This document is a bid tabulation (Bid Tabs) for the SE Johnson Creek Boulevard project between 79th Place and 82nd Avenue, issued by Clackamas County, Oregon for bid opening on June 10, 2025. The project encompasses comprehensive infrastructure improvements including traffic signal installation, roadway construction, utility work, and environmental mitigation. The bid involves 93 distinct line items covering activities such as mobilization, temporary traffic control, erosion management, excavation, storm and sanitary sewer installations, pavement work, concrete structures, signage, fencing, landscaping, and utility connections. The engineer's estimate for the total project is $1,645,052.75, with five bidders submitting proposals ranging from $1,714,494.04 to $2,128,912.44.
The bid analysis reveals significant variation among bidders, with unit prices fluctuating considerably across different line items. Westech Construction submitted the lowest bid at $1,714,494.04, which is 4.22% above the engineer's estimate. The project includes federal funding requirements, mandating compliance with prevailing wage standards and Build America, Buy America Act provisions. Specific project components include bioretention pond construction, traffic signal installation at Johnson Creek Boulevard and 79th Place, telecommunications infrastructure, chain link fencing, and various environmental and landscaping elements. The bid requires specialized construction expertise across multiple infrastructure domains, including electrical, earthwork, drainage, asphalt paving, and miscellaneous highway appurtenances.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABS
| SE JOHNSON CREEK BLVD: 79TH PL-82ND AVE | ||||||||||||||||||
| Bid Opening June 10, 2025 | ||||||||||||||||||
| Engineers Estimate | Westech Construction | Corpac Construction Co | Moore Excavation | Dirt & Agg interchange | Kodiak Pacific Construction | |||||||||||||
| Item # | Spec | Item Description | Unit | Quantity | Unit | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | LOW | HIGH |
| 1 | 0210-0100000A | MOBILIZATION | LS | 1 | 135,000.00 | 135,000.00 | 171,000.00 | 171,000.00 | 183,330.00 | 183,330.00 | 175,000.00 | 175,000.00 | 174,655.00 | 174,655.00 | 241,000.00 | 241,000.00 | 171,000.00 | 241,000.00 |
| 2 | 0221-0100000A | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | LS | 1 | 41,000.00 | 41,000.00 | 22,000.00 | 22,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 78,200.00 | 78,200.00 | 72,800.00 | 72,800.00 | 22,000.00 | 78,200.00 |
| 3 | 0222-0102000J | TEMPORARY SIGNS | SQFT | 200 | 24.00 | 4,800.00 | 33.30 | 6,660.00 | 25.00 | 5,000.00 | 33.00 | 6,600.00 | 29.50 | 5,900.00 | 31.00 | 6,200.00 | 5,000.00 | 6,660.00 |
| 4 | 0222-0162000E | SEQUENTIAL ARROW SIGNS | EACH | 1 | 5,000.00 | 5,000.00 | 1,345.00 | 1,345.00 | 750.00 | 750.00 | 2,000.00 | 2,000.00 | 1,600.00 | 1,600.00 | 1,025.00 | 1,025.00 | 750.00 | 2,000.00 |
| 5 | 0223-0168000T | FLAGGERS | HOUR | 800 | 50.00 | 40,000.00 | 80.00 | 64,000.00 | 78.00 | 62,400.00 | 82.00 | 65,600.00 | 90.56 | 72,448.00 | 67.00 | 53,600.00 | 53,600.00 | 72,448.00 |
| 6 | 0224-0104000E | TEMPORARY BARRICADES, TYPE II | EACH | 4 | 80.00 | 320.00 | 36.00 | 144.00 | 50.00 | 200.00 | 65.00 | 260.00 | 30.00 | 120.00 | 62.00 | 248.00 | 120.00 | 260.00 |
| 7 | 0224-0105000E | TEMPORARY BARRICADES, TYPE III | EACH | 2 | 150.00 | 300.00 | 99.00 | 198.00 | 100.00 | 200.00 | 225.00 | 450.00 | 120.00 | 240.00 | 180.00 | 360.00 | 198.00 | 450.00 |
| 8 | 0224-0145000E | TEMPORARY PLASTIC DRUMS | EACH | 26 | 50.00 | 1,300.00 | 22.00 | 572.00 | 50.00 | 1,300.00 | 70.00 | 1,820.00 | 24.00 | 624.00 | 88.00 | 2,288.00 | 572.00 | 2,288.00 |
| 9 | 0225-0153000F | TEMPORARY STRIPING | FOOT | 2700 | 1.00 | 2,700.00 | 1.60 | 4,320.00 | 0.20 | 540.00 | 2.75 | 7,425.00 | 1.81 | 4,887.00 | 1.54 | 4,158.00 | 540.00 | 7,425.00 |
| 10 | 0225-0154000F | STRIPE REMOVAL | FOOT | 3250 | 0.50 | 1,625.00 | 1.60 | 5,200.00 | 3.75 | 12,187.50 | 1.50 | 4,875.00 | 1.81 | 5,882.50 | 1.54 | 5,005.00 | 4,875.00 | 12,187.50 |
| 11 | 0228-0141600F | PEDESTRIAN CHANNELIZING DEVICES | FOOT | 300 | 10.00 | 3,000.00 | 5.50 | 1,650.00 | 25.00 | 7,500.00 | 30.00 | 9,000.00 | 24.15 | 7,245.00 | 45.00 | 13,500.00 | 1,650.00 | 13,500.00 |
| 12 | 0280-0100000A | EROSION CONTROL | LS | 1 | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 15,500.00 | 15,500.00 | 5,000.00 | 5,000.00 | 5,390.00 | 5,390.00 | 7,835.65 | 7,835.65 | 5,000.00 | 15,500.00 |
| 13 | 0280-0113000F | SEDIMENT FENCE | FOOT | 485 | 4.00 | 1,940.00 | 8.00 | 3,880.00 | 3.50 | 1,697.50 | 4.00 | 1,940.00 | 3.60 | 1,746.00 | 4.71 | 2,284.35 | 1,697.50 | 3,880.00 |
| 14 | 0280-0114040E | INLET PROTECTION, TYPE 4 | EACH | 14 | 125.00 | 1,750.00 | 46.00 | 644.00 | 75.00 | 1,050.00 | 125.00 | 1,750.00 | 81.00 | 1,134.00 | 155.00 | 2,170.00 | 644.00 | 2,170.00 |
| 15 | 0280-0110010E | CONSTRUCTION ENTRANCE, TYPE 1 | EACH | 1 | 750.00 | 750.00 | 2,700.00 | 2,700.00 | 1,875.00 | 1,875.00 | 5,000.00 | 5,000.00 | 4,600.00 | 4,600.00 | 6,500.00 | 6,500.00 | 1,875.00 | 6,500.00 |
| 16 | 0280-0111010E | TIRE WASH FACILITY, TYPE 1 | EACH | 1 | 750.00 | 750.00 | 6,500.00 | 6,500.00 | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 3,900.00 | 3,900.00 | 24,550.00 | 24,550.00 | 2,500.00 | 24,550.00 |
| 17 | 0290-0100000A | POLLUTION CONTROL PLAN | LS | 1 | 1,000.00 | 1,000.00 | 1,100.00 | 1,100.00 | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | 600.00 | 600.00 | 400.00 | 400.00 | 400.00 | 1,500.00 |
| 18 | 0294-0100000A | HEALTH AND SAFETY PLAN | LS | 1 | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 600.00 | 600.00 | 400.00 | 400.00 | 400.00 | 2,200.00 |
| 19 | 0294-0200010M | CONTAMINATED SOIL DISPOSAL | TON | 138 | 100.00 | 13,800.00 | 112.00 | 15,456.00 | 100.00 | 13,800.00 | 125.00 | 17,250.00 | 104.00 | 14,352.00 | 123.00 | 16,974.00 | 13,800.00 | 17,250.00 |
| 20 | 0294-0500000A | LEAD COMPLIANCE PLAN | LS | 1 | 2,500.00 | 2,500.00 | 5,500.00 | 5,500.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 1,800.00 | 1,800.00 | 400.00 | 400.00 | 400.00 | 5,500.00 |
| 21 | 0295-0100000F | REMOVE ASBESTOS MATERIAL, FRIABLE | FOOT | 5 | 300.00 | 1,500.00 | 61.00 | 305.00 | 85.00 | 425.00 | 55.00 | 275.00 | 1,875.00 | 9,375.00 | 1,025.00 | 5,125.00 | 275.00 | 9,375.00 |
| 22 | 0295-0200000F | REMOVE ASBESTOS MATERIAL, NON-FRIABLE | SQFT | 2750 | 5.00 | 13,750.00 | 3.50 | 9,625.00 | 15.00 | 41,250.00 | 7.00 | 19,250.00 | 7.85 | 21,587.50 | 9.00 | 24,750.00 | 9,625.00 | 41,250.00 |
| 23 | 0305-0100000A | CONSTRUCTION SURVEY WORK | LS | 1 | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | 19,000.00 | 19,000.00 | 25,000.00 | 25,000.00 | 18,100.00 | 18,100.00 | 19,000.00 | 19,000.00 | 18,100.00 | 25,000.00 |
| 24 | 0310-0100000F | REMOVAL OF PIPES | FOOT | 248 | 30.00 | 7,440.00 | 10.25 | 2,542.00 | 35.00 | 8,680.00 | 30.00 | 7,440.00 | 23.50 | 5,828.00 | 150.00 | 37,200.00 | 2,542.00 | 37,200.00 |
| 25 | 0310-0104000E | REMOVAL OF INLETS | EACH | 3 | 500.00 | 1,500.00 | 1,555.00 | 4,665.00 | 650.00 | 1,950.00 | 700.00 | 2,100.00 | 500.00 | 1,500.00 | 2,400.00 | 7,200.00 | 1,500.00 | 7,200.00 |
| 26 | 0310-0106000A | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | LS | 1 | 27,000.00 | 27,000.00 | 9,000.00 | 9,000.00 | 34,500.00 | 34,500.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 80,000.00 | 80,000.00 | 9,000.00 | 80,000.00 |
| 27 | 0310-0109000A | REMOVAL OF BUILDINGS | LS | 1 | 40,000.00 | 40,000.00 | 24,000.00 | 24,000.00 | 54,500.00 | 54,500.00 | 15,000.00 | 15,000.00 | 49,000.00 | 49,000.00 | 23,000.00 | 23,000.00 | 15,000.00 | 54,500.00 |
| 28 | 0310-0119000F | ASPHALT PAVEMENT SAW CUTTING | FOOT | 1030 | 5.00 | 5,150.00 | 3.25 | 3,347.50 | 5.75 | 5,922.50 | 6.00 | 6,180.00 | 2.70 | 2,781.00 | 2.00 | 2,060.00 | 2,060.00 | 6,180.00 |
| 29 | 0320-0100000A | CLEARING AND GRUBBING | LS | 1 | 12,000.00 | 12,000.00 | 4,000.00 | 4,000.00 | 7,500.00 | 7,500.00 | 11,500.00 | 11,500.00 | 15,350.00 | 15,350.00 | 20,000.00 | 20,000.00 | 4,000.00 | 20,000.00 |
| 30 | 0330-0105000K | GENERAL EXCAVATION | CUYD | 793 | 60.00 | 47,580.00 | 70.00 | 55,510.00 | 45.00 | 35,685.00 | 80.00 | 63,440.00 | 105.00 | 83,265.00 | 112.00 | 88,816.00 | 35,685.00 | 88,816.00 |
| 31 | 0331-0109000J | 18 INCH SUBGRADE STABILIZATION | SQYD | 114 | 65.00 | 7,410.00 | 19.00 | 2,166.00 | 35.00 | 3,990.00 | 65.00 | 7,410.00 | 10.00 | 1,140.00 | 235.00 | 26,790.00 | 1,140.00 | 26,790.00 |
| 32 | 0350-0105000J | SUBGRADE GEOTEXTILE | SQYD | 946 | 2.00 | 1,892.00 | 1.69 | 1,598.74 | 2.25 | 2,128.50 | 1.50 | 1,419.00 | 3.00 | 2,838.00 | 4.30 | 4,067.80 | 1,419.00 | 4,067.80 |
| 33 | 0390-0119000K | GROUTED RIPRAP | CUYD | 190 | 20.00 | 3,800.00 | 65.00 | 12,350.00 | 95.00 | 18,050.00 | 50.00 | 9,500.00 | 72.50 | 13,775.00 | 112.00 | 21,280.00 | 9,500.00 | 21,280.00 |
| 34 | 0415-0100000F | MAINLINE VIDEO INSPECTION | FOOT | 331 | 5.00 | 1,655.00 | 9.00 | 2,979.00 | 22.00 | 7,282.00 | 13.00 | 4,303.00 | 6.00 | 1,986.00 | 10.50 | 3,475.50 | 1,986.00 | 7,282.00 |
| 35 | 0415-0400000E | SERVICE LINE LATERAL VIDEO INSPECTION | EACH | 1 | 750.00 | 750.00 | 275.00 | 275.00 | 1,500.00 | 1,500.00 | 300.00 | 300.00 | 600.00 | 600.00 | 820.00 | 820.00 | 275.00 | 1,500.00 |
| 36 | 0445-030006BF | 6 INCH SANITARY SEWER PIPE, 10 FT DEPTH | FOOT | 52 | 150.00 | 7,800.00 | 340.00 | 17,680.00 | 250.00 | 13,000.00 | 300.00 | 15,600.00 | 325.00 | 16,900.00 | 258.00 | 13,416.00 | 13,000.00 | 17,680.00 |
| 37 | 0445-035012AF | 12 INCH STORM SEWER PIPE, 5 FT DEPTH | FOOT | 331 | 130.00 | 43,030.00 | 175.00 | 57,925.00 | 145.00 | 47,995.00 | 280.00 | 92,680.00 | 222.00 | 73,482.00 | 150.00 | 49,650.00 | 47,995.00 | 92,680.00 |
| 38 | 0445 | 6 INCH STORM SEWER CLEANOUT | EACH | 1 | 500.00 | 500.00 | 1,275.00 | 1,275.00 | 1,800.00 | 1,800.00 | 1,000.00 | 1,000.00 | 1,850.00 | 1,850.00 | 8,600.00 | 8,600.00 | 1,000.00 | 8,600.00 |
| 39 | 0470-0101000E | CONCRETE STORM SEWER MANHOLES | EACH | 1 | 7,000.00 | 7,000.00 | 6,800.00 | 6,800.00 | 9,750.00 | 9,750.00 | 8,500.00 | 8,500.00 | 9,865.00 | 9,865.00 | 15,800.00 | 15,800.00 | 6,800.00 | 15,800.00 |
| 40 | 0470-0315000E | CONCRETE INLETS, TYPE GB-2 | EACH | 5 | 2,900.00 | 14,500.00 | 2,250.00 | 11,250.00 | 4,000.00 | 20,000.00 | 4,200.00 | 21,000.00 | 3,600.00 | 18,000.00 | 6,990.00 | 34,950.00 | 11,250.00 | 34,950.00 |
| 41 | 0490-0100000E | ADJUSTING BOXES | EACH | 2 | 500.00 | 1,000.00 | 320.00 | 640.00 | 850.00 | 1,700.00 | 200.00 | 400.00 | 600.00 | 1,200.00 | 2,700.00 | 5,400.00 | 400.00 | 5,400.00 |
| 42 | 0490-0102000E | ADJUSTING CATCH BASINS | EACH | 1 | 1,000.00 | 1,000.00 | 1,200.00 | 1,200.00 | 800.00 | 800.00 | 2,000.00 | 2,000.00 | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | 800.00 | 2,000.00 |
| 43 | 0490-0104000E | CONNECTION TO EXISTING STRUCTURES | EACH | 2 | 2,000.00 | 4,000.00 | 2,300.00 | 4,600.00 | 4,500.00 | 9,000.00 | 5,000.00 | 10,000.00 | 2,800.00 | 5,600.00 | 4,000.00 | 8,000.00 | 4,600.00 | 10,000.00 |
| 44 | 0490-0120000E | MINOR ADJUSTMENT OF MANHOLES | EACH | 4 | 1,500.00 | 6,000.00 | 2,400.00 | 9,600.00 | 2,000.00 | 8,000.00 | 1,400.00 | 5,600.00 | 2,500.00 | 10,000.00 | 2,600.00 | 10,400.00 | 5,600.00 | 10,400.00 |
| 45 | 0620-0123000J | COLD PLANE PAVEMENT REMOVAL, 4 INCHES DEEP | SQYD | 3363 | 7.00 | 23,541.00 | 6.50 | 21,859.50 | 8.00 | 26,904.00 | 13.00 | 43,719.00 | 7.25 | 24,381.75 | 10.00 | 33,630.00 | 21,859.50 | 43,719.00 |
| 46 | 0640-0100000M | AGGREGATE BASE | TON | 740 | 45.00 | 33,300.00 | 75.00 | 55,500.00 | 45.00 | 33,300.00 | 65.00 | 48,100.00 | 67.50 | 49,950.00 | 106.00 | 78,440.00 | 33,300.00 | 78,440.00 |
| 47 | 0295-0200000F | REMOVE ASBESTOS MATERIAL, FRIABLE | SQFT | 470 | 25.00 | 11,750.00 | 19.00 | 8,930.00 | 15.00 | 7,050.00 | 7.00 | 3,290.00 | 7.85 | 3,689.50 | 1.00 | 470.00 | 470.00 | 8,930.00 |
| 48 | 0744-0302000M | LEVEL 3, 1/2 INCH ACP MIXTURE | TON | 1052 | 125.00 | 131,500.00 | 130.00 | 136,760.00 | 135.00 | 142,020.00 | 130.00 | 136,760.00 | 140.00 | 147,280.00 | 127.00 | 133,604.00 | 133,604.00 | 147,280.00 |
| 49 | 0748-0103000J | 6 INCH ASPHALT CONCRETE PAVEMENT REPAIR | SQYD | 500 | 50.00 | 25,000.00 | 118.00 | 59,000.00 | 72.00 | 36,000.00 | 100.00 | 50,000.00 | 72.50 | 36,250.00 | 30.00 | 15,000.00 | 15,000.00 | 59,000.00 |
| 50 | 0749-0100000E | EXTRA FOR ASPHALT APPROACHES | EACH | 5 | 2,000.00 | 10,000.00 | 685.00 | 3,425.00 | 2,200.00 | 11,000.00 | 1,000.00 | 5,000.00 | 1,350.00 | 6,750.00 | 1,540.00 | 7,700.00 | 3,425.00 | 11,000.00 |
| 51 | 0759-0103000F | CONCRETE CURBS, CURB AND GUTTER | FOOT | 634 | 40.00 | 25,360.00 | 42.95 | 27,230.30 | 55.00 | 34,870.00 | 40.00 | 25,360.00 | 45.25 | 28,688.50 | 53.00 | 33,602.00 | 25,360.00 | 34,870.00 |
| 52 | 0759-0106000F | CONCRETE CURBS, LOW PROFILE MOUNTABLE CURB | FOOT | 18 | 50.00 | 900.00 | 69.00 | 1,242.00 | 95.00 | 1,710.00 | 70.00 | 1,260.00 | 110.00 | 1,980.00 | 352.00 | 6,336.00 | 1,242.00 | 6,336.00 |
| 53 | 0759-0110000F | CONCRETE CURBS, STANDARD CURB | FOOT | 304 | 45.00 | 13,680.00 | 45.00 | 13,680.00 | 35.00 | 10,640.00 | 40.00 | 12,160.00 | 46.00 | 13,984.00 | 59.00 | 17,936.00 | 10,640.00 | 17,936.00 |
| 54 | 0759-0122000J | CONCRETE ISLANDS | SQFT | 370 | 25.00 | 9,250.00 | 18.00 | 6,660.00 | 25.00 | 9,250.00 | 20.00 | 7,400.00 | 20.00 | 7,400.00 | 63.00 | 23,310.00 | 6,660.00 | 23,310.00 |
| 55 | 0759-0126000J | CONCRETE DRIVEWAYS | SQFT | 215 | 20.00 | 4,300.00 | 33.00 | 7,095.00 | 25.00 | 5,375.00 | 26.00 | 5,590.00 | 58.25 | 12,523.75 | 43.00 | 9,245.00 | 5,375.00 | 12,523.75 |
| 56 | 0759-0127000J | CONCRETE DRIVEWAYS, REINFORCED | SQFT | 730 | 30.00 | 21,900.00 | 35.00 | 25,550.00 | 30.00 | 21,900.00 | 26.00 | 18,980.00 | 41.50 | 30,295.00 | 44.00 | 32,120.00 | 18,980.00 | 32,120.00 |
| 57 | 0759-0128000J | CONCRETE WALKS | SQFT | 3280 | 11.00 | 36,080.00 | 14.00 | 45,920.00 | 15.00 | 49,200.00 | 14.00 | 45,920.00 | 23.00 | 75,440.00 | 16.00 | 52,480.00 | 45,920.00 | 75,440.00 |
| 58 | 0759-0154100E | EXTRA FOR NEW CURB RAMPS | EACH | 12 | 2,000.00 | 24,000.00 | 2,200.00 | 26,400.00 | 1,750.00 | 21,000.00 | 1,900.00 | 22,800.00 | 2,600.00 | 31,200.00 | 1,400.00 | 16,800.00 | 16,800.00 | 31,200.00 |
| 59 | 0759-0510000J | TRUNCATED DOMES ON NEW SURFACES | SQFT | 155 | 50.00 | 7,750.00 | 50.00 | 7,750.00 | 35.00 | 5,425.00 | 45.00 | 6,975.00 | 55.00 | 8,525.00 | 33.00 | 5,115.00 | 5,115.00 | 8,525.00 |
| 60 | 0855-0102100E | BI-DIRECTIONAL YELLOW TYPE I MARKERS | EACH | 89 | 15.00 | 1,335.00 | 9.50 | 845.50 | 9.00 | 801.00 | 8.50 | 756.50 | 10.25 | 912.25 | 8.71 | 775.19 | 756.50 | 912.25 |
| 61 | 0855-0102100E | BI-DIRECTIONAL WHITE TYPE I MARKERS | EACH | 33 | 15.00 | 495.00 | 9.50 | 313.50 | 9.00 | 297.00 | 8.50 | 280.50 | 10.25 | 338.25 | 8.71 | 287.43 | 280.50 | 338.25 |
| 62 | 0865-0160000F | THERMOPLASTIC, EXTRUDED OR SPRAYED, SURFACE, NON-PROFILED | FOOT | 6662 | 1.50 | 9,993.00 | 2.15 | 14,323.30 | 2.00 | 13,324.00 | 2.25 | 14,989.50 | 2.35 | 15,655.70 | 2.00 | 13,324.00 | 13,324.00 | 15,655.70 |
| 63 | 0867-0103500E | PAVEMENT LEGEND, TYPE AB: ARROWS | EACH | 6 | 375.00 | 2,250.00 | 415.00 | 2,490.00 | 400.00 | 2,400.00 | 400.00 | 2,400.00 | 450.00 | 2,700.00 | 384.37 | 2,306.22 | 2,306.22 | 2,700.00 |
| 64 | 0867-0131000E | PAVEMENT LEGEND, TYPE B-HS: BICYCLE LANE STENCIL | EACH | 6 | 350.00 | 2,100.00 | 415.00 | 2,490.00 | 400.00 | 2,400.00 | 400.00 | 2,400.00 | 450.00 | 2,700.00 | 384.37 | 2,306.22 | 2,306.22 | 2,700.00 |
| 65 | 0867-0145100J | PAVEMENT BAR, TYPE B-HS | SQFT | 604 | 15.00 | 9,060.00 | 21.00 | 12,684.00 | 19.00 | 11,476.00 | 20.00 | 12,080.00 | 23.00 | 13,892.00 | 19.27 | 11,639.08 | 11,476.00 | 13,892.00 |
| 66 | 0867-0174000E | PAVEMENT LEGEND, TYPE B-HS : BICYCLE DETECTOR STENCIL | EACH | 1 | 500.00 | 500.00 | 333.00 | 333.00 | 325.00 | 325.00 | 325.00 | 325.00 | 360.00 | 360.00 | 307.50 | 307.50 | 307.50 | 360.00 |
| 67 | 0868-0100000J | GREEN BICYCLE LANE, PREFORMED THERMOPLASTIC FILM | SQFT | 75 | 15.00 | 1,125.00 | 20.00 | 1,500.00 | 18.00 | 1,350.00 | 19.00 | 1,425.00 | 21.00 | 1,575.00 | 17.94 | 1,345.50 | 1,345.50 | 1,575.00 |
| 68 | 0902-0101000E | CROSSWALK CLOSURE SUPPORTS | EACH | 4 | 1,300.00 | 5,200.00 | 1,350.00 | 5,400.00 | 1,000.00 | 4,000.00 | 1,400.00 | 5,600.00 | 1,100.00 | 4,400.00 | 940.00 | 3,760.00 | 3,760.00 | 5,600.00 |
| 69 | 0905-0100000A | REMOVE EXISTING SIGNS | LS | 1 | 1,200.00 | 1,200.00 | 555.00 | 555.00 | 300.00 | 300.00 | 500.00 | 500.00 | 350.00 | 350.00 | 300.00 | 300.00 | 300.00 | 555.00 |
| 70 | 0920-0100000A | SIGN SUPPORT FOOTINGS | LS | 1 | 2,000.00 | 2,000.00 | 4,100.00 | 4,100.00 | 2,500.00 | 2,500.00 | 6,000.00 | 6,000.00 | 2,350.00 | 2,350.00 | 1,950.00 | 1,950.00 | 1,950.00 | 6,000.00 |
| 71 | 0930-0114000A | PERFORATED STEEL SQUARE TUBE SLIP BASE SIGN SUPPORTS | LS | 1 | 3,100.00 | 3,100.00 | 3,400.00 | 3,400.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 3,450.00 | 3,450.00 | 2,900.00 | 2,900.00 | 2,900.00 | 5,000.00 |
| 72 | 0930-0117000A | PERFORATED STEEL SQUARE TUBE ANCHOR SIGN SUPPORTS | LS | 1 | 1,000.00 | 1,000.00 | 525.00 | 525.00 | 1,250.00 | 1,250.00 | 1,900.00 | 1,900.00 | 1,250.00 | 1,250.00 | 1,050.00 | 1,050.00 | 525.00 | 1,900.00 |
| 73 | 0940-0201000J | SIGNS, STANDARD SHEETING, EXTRUDED ALUMINUM | SQFT | 88 | 35.00 | 3,080.00 | 29.00 | 2,552.00 | 30.00 | 2,640.00 | 37.50 | 3,300.00 | 31.00 | 2,728.00 | 26.50 | 2,332.00 | 2,332.00 | 3,300.00 |
| 74 | 0970-0100000A | POLE FOUNDATIONS | LS | 1 | 1,500.00 | 1,500.00 | 3,000.00 | 3,000.00 | 6,300.00 | 6,300.00 | 2,000.00 | 2,000.00 | 3,600.00 | 3,600.00 | 17,000.00 | 17,000.00 | 2,000.00 | 17,000.00 |
| 75 | 0970-0105000A | SWITCHING, CONDUIT, AND WIRING | LS | 1 | 3,700.00 | 3,700.00 | 7,500.00 | 7,500.00 | 8,250.00 | 8,250.00 | 15,000.00 | 15,000.00 | 8,450.00 | 8,450.00 | 12,000.00 | 12,000.00 | 7,500.00 | 15,000.00 |
| 76 | 0987-0100000A | TELECOMMUNICATIONS, MATERIAL | LS | 1 | 30,600.00 | 30,600.00 | 23,000.00 | 23,000.00 | 10,500.00 | 10,500.00 | 9,000.00 | 9,000.00 | 26,565.00 | 26,565.00 | 8,300.00 | 8,300.00 | 8,300.00 | 26,565.00 |
| 77 | 0987-0110000A | TELECOMMUNICATIONS, INSTALLATION | LS | 1 | 20,400.00 | 20,400.00 | 32,000.00 | 32,000.00 | 24,000.00 | 24,000.00 | 45,000.00 | 45,000.00 | 38,640.00 | 38,640.00 | 41,000.00 | 41,000.00 | 24,000.00 | 45,000.00 |
| 78 | 0990-0101000A | TRAFFIC SIGNAL INSTALLATION, JOHNSON CK BLVD & 79TH PL | LS | 1 | 506,000.00 | 506,000.00 | 447,000.00 | 447,000.00 | 476,000.00 | 476,000.00 | 440,000.00 | 440,000.00 | 502,302.00 | 502,302.00 | 432,200.00 | 432,200.00 | 432,200.00 | 502,302.00 |
| 79 | 1011-0200000A | BIORETENTION POND, WATER QUALITY FACILITY | LS | 1 | 46,000.00 | 46,000.00 | 58,000.00 | 58,000.00 | 61,500.00 | 61,500.00 | 65,000.00 | 65,000.00 | 14,000.00 | 14,000.00 | 63,000.00 | 63,000.00 | 14,000.00 | 65,000.00 |
| 80 | 1030-0108000R | PERMANENT SEEDING | ACRE | 0.12 | 20,000.00 | 2,400.00 | 13,000.00 | 1,560.00 | 12,500.00 | 1,500.00 | 12,500.00 | 1,500.00 | 48,300.00 | 5,796.00 | 14,000.00 | 1,680.00 | 1,500.00 | 5,796.00 |
| 81 | 1030-0118000e | WETLAND PLANTS, PLUGS | EACH | 1607 | 1.25 | 2,008.75 | 1.10 | 1,767.70 | 3.00 | 4,821.00 | 1.00 | 1,607.00 | 3.75 | 6,026.25 | 5.00 | 8,035.00 | 1,607.00 | 8,035.00 |
| 82 | 1040-0101000K | TOPSOIL | CUYD | 64 | 100.00 | 6,400.00 | 50.00 | 3,200.00 | 50.00 | 3,200.00 | 45.00 | 2,880.00 | 84.50 | 5,408.00 | 94.00 | 6,016.00 | 2,880.00 | 6,016.00 |
| 83 | 1040-0153000E | SHRUBS, #1 CONTAINER | EACH | 29 | 18.00 | 522.00 | 13.00 | 377.00 | 15.00 | 435.00 | 13.00 | 377.00 | 18.00 | 522.00 | 37.00 | 1,073.00 | 377.00 | 1,073.00 |
| 84 | 1040-0171000E | WETLAND PLANTS, #1 CONTAINER | EACH | 218 | 12.00 | 2,616.00 | 13.00 | 2,834.00 | 15.00 | 3,270.00 | 13.00 | 2,834.00 | 18.00 | 3,924.00 | 37.00 | 8,066.00 | 2,834.00 | 8,066.00 |
| 85 | 1040-0190000K | BARK MULCH | CUYD | 15 | 220.00 | 3,300.00 | 66.00 | 990.00 | 65.00 | 975.00 | 65.00 | 975.00 | 90.00 | 1,350.00 | 96.00 | 1,440.00 | 975.00 | 1,440.00 |
| 86 | 1050-0162000F | TYPE CL-4R CHAIN LINK FENCE WITH BLACK PVC COATING | FOOT | 85 | 60.00 | 5,100.00 | 80.00 | 6,800.00 | 45.00 | 3,825.00 | 45.00 | 3,825.00 | 52.00 | 4,420.00 | 72.00 | 6,120.00 | 3,825.00 | 6,800.00 |
| 87 | 1050-0162000F | TYPE CL-6R CHAIN LINK FENCE WITH BLACK PVC COATING AND SCREENING PICKETS | FOOT | 139 | 110.00 | 15,290.00 | 95.00 | 13,205.00 | 65.00 | 9,035.00 | 68.00 | 9,452.00 | 78.50 | 10,911.50 | 88.00 | 12,232.00 | 9,035.00 | 13,205.00 |
| 88 | 1050-0198000E | 12 FOOT X 48 INCH CHAIN LINK DOUBLE GATES | EACH | 1 | 3,500.00 | 3,500.00 | 3,100.00 | 3,100.00 | 2,400.00 | 2,400.00 | 2,400.00 | 2,400.00 | 2,800.00 | 2,800.00 | 2,850.00 | 2,850.00 | 2,400.00 | 3,100.00 |
| 89 | 1070-0100000E | SINGLE MAILBOX SUPPORTS | EACH | 2 | 1,200.00 | 2,400.00 | 1,335.00 | 2,670.00 | 750.00 | 1,500.00 | 1,000.00 | 2,000.00 | 1,450.00 | 2,900.00 | 950.00 | 1,900.00 | 1,500.00 | 2,900.00 |
| 90 | 1070-0102000E | MAILBOX CONCRETE COLLARS | EACH | 1 | 750.00 | 750.00 | 720.00 | 720.00 | 350.00 | 350.00 | 500.00 | 500.00 | 785.00 | 785.00 | 950.00 | 950.00 | 350.00 | 950.00 |
| 91 | 1070-0103000E | REMOVE AND REINSTALL MAILBOX SUPPORTS | EACH | 1 | 1,500.00 | 1,500.00 | 1,550.00 | 1,550.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 1,690.50 | 1,690.50 | 1,600.00 | 1,600.00 | 500.00 | 1,690.50 |
| 92 | 1170-0109000F | 1 INCH COPPER WATER SERVICE LINE | FOOT | 127 | 75.00 | 9,525.00 | 115.00 | 14,605.00 | 55.00 | 6,985.00 | 70.00 | 8,890.00 | 95.00 | 12,065.00 | 103.00 | 13,081.00 | 6,985.00 | 14,605.00 |
| 93 | 0280-0111020H | CONCRETE WASH OUT FACILITY | EACH | 1 | 1,500.00 | 1,500.00 | 3,700.00 | 3,700.00 | 1,500.00 | 1,500.00 | 1,800.00 | 1,800.00 | 0.00 | 0.00 | 6,500.00 | 6,500.00 | 0.00 | 6,500.00 |
| $1,645,052.75 | $1,714,494.04 | $1,833,291.00 | $1,847,677.50 | $1,959,099.95 | $2,128,912.44 | LOW | HIGH | |||||||||||
| Engineers Est | $1,645,052.75 | Engineers Estimate | Westech Construction | Corpac Construction Co | Moore Excavation | Dirt & Agg interchange | Kodiak Pacific Construction | |||||||||||
| Westech Construction | $1,714,494.04 | |||||||||||||||||
| Corpac Const. | $1,833,291.00 | Bid item 22 quantity changed during bid | Bid amount said | $ 1,962,199.95 | Bid amount said | $ 2,104,612.44 | ||||||||||||
| Moore Ex | $1,847,677.50 | Bid item 93 added during bid | Missing Bid Item 93 amount in bid schedule | Bid Item 19 bid schedule not carried out correctly | ||||||||||||||
| Drit and Agg | $1,959,099.95 | Bid Item 33 in bid schedule not carried out correctly | ||||||||||||||||
| Kodiak | $2,128,912.44 |
Compare to Estimate
| SE JOHNSON CREEK BLVD: 79TH PL - 82ND AVE | ||||||||||||||
| Westech Construction | Estimate | |||||||||||||
| Item # | Spec | |||||||||||||
| Sec | Description | Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | Maximum | Minimum | |||||
| 1 | 0210-0100000A | MOBILIZATION | LS | 1 | 171,000.00 | $171,000.00 | 135,000.00 | $ 135,000.00 | $ 171,000.00 | $ 135,000.00 | ||||
| 2 | 0221-0100000A | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | LS | 1 | 22,000.00 | $22,000.00 | 41,000.00 | $ 41,000.00 | $ 41,000.00 | $ 22,000.00 | ||||
| 3 | 0222-0102000J | TEMPORARY SIGNS | SQFT | 200 | 33.30 | $6,660.00 | 24.00 | $ 4,800.00 | $ 6,660.00 | $ 4,800.00 | ||||
| 4 | 0222-0162000E | SEQUENTIAL ARROW SIGNS | EACH | 1 | 1,345.00 | $1,345.00 | 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 1,345.00 | ||||
| 5 | 0223-0168000T | FLAGGERS | HOUR | 800 | 80.00 | $64,000.00 | 50.00 | $ 40,000.00 | $ 64,000.00 | $ 40,000.00 | ||||
| 6 | 0224-0104000E | TEMPORARY BARRICADES, TYPE II | EACH | 4 | 36.00 | $144.00 | 80.00 | $ 320.00 | $ 320.00 | $ 144.00 | ||||
| 7 | 0224-0105000E | TEMPORARY BARRICADES, TYPE III | EACH | 2 | 99.00 | $198.00 | 150.00 | $ 300.00 | $ 300.00 | $ 198.00 | ||||
| 8 | 0224-0145000E | TEMPORARY PLASTIC DRUMS | EACH | 26 | 22.00 | $572.00 | 50.00 | $ 1,300.00 | $ 1,300.00 | $ 572.00 | ||||
| 9 | 0225-0153000F | TEMPORARY STRIPING | FOOT | 2700 | 1.60 | $4,320.00 | 1.00 | $ 2,700.00 | $ 4,320.00 | $ 2,700.00 | ||||
| 10 | 0225-0154000F | STRIPE REMOVAL | FOOT | 3250 | 1.60 | $5,200.00 | 0.50 | $ 1,625.00 | $ 5,200.00 | $ 1,625.00 | ||||
| 11 | 0228-0141600F | PEDESTRIAN CHANNELIZING DEVICES | FOOT | 300 | 5.50 | $1,650.00 | 10.00 | $ 3,000.00 | $ 3,000.00 | $ 1,650.00 | ||||
| 12 | 0280-0100000A | EROSION CONTROL | LS | 1 | 10,000.00 | $10,000.00 | 3,000.00 | $ 3,000.00 | $ 10,000.00 | $ 3,000.00 | ||||
| 13 | 0280-0113000F | SEDIMENT FENCE | FOOT | 485 | 8.00 | $3,880.00 | 4.00 | $ 1,940.00 | $ 3,880.00 | $ 1,940.00 | ||||
| 14 | 0280-0114040E | INLET PROTECTION, TYPE 4 | EACH | 14 | 46.00 | $644.00 | 125.00 | $ 1,750.00 | $ 1,750.00 | $ 644.00 | ||||
| 15 | 0280-0110010E | CONSTRUCTION ENTRANCE, TYPE 1 | EACH | 1 | 2,700.00 | $2,700.00 | 750.00 | $ 750.00 | $ 2,700.00 | $ 750.00 | ||||
| 16 | 0280-0111010E | TIRE WASH FACILITY, TYPE 1 | EACH | 1 | 6,500.00 | $6,500.00 | 750.00 | $ 750.00 | $ 6,500.00 | $ 750.00 | ||||
| 17 | 0290-0100000A | POLLUTION CONTROL PLAN | LS | 1 | 1,100.00 | $1,100.00 | 1,000.00 | $ 1,000.00 | $ 1,100.00 | $ 1,000.00 | ||||
| 18 | 0294-0100000A | HEALTH AND SAFETY PLAN | LS | 1 | 2,200.00 | $2,200.00 | 2,500.00 | $ 2,500.00 | $ 2,500.00 | $ 2,200.00 | ||||
| 19 | 0294-0200010M | CONTAMINATED SOIL DISPOSAL | TON | 138 | 112.00 | $15,456.00 | 100.00 | $ 13,800.00 | $ 15,456.00 | $ 13,800.00 | ||||
| 20 | 0294-0500000A | LEAD COMPLIANCE PLAN | LS | 1 | 5,500.00 | $5,500.00 | 2,500.00 | $ 2,500.00 | $ 5,500.00 | $ 2,500.00 | ||||
| 21 | 0295-0100000F | REMOVE ASBESTOS MATERIAL, FRIABLE | FOOT | 5 | 61.00 | $305.00 | 300.00 | $ 1,500.00 | $ 1,500.00 | $ 305.00 | ||||
| 22 | 0295-0200000F | REMOVE ASBESTOS MATERIAL, NON-FRIABLE | SQFT | 2750 | 3.50 | $9,625.00 | 5.00 | $ 13,750.00 | $ 13,750.00 | $ 9,625.00 | ||||
| 23 | 0305-0100000A | CONSTRUCTION SURVEY WORK | LS | 1 | 20,000.00 | $20,000.00 | 40,000.00 | $ 40,000.00 | $ 40,000.00 | $ 20,000.00 | ||||
| 24 | 0310-0100000F | REMOVAL OF PIPES | FOOT | 248 | 10.25 | $2,542.00 | 30.00 | $ 7,440.00 | $ 7,440.00 | $ 2,542.00 | ||||
| 25 | 0310-0104000E | REMOVAL OF INLETS | EACH | 3 | 1,555.00 | $4,665.00 | 500.00 | $ 1,500.00 | $ 4,665.00 | $ 1,500.00 | ||||
| 26 | 0310-0106000A | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | LS | 1 | 9,000.00 | $9,000.00 | 27,000.00 | $ 27,000.00 | $ 27,000.00 | $ 9,000.00 | ||||
| 27 | 0310-0109000A | REMOVAL OF BUILDINGS | LS | 1 | 24,000.00 | $24,000.00 | 40,000.00 | $ 40,000.00 | $ 40,000.00 | $ 24,000.00 | ||||
| 28 | 0310-0119000F | ASPHALT PAVEMENT SAW CUTTING | FOOT | 1030 | 3.25 | $3,347.50 | 5.00 | $ 5,150.00 | $ 5,150.00 | $ 3,347.50 | ||||
| 29 | 0320-0100000A | CLEARING AND GRUBBING | LS | 1 | 4,000.00 | $4,000.00 | 12,000.00 | $ 12,000.00 | $ 12,000.00 | $ 4,000.00 | ||||
| 30 | 0330-0105000K | GENERAL EXCAVATION | CUYD | 793 | 70.00 | $55,510.00 | 60.00 | $ 47,580.00 | $ 55,510.00 | $ 47,580.00 | ||||
| 31 | 0331-0109000J | 18 INCH SUBGRADE STABILIZATION | SQYD | 114 | 19.00 | $2,166.00 | 65.00 | $ 7,410.00 | $ 7,410.00 | $ 2,166.00 | ||||
| 32 | 0350-0105000J | SUBGRADE GEOTEXTILE | SQYD | 946 | 1.69 | $1,598.74 | 2.00 | $ 1,892.00 | $ 1,892.00 | $ 1,598.74 | ||||
| 33 | 0390-0119000K | GROUTED RIPRAP | CUYD | 190 | 65.00 | $12,350.00 | 20.00 | $ 3,800.00 | $ 12,350.00 | $ 3,800.00 | ||||
| 34 | 0415-0100000F | MAINLINE VIDEO INSPECTION | FOOT | 331 | 9.00 | $2,979.00 | 5.00 | $ 1,655.00 | $ 2,979.00 | $ 1,655.00 | ||||
| 35 | 0415-0400000E | SERVICE LINE LATERAL VIDEO INSPECTION | EACH | 1 | 275.00 | $275.00 | 750.00 | $ 750.00 | $ 750.00 | $ 275.00 | ||||
| 36 | 0445-030006BF | 6 INCH SANITARY SEWER PIPE, 10 FT DEPTH | FOOT | 52 | 340.00 | $17,680.00 | 150.00 | $ 7,800.00 | $ 17,680.00 | $ 7,800.00 | ||||
| 37 | 0445-035012AF | 12 INCH STORM SEWER PIPE, 5 FT DEPTH | FOOT | 331 | 175.00 | $57,925.00 | 130.00 | $ 43,030.00 | $ 57,925.00 | $ 43,030.00 | ||||
| 38 | 0445 | 6 INCH STORM SEWER CLEANOUT | EACH | 1 | 1,275.00 | $1,275.00 | 500.00 | $ 500.00 | $ 1,275.00 | $ 500.00 | ||||
| 39 | 0470-0101000E | CONCRETE STORM SEWER MANHOLES | EACH | 1 | 6,800.00 | $6,800.00 | 7,000.00 | $ 7,000.00 | $ 7,000.00 | $ 6,800.00 | ||||
| 40 | 0470-0315000E | CONCRETE INLETS, TYPE GB-2 | EACH | 5 | 2,250.00 | $11,250.00 | 2,900.00 | $ 14,500.00 | $ 14,500.00 | $ 11,250.00 | ||||
| 41 | 0490-0100000E | ADJUSTING BOXES | EACH | 2 | 320.00 | $640.00 | 500.00 | $ 1,000.00 | $ 1,000.00 | $ 640.00 | ||||
| 42 | 0490-0102000E | ADJUSTING CATCH BASINS | EACH | 1 | 1,200.00 | $1,200.00 | 1,000.00 | $ 1,000.00 | $ 1,200.00 | $ 1,000.00 | ||||
| 43 | 0490-0104000E | CONNECTION TO EXISTING STRUCTURES | EACH | 2 | 2,300.00 | $4,600.00 | 2,000.00 | $ 4,000.00 | $ 4,600.00 | $ 4,000.00 | ||||
| 44 | 0490-0120000E | MINOR ADJUSTMENT OF MANHOLES | EACH | 4 | 2,400.00 | $9,600.00 | 1,500.00 | $ 6,000.00 | $ 9,600.00 | $ 6,000.00 | ||||
| 45 | 0620-0123000J | COLD PLANE PAVEMENT REMOVAL, 4 INCHES DEEP | SQYD | 3363 | 6.50 | $21,859.50 | 7.00 | $ 23,541.00 | $ 23,541.00 | $ 21,859.50 | ||||
| 46 | 0640-0100000M | AGGREGATE BASE | TON | 740 | 75.00 | $55,500.00 | 45.00 | $ 33,300.00 | $ 55,500.00 | $ 33,300.00 | ||||
| 47 | 0295-0200000F | REMOVE ASBESTOS MATERIAL, FRIABLE | SQFT | 470 | 19.00 | $8,930.00 | 25.00 | $ 11,750.00 | $ 11,750.00 | $ 8,930.00 | ||||
| 48 | 0744-0302000M | LEVEL 3, 1/2 INCH ACP MIXTURE | TON | 1052 | 130.00 | $136,760.00 | 125.00 | $ 131,500.00 | $ 136,760.00 | $ 131,500.00 | ||||
| 49 | 0748-0103000J | 6 INCH ASPHALT CONCRETE PAVEMENT REPAIR | SQYD | 500 | 118.00 | $59,000.00 | 50.00 | $ 25,000.00 | $ 59,000.00 | $ 25,000.00 | ||||
| 50 | 0749-0100000E | EXTRA FOR ASPHALT APPROACHES | EACH | 5 | 685.00 | $3,425.00 | 2,000.00 | $ 10,000.00 | $ 10,000.00 | $ 3,425.00 | ||||
| 51 | 0759-0103000F | CONCRETE CURBS, CURB AND GUTTER | FOOT | 634 | 42.95 | $27,230.30 | 40.00 | $ 25,360.00 | $ 27,230.30 | $ 25,360.00 | ||||
| 52 | 0759-0106000F | CONCRETE CURBS, LOW PROFILE MOUNTABLE CURB | FOOT | 18 | 69.00 | $1,242.00 | 50.00 | $ 900.00 | $ 1,242.00 | $ 900.00 | ||||
| 53 | 0759-0110000F | CONCRETE CURBS, STANDARD CURB | FOOT | 304 | 45.00 | $13,680.00 | 45.00 | $ 13,680.00 | $ 13,680.00 | $ 13,680.00 | ||||
| 54 | 0759-0122000J | CONCRETE ISLANDS | SQFT | 370 | 18.00 | $6,660.00 | 25.00 | $ 9,250.00 | $ 9,250.00 | $ 6,660.00 | ||||
| 55 | 0759-0126000J | CONCRETE DRIVEWAYS | SQFT | 215 | 33.00 | $7,095.00 | 20.00 | $ 4,300.00 | $ 7,095.00 | $ 4,300.00 | ||||
| 56 | 0759-0127000J | CONCRETE DRIVEWAYS, REINFORCED | SQFT | 730 | 35.00 | $25,550.00 | 30.00 | $ 21,900.00 | $ 25,550.00 | $ 21,900.00 | ||||
| 57 | 0759-0128000J | CONCRETE WALKS | SQFT | 3280 | 14.00 | $45,920.00 | 11.00 | $ 36,080.00 | $ 45,920.00 | $ 36,080.00 | ||||
| 58 | 0759-0154100E | EXTRA FOR NEW CURB RAMPS | EACH | 12 | 2,200.00 | $26,400.00 | 2,000.00 | $ 24,000.00 | $ 26,400.00 | $ 24,000.00 | ||||
| 59 | 0759-0510000J | TRUNCATED DOMES ON NEW SURFACES | SQFT | 155 | 50.00 | $7,750.00 | 50.00 | $ 7,750.00 | $ 7,750.00 | $ 7,750.00 | ||||
| 60 | 0855-0102100E | BI-DIRECTIONAL YELLOW TYPE I MARKERS | EACH | 89 | 9.50 | $845.50 | 15.00 | $ 1,335.00 | $ 1,335.00 | $ 845.50 | ||||
| 61 | 0855-0102100E | BI-DIRECTIONAL WHITE TYPE I MARKERS | EACH | 33 | 9.50 | $313.50 | 15.00 | $ 495.00 | $ 495.00 | $ 313.50 | ||||
| 62 | 0865-0160000F | THERMOPLASTIC, EXTRUDED OR SPRAYED, SURFACE, NON-PROFILED | FOOT | 6662 | 2.15 | $14,323.30 | 1.50 | $ 9,993.00 | $ 14,323.30 | $ 9,993.00 | ||||
| 63 | 0867-0103500E | PAVEMENT LEGEND, TYPE AB: ARROWS | EACH | 6 | 415.00 | $2,490.00 | 375.00 | $ 2,250.00 | $ 2,490.00 | $ 2,250.00 | ||||
| 64 | 0867-0131000E | PAVEMENT LEGEND, TYPE B-HS: BICYCLE LANE STENCIL | EACH | 6 | 415.00 | $2,490.00 | 350.00 | $ 2,100.00 | $ 2,490.00 | $ 2,100.00 | ||||
| 65 | 0867-0145100J | PAVEMENT BAR, TYPE B-HS | SQFT | 604 | 21.00 | $12,684.00 | 15.00 | $ 9,060.00 | $ 12,684.00 | $ 9,060.00 | ||||
| 66 | 0867-0174000E | PAVEMENT LEGEND, TYPE B-HS : BICYCLE DETECTOR STENCIL | EACH | 1 | 333.00 | $333.00 | 500.00 | $ 500.00 | $ 500.00 | $ 333.00 | ||||
| 67 | 0868-0100000J | GREEN BICYCLE LANE, PREFORMED THERMOPLASTIC FILM | SQFT | 75 | 20.00 | $1,500.00 | 15.00 | $ 1,125.00 | $ 1,500.00 | $ 1,125.00 | ||||
| 68 | 0902-0101000E | CROSSWALK CLOSURE SUPPORTS | EACH | 4 | 1,350.00 | $5,400.00 | 1,300.00 | $ 5,200.00 | $ 5,400.00 | $ 5,200.00 | ||||
| 69 | 0905-0100000A | REMOVE EXISTING SIGNS | LS | 1 | 555.00 | $555.00 | 1,200.00 | $ 1,200.00 | $ 1,200.00 | $ 555.00 | ||||
| 70 | 0920-0100000A | SIGN SUPPORT FOOTINGS | LS | 1 | 4,100.00 | $4,100.00 | 2,000.00 | $ 2,000.00 | $ 4,100.00 | $ 2,000.00 | ||||
| 71 | 0930-0114000A | PERFORATED STEEL SQUARE TUBE SLIP BASE SIGN SUPPORTS | LS | 1 | 3,400.00 | $3,400.00 | 3,100.00 | $ 3,100.00 | $ 3,400.00 | $ 3,100.00 | ||||
| 72 | 0930-0117000A | PERFORATED STEEL SQUARE TUBE ANCHOR SIGN SUPPORTS | LS | 1 | 525.00 | $525.00 | 1,000.00 | $ 1,000.00 | $ 1,000.00 | $ 525.00 | ||||
| 73 | 0940-0201000J | SIGNS, STANDARD SHEETING, EXTRUDED ALUMINUM | SQFT | 88 | 29.00 | $2,552.00 | 35.00 | $ 3,080.00 | $ 3,080.00 | $ 2,552.00 | ||||
| 74 | 0970-0100000A | POLE FOUNDATIONS | LS | 1 | 3,000.00 | $3,000.00 | 1,500.00 | $ 1,500.00 | $ 3,000.00 | $ 1,500.00 | ||||
| 75 | 0970-0105000A | SWITCHING, CONDUIT, AND WIRING | LS | 1 | 7,500.00 | $7,500.00 | 3,700.00 | $ 3,700.00 | $ 7,500.00 | $ 3,700.00 | ||||
| 76 | 0987-0100000A | TELECOMMUNICATIONS, MATERIAL | LS | 1 | 23,000.00 | $23,000.00 | 30,600.00 | $ 30,600.00 | $ 30,600.00 | $ 23,000.00 | ||||
| 77 | 0987-0110000A | TELECOMMUNICATIONS, INSTALLATION | LS | 1 | 32,000.00 | $32,000.00 | 20,400.00 | $ 20,400.00 | $ 32,000.00 | $ 20,400.00 | ||||
| 78 | 0990-0101000A | TRAFFIC SIGNAL INSTALLATION, JOHNSON CK BLVD & 79TH PL | LS | 1 | 447,000.00 | $447,000.00 | 506,000.00 | $ 506,000.00 | $ 506,000.00 | $ 447,000.00 | ||||
| 79 | 1011-0200000A | BIORETENTION POND, WATER QUALITY FACILITY | LS | 1 | 58,000.00 | $58,000.00 | 46,000.00 | $ 46,000.00 | $ 58,000.00 | $ 46,000.00 | ||||
| 80 | 1030-0108000R | PERMANENT SEEDING | ACRE | 0.12 | 13,000.00 | $1,560.00 | 20,000.00 | $ 2,400.00 | $ 2,400.00 | $ 1,560.00 | ||||
| 81 | 1030-0118000e | WETLAND PLANTS, PLUGS | EACH | 1607 | 1.10 | $1,767.70 | 1.25 | $ 2,008.75 | $ 2,008.75 | $ 1,767.70 | ||||
| 82 | 1040-0101000K | TOPSOIL | CUYD | 64 | 50.00 | $3,200.00 | 100.00 | $ 6,400.00 | $ 6,400.00 | $ 3,200.00 | ||||
| 83 | 1040-0153000E | SHRUBS, #1 CONTAINER | EACH | 29 | 13.00 | $377.00 | 18.00 | $ 522.00 | $ 522.00 | $ 377.00 | ||||
| 84 | 1040-0171000E | WETLAND PLANTS, #1 CONTAINER | EACH | 218 | 13.00 | $2,834.00 | 12.00 | $ 2,616.00 | $ 2,834.00 | $ 2,616.00 | ||||
| 85 | 1040-0190000K | BARK MULCH | CUYD | 15 | 66.00 | $990.00 | 220.00 | $ 3,300.00 | $ 3,300.00 | $ 990.00 | ||||
| 86 | 1050-0162000F | TYPE CL-4R CHAIN LINK FENCE WITH BLACK PVC COATING | FOOT | 85 | 80.00 | $6,800.00 | 60.00 | $ 5,100.00 | $ 6,800.00 | $ 5,100.00 | ||||
| 87 | 1050-0162000F | TYPE CL-6R CHAIN LINK FENCE WITH BLACK PVC COATING AND SCREENING PICKETS | FOOT | 139 | 95.00 | $13,205.00 | 110.00 | $ 15,290.00 | $ 15,290.00 | $ 13,205.00 | ||||
| 88 | 1050-0198000E | 12 FOOT X 48 INCH CHAIN LINK DOUBLE GATES | EACH | 1 | 3,100.00 | $3,100.00 | 3,500.00 | $ 3,500.00 | $ 3,500.00 | $ 3,100.00 | ||||
| 89 | 1070-0100000E | SINGLE MAILBOX SUPPORTS | EACH | 2 | 1,335.00 | $2,670.00 | 1,200.00 | $ 2,400.00 | $ 2,670.00 | $ 2,400.00 | ||||
| 90 | 1070-0102000E | MAILBOX CONCRETE COLLARS | EACH | 1 | 720.00 | $720.00 | 750.00 | $ 750.00 | $ 750.00 | $ 720.00 | ||||
| 91 | 1070-0103000E | REMOVE AND REINSTALL MAILBOX SUPPORTS | EACH | 1 | 1,550.00 | $1,550.00 | 1,500.00 | $ 1,500.00 | $ 1,550.00 | $ 1,500.00 | ||||
| 92 | 1170-0109000F | 1 INCH COPPER WATER SERVICE LINE | FOOT | 127 | 115.00 | $14,605.00 | 75.00 | $ 9,525.00 | $ 14,605.00 | $ 9,525.00 | ||||
| 93 | 0280-0111020H | CONCRETE WASH OUT FACILITY | EACH | 1 | 3,700.00 | $3,700.00 | 1,500.00 | $ 1,500.00 | $ 3,700.00 | $ 1,500.00 | ||||
| $1,714,494.04 | $ 1,645,052.75 | $ 1,714,494.04 | $ 1,645,052.75 |
3 lowest Bid Analysis
| SE JOHNSON CREEK BLVD: 79TH PL-82ND AVE | ||||||||||||||||||||
| Bid Opening June 10, 2025 | ||||||||||||||||||||
| Engineers Estimate | Westech Construction | % OVR/UND. | % OVR/UND. | ITEM % OF | Corpac Construction | Moore | ||||||||||||||
| Item # | Spec | |||||||||||||||||||
| Sec | Description | Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | Low Bidder | ||||||||||||
| to Engr. Estimate | 3 Lowest Bidders | |||||||||||||||||||
| Average | Lowest Bid | |||||||||||||||||||
| to Total Bid | Unit Price | Total Price | Unit Price | Total Price | ||||||||||||||||
| 1 | 0210-0100000A | MOBILIZATION | LS | 1 | 135,000.00 | 135,000.00 | 171,000.00 | $ 171,000.00 | 26.67% | -3.18% | 9.97% | 1 | 183,330.00 | $ 183,330.00 | 175,000.00 | $ 175,000.00 | 1 | |||
| 2 | 0221-0100000A | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | LS | 1 | 41,000.00 | 41,000.00 | 22,000.00 | 22,000.00 | -46.34% | -160.61% | 1.28% | 2 | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 2 | |||
| 3 | 0222-0102000J | TEMPORARY SIGNS | SQFT | 200 | 24.00 | 4,800.00 | 33.30 | 6,660.00 | 38.75% | 8.61% | 0.39% | 3 | 25.00 | 5,000.00 | 33.00 | 6,600.00 | 3 | |||
| 4 | 0222-0162000E | SEQUENTIAL ARROW SIGNS | EACH | 1 | 5,000.00 | 5,000.00 | 1,345.00 | 1,345.00 | -73.10% | -1.49% | 0.08% | 4 | 750.00 | 750.00 | 2,000.00 | 2,000.00 | 4 | |||
| 5 | 0223-0168000T | FLAGGERS | HOUR | 800 | 50.00 | 40,000.00 | 80.00 | 64,000.00 | 60.00% | 0.00% | 3.73% | 5 | 78.00 | 62,400.00 | 82.00 | 65,600.00 | 5 | |||
| 6 | 0224-0104000E | TEMPORARY BARRICADES, TYPE II | EACH | 4 | 80.00 | 320.00 | 36.00 | 144.00 | -55.00% | -39.81% | 0.01% | 6 | 50.00 | 200.00 | 65.00 | 260.00 | 6 | |||
| 7 | 0224-0105000E | TEMPORARY BARRICADES, TYPE III | EACH | 2 | 150.00 | 300.00 | 99.00 | 198.00 | -34.00% | -42.76% | 0.01% | 7 | 100.00 | 200.00 | 225.00 | 450.00 | 7 | |||
| 8 | 0224-0145000E | TEMPORARY PLASTIC DRUMS | EACH | 26 | 50.00 | 1,300.00 | 22.00 | 572.00 | -56.00% | -115.15% | 0.03% | 8 | 50.00 | 1,300.00 | 70.00 | 1,820.00 | 8 | |||
| 9 | 0225-0153000F | TEMPORARY STRIPING | FOOT | 2700 | 1.00 | 2,700.00 | 1.60 | 4,320.00 | 60.00% | 5.21% | 0.25% | 9 | 0.20 | 540.00 | 2.75 | 7,425.00 | 9 | |||
| 10 | 0225-0154000F | STRIPE REMOVAL | FOOT | 3250 | 0.50 | 1,625.00 | 1.60 | 5,200.00 | 220.00% | -42.71% | 0.30% | 10 | 3.75 | 12,187.50 | 1.50 | 4,875.00 | 10 | |||
| 11 | 0228-0141600F | PEDESTRIAN CHANNELIZING DEVICES | FOOT | 300 | 10.00 | 3,000.00 | 5.50 | 1,650.00 | -45.00% | -266.67% | 0.10% | 11 | 25.00 | 7,500.00 | 30.00 | 9,000.00 | 11 | |||
| 12 | 0280-0100000A | EROSION CONTROL | LS | 1 | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 233.33% | -1.67% | 0.58% | 12 | 15,500.00 | 15,500.00 | 5,000.00 | 5,000.00 | 12 | |||
| 13 | 0280-0113000F | SEDIMENT FENCE | FOOT | 485 | 4.00 | 1,940.00 | 8.00 | 3,880.00 | 100.00% | 35.42% | 0.23% | 13 | 3.50 | 1,697.50 | 4.00 | 1,940.00 | 13 | |||
| 14 | 0280-0114040E | INLET PROTECTION, TYPE 4 | EACH | 14 | 125.00 | 1,750.00 | 46.00 | 644.00 | -63.20% | -78.26% | 0.04% | 14 | 75.00 | 1,050.00 | 125.00 | 1,750.00 | 14 | |||
| 15 | 0280-0110010E | CONSTRUCTION ENTRANCE, TYPE 1 | EACH | 1 | 750.00 | 750.00 | 2,700.00 | 2,700.00 | 260.00% | -18.21% | 0.16% | 15 | 1,875.00 | 1,875.00 | 5,000.00 | 5,000.00 | 15 | |||
| 16 | 0280-0111010E | TIRE WASH FACILITY, TYPE 1 | EACH | 1 | 750.00 | 750.00 | 6,500.00 | 6,500.00 | 766.67% | 35.90% | 0.38% | 16 | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 16 | |||
| 17 | 0290-0100000A | POLLUTION CONTROL PLAN | LS | 1 | 1,000.00 | 1,000.00 | 1,100.00 | 1,100.00 | 10.00% | -9.09% | 0.06% | 17 | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | 17 | |||
| 18 | 0294-0100000A | HEALTH AND SAFETY PLAN | LS | 1 | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 | -12.00% | 13.64% | 0.13% | 18 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 18 | |||
| 19 | 0294-0200010M | CONTAMINATED SOIL DISPOSAL | TON | 138 | 100.00 | 13,800.00 | 112.00 | 15,456.00 | 12.00% | -0.30% | 0.90% | 19 | 100.00 | 13,800.00 | 125.00 | 17,250.00 | 19 | |||
| 20 | 0294-0500000A | LEAD COMPLIANCE PLAN | LS | 1 | 2,500.00 | 2,500.00 | 5,500.00 | 5,500.00 | 120.00% | 45.45% | 0.32% | 20 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 20 | |||
| 21 | 0295-0100000F | REMOVE ASBESTOS MATERIAL, FRIABLE | FOOT | 5 | 300.00 | 1,500.00 | 61.00 | 305.00 | -79.67% | -9.84% | 0.02% | 21 | 85.00 | 425.00 | 55.00 | 275.00 | 21 | |||
| 22 | 0295-0200000F | REMOVE ASBESTOS MATERIAL, NON-FRIABLE | SQFT | 2750 | 5.00 | 13,750.00 | 3.50 | 9,625.00 | -30.00% | -142.86% | 0.56% | 22 | 15.00 | 41,250.00 | 7.00 | 19,250.00 | 22 | |||
| 23 | 0305-0100000A | CONSTRUCTION SURVEY WORK | LS | 1 | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | -50.00% | -6.67% | 1.17% | 23 | 19,000.00 | 19,000.00 | 25,000.00 | 25,000.00 | 23 | |||
| 24 | 0310-0100000F | REMOVAL OF PIPES | FOOT | 248 | 30.00 | 7,440.00 | 10.25 | 2,542.00 | -65.83% | -144.72% | 0.15% | 24 | 35.00 | 8,680.00 | 30.00 | 7,440.00 | 24 | |||
| 25 | 0310-0104000E | REMOVAL OF INLETS | EACH | 3 | 500.00 | 1,500.00 | 1,555.00 | 4,665.00 | 211.00% | 37.73% | 0.27% | 25 | 650.00 | 1,950.00 | 700.00 | 2,100.00 | 25 | |||
| 26 | 0310-0106000A | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | LS | 1 | 27,000.00 | 27,000.00 | 9,000.00 | 9,000.00 | -66.67% | -153.70% | 0.52% | 26 | 34,500.00 | 34,500.00 | 25,000.00 | 25,000.00 | 26 | |||
| 27 | 0310-0109000A | REMOVAL OF BUILDINGS | LS | 1 | 40,000.00 | 40,000.00 | 24,000.00 | 24,000.00 | -40.00% | -29.86% | 1.40% | 27 | 54,500.00 | 54,500.00 | 15,000.00 | 15,000.00 | 27 | |||
| 28 | 0310-0119000F | ASPHALT PAVEMENT SAW CUTTING | FOOT | 1030 | 5.00 | 5,150.00 | 3.25 | 3,347.50 | -35.00% | -53.85% | 0.20% | 28 | 5.75 | 5,922.50 | 6.00 | 6,180.00 | 28 | |||
| 29 | 0320-0100000A | CLEARING AND GRUBBING | LS | 1 | 12,000.00 | 12,000.00 | 4,000.00 | 4,000.00 | -66.67% | -91.67% | 0.23% | 29 | 7,500.00 | 7,500.00 | 11,500.00 | 11,500.00 | 29 | |||
| 30 | 0330-0105000K | GENERAL EXCAVATION | CUYD | 793 | 60.00 | 47,580.00 | 70.00 | 55,510.00 | 16.67% | 7.14% | 3.24% | 30 | 45.00 | 35,685.00 | 80.00 | 63,440.00 | 30 | |||
| 31 | 0331-0109000J | 18 INCH SUBGRADE STABILIZATION | SQYD | 114 | 65.00 | 7,410.00 | 19.00 | 2,166.00 | -70.77% | -108.77% | 0.13% | 31 | 35.00 | 3,990.00 | 65.00 | 7,410.00 | 31 | |||
| 32 | 0350-0105000J | SUBGRADE GEOTEXTILE | SQYD | 946 | 2.00 | 1,892.00 | 1.69 | 1,598.74 | -15.50% | -7.30% | 0.09% | 32 | 2.25 | 2,128.50 | 1.50 | 1,419.00 | 32 | |||
| 33 | 0390-0119000K | GROUTED RIPRAP | CUYD | 190 | 20.00 | 3,800.00 | 65.00 | 12,350.00 | 225.00% | -7.69% | 0.72% | 33 | 95.00 | 18,050.00 | 50.00 | 9,500.00 | 33 | |||
| 34 | 0415-0100000F | MAINLINE VIDEO INSPECTION | FOOT | 331 | 5.00 | 1,655.00 | 9.00 | 2,979.00 | 80.00% | -62.96% | 0.17% | 34 | 22.00 | 7,282.00 | 13.00 | 4,303.00 | 34 | |||
| 35 | 0415-0400000E | SERVICE LINE LATERAL VIDEO INSPECTION | EACH | 1 | 750.00 | 750.00 | 275.00 | 275.00 | -63.33% | -151.52% | 0.02% | 35 | 1,500.00 | 1,500.00 | 300.00 | 300.00 | 35 | |||
| 36 | 0445-030006BF | 6 INCH SANITARY SEWER PIPE, 10 FT DEPTH | FOOT | 52 | 150.00 | 7,800.00 | 340.00 | 17,680.00 | 126.67% | 12.75% | 1.03% | 36 | 250.00 | 13,000.00 | 300.00 | 15,600.00 | 36 | |||
| 37 | 0445-035012AF | 12 INCH STORM SEWER PIPE, 5 FT DEPTH | FOOT | 331 | 130.00 | 43,030.00 | 175.00 | 57,925.00 | 34.62% | -14.29% | 3.38% | 37 | 145.00 | 47,995.00 | 280.00 | 92,680.00 | 37 | |||
| 38 | 0445 | 6 INCH STORM SEWER CLEANOUT | EACH | 1 | 500.00 | 500.00 | 1,275.00 | 1,275.00 | 155.00% | -6.54% | 0.07% | 38 | 1,800.00 | 1,800.00 | 1,000.00 | 1,000.00 | 38 | |||
| 39 | 0470-0101000E | CONCRETE STORM SEWER MANHOLES | EACH | 1 | 7,000.00 | 7,000.00 | 6,800.00 | 6,800.00 | -2.86% | -22.79% | 0.40% | 39 | 9,750.00 | 9,750.00 | 8,500.00 | 8,500.00 | 39 | |||
| 40 | 0470-0315000E | CONCRETE INLETS, TYPE GB-2 | EACH | 5 | 2,900.00 | 14,500.00 | 2,250.00 | 11,250.00 | -22.41% | -54.81% | 0.66% | 40 | 4,000.00 | 20,000.00 | 4,200.00 | 21,000.00 | 40 | |||
| 41 | 0490-0100000E | ADJUSTING BOXES | EACH | 2 | 500.00 | 1,000.00 | 320.00 | 640.00 | -36.00% | -42.71% | 0.04% | 41 | 850.00 | 1,700.00 | 200.00 | 400.00 | 41 | |||
| 42 | 0490-0102000E | ADJUSTING CATCH BASINS | EACH | 1 | 1,000.00 | 1,000.00 | 1,200.00 | 1,200.00 | 20.00% | -11.11% | 0.07% | 42 | 800.00 | 800.00 | 2,000.00 | 2,000.00 | 42 | |||
| 43 | 0490-0104000E | CONNECTION TO EXISTING STRUCTURES | EACH | 2 | 2,000.00 | 4,000.00 | 2,300.00 | 4,600.00 | 15.00% | -71.01% | 0.27% | 43 | 4,500.00 | 9,000.00 | 5,000.00 | 10,000.00 | 43 | |||
| 44 | 0490-0120000E | MINOR ADJUSTMENT OF MANHOLES | EACH | 4 | 1,500.00 | 6,000.00 | 2,400.00 | 9,600.00 | 60.00% | 19.44% | 0.56% | 44 | 2,000.00 | 8,000.00 | 1,400.00 | 5,600.00 | 44 | |||
| 45 | 0620-0123000J | COLD PLANE PAVEMENT REMOVAL, 4 INCHES DEEP | SQYD | 3363 | 7.00 | 23,541.00 | 6.50 | 21,859.50 | -7.14% | -41.03% | 1.27% | 45 | 8.00 | 26,904.00 | 13.00 | 43,719.00 | 45 | |||
| 46 | 0640-0100000M | AGGREGATE BASE | TON | 740 | 45.00 | 33,300.00 | 75.00 | 55,500.00 | 66.67% | 17.78% | 3.24% | 46 | 45.00 | 33,300.00 | 65.00 | 48,100.00 | 46 | |||
| 47 | 0295-0200000F | REMOVE ASBESTOS MATERIAL, FRIABLE | SQFT | 470 | 25.00 | 11,750.00 | 19.00 | 8,930.00 | -24.00% | 28.07% | 0.52% | 47 | 15.00 | 7,050.00 | 7.00 | 3,290.00 | 47 | |||
| 48 | 0744-0302000M | LEVEL 3, 1/2 INCH ACP MIXTURE | TON | 1052 | 125.00 | 131,500.00 | 130.00 | 136,760.00 | 4.00% | -1.28% | 7.98% | 48 | 135.00 | 142,020.00 | 130.00 | 136,760.00 | 48 | |||
| 49 | 0748-0103000J | 6 INCH ASPHALT CONCRETE PAVEMENT REPAIR | SQYD | 500 | 50.00 | 25,000.00 | 118.00 | 59,000.00 | 136.00% | 18.08% | 3.44% | 49 | 72.00 | 36,000.00 | 100.00 | 50,000.00 | 49 | |||
| 50 | 0749-0100000E | EXTRA FOR ASPHALT APPROACHES | EACH | 5 | 2,000.00 | 10,000.00 | 685.00 | 3,425.00 | -65.75% | -89.05% | 0.20% | 50 | 2,200.00 | 11,000.00 | 1,000.00 | 5,000.00 | 50 | |||
| 51 | 0759-0103000F | CONCRETE CURBS, CURB AND GUTTER | FOOT | 634 | 40.00 | 25,360.00 | 42.95 | 27,230.30 | 7.38% | -7.06% | 1.59% | 51 | 55.00 | 34,870.00 | 40.00 | 25,360.00 | 51 | |||
| 52 | 0759-0106000F | CONCRETE CURBS, LOW PROFILE MOUNTABLE CURB | FOOT | 18 | 50.00 | 900.00 | 69.00 | 1,242.00 | 38.00% | -13.04% | 0.07% | 52 | 95.00 | 1,710.00 | 70.00 | 1,260.00 | 52 | |||
| 53 | 0759-0110000F | CONCRETE CURBS, STANDARD CURB | FOOT | 304 | 45.00 | 13,680.00 | 45.00 | 13,680.00 | 0.00% | 11.11% | 0.80% | 53 | 35.00 | 10,640.00 | 40.00 | 12,160.00 | 53 | |||
| 54 | 0759-0122000J | CONCRETE ISLANDS | SQFT | 370 | 25.00 | 9,250.00 | 18.00 | 6,660.00 | -28.00% | -16.67% | 0.39% | 54 | 25.00 | 9,250.00 | 20.00 | 7,400.00 | 54 | |||
| 55 | 0759-0126000J | CONCRETE DRIVEWAYS | SQFT | 215 | 20.00 | 4,300.00 | 33.00 | 7,095.00 | 65.00% | 15.15% | 0.41% | 55 | 25.00 | 5,375.00 | 26.00 | 5,590.00 | 55 | |||
| 56 | 0759-0127000J | CONCRETE DRIVEWAYS, REINFORCED | SQFT | 730 | 30.00 | 21,900.00 | 35.00 | 25,550.00 | 16.67% | 13.33% | 1.49% | 56 | 30.00 | 21,900.00 | 26.00 | 18,980.00 | 56 | |||
| 57 | 0759-0128000J | CONCRETE WALKS | SQFT | 3280 | 11.00 | 36,080.00 | 14.00 | 45,920.00 | 27.27% | -2.38% | 2.68% | 57 | 15.00 | 49,200.00 | 14.00 | 45,920.00 | 57 | |||
| 58 | 0759-0154100E | EXTRA FOR NEW CURB RAMPS | EACH | 12 | 2,000.00 | 24,000.00 | 2,200.00 | 26,400.00 | 10.00% | 11.36% | 1.54% | 58 | 1,750.00 | 21,000.00 | 1,900.00 | 22,800.00 | 58 | |||
| 59 | 0759-0510000J | TRUNCATED DOMES ON NEW SURFACES | SQFT | 155 | 50.00 | 7,750.00 | 50.00 | 7,750.00 | 0.00% | 13.33% | 0.45% | 59 | 35.00 | 5,425.00 | 45.00 | 6,975.00 | 59 | |||
| 60 | 0855-0102100E | BI-DIRECTIONAL YELLOW TYPE I MARKERS | EACH | 89 | 15.00 | 1,335.00 | 9.50 | 845.50 | -36.67% | 5.26% | 0.05% | 60 | 9.00 | 801.00 | 8.50 | 756.50 | 60 | |||
| 61 | 0855-0102100E | BI-DIRECTIONAL WHITE TYPE I MARKERS | EACH | 33 | 15.00 | 495.00 | 9.50 | 313.50 | -36.67% | 5.26% | 0.02% | 61 | 9.00 | 297.00 | 8.50 | 280.50 | 61 | |||
| 62 | 0865-0160000F | THERMOPLASTIC, EXTRUDED OR SPRAYED, SURFACE, NON-PROFILED | FOOT | 6662 | 1.50 | 9,993.00 | 2.15 | 14,323.30 | 43.33% | 0.78% | 0.84% | 62 | 2.00 | 13,324.00 | 2.25 | 14,989.50 | 62 | |||
| 63 | 0867-0103500E | PAVEMENT LEGEND, TYPE AB: ARROWS | EACH | 6 | 375.00 | 2,250.00 | 415.00 | 2,490.00 | 10.67% | 2.41% | 0.15% | 63 | 400.00 | 2,400.00 | 400.00 | 2,400.00 | 63 | |||
| 64 | 0867-0131000E | PAVEMENT LEGEND, TYPE B-HS: BICYCLE LANE STENCIL | EACH | 6 | 350.00 | 2,100.00 | 415.00 | 2,490.00 | 18.57% | 2.41% | 0.15% | 64 | 400.00 | 2,400.00 | 400.00 | 2,400.00 | 64 | |||
| 65 | 0867-0145100J | PAVEMENT BAR, TYPE B-HS | SQFT | 604 | 15.00 | 9,060.00 | 21.00 | 12,684.00 | 40.00% | 4.76% | 0.74% | 65 | 19.00 | 11,476.00 | 20.00 | 12,080.00 | 65 | |||
| 66 | 0867-0174000E | PAVEMENT LEGEND, TYPE B-HS : BICYCLE DETECTOR STENCIL | EACH | 1 | 500.00 | 500.00 | 333.00 | 333.00 | -33.40% | 1.60% | 0.02% | 66 | 325.00 | 325.00 | 325.00 | 325.00 | 66 | |||
| 67 | 0868-0100000J | GREEN BICYCLE LANE, PREFORMED THERMOPLASTIC FILM | SQFT | 75 | 15.00 | 1,125.00 | 20.00 | 1,500.00 | 33.33% | 5.00% | 0.09% | 67 | 18.00 | 1,350.00 | 19.00 | 1,425.00 | 67 | |||
| 68 | 0902-0101000E | CROSSWALK CLOSURE SUPPORTS | EACH | 4 | 1,300.00 | 5,200.00 | 1,350.00 | 5,400.00 | 3.85% | 7.41% | 0.31% | 68 | 1,000.00 | 4,000.00 | 1,400.00 | 5,600.00 | 68 | |||
| 69 | 0905-0100000A | REMOVE EXISTING SIGNS | LS | 1 | 1,200.00 | 1,200.00 | 555.00 | 555.00 | -53.75% | 18.62% | 0.03% | 69 | 300.00 | 300.00 | 500.00 | 500.00 | 69 | |||
| 70 | 0920-0100000A | SIGN SUPPORT FOOTINGS | LS | 1 | 2,000.00 | 2,000.00 | 4,100.00 | 4,100.00 | 105.00% | -2.44% | 0.24% | 70 | 2,500.00 | 2,500.00 | 6,000.00 | 6,000.00 | 70 | |||
| 71 | 0930-0114000A | PERFORATED STEEL SQUARE TUBE SLIP BASE SIGN SUPPORTS | LS | 1 | 3,100.00 | 3,100.00 | 3,400.00 | 3,400.00 | 9.68% | -11.76% | 0.20% | 71 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 71 | |||
| 72 | 0930-0117000A | PERFORATED STEEL SQUARE TUBE ANCHOR SIGN SUPPORTS | LS | 1 | 1,000.00 | 1,000.00 | 525.00 | 525.00 | -47.50% | -133.33% | 0.03% | 72 | 1,250.00 | 1,250.00 | 1,900.00 | 1,900.00 | 72 | |||
| 73 | 0940-0201000J | SIGNS, STANDARD SHEETING, EXTRUDED ALUMINUM | SQFT | 88 | 35.00 | 3,080.00 | 29.00 | 2,552.00 | -17.14% | -10.92% | 0.15% | 73 | 30.00 | 2,640.00 | 37.50 | 3,300.00 | 73 | |||
| 74 | 0970-0100000A | POLE FOUNDATIONS | LS | 1 | 1,500.00 | 1,500.00 | 3,000.00 | 3,000.00 | 100.00% | -25.56% | 0.17% | 74 | 6,300.00 | 6,300.00 | 2,000.00 | 2,000.00 | 74 | |||
| 75 | 0970-0105000A | SWITCHING, CONDUIT, AND WIRING | LS | 1 | 3,700.00 | 3,700.00 | 7,500.00 | 7,500.00 | 102.70% | -36.67% | 0.44% | 75 | 8,250.00 | 8,250.00 | 15,000.00 | 15,000.00 | 75 | |||
| 76 | 0987-0100000A | TELECOMMUNICATIONS, MATERIAL | LS | 1 | 30,600.00 | 30,600.00 | 23,000.00 | 23,000.00 | -24.84% | 38.41% | 1.34% | 76 | 10,500.00 | 10,500.00 | 9,000.00 | 9,000.00 | 76 | |||
| 77 | 0987-0110000A | TELECOMMUNICATIONS, INSTALLATION | LS | 1 | 20,400.00 | 20,400.00 | 32,000.00 | 32,000.00 | 56.86% | -5.21% | 1.87% | 77 | 24,000.00 | 24,000.00 | 45,000.00 | 45,000.00 | 77 | |||
| 78 | 0990-0101000A | TRAFFIC SIGNAL INSTALLATION, JOHNSON CK BLVD & 79TH PL | LS | 1 | 506,000.00 | 506,000.00 | 447,000.00 | 447,000.00 | -11.66% | -1.64% | 26.07% | 78 | 476,000.00 | 476,000.00 | 440,000.00 | 440,000.00 | 78 | |||
| 79 | 1011-0200000A | BIORETENTION POND, WATER QUALITY FACILITY | LS | 1 | 46,000.00 | 46,000.00 | 58,000.00 | 58,000.00 | 26.09% | -6.03% | 3.38% | 79 | 61,500.00 | 61,500.00 | 65,000.00 | 65,000.00 | 79 | |||
| 80 | 1030-0108000R | PERMANENT SEEDING | ACRE | 0.12 | 20,000.00 | 2,400.00 | 13,000.00 | 1,560.00 | -35.00% | 2.56% | 0.09% | 80 | 12,500.00 | 1,500.00 | 12,500.00 | 1,500.00 | 80 | |||
| 81 | 1030-0118000e | WETLAND PLANTS, PLUGS | EACH | 1607 | 1.25 | 2,008.75 | 1.10 | 1,767.70 | -12.00% | -54.55% | 0.10% | 81 | 3.00 | 4,821.00 | 1.00 | 1,607.00 | 81 | |||
| 82 | 1040-0101000K | TOPSOIL | CUYD | 64 | 100.00 | 6,400.00 | 50.00 | 3,200.00 | -50.00% | 3.33% | 0.19% | 82 | 50.00 | 3,200.00 | 45.00 | 2,880.00 | 82 | |||
| 83 | 1040-0153000E | SHRUBS, #1 CONTAINER | EACH | 29 | 18.00 | 522.00 | 13.00 | 377.00 | -27.78% | -5.13% | 0.02% | 83 | 15.00 | 435.00 | 13.00 | 377.00 | 83 | |||
| 84 | 1040-0171000E | WETLAND PLANTS, #1 CONTAINER | EACH | 218 | 12.00 | 2,616.00 | 13.00 | 2,834.00 | 8.33% | -5.13% | 0.17% | 84 | 15.00 | 3,270.00 | 13.00 | 2,834.00 | 84 | |||
| 85 | 1040-0190000K | BARK MULCH | CUYD | 15 | 220.00 | 3,300.00 | 66.00 | 990.00 | -70.00% | 1.01% | 0.06% | 85 | 65.00 | 975.00 | 65.00 | 975.00 | 85 | |||
| 86 | 1050-0162000F | TYPE CL-4R CHAIN LINK FENCE WITH BLACK PVC COATING | FOOT | 85 | 60.00 | 5,100.00 | 80.00 | 6,800.00 | 33.33% | 29.17% | 0.40% | 86 | 45.00 | 3,825.00 | 45.00 | 3,825.00 | 86 | |||
| 87 | 1050-0162000F | TYPE CL-6R CHAIN LINK FENCE WITH BLACK PVC COATING AND SCREENING PICKETS | FOOT | 139 | 110.00 | 15,290.00 | 95.00 | 13,205.00 | -13.64% | 20.00% | 0.77% | 87 | 65.00 | 9,035.00 | 68.00 | 9,452.00 | 87 | |||
| 88 | 1050-0198000E | 12 FOOT X 48 INCH CHAIN LINK DOUBLE GATES | EACH | 1 | 3,500.00 | 3,500.00 | 3,100.00 | 3,100.00 | -11.43% | 15.05% | 0.18% | 88 | 2,400.00 | 2,400.00 | 2,400.00 | 2,400.00 | 88 | |||
| 89 | 1070-0100000E | SINGLE MAILBOX SUPPORTS | EACH | 2 | 1,200.00 | 2,400.00 | 1,335.00 | 2,670.00 | 11.25% | 22.97% | 0.16% | 89 | 750.00 | 1,500.00 | 1,000.00 | 2,000.00 | 89 | |||
| 90 | 1070-0102000E | MAILBOX CONCRETE COLLARS | EACH | 1 | 750.00 | 750.00 | 720.00 | 720.00 | -4.00% | 27.31% | 0.04% | 90 | 350.00 | 350.00 | 500.00 | 500.00 | 90 | |||
| 91 | 1070-0103000E | REMOVE AND REINSTALL MAILBOX SUPPORTS | EACH | 1 | 1,500.00 | 1,500.00 | 1,550.00 | 1,550.00 | 3.33% | 34.41% | 0.09% | 91 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 91 | |||
| 92 | 1170-0109000F | 1 INCH COPPER WATER SERVICE LINE | FOOT | 127 | 75.00 | 9,525.00 | 115.00 | 14,605.00 | 53.33% | 30.43% | 0.85% | 92 | 55.00 | 6,985.00 | 70.00 | 8,890.00 | 92 | |||
| 93 | 0280-0111020H | CONCRETE WASH OUT FACILITY | EACH | 1 | 1,500.00 | 1,500.00 | 3,700.00 | 3,700.00 | 146.67% | 36.94% | 0.22% | 93 | 1,500.00 | 1,500.00 | 1,800.00 | 1,800.00 | 93 | |||
| 1,645,052.75 | 1,714,494.04 | 4.22% | -4.90% | 100.00% | 1,833,291.00 | 1,847,677.50 |
| Engineers Estimate | Westech Construction | % OVR/UND. | % OVR/UND. | ITEM % OF | Corpac Construction | Moore Excavation | ||||
| 4.2% | Low Bidder | |||||||||
| to Engr. Estimate | 3 Lowest Bidders | |||||||||
| Average | Lowest Bid | |||||||||
| to Total Bid | 6.9% |