPACES WITHOUT HOT SPOTS. PROVIDE 5 SEPERATE TEMPERATURE RECORDINGS TO

ENSURE SPACE SETPOINTS ARE MET.

C. PROVIDE UNITS SERVING ADMIN SPACES WITH TWO DAYS OF CONTINUOUS RUN TIME. PROVIDE UNITS SERVING CRITICAL SPACES WITH 7 DAYS OF

CONTINUOUS RUN TIME.

D. SPACES SERVED BY TEMPORARY UNITS ABOVE ARE NOW RUNNING ON TEMPORARY COOLING EQUIPMENT.

IV. AREA A CRITICAL SPACES (EQUIPMENT ROOM, TRACON)

V. AREA B ADMIN SPACES

A. INSTALL DSS-1, DSS-2 AND ASSOCIATED CONDENSING UNITS INCLUDING ALL ASSOCIATED PIPING, SUPPORTS AND APPURTENANCES.

B. PROVIDE UNITS SERVING CRITICAL SPACES WITH 7 DAYS OF CONTINUOUS RUN TIME.

C. SPACES SERVED BY TEMPORARY UNITS ABOVE ARE NOW RUNNING ON TEMPORARY COOLING EQUIPMENT.

STEP 3 - ATCT CONTROL CAB

*TEMPORARY UNITS SERVING NON CRITICAL SPACES TO BE FIRST INSTALLED AND TESTED PRIOR TO UNITS SERVING CRITICAL SPACES.

CRAC UNITS TO BE REPLACED ONE AT A TIME TO ALLOW AT LEAST ONE CRAC UNIT TO BE FUNCTIONAL.*

A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING RTU-6 & 7 AND AHU-11 & 12 MECHANICAL SYSTEMS.

B. REMOVE EXISTING DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.

C. INSTALL NEW AHU-3 & 4 AND AHU-6 & 7 AND ALL ASSOCIATED DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS. CONNECT CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON

DRAWINGS.

D. PROVE AHU-3 & 4 AND AHU-6 & 7 WITH THREE DAYS OF CONTINUOUS RUN TIME.

E. ONCE AHU-3 & 4 AND AHU-6 & 7 HAVE BEEN PROVEN, CONDITIONING OF CRITICAL SPACES ARE SUPPLIED BY AHU-3 & 4.

VI. AREA B CRITICAL SPACES (COMM EQUIPMENT ROOM)

A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING CRAC-1 & 2 MECHANICAL SYSTEM.

B. REMOVE EXISTING DUCTWORK, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.

C. CRAC UNITS ARE TO BE REMOVED ONE AT A TIME. ONCE EXISTING CRAC UNIT HAS BEEN INSTALLED AND TESTED, SECOND EXISTING CRAC UNIT CAN BE

DEMOLISHED FOR REPLACEMENT. REMOVE EXISTING CONTROLS ASSOCIATED WITH CRAC UNITS.

D. CONNECT CRAC CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.

E. INSTALL NEW CRAC-1 & 2 AND ALL ASSOCIATED DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.

CONNECT CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.

F. PROVE CRAC-1 & 2 WITH THREE DAYS OF CONTINUOUS RUN TIME.

G. ONCE CRAC-1 & 2 HAVE BEEN PROVEN, CONDITIONING OF CRITICAL SPACES ARE SUPPLIED BY CRAC-1 & 2.

H. DE-ENERGIZE TEMPORARY SYSTEM SERVING SPACES, REMOVE TEMPORARY EQUIPMENT AND ALL ASSOCIATED TEMPORARY DUCTWORK, PIPING, DIFFUSERS, REGISTERS, GRILLES, CONTROLS, SUPPORTS AND APPURTENANCES.

VII. ATCT CONTROL CAB

A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING AHU-2 & 3 MECHANICAL SYSTEM.

B. REMOVE EXISTING DUCTWORK, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.

C. INSTALL NEW AHU-1 & 2 AND ALL ASSOCIATED DUCTWORK, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.

D. PROVE AHU-1 & 2 WITH THREE DAYS OF CONTINUOUS RUN TIME.

E. ONCE AHU-1 & 2 HAVE BEEN PROVEN, CONDITIONING OF CRITICAL SPACES ARE SUPPLIED BY AHU-1 & 2 AS WELL AS DSS-1 & 2.

F. DE-ENERGIZE RTU-1 SYSTEM SERVING SPACES, REMOVE RTU-1 EQUIPMENT AND ALL ASSOCIATED TEMPORARY DUCTWORK, PIPING, DIFFUSERS, REGISTERS, GRILLES, CONTROLS, SUPPORTS AND APPURTENANCES.

G. DSS-1 & 2 SYSTEM TO REMAIN AS PART OF REDUNDANT COOLING SYSTEM. INTEGRATE THE DSS-1 & 2 SYSTEM INTO THE DDCS. CONNECT DSS-1 & 2 SYSTEM TO AHU-1 & 2 CONTROL PANELS AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.

H. DISCONNECT AND REMOVE EXISTING DDCS OPERATOR'S WORKSTATION AND ASSOCIATED DDC COMMUNICATION WIRING.

A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING AHU-10 MECHANICAL SYSTEM.

B. REMOVE EXISTING DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.

C. INSTALL NEW AHU-8 AND ALL ASSOCIATED DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS. CONNECT CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.

D. PROVE AHU-8 WITH THREE DAYS OF CONTINUOUS RUN TIME.

E. ONCE AHU-8 HAS BEEN PROVEN, CONDITIONING OF ADMIN SPACES ARE NOW SUPPLIED BY AHU-8.

F. TEMPORARY UNITS SERVING NON CRITICAL SPACES TO BE FIRST INSTALLED AND TESTED PRIOR TO UNITS SERVING CRITICAL SPACES.

G. DE-ENERGIZE TEMPORARY SYSTEM SERVING SPACES, REMOVE TEMPORARY EQUIPMENT AND ALL ASSOCIATED TEMPORARY DUCTWORK, PIPING, DIFFUSERS, REGISTERS, GRILLES, CONTROLS, SUPPORTS AND APPURTENANCES.

III. AREA A ADMIN SPACES

A. ONCE SPACES ARE RUNNING ON TEMPORARY COOLING, DE-ENERGIZE EXISTING AHU-4 MECHANICAL SYSTEM.

B. REMOVE EXISTING DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS.

C. INSTALL NEW DDCS OPERATOR'S WORKSTATION LOADED WITH DDC MANUFACTURER'S FRONT-END INTERFACE SOFTWARE, NETWORK SWITCH, AND DDC

COMMUNICATION WIRING AS INDICATED BY DRAWINGS.

D. INSTALL NEW AHU-5 AND ALL ASSOCIATED DUCTWORK, VAV BOXES, CONTROLS, SUPPORTS AND APPURTENANCES AS INDICATED BY DRAWINGS. CONNECT CONTROLLERS TO NEW DDC NETWORK AND PROVIDE PROGRAMMING BASED ON SEQUENCES OF OPERATION SHOWN ON DRAWINGS.

E. PROVE AHU-5 WITH THREE DAYS OF CONTINUOUS RUN TIME.

F. ONCE AHU-5 HAS BEEN PROVEN, CONDITIONING OF ADMIN SPACES ARE NOW SUPPLIED BY AHU-5.

G. TEMPORARY UNITS SERVING NON CRITICAL SPACES TO BE FIRST INSTALLED AND TESTED PRIOR TO UNITS SERVING CRITICAL SPACES.

H. DE-ENERGIZE TEMPORARY SYSTEM SERVING SPACES, REMOVE TEMPORARY EQUIPMENT AND ALL ASSOCIATED TEMPORARY DUCTWORK, PIPING, DIFFUSERS, REGISTERS, GRILLES, CONTROLS, SUPPORTS AND APPURTENANCES.

VIII. FACILITY-WIDE CONTROLS ACTIVITIES

A. TEST THE OPERATIONS OF ALL CONTROLS. DEMONSTRATE SEQUENCING CONTROL FROM OPERATOR'S WORKSTATION..

B. PROVIDE FINAL TRAINING AND INSTRUCTION OF TOTAL SYSTEM TO FAA PERSONNEL.

REV. APPROVED

DATE DESCRIPTION JCN REDLINE

DATE APVD

REVIEWED BY SUBMITTED BY APPROVED BY

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

A

B

C

D

E

F

G

H

7 6 5 4 3 2 1

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

PL

O

T D

AT

E/

TI

M

E:

4/

2/

0:

:4

AM

MIDLAND TXMIDLAND (MAF) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

ENGINEERING

SERVICES

TERMINAL

April 2, 2024 2200347

MAF - D - ATCT - M010

MECHANICAL INSTRUMENTATION

MIDLAND AIRPORT TRAFFIC CONTROL TOWER

MAF ATCT MODERNIZATION

MP

AH

RJ

MIDLAND ATCT

MIDLAND,

TEXAS

4-2-24 ARTURO MEDINA Digitally signed by ARTURO MEDINA

Date: 2024.06.27 17:59:09 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:43:20 -05'00'

TSHSTS HS

T

TS

HS

TS

TS

TS HSHSTSTS HS

TSHS TS

HS

TS HS

HS

TS TS HS

TSHS HSTSTSHS

HS

TS

TSHS

HS

T

T T

T

T

2.2

2.8

3.9

G F E D C B A

20"ø SA 20"ø RA

20"ø RA 20"ø SA

20"ø SA20"ø RA

20"ø RA

20"ø SA

SD-1 1200

TYP. 2

SD-1 800 SD-1 800

TYP. 2

SD-1 500

TYP. 2

SD-1 300

SD-1 150

SD-1 150

SD-1 500

SD-1 300 SD-1 410

TYP. 2 SD-1 200 SD-1 200 SD-1 200

SD-1 150

SD-1 600

SD-1 2000

TYP. 3

TAHU-1

TAHU-5

TAHU-4 TAHU-3

TAHU-2

4 4

SD-1 750

TYP. 4

EQUIPMENT ROOM

118 MECHANICAL

EMERGENCY

GENERATOR

SSC

WOMENS

RESTROOM

MENS RESTROOM

SSC COMPUTER

AT. MANAGER

RECEPTIONIST/

SECRETARY

CORRIDOR

QATS

108 PPS OFFICE

OFFICE AREA

109CONFERENCE ROOM

SECRETARY

OFFICE

114-1

OFFICE

STORAGE ROOM

TRACON

114-A

TRACON

LOCKER ROOM

BREAKROOM

CORRIDOR

102-A

STORAGE ROOM

WOMENS

RESTROOM

MENS RESTROOM

COMM EQUIPMENT

ROOM

118-A

ETG LAB

114-B

TECHNICIANS

OFFICE

SMOKE SHELTER

S1

LINK

20"ø RA 20"ø SA

TEMPORARY EQUIPMENT REQUIREMENTS

1. RENTAL EQUIPMENT FOR TEMPORARY COOLING AND HEATING (PACKAGED AIR CONDITIONERS/HEAT

PUMPS, CONTROLS, ETC.) MUST BE PROVIDED BY THE SAME SOURCE. TEMPORARY COMPONENTS

INCLUDING BUT NOT LIMITED TO DUCTWORK, PIPING, VALVES, STAIRS/WALKWAYS/RAILINGS MUST

BE SUBMITTED FOR APPROVAL PER DIVISION 1 SPECIFICATION 01 30 00.

2. TEMPORARY UNITS SHALL BE COOLING ONLY OR HEAT PUMPS DEPENDING ON SEASON OF WORK.

3. PROVIDE MAINTENANCE AND REPAIRS OF THE TEMPORARY SYSTEM. CONTRACTOR MUST HAVE 24/7

CONTACT VIA TELEPHONE. SERVICE CALLS MUST BE RETURNED WITHIN 1-HOUR. THE CONTRACTOR MUST HAVE A QUALIFIED REPAIR TECHNICIAN ON SITE WITHIN 2 HOURS OF THE SERVICE CALL AND THE EQUIPMENT MUST BE REPAIRED OR REPLACED WITHIN 2 HOURS. FAILURE OF MORE THAN 1

UNIT WOULD BE CONSIDERED AN EMERGENCY AND ADDITIONAL RESOURCES, NAMELY ALTERNATE

REPLACEMENT RENTAL UNITS, MUST BE AVAILABLE TO RETURN THE SYSTEM TO OPERATION AS

QUICKLY AS POSSIBLE. IF ANY OF THESE CONDITIONS ARE NOT MET, THE FAA RESERVES THE RIGHT

TO PERFORM REPAIRS AS NECESSARY TO RESTORE OPERATION AND BACK CHARGE THE

CONTRACTOR FOR ANY COSTS INCURRED. A QUALIFIED TECHNICAN MUST BE ON SITE FOR A

MINIMUM OF 4 HOURS PER WEEK WHILE THE RENTAL EQUIPMENT IS IN OPERATION TO INSPECT, CLEAN, AND MAINTAIN THE EQUIPMENT.

4. TEMPORARY EQUIPMENT PROVIDER MUST HAVE AN ESTABLISHED, OPERATIONAL OFFICE LOCATED

WITHIN 1 HOUR TRAVEL TIME OF THE FAA FACILITY.

5. EQUIPMENT COMPANY MUST SUBMIT FOR APPROVAL DOCUMENTATION ATTESTING TO THE

COMPATIBILITY OF THE TEMPORARY COOLING PLAN.

6. DOCUMENTATION MUST BE SUBMITTED FOR APPROVAL DETAILING REQUIRED MAINTENANCE

REGIME AND SCHEDULE FOR THE TEMPORARY AIR CONDITIONERS FOR THE PROJECTED DURATION

OF THE INSTALLATION.

7. UNIT MUST OPERATE AT MAXIMUM OF 55 F UNIT DISCHARGE AIR TEMPERATURE. AIR CONDITIONERS

MUST BE CERTIFIED ANNUALLY OR ALTERNATIVELY FIELD ACCEPTANCE TESTED. PACKAGED

CONTROLS AND DUCTWORK CONNECTIONS ARE TO BE INCLUDED.

8. SUBMIT FOR APPROVAL DESIGN DRAWINGS SHOWING PROPOSED AIR CONDITIONERS, DUCTWORK INSTALLATION REQUIREMENTS INCLUDING FOUNDATIONS, ANCHORAGE, BRACING AND SUPPORTS, AND EQUIPMENT YARD FENCING. SUBMITTALS MUST BE SIGNED AND SEALED BY A LICENSED

PROFESSIONAL ENGINEER IN THE STATE OF TEXAS. WORK ASSOCIATED WITH THE TEMPORARY

EQUIPMENT MUST BE ACCOMPLISHED IN ACCORDANCE WITH PROJECT SPECIFICATIONS. WORK

MUST BE ACCOMPLISHED IN A PROFESSIONAL MANNER AND COMPLETED BY PERSONNEL

EXPERIENCED IN THAT PARTICULAR ASPECT OF INSTALLATION.

9. NO OTHER CONSTRUCTION RELATED ACTIVITIES, INCLUDING BUT NOT LIMITED TO MATERIAL

STORAGE, PARKING, CUTTING, OR WELDING ALLOWED WITHIN TEMPORARY EQUIPMENT AREAS.

10. TEMPORARY RENTAL EQUIPMENT MUST BE TESTED AND COMMISSIONED PRIOR TO OPERATION

WITHIN THE FACILITY. THE TEMPORARY SYSTEM MUST OPERATE CONTINUOUSLY FOR 1 DAY

WITHOUT FAILURE BEFORE DEMOLITION OF THE EXISTING SYSTEM CAN BE STARTED. THE

TEMPORARY EQUIPMENT MUST BE OPERATED CONTINUOUSLY DURING THE 1 DAY PERIOD.

11. TEMPORARY PACKAGED AIR CONDITIONERS MUST BE PROVIDED WITH CONTROLS FOR OPERATION

OF TEMPORARY EQUIPMENT. FAA SITE PERSONNEL MUST BE ABLE TO MANUALLY OPERATE EACH

AIR CONDITIONER FROM A THERMOSTAT. TEMPORARY EQUIPMENT MUST HAVE RA TEMPERATURE

SENSOR TO MONITOR SPACE TEMPERATURE. ONCE TEMPORARY UNITS ARE STARTED BY THE SITE

PERSONNEL, THERMOSTAT MUST STAGE EQUIPMENT ON AND OFF AS REQUIRED TO MAINTAIN

SPACE TEMPERATURE AT SET POINT. POWER WIRING AND CONTROL WIRING MUST BE INSTALLED IN

RGS CONDUIT. AFTER POWER INTERRUPTION, THE CONTRACTOR MUST RETURN THE SYSTEM TO

OPERATIONAL STATUS. PACKAGED AIR CONDITIONER MUST AUTOMATICALLY RECOVER FROM A

POWER INTERRUPTION.

12. PROVIDE LIGHTING IN TEMPORARY EQUIPMENT AREAS PER OSHA AND FACILITY SECURITY

REQUIREMENTS. COORDINATE LIGHTING REQUIREMENTS WITH SITE.

13. PROVIDE OPERATION AND MAINTENANCE TRAINING FOR FACILITY PERSONNEL.

14. DEMOBILIZE TEMPORARY EQUIPMENT, DUCTWORK, SUPPORTS, CONTROLS, AND WIRING AT

COMPLETION OF WORK. RETURN THE SITE TO ITS ORIGINAL CONDITION.

15. TEMPORARY AIR CONDITIONING UNITS TO KEEP ELECTRONIC SPACES CONDITIONED AT 73 DEG F DB

AND MAXIMUM 60% RH.

REV. APPROVED

DATE DESCRIPTION JCN REDLINE

DATE APVD

REVIEWED BY SUBMITTED BY APPROVED BY

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

A

B

C

D

E

F

G

H

7 6 5 4 3 2 1

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

8 0 8

Scale: 1/8 INCH = 1 FOOT

N

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

PL

O

T D

AT

E/

TI

M

E:

4/

2/

0:

:4

AM

MIDLAND TXMIDLAND (MAF) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

ENGINEERING

SERVICES

TERMINAL

April 2, 2024 2200347

MAF - D - ATCT - M011

HVAC TEMPORARY WORK - BASE BUILDING -

GROUND LEVEL FLOOR PLAN

MIDLAND AIRPORT TRAFFIC CONTROL TOWER

MAF ATCT MODERNIZATION

BS

CB

JL

MIDLAND ATCT

MIDLAND,

TEXAS

1/8" = 1'-0"M011

C8 HVAC TEMPORARY - BASE BUILDING - GROUND LEVEL

1 ROUTE TEMPORARY DUCTWORK THROUGH EXTERIOR WINDOW AND SEAL WEATHERTIGHT.

2 ROUTE TEMPORARY DUCTWORK THROUGH EXTERIOR WINDOWS AND SEAL WEATHERTIGHT.

REPLACE WINDOWS UPON COMPLETION OF PROJECT.

3 LOCATE 5 TON TEMPORARY AIR HANDLING UNIT.

4 LOCATE 20 TON TEMPORARY AIR HANDLING UNIT.

5 INSTALL, TEST, AND OPERATE TEMPORARY UNIT SERVING ADMINISTRATIVE AREAS (NON-CRITICAL

SPACES) PRIOR TO INSTALLATION OF TEMPORARY UNITS SERVING CRITICAL SPACES.

6 TEMPORARY DUCTWORK TO PENETRATE THROUGH FIRE RATED WALL. PROVIDE FIRE DAMPER

FOR TEMPORARY DUCTWORK. REPAIR PENETRATION TO MEET FIRE RATING AFTER TEMPORARY

CONSTRUCTION.

7 REMOVE DOUBLE DOOR AND REPLACE WITH TEMPORARY WALL ON ONE SIDE AND 3' DOOR ON

THE OTHER. INSTALL TEMPORARY WALL TO ALLOW FOR TRANSITION OF DUCTWORK FROM ROOM

TO ROOM. PROTECT DOOR DURING CONSTRUCTION. ANY DAMAGE TO DOOR TO BE BORNE BY

THE CONTRACTOR. TEMPORARY SINGLE DOOR TO REMAIN OPERATIONAL AT ALL TIMES. AFTER

COMPLETION OF TEMPORARY PHASE, REINSTALL DOUBLE DOOR.

8 REDUNDANT TEMPORARY HVAC SYSTEM TAHU-3 AND 4 MUST BE ROUTED TO SERVE COMM

EQUIPMENT ROOM 118-A DURING THE REPLACEMENT OF CRAC-1 & 2. UPON COMPLETION OF

WORK IN THIS SPACE, DISCONNECT DIFFUSERS IN COMM EQUIPMENT ROOM 118-A FROM THE

SYSTEM AND ROUTE TEMPORARY DUCTWORK TO SERVE EQUIPMENT ROOM 118 AND TRACON

114.

9 PROVIDE TEMPORARY RA DUCTWORK WITH WIRE MESH SCREEN AT END OF RUN.

10 THERMOSTAT PROVIDED BY TEMPORARY AIR HANDLING UNIT MANUFACTURER. WHEN

TEMPORARY EQUIPMENT IS REMOVED, DEMOLISH THERMOSTAT AND ASSOCIATED WIRING AND

CONDUIT.

11 PROVIDE TEMPORARY DUCTWORK FOR TAHU-4 TO ALLOW FOR QUICK CHANGEOVER IN EVENT OF

TAHU-3 FAILURE.

12 PROVIDE TEMPORARY DUCTWORK WITH MANUAL BALANCING DAMPER TO CONTROL AIRFLOW TO

TRACON 114 DURING HVAC REPLACEMENT IN AREA A.

-SHEET NOTES

AREA B AREA A

4-2-24 ARTURO MEDINA Digitally signed by ARTURO MEDINA

Date: 2024.06.27 17:59:23 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:43:36 -05'00'

C

CU-X1

CU-X2

RS/RL

RS/RL3

(E) RTU-1

(E) CU-2

(E) CU-3

C

RS/RL

RS/RL

DSS-2DSS-1

RS/RL

UP

SECONDARY EQUIPMENT REQUIREMENTS

1. PROVIDE REDUNDANT COOLING SYSTEM FOR THE CONTROL CAB THAT WILL PROVIDE COOLING

WHILE EXSTING UNITS ARE BEING REPLACED. THIS UNIT IS TO BE INSTALLED PRIOR TO THE

REMOVAL OF THE EXISTING PACKAGED ROOF TOP UNIT. PACKAGED ROOFTOP UNIT TO NOT BE

REMOVED UNTIL AHU-1/2 HAVE BEEN REPLACED AND ARE ACTIVE. UPON COMPLETION OF PROJECT CONTROL CAB TEMPORARY COOLING EQUIPMENT MUST REMAIN IN PLACE AS THE SUPPLEMENTARY COOLING SYSTEM. THIS SYSTEM, INCLUDING ALL EQUIPMENT, DUCTWORK, REFRIGERANT PIPING, CONTROLS AND APPURTENANCES MUST BE PROVIDED BY CONTRACTOR AS PART OF THE DESIGN

PACKAGE. SEE MECHANICAL SCHEDULES AND SPECIFICATIONS FOR EQUIPMENT AND SYSTEM

INFORMATION.

2. ALL COOLING EQUIPMENT FOR SECONDARY COOLING (DUCTLESS SPLIT SYSTEM CASSETTES,

CONDENSING UNITS, CONTROLS, ETC.) MUST BE PROVIDED BY THE SAME SOURCE (TRANE,

CARRIER, DAIKIN OR APPROVED EQUAL). ALL COMPONENTS INCLUDING BUT NOT LIMITED TO

DUCTWORK, PIPING, VALVES, STAIRS/WALKWAYS/RAILINGS MUST BE SUBMITTED FOR APPROVAL

PER CONTRACT SPECIFICATIONS.

3. DURING PROJECT CONSTRUCTION, CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND

REPAIRS OF THE SECONDARY SYSTEM. CONTRACTOR MUST HAVE 24/7 CONTACT VIA TELEPHONE.

SERVICE CALLS MUST BE RETURNED WITHIN 1-HOUR. THE CONTRACTOR MUST HAVE A QUALIFIED REPAIR TECHNICIAN ON SITE WITHIN 1 HOUR OF THE SERVICE CALL AND THE EQUIPMENT MUST BE REPAIRED OR REPLACED WITHIN 1 HOUR. FAILURE OF MORE THAN 1 UNIT WOULD BE CONSIDERED AN EMERGENCY AND ADDITIONAL RESOURCES, NAMELY ALTERNATE REPLACEMENT UNITS, MUST BE AVAILABLE TO RETURN THE SYSTEM TO OPERATION AS QUICKLY AS POSSIBLE. IF ANY OF THESE CONDITIONS ARE NOT MET, THE FAA RESERVES THE RIGHT TO PERFORM REPAIRS AS NECESSARY

TO RESTORE OPERATION AND BACK CHARGE THE CONTRACTOR FOR ANY COSTS INCURRED.

4. EQUIPMENT PROVIDER MUST HAVE AN ESTABLISHED, OPERATIONAL OFFICE LOCATED WITHIN 1

HOUR TRAVEL TIME OF THE FAA FACILITY.

5. EQUIPMENT COMPANY MUST SUBMIT FOR APPROVAL DOCUMENTATION ATTESTING TO THE

COMPATIBILITY OF THE SECONDARY COOLING PLAN.

6. DOCUMENTATION MUST BE SUBMITTED FOR APPROVAL DETAILING REQUIRED MAINTENANCE

REGIME AND SCHEDULE FOR THE AIR CONDITIONERS FOR THE PROJECTED DURATION OF THE

INSTALLATION AND SUBSEQUENT CONSTRUCTION.

7. TWO (2) DIRECT EXPANSION DUCTLESS SPLIT SYSTEM CASSETTES AND TWO (2) ASSOCIATED

CONDENSING UNITS ARE REQUIRED FOR LOAD CAPACITY. SEE MECHANICAL SCHEDULES FOR

REQUIRED CAPACITIES. UNITS MUST OPERATE AT MAXIMUM OF 55 F UNIT DISCHARGE AIR

TEMPERATURE. DUCTWORK CONNECTIONS ARE TO BE INCLUDED. CONTROLS MUST BE PROVIDED.

8. PROVIDE ASSOCIATED SYSTEM POWER DISTRIBUTION AND EQUIPMENT TO TERMINATE DEDICATED

SINGLE-POINT POWER SUPPLY CONNECTION. SEE ELECTRICAL DRAWINGS FOR EQUIPMENT

ELECTRICAL CHARACTERISTICS.

9. THE DUCTLESS SPLIT SYSTEM CASSETTES AND CONDENSING UNITS MUST BE INSTALLED AS THE

SECONDARY COOLING SYSTEM. THE SECONDARY COOLING SYTEM WILL ACT AS THE TEMPORARY

COOLING SYSTEM FOR THE DURATION OF CONSTRUCTION WHILE AHU-2/3 ARE BEING REPLACED.

EXISTING PACKAGED ROOF TOP UNIT TO REMAIN IN OPERATION DURING THIS TIME. SHOULD ANY DUCTLESS SPLIT SYSTEM CASSETE OR CONDENSING UNIT FAIL DURING CONSTRUCTION, THE TWO

FUNCTIONING UNITS MUST BE UTILIZED TO PROVIDE COOLING THE SPACE UNTIL THE

MALFUNCTIONING UNIT CAN BE REPAIRED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO

ENSURE THAT ADEQUATE TEMPORARY COOLING IS PROVIDED DURING CONSTRUCTION AT ALL

TIMES.

10. SUBMIT FOR APPROVAL DESIGN DRAWINGS SHOWING PROPOSED AIR CONDITIONERS AND

DUCTWORK INSTALLATION REQUIREMENTS INCLUDING FOUNDATIONS, ANCHORAGE, BRACING AND

SUPPORTS. SUBMITTALS MUST BE SIGNED AND SEALED BY A LICENSED PROFESSIONAL ENGINEER IN

THE STATE OF TEXAS. WORK ASSOCIATED WITH THE SECONDARY COOLING EQUIPMENT MUST BE

ACCOMPLISHED IN ACCORDANCE WITH PROJECT SPECIFICATIONS. WORK MUST BE ACCOMPLISHED IN A PROFESSIONAL MANNER AND COMPLETED BY PERSONNEL EXPERIENCED IN THAT PARTICULAR

ASPECT OF INSTALLATION.

11. EACH AIR CONDITIONER, FOUNDATION, ANCHORAGE AND STRUCTURAL STEEL SUPPORTS MUST BE

DESIGNED TO WITHSTAND WIND AND SEISMIC FORCES PER PROJECT SPECIFICATIONS.

12. SECONDARY EQUIPMENT AND CONTROLS MUST BE TESTED AND COMMISSIONED PRIOR TO

OPERATION WITHIN THE FACILITY. THE SECONDARY SYSTEM MUST OPERATE CONTINUOUSLY FOR 48 HOURS WITHOUT FAILURE BEFORE DEMOLITION OF THE EXISTING SYSTEM CAN BE STARTED. THE

TEMPORARY EQUIPMENT MUST BE OPERATED CONTINUOUSLY DURING THE 48 HOUR PERIOD.

13. PROVIDE OPERATION AND MAINTENANCE TRAINING FOR FACILITY PERSONNEL. PROVIDE A MINIMUM

OF 2 SESSIONS, 4 HOURS IN DURATION FOR EACH SESSION.

14. EACH AIR CONDITIONER, FOUNDATION, ANCHORAGE AND STRUCTURAL STEEL SUPPORTS MUST BE

DESIGNED TO WITHSTAND WIND AND SEISMIC FORCES PER PROJECT SPECIFICATIONS.

15. SECONDARY COOLING EQUIPMENT, REFRIGERANT, AND SUPPORTS TO REMAIN AT COMPLETION OF

WORK. SECONDARY COOLING SYSTEM TO SERVE AS SUPPLIMENTARY COOLING SYSTEM.

16. REMOVE TEMPORARY CONTROLS ASSOCIATED WITH SECONDARY COOLING SYSTEM.AIR

CONDITIONING SYSTEM. CONNECT COOLING SYSTEM AND SUPPLY FAN TO NEW DDC PANEL AND

PROVIDE PROGRAMMING AS INDICATED ON CONTROLS SHEETS.

17. PROVE SECONDARY COOLING EQUIPMENT FOR TWO (2) DAYS CONTINOUS RUNTIME

REV. APPROVED

DATE DESCRIPTION JCN REDLINE

DATE APVD

REVIEWED BY SUBMITTED BY APPROVED BY

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

A

B

C

D

E

F

G

H

7 6 5 4 3 2 1

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

4 0 4 8

Scale: 1/4 INCH = 1 FOOT

N

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

PL

O

T D

AT

E/

TI

M

E:

4/

2/

0:

:5

AM

MIDLAND TXMIDLAND (MAF) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

ENGINEERING

SERVICES

TERMINAL

April 2, 2024 2200347

MAF - D - ATCT - M012

HVAC SECONDARY WORK - ATCT

MIDLAND AIRPORT TRAFFIC CONTROL TOWER

MAF ATCT MODERNIZATION

BS

CB

JL

MIDLAND ATCT

MIDLAND,

TEXAS

1/4" = 1'-0"M012

A8 HVAC SECONDARY- ATCT - CAB ROOF LEVEL

1/4" = 1'-0"M012

E8 HVAC SECONDARY - ATCT - CAB LEVEL

1 SECONDARY DUCTLESS SPLIT SYSTEM PROVIDED DURING TEMPORARY COOLING PHASE. DURING CONSTRUCTION, THE DUCTLESS SPLIT SYSTEM MUST PROVIDE TEMPORARY COOLING TO THE CAB.

UPON COMPLETION OF WORK, THE DUCTLESS SPLIT SYSTEM IS TO REMAIN AND SERVE AS REDUNDANT

COOLING SYSTEM.

2 PROVIDE INTERIOR REFRIGERANT LINES WITH INSULATED PVC SLEEVE, ONE SLEEVE PER EACH

REFRIGERANT LINE.

3 PROVIDE REFRIGERANT AND CONDUIT PIPING CURB. SEE DETAIL A8/M024.

4 PROVIDE EQUIPMENT SUPPORT RAIL. REFER TO ARCH DWGS FOR EQUIPMENT SUPPORT RAIL DETAIL.

5 PROVIDE PIPING SUPPORTS PER SMACNA. TYPICAL OF ALL EXTERIOR PIPING.

6 EXISTING THERMOSTAT ASSOCIATED WITH ROOFTOP AIR HANDLING UNIT RTU-1, THE TEMPORARY HVAC

SYSTEM SERVING THE CAB DURING CONSTRUCTION. WHEN EQUIPMENT IS REMOVED, DEMOLISH

THERMOSTAT AND ASSOCIATED WIRING AND CONDUIT.

7 THERMOSTAT PROVIDED BY EQUIPMENT MANUFACTURER. WHEN NEW AIR HANDLING UNITS AHU-1 AND AHU-2 ARE PROVEN OPERATIONAL, DEMOLISH THERMOSTAT AND ASSOCIATED WIRING AND CONDUIT.

-SHEET NOTES

4-2-24 ARTURO MEDINA Digitally signed by ARTURO MEDINA

Date: 2024.06.27 17:59:34 -05'00' KEVIN D MILES Digitally signed by KEVIN D MILES Date: 2024.07.01 07:43:42 -05'00'

TSHSTSHS

TS

HS

TS

TS

TS HSHSTS

TSHS TS

HS

TS HS

HS

TS TS HS

TSHS HSTSTSHS

HS

TS

TSHS

HS

T

T T

T

T

VAV-C

VAV-A

VAV-D

VAV-B

VAV-1

VAV-3

VAV-2

VAV-5 VAV-4

EH-1

EH-2

CRU-1 CRU-2

CRU-CU-1 CRU-CU-2

VAV-6

STORAGE ROOM

TECHNICIANS

OFFICE

MENS RESTROOM

ETG LAB

114-B

COMM EQUIPMENT

ROOM

118-A

VEST

BREAKROOM

SSC SUPERVISOR

SECRETARY

CONFERENCE ROOM

112 OFFICE AREA

QATS

PPS OFFICE

CORRIDOR

TRACON

114-A

TRACON

CORRIDOR

102-A

AT. MANAGER

RECEPTIONIST/

SECRETARY

SSC COMPUTER

MENS RESTROOM

WOMENS

RESTROOM

ICSS/TELCO

VEST

SSC

CORR

EMERGENCY

GENERATOR

MECHANICAL

SOLAR CHAMBER

120-1

OFFICE

114-1

OFFICE

STORAGE ROOM

TRACON

114-A

EQUIPMENT ROOM

SMOKE SHELTER

S1

WOMENS

RESTROOM

2.2

2.8

3.9

G F E D C B A

CF-1

CF-2

CF-5

CF-4

CF-6

CF-3

CF-7CF-8CF-9

CF-10CF-12

CF-11

CF-14

CF-13

6 6

9 10

13 14

PTAC-1

HU-1

HU-2

171717

UH-5

22 23

A. REFER TO DRAWINGS M009 AND M010 FOR SYMBOLS, ABBREVIATIONS AND GENERAL NOTES.

B. PROTECT EQUIPMENT TO REMAIN IN THE AREA OF WORK. COORDINATE WITH COR.

C. FIRE/LIFE SAFETY EQUIPMENT AND COMPONENTS ARE EXISTING AND ARE TO REMAIN UNLESS

OTHERWISE NOTED.

D. DUCTWORK DIMENSIONS SHOWN FOR REFERENCE ONLY.

E. DISCONNECT AND REMOVE CONDUIT, SUPPORTS, AND WIRING ASSOCIATED WITH CONTROLS

DESIGNATED FOR DEMOLITION. COORDINATE WORK WITH COR.

F. PRESERVE THE INTEGRITY OF EXISTING DDCS COMMUNICATION NETWORK THROUGHOUT

PROJECT DEMOLITION WORK. DO NOT DISCONNECT AND/OR REMOVE EXISTING DDCS NETWORK

WITHOUT PROPER NOTIFICATION AND/OR PRIOR WRITTEN APPROVAL BY COR.

REV. APPROVED

DATE DESCRIPTION JCN REDLINE

DATE APVD

REVIEWED BY SUBMITTED BY APPROVED BY

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

A

B

C

D

E

F

G

H

7 6 5 4 3 2 1

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

8 0 8

Scale: 1/8 INCH = 1 FOOT

N

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

PL

O

T D

AT

E/

TI

M

E:

4/

2/

0:

:5

AM

MIDLAND TXMIDLAND (MAF) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

ENGINEERING

SERVICES

TERMINAL

April 2, 2024 2200347

MAF - D - ATCT - M013

HVAC DEMOLITION - BASE BUILDING - GROUND

LEVEL FLOOR PLAN

MIDLAND AIRPORT TRAFFIC CONTROL TOWER

MAF ATCT MODERNIZATION

BS

CB

JL

MIDLAND ATCT

MIDLAND,

TEXAS

1/8" = 1'-0"M013

B8 HVAC DEMOLITON - BASE BUILDING - GROUND LEVEL

1 DEMOLISH FAN POWERED VAV BOXES AND ASSOCIATED FLEXIBLE DUCT CONNECTIONS. TYPICAL

FOR ALL FAN POWERED BOXES.

2 REMOVE HUMIDIFIERS IN MECHANICAL ROOM. PREPARE PIPING FOR NEW HUMIDIFIER

CONNECTIONS.

3 REMOVE COMPUTER ROOM AIR HANDLING UNITS AND COMPUTER ROOM CONDENSING UNITS

INCLUDING ALL EQUIPMENT STANDS, PIPING, VALVES, AND APPURTENANCES. REFER TO ARCH

DWGS FOR REPAIR OF EXTERIOR BUILDING.

4 DISCONNECT AND REMOVE CONTROL PANEL ONCE ASSOCIATED AIR HANDLERS AHU-4, AHU-5,

AHU-5A, AHU-6 AND AHU-7 HAVE BEEN REMOVED FROM SERVICE. COORDINATE WORK WITH

OTHER TRADES AND COR.

5 DISCONNECT AND REMOVE CONTROL PANEL ONCE ASSOCIATED AIR HANDLER AHU-12 (ABOVE)

HAS BEEN REMOVED FROM SERVICE. COORDINATE WORK WITH OTHER TRADES AND COR.

6 DISCONNECT AND REMOVE COMBINATION SPACE TEMPERATURE AND HUMIDITY SENSOR

ASSOCIATED WITH FAN POWERED BOX.

7 DISCONNECT AND REMOVE COMBINATION SPACE TEMPERATURE AND HUMIDITY SENSOR

ASSOCIATED WITH AHU-11.

8 DISCONNECT AND REMOVE COMBINATION SPACE TEMPERATURE AND HUMIDITY SENSOR

ASSOCIATED WITH AHU-12.

9 DISCONNECT AND REMOVE COMBINATION SPACE TEMPERATURE AND HUMIDITY SENSOR

ASSOCIATED WITH AHU-5a.

10 DISCONNECT AND REMOVE COMBINATION SPACE TEMPERATURE AND HUMIDITY SENSOR

ASSOCIATED WITH AHU-5.

11 DISCONNECT AND REMOVE ABANDONED SPACE TEMPERATURE SENSOR.

12 DISCONNECT AND REMOVE THERMOSTAT ONCE ASSOCIATED UNIT HEATER HAS BEEN

REMOVED.S

13 DISCONNECT AND REMOVE COMBINATION SPACE TEMPERATURE AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .